A Robust Multi-Stage Scheduling Approach for Semiconductor Manufacturing Production Areas with Time Contraints

Christian Maleck, Gottfried Nieke, K. Bock, Detlef Pabst, M. Schulze, M. Stehli
{"title":"A Robust Multi-Stage Scheduling Approach for Semiconductor Manufacturing Production Areas with Time Contraints","authors":"Christian Maleck, Gottfried Nieke, K. Bock, Detlef Pabst, M. Schulze, M. Stehli","doi":"10.1109/ASMC.2019.8791779","DOIUrl":null,"url":null,"abstract":"In this paper we will present a multi-stage scheduling approach to generate robust schedules for a challenging aspect of semiconductor manufacturing called time-link areas. A time-link is a technologically induced time constraint between one or more consecutive process steps requiring the process steps to be executed within a predefined time window. Time-links are often introduced to control contamination or unwanted oxidation. Violating time-link constraints may lead to extra effort due to additional rework steps and may have negative yield impact or may even, result in scrap.","PeriodicalId":287541,"journal":{"name":"2019 30th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 30th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.2019.8791779","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In this paper we will present a multi-stage scheduling approach to generate robust schedules for a challenging aspect of semiconductor manufacturing called time-link areas. A time-link is a technologically induced time constraint between one or more consecutive process steps requiring the process steps to be executed within a predefined time window. Time-links are often introduced to control contamination or unwanted oxidation. Violating time-link constraints may lead to extra effort due to additional rework steps and may have negative yield impact or may even, result in scrap.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
具有时间约束的半导体制造生产区域鲁棒多阶段调度方法
在本文中,我们将提出一种多阶段调度方法,为半导体制造的一个具有挑战性的方面生成鲁棒调度,称为时间链接区域。时间链接是在一个或多个连续流程步骤之间由技术引起的时间约束,要求在预定义的时间窗口内执行流程步骤。时间链常用于控制污染或不需要的氧化。违反时间链接约束可能会导致额外的工作,因为额外的返工步骤,可能会对产量产生负面影响,甚至可能导致报废。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fast and accurate defect classification for CMP process monitoring A Deep Learning Model for Identification of Defect Patterns in Semiconductor Wafer Map The Etching of Silicon Nitride in Phosphoric Acid with Novel Single Wafer Processor Methods for RFSOI Damascene Tungsten Contact Etching Using High-Speed Video Analysis for Defect Investigation and Process Improvement
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1