Threshold N-policy for machine interference problem with additional repairman and spares under Bernoulli vacation schedule

Richa Sharma
{"title":"Threshold N-policy for machine interference problem with additional repairman and spares under Bernoulli vacation schedule","authors":"Richa Sharma","doi":"10.1109/ICRMS.2016.8050051","DOIUrl":null,"url":null,"abstract":"This research deals with machine interference problem with additional repairman and warm standby under Bernoulli vacation schedule. Moreover, threshold N-policy is considered for controlling the vacation period of repairman. The first repairman opt a vacation with probability ‘q’ whereas with probability ‘p=1-q’ he would like to stay in the system and continue repair to the next failed machine. On the other hand, the second repairman takes the vacation when the number of failed machine is less than ‘N’. After completion of vacation, if second repairman finds ‘N’ or more failed machine available in the system he instantly stops his vacation and repair the failed machines otherwise he may go for another vacation. Various performance measures are determined using Runge-Kutta (RK) method. Sensitivity analysis is also performed.","PeriodicalId":347031,"journal":{"name":"2016 11th International Conference on Reliability, Maintainability and Safety (ICRMS)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 11th International Conference on Reliability, Maintainability and Safety (ICRMS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICRMS.2016.8050051","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This research deals with machine interference problem with additional repairman and warm standby under Bernoulli vacation schedule. Moreover, threshold N-policy is considered for controlling the vacation period of repairman. The first repairman opt a vacation with probability ‘q’ whereas with probability ‘p=1-q’ he would like to stay in the system and continue repair to the next failed machine. On the other hand, the second repairman takes the vacation when the number of failed machine is less than ‘N’. After completion of vacation, if second repairman finds ‘N’ or more failed machine available in the system he instantly stops his vacation and repair the failed machines otherwise he may go for another vacation. Various performance measures are determined using Runge-Kutta (RK) method. Sensitivity analysis is also performed.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
伯努利休假计划下带有额外修理和备件的机器干扰问题的阈值n策略
本文研究了在伯努利休假计划下附加修理工和热备的机器干扰问题。此外,还考虑阈值n策略来控制修理工的休假时间。第一个修理工选择休假的概率为“q”,而在概率为“p=1-q”的情况下,他愿意留在系统中继续修理下一台故障的机器。另一方面,当故障机器数量小于N时,第二修理工休假。假期结束后,如果第二个修理工发现系统中有N台或更多的故障机器,他立即停止休假并修理故障机器,否则他可能会再次休假。采用龙格-库塔(RK)法确定各种性能指标。并进行了敏感性分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Review on civil aviation safety investment research A non-invasive framework for XML data binding Maintenance policies for improving the availability of a software-hardware system Analysis of reliability growth model of domestic large thermal power unit A new method for product field reliability assessment based on accelerated life test
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1