{"title":"On the capability of job-group loading in FMS management","authors":"G. Cardarelli, P. M. Pelagagge","doi":"10.1109/ISIE.1993.268769","DOIUrl":null,"url":null,"abstract":"The results of simulation tests have been presented in order to illustrate the capability in FMS management of a scheduling based on the job-group loading rule. In particular the effects of the interferences on the material handling system, the variability of machining times and the stops for breakdown or preventive maintenance, have been examined.<<ETX>>","PeriodicalId":267349,"journal":{"name":"ISIE '93 - Budapest: IEEE International Symposium on Industrial Electronics Conference Proceedings","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ISIE '93 - Budapest: IEEE International Symposium on Industrial Electronics Conference Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISIE.1993.268769","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The results of simulation tests have been presented in order to illustrate the capability in FMS management of a scheduling based on the job-group loading rule. In particular the effects of the interferences on the material handling system, the variability of machining times and the stops for breakdown or preventive maintenance, have been examined.<>