Study on Risk Management Practices on Public Building Construction Project: In Case of Eastern Wollega Zone

Zelalem Mebrate
{"title":"Study on Risk Management Practices on Public Building Construction Project: In Case of Eastern Wollega Zone","authors":"Zelalem Mebrate","doi":"10.11648/J.AJCE.20210903.12","DOIUrl":null,"url":null,"abstract":"This research work was tries to study the risk management practice on public building construction projects and aims to identify the level that use of risk management practice especially in the public building. The data collection method was a combination of interview and questionnaire. Samples were purposively selected from clients, consultants, and contractors representatives who are now actively participating in public building construction projects. For this study, the data was collected using both primary and secondary sources. Depending on the data that was gathered from the respondent to test the level of awareness, identifying the Risk that affect the performance of public building construction project and major risk management practice on public building construction project are considered and the RII was used to rank the factors. This data was analyzed using SPSS of version 22 to perform descriptive statistics. A total of 75 questionnaires were targeted to be distributed and out of those 50 which is 66.67% are successfully responded. The finding from this study revealed that, about (52%) of the project progress is lagging from the schedule. Regarding the awareness of the risk management, (94%) of the respondents where confirmed that they have awareness of risk management ideologies and they are confident enough to implement their knowledge while, (6%) of them have no concept about the risk management. The top five risks that affect the performance of construction project have been identified and ranked. Accordingly; market condition, unexpected inflation, local taxes, inadequate production of raw materials, and the economic condition of country are the top five identified associated project risks.","PeriodicalId":7606,"journal":{"name":"American Journal of Civil Engineering","volume":"70 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"American Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/J.AJCE.20210903.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This research work was tries to study the risk management practice on public building construction projects and aims to identify the level that use of risk management practice especially in the public building. The data collection method was a combination of interview and questionnaire. Samples were purposively selected from clients, consultants, and contractors representatives who are now actively participating in public building construction projects. For this study, the data was collected using both primary and secondary sources. Depending on the data that was gathered from the respondent to test the level of awareness, identifying the Risk that affect the performance of public building construction project and major risk management practice on public building construction project are considered and the RII was used to rank the factors. This data was analyzed using SPSS of version 22 to perform descriptive statistics. A total of 75 questionnaires were targeted to be distributed and out of those 50 which is 66.67% are successfully responded. The finding from this study revealed that, about (52%) of the project progress is lagging from the schedule. Regarding the awareness of the risk management, (94%) of the respondents where confirmed that they have awareness of risk management ideologies and they are confident enough to implement their knowledge while, (6%) of them have no concept about the risk management. The top five risks that affect the performance of construction project have been identified and ranked. Accordingly; market condition, unexpected inflation, local taxes, inadequate production of raw materials, and the economic condition of country are the top five identified associated project risks.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
公共建筑建设项目风险管理实践研究——以东沃勒加区为例
本研究工作试图对公共建筑建设项目的风险管理实践进行研究,旨在确定风险管理实践在公共建筑建设项目中的应用水平。数据收集方法采用访谈与问卷调查相结合的方法。样本有目的地从目前积极参与公共建筑建设项目的客户、顾问和承包商代表中选择。在这项研究中,数据是通过第一手和二手资料收集的。根据从受访者收集的数据来测试意识水平,确定影响公共建筑建设项目绩效的风险,并考虑公共建筑建设项目的主要风险管理实践,并使用RII对因素进行排名。本数据分析使用SPSS版本22进行描述性统计。本次调查共发放问卷75份,成功回复率为66.67%。这项研究的结果显示,大约(52%)的项目进度滞后于计划。在风险管理意识方面,(94%)的受访者确认他们有风险管理意识的意识,并有足够的信心去实施他们的知识,而(6%)的受访者对风险管理没有概念。对影响建设项目绩效的五大风险进行了识别和排序。相应的;市场状况、意外的通货膨胀、地方税收、原材料生产不足和国家经济状况是确定的五大相关项目风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Conformance and Performance Evaluation of Land Use Plan of Yirba Town Performance of Simplified Damage-Based Concrete Models in Seismic Applications Pavement Service Life Prediction with PLAXIS 3D in Bangladesh Surface-Modified Nanoclays for Enhancing Resistance to Moisture Damage in Hot Mix Asphalt Structural Performance Evaluation of Diversion Weir Structure: Case Study of Basaka Small Scale Irrigation Scheme, Oromia, Ethiopia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1