Study of delays in constructions: a managerial point of view of private companies in Brasilia, Brazil

Q3 Engineering Gestao e Producao Pub Date : 2021-08-02 DOI:10.1590/1806-9649-2021v28e5194
Eduardo Lavocat Galvão de Almeida, Vitor Amadeu da Silva Feitoza, M. Carvalho, Ana Beatriz Souza Piña, L. Araújo, L. A. Aidar
{"title":"Study of delays in constructions: a managerial point of view of private companies in Brasilia, Brazil","authors":"Eduardo Lavocat Galvão de Almeida, Vitor Amadeu da Silva Feitoza, M. Carvalho, Ana Beatriz Souza Piña, L. Araújo, L. A. Aidar","doi":"10.1590/1806-9649-2021v28e5194","DOIUrl":null,"url":null,"abstract":"Abstract Delay is one of the most recurrent problems in the construction industry. It is the cause of major negative consequences on construction projects and it can be the main reason for project failures. Still, there is a need for studies focusing on causes of these delays. The objective of this article is to determine the factors with greatest influence on the backlog of real estate developments, improving the collective list of causes of delays in construction projects. A list of 24 probable causes was assembled and submitted as a survey for 47 professionals in administrative rolls from the building construction sector, more precisely, from private companies. The results were processed utilizing the Relative Importance Index (RII) ranking approach. The outcome shows that the most important delay causes are: rework, poor labor productivity, lack of qualified labor, unqualified labor, and project changes. The results also indicate that there are significant differences of opinion between the professionals of distinct hierarchy positions. The results obtained indicate that there is a transition between the opinions of professionals in different roles regarding the importance of influential factors in the delay of works, according to the managerial level of each group.","PeriodicalId":35415,"journal":{"name":"Gestao e Producao","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gestao e Producao","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/1806-9649-2021v28e5194","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 1

Abstract

Abstract Delay is one of the most recurrent problems in the construction industry. It is the cause of major negative consequences on construction projects and it can be the main reason for project failures. Still, there is a need for studies focusing on causes of these delays. The objective of this article is to determine the factors with greatest influence on the backlog of real estate developments, improving the collective list of causes of delays in construction projects. A list of 24 probable causes was assembled and submitted as a survey for 47 professionals in administrative rolls from the building construction sector, more precisely, from private companies. The results were processed utilizing the Relative Importance Index (RII) ranking approach. The outcome shows that the most important delay causes are: rework, poor labor productivity, lack of qualified labor, unqualified labor, and project changes. The results also indicate that there are significant differences of opinion between the professionals of distinct hierarchy positions. The results obtained indicate that there is a transition between the opinions of professionals in different roles regarding the importance of influential factors in the delay of works, according to the managerial level of each group.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
施工延误研究:巴西巴西利亚私营公司的管理观点
延迟是建筑行业中最常见的问题之一。它是对建设项目产生重大负面影响的原因,它可能是项目失败的主要原因。尽管如此,仍有必要对这些延迟的原因进行研究。本文的目的是确定对房地产开发积压影响最大的因素,完善建设项目延误原因的集体清单。收集了一份24个可能原因的清单,作为对47名来自建筑部门,更确切地说,来自私营公司的行政名册专业人员的调查提交。采用相对重要性指数(RII)排序法对结果进行处理。结果表明,最重要的延迟原因是:返工、劳动生产率低、缺乏合格劳动力、不合格劳动力和项目变更。结果还表明,不同层级职位的专业人员之间的意见存在显著差异。结果表明,不同角色的专业人员对影响工程延误的因素的重要性的看法存在转变,根据每一组的管理水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Gestao e Producao
Gestao e Producao Engineering-Industrial and Manufacturing Engineering
CiteScore
1.60
自引率
0.00%
发文量
23
审稿时长
44 weeks
期刊介绍: Gestão & Produção is a journal published four times a year year (March, June, September and December) by the Departamento de Engenharia de Produção (DEP) of Universidade Federal de São Carlos (UFSCar). The first issue of Gestão & Produção was published in April, 1994. Actually, G&P was result of experience of professors of DEP/UFSCar in editing, in the beginning, "Cadernos DEP" in the 1980s, followed by "Cadernos de Engenharia de Produção". The last three issues of "Cadernos de Engenharia de Produção" were a test previous to the launch of Gestão & Produção because most of the journal characteristics were already established, like regularity.
期刊最新文献
Comparison of artificial neural networks learning methods to evaluate supply chain performance Evaluation of the socioeconomic and environmental sustainability of banking institutions in Brazil using the Analytic Hierarchy Process with ratings approach Economic, social and environmental aspects of the sustainability of a construction waste recycling plant A bibliometric study on the use of games in the Production Engineering area Competences of the Executive Secretariat in project management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1