Initial operating experience of the 1.2-MW La Ola photovoltaic system

Jay Johnson, B. Schenkman, A. Ellis, J. Quiroz, C. Lenox
{"title":"Initial operating experience of the 1.2-MW La Ola photovoltaic system","authors":"Jay Johnson, B. Schenkman, A. Ellis, J. Quiroz, C. Lenox","doi":"10.2172/1031297","DOIUrl":null,"url":null,"abstract":"The 1.2-MW La Ola photovoltaic (PV) power plant in Lanai, Hawaii, has been in operation since December 2009. The host system is a small island microgrid with peak load of 5 MW. Simulations conducted as part of the interconnection study concluded that unmitigated PV output ramps had the potential to negatively affect system frequency. Based on that study, the PV system was initially allowed to operate with output limited to 50% of nameplate power capacity to reduce the potential for frequency instability due to PV variability. Based on the analysis of historical voltage, frequency, and power output data at 50% output level, the PV system has not significantly affected grid performance. However, it should be noted that the impact of PV variability on active and reactive power output of the nearby diesel generators was not evaluated.","PeriodicalId":6420,"journal":{"name":"2012 IEEE 38th Photovoltaic Specialists Conference (PVSC) PART 2","volume":"9 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2013-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"45","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE 38th Photovoltaic Specialists Conference (PVSC) PART 2","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2172/1031297","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 45

Abstract

The 1.2-MW La Ola photovoltaic (PV) power plant in Lanai, Hawaii, has been in operation since December 2009. The host system is a small island microgrid with peak load of 5 MW. Simulations conducted as part of the interconnection study concluded that unmitigated PV output ramps had the potential to negatively affect system frequency. Based on that study, the PV system was initially allowed to operate with output limited to 50% of nameplate power capacity to reduce the potential for frequency instability due to PV variability. Based on the analysis of historical voltage, frequency, and power output data at 50% output level, the PV system has not significantly affected grid performance. However, it should be noted that the impact of PV variability on active and reactive power output of the nearby diesel generators was not evaluated.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
1.2 mw La Ola光伏系统的初步运行经验
位于夏威夷拉奈岛的1.2兆瓦的拉奥拉光伏电站自2009年12月开始运行。主机系统为小岛型微电网,峰值负荷为5mw。作为互联研究的一部分进行的模拟得出结论,未减轻的光伏输出坡道有可能对系统频率产生负面影响。基于该研究,PV系统最初被允许将输出限制在铭牌功率容量的50%,以减少由于PV可变性导致的频率不稳定的可能性。根据历史电压、频率和50%输出水平下的输出功率数据分析,光伏系统对电网性能没有明显影响。但是,需要注意的是,没有评估光伏变率对附近柴油发电机输出有功和无功功率的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Initial operating experience of the 1.2-MW La Ola photovoltaic system The impact of selenisation on damp heat degradation of the CIGS back contact molybdenum Remote plasma chemical vapor deposition for high-efficiency ultra-thin ∼25-microns crystalline Si solar cells Study of point defects in ns pulsed-laser annealed CuInSe2 thin films Optical monitoring and control of three-stage coevaporated Cu(In1−xGax)Se2 by real-time spectroscopic ellipsometry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1