Testing: closing the loop through verification and validation of procedures

M. Sturdivant, C.D. Allred, D. Grider, R.W. Holloran, R.W. Johnson, R.P. Keele, S.F. Luna, R.E. Spence, J. Thomason, S. Thomason, R.L. Norman
{"title":"Testing: closing the loop through verification and validation of procedures","authors":"M. Sturdivant, C.D. Allred, D. Grider, R.W. Holloran, R.W. Johnson, R.P. Keele, S.F. Luna, R.E. Spence, J. Thomason, S. Thomason, R.L. Norman","doi":"10.1109/IPCC.1988.24068","DOIUrl":null,"url":null,"abstract":"The testing phase in an integrated procedures system for nuclear power plants is described. Testing through verification ensures technical accuracy and written correctness. Procedures are verified first by writers, and then by qualified reviewers through the review and approval process built into the integrated procedures system. Testing through validation ensures usability and operational correctness. Specialists independent of the procedure writer validate procedures using one or more methods: simulator, mock-up, walk-through, table-top, actual use, or reference. Testing of the whole procedures system is provided by feedback from a requirements database, periodic assessments of management programs, trainers, and users.<<ETX>>","PeriodicalId":374472,"journal":{"name":"IPCC '88 Conference Record 'On the Edge: A Pacific Rim Conference on Professional Technical Communication'.","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-10-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IPCC '88 Conference Record 'On the Edge: A Pacific Rim Conference on Professional Technical Communication'.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPCC.1988.24068","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The testing phase in an integrated procedures system for nuclear power plants is described. Testing through verification ensures technical accuracy and written correctness. Procedures are verified first by writers, and then by qualified reviewers through the review and approval process built into the integrated procedures system. Testing through validation ensures usability and operational correctness. Specialists independent of the procedure writer validate procedures using one or more methods: simulator, mock-up, walk-through, table-top, actual use, or reference. Testing of the whole procedures system is provided by feedback from a requirements database, periodic assessments of management programs, trainers, and users.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
测试:通过程序的验证和确认来闭合循环
介绍了核电站综合程序系统的测试阶段。通过验证的测试确保了技术的准确性和书面的正确性。程序首先由编写者进行验证,然后由合格的审稿人通过集成程序系统内建的审查和批准过程进行验证。通过验证进行测试可以确保可用性和操作正确性。独立于过程编写者的专家使用一种或多种方法验证过程:模拟器、模型、演练、桌面、实际使用或参考。整个程序系统的测试由需求数据库的反馈、管理程序、培训师和用户的定期评估提供。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A hitchhiker's guide to desktop publishing Grease the wheels that make you go around (technical communications) Cross-cultural editing Testing: closing the loop through verification and validation of procedures Overcoming cultural barriers to international communication: doing business with Japan, Taiwan, and South Korea
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1