T40——大幅缩短建设项目的时间

Vernon Ireland
{"title":"T40——大幅缩短建设项目的时间","authors":"Vernon Ireland","doi":"10.1002/(SICI)1099-0828(199601)3:1<28::AID-BCR48>3.0.CO;2-A","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":100208,"journal":{"name":"Business Change and Re-engineering","volume":"3 1","pages":"28-38"},"PeriodicalIF":0.0000,"publicationDate":"1996-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"T40—Radical time reduction in construction projects\",\"authors\":\"Vernon Ireland\",\"doi\":\"10.1002/(SICI)1099-0828(199601)3:1<28::AID-BCR48>3.0.CO;2-A\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":100208,\"journal\":{\"name\":\"Business Change and Re-engineering\",\"volume\":\"3 1\",\"pages\":\"28-38\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1996-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Business Change and Re-engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/%28SICI%291099-0828%28199601%293%3A1%3C28%3A%3AAID-BCR48%3E3.0.CO%3B2-A\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Business Change and Re-engineering","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/%28SICI%291099-0828%28199601%293%3A1%3C28%3A%3AAID-BCR48%3E3.0.CO%3B2-A","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

Fletcher Construction Group是一家大型建筑承包商,在美国西海岸、整个太平洋、新西兰、澳大利亚和一些亚洲国家都有业务部门。本案例研究描述了包括Fletcher Construction在内的多个行业组织如何合作设计新的全行业施工流程。新工艺可以将完成施工的时间减少40%,成本减少资本价值的25%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
T40—Radical time reduction in construction projects
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Business Process Re-Engineering using Groupware: A Case Study Mike Tucker, Chairman of the Institute of BPR The Virtual Business: Creating the Effective Business Organization Business Process Re-engineering in Scotland: Survey and Comparison
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1