Optimizing Company Performance Through Industrial Coordinator Training : A Practical Needs Assessment

Putri Nia Luki Patmasari Putri, Muhamad Abdul Jumali, Rusdiyantoro Rusdiyantoro
{"title":"Optimizing Company Performance Through Industrial Coordinator Training : A Practical Needs Assessment","authors":"Putri Nia Luki Patmasari Putri, Muhamad Abdul Jumali, Rusdiyantoro Rusdiyantoro","doi":"10.36456/tibuana.6.2.7665.104-108","DOIUrl":null,"url":null,"abstract":"The study of performance is incredibly fascinating. One of them is the way in which mid-level management functions as both a conduit for information to top management and the person in control of subordinates. This study aims to enhance the coordinator of the industrial department's performance. This study's data processing and analysis procedure employs a qualitative approach by carrying out an analysis using the TNA (Training Need Analysis) method. At electromotor engine repair service firms in East Java, this method is used to assess the variables that contribute to delays in the completion of repairs of goods as well as the kind of training provided to coordinators to prevent delays in the completion of repairs of goods. The outcomes show in the study, it was discovered that the absence of effective communication between division coordinators in the industrial department, skill gaps, and workers who are not suited for the job are the main causes of delays in the completion of goods. Because the percentage is still low for corporate performance and still less productive, the performance value in each division, such as industrial repair, is 6.1%, vacuum pump 6.6%, blower 6.2%, fabrication 7.4 and rewinding 7.5% to complete the items.
","PeriodicalId":486857,"journal":{"name":"Tibuana","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tibuana","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36456/tibuana.6.2.7665.104-108","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The study of performance is incredibly fascinating. One of them is the way in which mid-level management functions as both a conduit for information to top management and the person in control of subordinates. This study aims to enhance the coordinator of the industrial department's performance. This study's data processing and analysis procedure employs a qualitative approach by carrying out an analysis using the TNA (Training Need Analysis) method. At electromotor engine repair service firms in East Java, this method is used to assess the variables that contribute to delays in the completion of repairs of goods as well as the kind of training provided to coordinators to prevent delays in the completion of repairs of goods. The outcomes show in the study, it was discovered that the absence of effective communication between division coordinators in the industrial department, skill gaps, and workers who are not suited for the job are the main causes of delays in the completion of goods. Because the percentage is still low for corporate performance and still less productive, the performance value in each division, such as industrial repair, is 6.1%, vacuum pump 6.6%, blower 6.2%, fabrication 7.4 and rewinding 7.5% to complete the items.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
通过产业协调员培训优化公司绩效:实际需求评估
对表现的研究是非常迷人的。其中之一是中层管理既是向高层管理者传递信息的渠道,又是控制下属的人。本研究旨在提升工业部门绩效协调能力。本研究的数据处理和分析过程采用定性方法,采用TNA (Training Need analysis)方法进行分析。在东爪哇的电动机发动机修理服务公司,使用这种方法来评估造成货物修理工作延误的各种变量,以及为防止货物修理工作延误而向协调员提供的培训种类。研究结果显示,工业部门部门协调员之间缺乏有效沟通,技能差距,工人不适合工作是导致货物完成延迟的主要原因。由于企业绩效占比仍然较低,生产效率仍然较低,因此各个部门的绩效值,如工业维修为6.1%,真空泵为6.6%,鼓风机为6.2%,制造为7.4,复卷为7.5%,以完成项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of time and cost using time cost trade off method in pressure vessel project Student Satisfaction with Online-Based Libraries Using Structural Equation Modelling Optimizing Company Performance Through Industrial Coordinator Training : A Practical Needs Assessment Implementation of Material Requirement Planning (MRP) in Controlling Raw Materials for Shoes Products at PT.XYZ Analysis of Photocopy Service Queue System in “Sustainable Photocopy” Using The FIFO Queue Method
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1