TOTAL FLOAT MANAGEMENT TECHNIQUE UNDER THE FLOAT AND RESOURCE LOADING

Huy Minh Vo
{"title":"TOTAL FLOAT MANAGEMENT TECHNIQUE UNDER THE FLOAT AND RESOURCE LOADING","authors":"Huy Minh Vo","doi":"10.35382/tvujs.13.2.2023.1933","DOIUrl":null,"url":null,"abstract":"Schedule delays in construction projects are a common occurrence and have a significant impact on the overall project duration. Plentiful delay analysis techniques have been proposed and utilized to resolve these issues.The total float management method is widely accepted and considered the most fundamental approach as it effectively resolves four major delay issues and measures float consumption. However, current delay analysis techniques have often overlooked the allocation of float and resources, which can remarkably affect the determination of delay responsibilities for involved parties. This study aims to enhance the total float management approach by intensively incorporating float and resource loading considerations before delayanalysis implementation. The research methodology includes an extensive literature review, identification of crucial issues related to schedule delays arising from the lack of resource and total float allocation, and the application of enhanced total float management under float and resource loading through a case study for test validation. The research findings provide transparent insights into delay liability considering both time delays and float consumption and emphasize the importance of float and resource allocation in the early stages of construction projects for a consensus before analyzing and assigning delay responsibilities. Future studies could focus on legalizing the procedural considerations of float ownership and resource allocation in contractagreements.","PeriodicalId":471814,"journal":{"name":"THE SCIENTIFIC JOURNAL OF TRA VINH UNIVERSITY ISSN 2815-6072 E-ISSN 2815-6099","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"THE SCIENTIFIC JOURNAL OF TRA VINH UNIVERSITY ISSN 2815-6072 E-ISSN 2815-6099","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35382/tvujs.13.2.2023.1933","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Schedule delays in construction projects are a common occurrence and have a significant impact on the overall project duration. Plentiful delay analysis techniques have been proposed and utilized to resolve these issues.The total float management method is widely accepted and considered the most fundamental approach as it effectively resolves four major delay issues and measures float consumption. However, current delay analysis techniques have often overlooked the allocation of float and resources, which can remarkably affect the determination of delay responsibilities for involved parties. This study aims to enhance the total float management approach by intensively incorporating float and resource loading considerations before delayanalysis implementation. The research methodology includes an extensive literature review, identification of crucial issues related to schedule delays arising from the lack of resource and total float allocation, and the application of enhanced total float management under float and resource loading through a case study for test validation. The research findings provide transparent insights into delay liability considering both time delays and float consumption and emphasize the importance of float and resource allocation in the early stages of construction projects for a consensus before analyzing and assigning delay responsibilities. Future studies could focus on legalizing the procedural considerations of float ownership and resource allocation in contractagreements.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
浮动和资源负载下的总浮动管理技术
进度延迟在建设项目中是一种常见的现象,并对整个项目的持续时间产生重大影响。许多延迟分析技术被提出并用于解决这些问题。全浮存金管理方法有效地解决了四大延迟问题,并衡量了浮存金的消耗,被广泛接受,被认为是最根本的方法。然而,现有的延迟分析技术往往忽略了浮动和资源的分配,这对相关方延迟责任的确定有很大的影响。本研究旨在通过在延迟分析实施之前集中考虑浮动和资源负载来增强总浮动管理方法。研究方法包括广泛的文献回顾,确定与缺乏资源和总浮动分配引起的进度延迟相关的关键问题,以及通过案例研究进行测试验证,在浮动和资源负载下应用增强的总浮动管理。研究结果为考虑时间延迟和浮动消耗的延迟责任提供了透明的见解,并强调了浮动和资源分配在建设项目早期阶段的重要性,以便在分析和分配延迟责任之前达成共识。未来的研究可以侧重于使合同协议中浮动所有权和资源分配的程序性考虑合法化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
SNAIL COMPOSITION AND ITS CERCARIAE IN HIEP PHUOC RICE FIELD OF NHA BE DISTRICT, HO CHI MINH CITY, VIETNAM FACTORS INFLUENCING THE QUALITY OF ORANGE PEEL TEA INTERVENTIONS FOR STUDENT AUTONOMY IN A VIRTUAL EFL WRITING CLASSROOM TOTAL FLOAT MANAGEMENT TECHNIQUE UNDER THE FLOAT AND RESOURCE LOADING FACTORS AFFECTING CUSTOMER SATISFACTION ON SERVICE QUALITY AT SAN HA RETAIL GROUP
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1