{"title":"SPC implementation for improving product quality","authors":"A. Donnell, S. Singhal","doi":"10.1109/IEMT.1996.559778","DOIUrl":null,"url":null,"abstract":"Process Quality is one of the key factors and early indicators that impacts outgoing duality and removal rates of the product (system or component). During the last five years, Lucent Technologies in Dallas (formerly AT&T Power Systems) has placed great emphasis on improving process quality by properly implementing Statistical Process Control (SPC). In 1990, AT&T Power Systems started their journey of implementing Total Quality Management (TQM) and challenging for the most prestigious duality award, the Deming Prize. A robust SPC program is a key requirement of the Deming Prize. As a result of the successful implementation of TQM and SPC, AT&T Power Systems was the first United States manufacturing company (and the second US company) to win the Deming Prize. During the examination process for the Deming Prize, an intense emphasis is placed on auditing the systems and processes in place to improve the product quality. Specifically, the effective implementation of SPC is a fundamental element of the examination process. SPC implementation included: a well structured and documented SPC plan; a comprehensive SPC training program for engineers, managers, and production employees; a team approach; and senior management involvement and reviews. The key elements of the SPC Plan are: product/process quality metrics, process control, process improvement, and capability indices improvement. This paper presents the details of this plan and resulting improvements in the product quality. The SPC implementation and product quality improvement exceeded the expectations of the JUSE (Japanese Union of Scientist and Engineers) examiners. Currently, Lucent Technologies (formerly AT&T Power Systems) is viewed as a world leader in quality and TQM.","PeriodicalId":177653,"journal":{"name":"Nineteenth IEEE/CPMT International Electronics Manufacturing Technology Symposium","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nineteenth IEEE/CPMT International Electronics Manufacturing Technology Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.1996.559778","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
Process Quality is one of the key factors and early indicators that impacts outgoing duality and removal rates of the product (system or component). During the last five years, Lucent Technologies in Dallas (formerly AT&T Power Systems) has placed great emphasis on improving process quality by properly implementing Statistical Process Control (SPC). In 1990, AT&T Power Systems started their journey of implementing Total Quality Management (TQM) and challenging for the most prestigious duality award, the Deming Prize. A robust SPC program is a key requirement of the Deming Prize. As a result of the successful implementation of TQM and SPC, AT&T Power Systems was the first United States manufacturing company (and the second US company) to win the Deming Prize. During the examination process for the Deming Prize, an intense emphasis is placed on auditing the systems and processes in place to improve the product quality. Specifically, the effective implementation of SPC is a fundamental element of the examination process. SPC implementation included: a well structured and documented SPC plan; a comprehensive SPC training program for engineers, managers, and production employees; a team approach; and senior management involvement and reviews. The key elements of the SPC Plan are: product/process quality metrics, process control, process improvement, and capability indices improvement. This paper presents the details of this plan and resulting improvements in the product quality. The SPC implementation and product quality improvement exceeded the expectations of the JUSE (Japanese Union of Scientist and Engineers) examiners. Currently, Lucent Technologies (formerly AT&T Power Systems) is viewed as a world leader in quality and TQM.
过程质量是影响产品(系统或组件)输出对偶性和去除率的关键因素和早期指标之一。在过去的五年中,位于达拉斯的朗讯技术公司(前身为AT&T Power Systems)非常重视通过正确实施统计过程控制(SPC)来提高过程质量。1990年,AT&T电力系统开始了他们实施全面质量管理(TQM)的旅程,并向最负盛名的双重性奖戴明奖发起挑战。一个强大的SPC程序是戴明奖的关键要求。由于TQM和SPC的成功实施,AT&T电力系统是第一家美国制造公司(也是第二家美国公司)赢得戴明奖。在戴明奖的审查过程中,重点是审查现有的系统和流程,以提高产品质量。具体来说,SPC的有效实施是审查过程的基本要素。SPC实施包括:一个结构良好、文件化的SPC计划;针对工程师、经理和生产员工的全面SPC培训计划;团队方法;高级管理层的参与和审查。SPC计划的关键要素是:产品/过程质量度量、过程控制、过程改进和能力指标改进。本文介绍了该计划的细节以及由此带来的产品质量的改进。SPC的实施和产品质量的改进超出了JUSE(日本科学家和工程师联盟)审查员的预期。目前,朗讯科技(前身为AT&T电力系统)被视为质量和全面质量管理的全球领导者。