Monitoring multinomial processes based on a weighted chi-square control chart

Q3 Engineering Gestao e Producao Pub Date : 2021-07-02 DOI:10.1590/1806-9649-2021v28e43
Achouri Ali, Emira Khedhiri, Ramzi Talmoudi, H. Taleb
{"title":"Monitoring multinomial processes based on a weighted chi-square control chart","authors":"Achouri Ali, Emira Khedhiri, Ramzi Talmoudi, H. Taleb","doi":"10.1590/1806-9649-2021v28e43","DOIUrl":null,"url":null,"abstract":"Abstract: Interpreting an out-of-control signal is a crucial step in monitoring categorical processes. For the Chi-Square Control Chart (CSCC), an out-of control situation does not specify if it was a process deterioration or a process improvement. For this reason, a weighted chi-square statistical control chart WSCC is proposed with different weighting categories in order to enable an accelerated disclosure of a control situation after a shift due to a deterioration of quality and on the other hand, decelerate an out of control situation after a shift due to a quality improvement. Furthermore, in comparison with Marcucci’s method, the new procedure provides an accurate and easier way to interpret several signals. In other words, the WSCC allows a faster detection of an out-of control situation in the case of a quality deterioration, however, an out-of control situation is not quickly detected in the case of a quality improvement. Indeed, comparative studies have been performed to find the best control chart for each combination. Concluding remarks with comments and recommendations are given based on Average Run Length (ARL) and standard deviation run length (SDRL).","PeriodicalId":35415,"journal":{"name":"Gestao e Producao","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-07-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gestao e Producao","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/1806-9649-2021v28e43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 2

Abstract

Abstract: Interpreting an out-of-control signal is a crucial step in monitoring categorical processes. For the Chi-Square Control Chart (CSCC), an out-of control situation does not specify if it was a process deterioration or a process improvement. For this reason, a weighted chi-square statistical control chart WSCC is proposed with different weighting categories in order to enable an accelerated disclosure of a control situation after a shift due to a deterioration of quality and on the other hand, decelerate an out of control situation after a shift due to a quality improvement. Furthermore, in comparison with Marcucci’s method, the new procedure provides an accurate and easier way to interpret several signals. In other words, the WSCC allows a faster detection of an out-of control situation in the case of a quality deterioration, however, an out-of control situation is not quickly detected in the case of a quality improvement. Indeed, comparative studies have been performed to find the best control chart for each combination. Concluding remarks with comments and recommendations are given based on Average Run Length (ARL) and standard deviation run length (SDRL).
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于加权卡方控制图的多项过程监控
摘要:解释失控信号是监测分类过程的关键步骤。在卡方控制图(CSCC)中,失控情况没有指明是工艺恶化还是工艺改进。为此,我们提出了加权卡方统计控制图WSCC,该加权卡方统计控制图具有不同的权重类别,一方面可以使由于质量恶化导致的换班后控制情况加速披露,另一方面可以使由于质量改善导致的换班后失控情况减速。此外,与Marcucci的方法相比,新方法提供了一种准确而简单的方法来解释几种信号。换句话说,在质量恶化的情况下,WSCC允许更快地检测到失控情况,然而,在质量改进的情况下,无法快速检测到失控情况。事实上,已经进行了比较研究,以找到每种组合的最佳控制图。根据平均运行长度(ARL)和标准偏差运行长度(SDRL)给出结论和建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Gestao e Producao
Gestao e Producao Engineering-Industrial and Manufacturing Engineering
CiteScore
1.60
自引率
0.00%
发文量
23
审稿时长
44 weeks
期刊介绍: Gestão & Produção is a journal published four times a year year (March, June, September and December) by the Departamento de Engenharia de Produção (DEP) of Universidade Federal de São Carlos (UFSCar). The first issue of Gestão & Produção was published in April, 1994. Actually, G&P was result of experience of professors of DEP/UFSCar in editing, in the beginning, "Cadernos DEP" in the 1980s, followed by "Cadernos de Engenharia de Produção". The last three issues of "Cadernos de Engenharia de Produção" were a test previous to the launch of Gestão & Produção because most of the journal characteristics were already established, like regularity.
期刊最新文献
Comparison of artificial neural networks learning methods to evaluate supply chain performance Evaluation of the socioeconomic and environmental sustainability of banking institutions in Brazil using the Analytic Hierarchy Process with ratings approach Economic, social and environmental aspects of the sustainability of a construction waste recycling plant A bibliometric study on the use of games in the Production Engineering area Competences of the Executive Secretariat in project management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1