{"title":"A chance-constrained programming approach to determine requirement of optimal spinning reserve capacity","authors":"Lu Wang, C. Yu, F. Wen","doi":"10.13335/J.1000-3673.PST.2006.20.004","DOIUrl":null,"url":null,"abstract":"Under the premise of chance-constrained programming,when the consideration to reliability and economy of system operation should be given,how to consider the uncertainty factors such as the fault outage of generators and the error of load forecasting is researched so as to determine the optimal spinning reserve capacity that power system requires.Taking the purchase cost of minimized spinning reserve as objective as well as the secure requirement of power system as chance-constraint,a mathematical model to determine optimal spinning reserve capacity required by power system is constructed,and Monte Carlo simulation based genetic algorithm is adopted to solve the constructed model.Taking a power system containing 18 generating units for example the proposed model is illustrated.","PeriodicalId":20420,"journal":{"name":"电网技术","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2006-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"电网技术","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.13335/J.1000-3673.PST.2006.20.004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 21
Abstract
Under the premise of chance-constrained programming,when the consideration to reliability and economy of system operation should be given,how to consider the uncertainty factors such as the fault outage of generators and the error of load forecasting is researched so as to determine the optimal spinning reserve capacity that power system requires.Taking the purchase cost of minimized spinning reserve as objective as well as the secure requirement of power system as chance-constraint,a mathematical model to determine optimal spinning reserve capacity required by power system is constructed,and Monte Carlo simulation based genetic algorithm is adopted to solve the constructed model.Taking a power system containing 18 generating units for example the proposed model is illustrated.
期刊介绍:
"Power System Technology" (monthly) was founded in 1957. It is a comprehensive academic journal in the field of energy and power, supervised and sponsored by the State Grid Corporation of China. It is published by the Power System Technology Magazine Co., Ltd. of the China Electric Power Research Institute. It is publicly distributed at home and abroad and is included in 12 famous domestic and foreign literature databases such as the Engineering Index (EI) and the National Chinese Core Journals.
The purpose of "Power System Technology" is to serve the national innovation-driven development strategy, promote scientific and technological progress in my country's energy and power fields, and promote the application of new technologies and new products. "Power System Technology" has adhered to the publishing characteristics of combining "theoretical innovation with applied practice" for many years, and the scope of manuscript selection covers the fields of power generation, transmission, distribution, and electricity consumption.