V. Vladislav, Dubnitsky Ivan, M. Ilkam, I. Shmarin, Y. Mishin, Kramar Vladimir, Valiakhmetov Artur, M. Medvedev
{"title":"西西伯利亚地区Turonian组多层储层升井水平井钻井与配井","authors":"V. Vladislav, Dubnitsky Ivan, M. Ilkam, I. Shmarin, Y. Mishin, Kramar Vladimir, Valiakhmetov Artur, M. Medvedev","doi":"10.3997/2214-4609.202154054","DOIUrl":null,"url":null,"abstract":"Summary The developed methodology is based on the reducing of geological uncertainty, the optimal positioning of the horizontal uprising wells in the target interval, an increase of Net to Gross ratio and, therefore, an increase in well productivity. The proposed integrated engineering solutions was successfully implemented in 50 horizontal wells.","PeriodicalId":105144,"journal":{"name":"Horizontal Wells 2021","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Drilling and well placement of uprising horizontal wells in multizone reservoirs of Turonian formation in Western Siberia\",\"authors\":\"V. Vladislav, Dubnitsky Ivan, M. Ilkam, I. Shmarin, Y. Mishin, Kramar Vladimir, Valiakhmetov Artur, M. Medvedev\",\"doi\":\"10.3997/2214-4609.202154054\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary The developed methodology is based on the reducing of geological uncertainty, the optimal positioning of the horizontal uprising wells in the target interval, an increase of Net to Gross ratio and, therefore, an increase in well productivity. The proposed integrated engineering solutions was successfully implemented in 50 horizontal wells.\",\"PeriodicalId\":105144,\"journal\":{\"name\":\"Horizontal Wells 2021\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Horizontal Wells 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3997/2214-4609.202154054\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Horizontal Wells 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.202154054","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Drilling and well placement of uprising horizontal wells in multizone reservoirs of Turonian formation in Western Siberia
Summary The developed methodology is based on the reducing of geological uncertainty, the optimal positioning of the horizontal uprising wells in the target interval, an increase of Net to Gross ratio and, therefore, an increase in well productivity. The proposed integrated engineering solutions was successfully implemented in 50 horizontal wells.