Tentative criteria for the design and installation of electrical power systems subject to seismic hazard

G. Parise, F. Ferranti, R. Colozza
{"title":"Tentative criteria for the design and installation of electrical power systems subject to seismic hazard","authors":"G. Parise, F. Ferranti, R. Colozza","doi":"10.1109/ICPS.1995.526994","DOIUrl":null,"url":null,"abstract":"This paper discusses the need to study the criteria for the design and installation of electrical power systems in buildings subject to seismic hazards. Nowadays, all the recommended seismic requirements (according to the Uniform Building Code [UBC], Structural Engineers Association of California [SEAOC] and National Earthquake Hazards Reduction Program [NEHRP]) do not specifically take into account the electrical or technological power systems. This paper analyzes the problems an earthquake can cause with regard to the functional reliability and continuity of supply of electrical power systems. Therefore, it proposes design and installation requirements, to be graduated according to building occupancy categories. Basically, the criteria relative to the installation of the electrical equipment are an appropriate extension of those general static ones for nonstructural components. Their consideration is essential for the settlement of the design criteria, which, as far as the configuration and the size of the electrical power system are concerned, aim at limiting the same installation problems. Other general design criteria, designed as a guarantee for supply continuity and power system reliability, have a particular use in these appliances.","PeriodicalId":138670,"journal":{"name":"Proceedings of 1995 Industrial and Commercial Power Systems Conference","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 1995 Industrial and Commercial Power Systems Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS.1995.526994","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17

Abstract

This paper discusses the need to study the criteria for the design and installation of electrical power systems in buildings subject to seismic hazards. Nowadays, all the recommended seismic requirements (according to the Uniform Building Code [UBC], Structural Engineers Association of California [SEAOC] and National Earthquake Hazards Reduction Program [NEHRP]) do not specifically take into account the electrical or technological power systems. This paper analyzes the problems an earthquake can cause with regard to the functional reliability and continuity of supply of electrical power systems. Therefore, it proposes design and installation requirements, to be graduated according to building occupancy categories. Basically, the criteria relative to the installation of the electrical equipment are an appropriate extension of those general static ones for nonstructural components. Their consideration is essential for the settlement of the design criteria, which, as far as the configuration and the size of the electrical power system are concerned, aim at limiting the same installation problems. Other general design criteria, designed as a guarantee for supply continuity and power system reliability, have a particular use in these appliances.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
易受地震危害的电力系统设计和安装的暂定标准
本文讨论了有地震危险的建筑物中电力系统设计和安装准则研究的必要性。如今,所有推荐的抗震要求(根据统一建筑规范[UBC]、加州结构工程师协会[SEAOC]和国家减少地震危害计划[NEHRP])都没有特别考虑电气或技术动力系统。本文分析了地震对电力系统的功能可靠性和供电连续性所带来的问题。因此,提出了设计和安装要求,根据建筑使用类别进行分级。基本上,与电气设备安装有关的标准是对非结构部件的一般静态标准的适当扩展。他们的考虑对于解决设计标准是必不可少的,就电力系统的配置和大小而言,设计标准旨在限制相同的安装问题。为保证供电连续性和电力系统可靠性而设计的其他通用设计标准在这些器具中有特殊用途。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A new method for both harmonic voltage and harmonic current suppression and power factor correction in industrial power systems Applications of EMTP for transient stability study of an islanded industrial power system Minimizing the effects of voltage disturbances on continuous industrial processes Comparison between different procedures of reliability analysis for emergency and stand-by power systems A comparison between the ANSI/IEEE and the CENELEC/IEC approach to overload protection of insulated power cables
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1