Caijin Wang , Liangfu Xie , Zhiming Liu , Meng Wu , Tao Zhang , Guojun Cai , Songyu Liu
{"title":"Study on settlement deformation law of new and old subgrade of expressway reconstruction and expansion based on CPTU","authors":"Caijin Wang , Liangfu Xie , Zhiming Liu , Meng Wu , Tao Zhang , Guojun Cai , Songyu Liu","doi":"10.1016/j.trgeo.2024.101392","DOIUrl":null,"url":null,"abstract":"<div><div>In the reconstruction and expansion of expressways in soft soil areas, controlling the differential settlement between the new and existing subgrades is of vital importance. To investigate the settlement and deformation characteristics of both the new and existing subgrades, piezocone penetration test (CPTU) and dissipation tests were conducted on these subgrades. The CPTU dissipation data was utilized to determine the soil’s degree of consolidation, and settlement calculations for the new and existing road subgrades were based on the CPTU test results. Subsequently, a finite element model was developed using the CPTU test findings to analyze the horizontal displacements, vertical settlements, and differential settlements of the new and existing subgrades before and after the reconstruction and expansion. Based on the measured settlement results, the new and old subgrade settlement calculation results are verified. The outcomes revealed that the degree of consolidation for the existing road subgrade of the Lianhuai Expressway ranged between 42 % and 96 %. The maximum horizontal displacement of the subgrade pre- and post-expansion occurred at the slope toe. Before expansion, the maximum vertical settlement was observed along the road’s centerline, while after expansion, it was located in the centerline of the widened section. The maximum additional settlement amounted to 274.77 mm. During the new road construction phase, the differential settlement between the new and existing road subgrades increased rapidly over time, peaking at its maximum value. However, during the operational phase of the new road, this differential settlement tapered off as time progressed.</div></div>","PeriodicalId":56013,"journal":{"name":"Transportation Geotechnics","volume":"49 ","pages":"Article 101392"},"PeriodicalIF":4.9000,"publicationDate":"2024-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Geotechnics","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2214391224002137","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0
Abstract
In the reconstruction and expansion of expressways in soft soil areas, controlling the differential settlement between the new and existing subgrades is of vital importance. To investigate the settlement and deformation characteristics of both the new and existing subgrades, piezocone penetration test (CPTU) and dissipation tests were conducted on these subgrades. The CPTU dissipation data was utilized to determine the soil’s degree of consolidation, and settlement calculations for the new and existing road subgrades were based on the CPTU test results. Subsequently, a finite element model was developed using the CPTU test findings to analyze the horizontal displacements, vertical settlements, and differential settlements of the new and existing subgrades before and after the reconstruction and expansion. Based on the measured settlement results, the new and old subgrade settlement calculation results are verified. The outcomes revealed that the degree of consolidation for the existing road subgrade of the Lianhuai Expressway ranged between 42 % and 96 %. The maximum horizontal displacement of the subgrade pre- and post-expansion occurred at the slope toe. Before expansion, the maximum vertical settlement was observed along the road’s centerline, while after expansion, it was located in the centerline of the widened section. The maximum additional settlement amounted to 274.77 mm. During the new road construction phase, the differential settlement between the new and existing road subgrades increased rapidly over time, peaking at its maximum value. However, during the operational phase of the new road, this differential settlement tapered off as time progressed.
期刊介绍:
Transportation Geotechnics is a journal dedicated to publishing high-quality, theoretical, and applied papers that cover all facets of geotechnics for transportation infrastructure such as roads, highways, railways, underground railways, airfields, and waterways. The journal places a special emphasis on case studies that present original work relevant to the sustainable construction of transportation infrastructure. The scope of topics it addresses includes the geotechnical properties of geomaterials for sustainable and rational design and construction, the behavior of compacted and stabilized geomaterials, the use of geosynthetics and reinforcement in constructed layers and interlayers, ground improvement and slope stability for transportation infrastructures, compaction technology and management, maintenance technology, the impact of climate, embankments for highways and high-speed trains, transition zones, dredging, underwater geotechnics for infrastructure purposes, and the modeling of multi-layered structures and supporting ground under dynamic and repeated loads.