{"title":"FMS管理中作业组加载能力研究","authors":"G. Cardarelli, P. M. Pelagagge","doi":"10.1109/ISIE.1993.268769","DOIUrl":null,"url":null,"abstract":"The results of simulation tests have been presented in order to illustrate the capability in FMS management of a scheduling based on the job-group loading rule. In particular the effects of the interferences on the material handling system, the variability of machining times and the stops for breakdown or preventive maintenance, have been examined.<<ETX>>","PeriodicalId":267349,"journal":{"name":"ISIE '93 - Budapest: IEEE International Symposium on Industrial Electronics Conference Proceedings","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"On the capability of job-group loading in FMS management\",\"authors\":\"G. Cardarelli, P. M. Pelagagge\",\"doi\":\"10.1109/ISIE.1993.268769\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The results of simulation tests have been presented in order to illustrate the capability in FMS management of a scheduling based on the job-group loading rule. In particular the effects of the interferences on the material handling system, the variability of machining times and the stops for breakdown or preventive maintenance, have been examined.<<ETX>>\",\"PeriodicalId\":267349,\"journal\":{\"name\":\"ISIE '93 - Budapest: IEEE International Symposium on Industrial Electronics Conference Proceedings\",\"volume\":\"51 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ISIE '93 - Budapest: IEEE International Symposium on Industrial Electronics Conference Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISIE.1993.268769\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ISIE '93 - Budapest: IEEE International Symposium on Industrial Electronics Conference Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISIE.1993.268769","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
On the capability of job-group loading in FMS management
The results of simulation tests have been presented in order to illustrate the capability in FMS management of a scheduling based on the job-group loading rule. In particular the effects of the interferences on the material handling system, the variability of machining times and the stops for breakdown or preventive maintenance, have been examined.<>