{"title":"T40——大幅缩短建设项目的时间","authors":"Vernon Ireland","doi":"10.1002/(SICI)1099-0828(199601)3:1<28::AID-BCR48>3.0.CO;2-A","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":100208,"journal":{"name":"Business Change and Re-engineering","volume":"3 1","pages":"28-38"},"PeriodicalIF":0.0000,"publicationDate":"1996-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"T40—Radical time reduction in construction projects\",\"authors\":\"Vernon Ireland\",\"doi\":\"10.1002/(SICI)1099-0828(199601)3:1<28::AID-BCR48>3.0.CO;2-A\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":100208,\"journal\":{\"name\":\"Business Change and Re-engineering\",\"volume\":\"3 1\",\"pages\":\"28-38\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1996-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Business Change and Re-engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/%28SICI%291099-0828%28199601%293%3A1%3C28%3A%3AAID-BCR48%3E3.0.CO%3B2-A\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Business Change and Re-engineering","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/%28SICI%291099-0828%28199601%293%3A1%3C28%3A%3AAID-BCR48%3E3.0.CO%3B2-A","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
摘要
Fletcher Construction Group是一家大型建筑承包商,在美国西海岸、整个太平洋、新西兰、澳大利亚和一些亚洲国家都有业务部门。本案例研究描述了包括Fletcher Construction在内的多个行业组织如何合作设计新的全行业施工流程。新工艺可以将完成施工的时间减少40%,成本减少资本价值的25%。