{"title":"彭亨州关丹港波浪能转换器的风险评估","authors":"Muhammad Asyraf Abdullah, Noh Zainal Abidin, Zulkifly Mat Radzi, Mohd Arif Ahmad, V. Munikanan, Mohd Norsyarizad Razali, Neza Ismail","doi":"10.7225/toms.v10.n02.002","DOIUrl":null,"url":null,"abstract":"Harvesting energy from ocean waves remains an untapped resource, and it is considered a new methodology in renewable energy, especially in Malaysia. This research is based on a project at Kuantan Port that used Wave Energy Converter (WEC) as a platform to generate energy from waves and convert it into electricity. The purpose of this research is to conduct a risk assessment before the execution of the project by referring to the International Organization for Standardization (ISO) 31000 and Risk Management Guidelines: Companion to AS/NZS 4360:2004. It started from risk identification and planned a mitigation way to reduce the grade of risk. These mitigations will be monitored throughout the project to avoid any accidents or harm during construction and installation in the future. The assessment will be using a qualitative analysis method that will gather all the possible risks that impact the project and propose the actions to mitigate the risk. The assessment will also consider the likelihood, seriousness, and weightage to determine the risk level. The risk assessment is divided into six clusters: project management, hydrography, mechanical, electrical, civil, and safety and security. After analysis, each cluster has given their feedback on the risk assessment and their cluster-s risk grade. This research has found that the risk grade is at grade C, which needs the risk assessment of this project to reduce the likelihood, seriousness, and required mitigation actions. Eventually, after the mitigation plan is applied to each risk, the grade of risk is reduced to N.","PeriodicalId":42576,"journal":{"name":"Transactions on Maritime Science-ToMS","volume":"41 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Assessment of Wave Energy Converter At Kuantan Port, Pahang\",\"authors\":\"Muhammad Asyraf Abdullah, Noh Zainal Abidin, Zulkifly Mat Radzi, Mohd Arif Ahmad, V. Munikanan, Mohd Norsyarizad Razali, Neza Ismail\",\"doi\":\"10.7225/toms.v10.n02.002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Harvesting energy from ocean waves remains an untapped resource, and it is considered a new methodology in renewable energy, especially in Malaysia. This research is based on a project at Kuantan Port that used Wave Energy Converter (WEC) as a platform to generate energy from waves and convert it into electricity. The purpose of this research is to conduct a risk assessment before the execution of the project by referring to the International Organization for Standardization (ISO) 31000 and Risk Management Guidelines: Companion to AS/NZS 4360:2004. It started from risk identification and planned a mitigation way to reduce the grade of risk. These mitigations will be monitored throughout the project to avoid any accidents or harm during construction and installation in the future. The assessment will be using a qualitative analysis method that will gather all the possible risks that impact the project and propose the actions to mitigate the risk. The assessment will also consider the likelihood, seriousness, and weightage to determine the risk level. The risk assessment is divided into six clusters: project management, hydrography, mechanical, electrical, civil, and safety and security. After analysis, each cluster has given their feedback on the risk assessment and their cluster-s risk grade. This research has found that the risk grade is at grade C, which needs the risk assessment of this project to reduce the likelihood, seriousness, and required mitigation actions. Eventually, after the mitigation plan is applied to each risk, the grade of risk is reduced to N.\",\"PeriodicalId\":42576,\"journal\":{\"name\":\"Transactions on Maritime Science-ToMS\",\"volume\":\"41 1\",\"pages\":\"\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2021-10-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transactions on Maritime Science-ToMS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7225/toms.v10.n02.002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, MARINE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions on Maritime Science-ToMS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7225/toms.v10.n02.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MARINE","Score":null,"Total":0}
Risk Assessment of Wave Energy Converter At Kuantan Port, Pahang
Harvesting energy from ocean waves remains an untapped resource, and it is considered a new methodology in renewable energy, especially in Malaysia. This research is based on a project at Kuantan Port that used Wave Energy Converter (WEC) as a platform to generate energy from waves and convert it into electricity. The purpose of this research is to conduct a risk assessment before the execution of the project by referring to the International Organization for Standardization (ISO) 31000 and Risk Management Guidelines: Companion to AS/NZS 4360:2004. It started from risk identification and planned a mitigation way to reduce the grade of risk. These mitigations will be monitored throughout the project to avoid any accidents or harm during construction and installation in the future. The assessment will be using a qualitative analysis method that will gather all the possible risks that impact the project and propose the actions to mitigate the risk. The assessment will also consider the likelihood, seriousness, and weightage to determine the risk level. The risk assessment is divided into six clusters: project management, hydrography, mechanical, electrical, civil, and safety and security. After analysis, each cluster has given their feedback on the risk assessment and their cluster-s risk grade. This research has found that the risk grade is at grade C, which needs the risk assessment of this project to reduce the likelihood, seriousness, and required mitigation actions. Eventually, after the mitigation plan is applied to each risk, the grade of risk is reduced to N.
期刊介绍:
ToMS is a scientific journal with international peer review which publishes papers in the following areas: ~ Marine Engineering, ~ Navigation, ~ Safety Systems, ~ Marine Ecology, ~ Marine Fisheries, ~ Hydrography, ~ Marine Automation and Electronics, ~ Transportation and Modes of Transport, ~ Marine Information Systems, ~ Maritime Law, ~ Management of Marine Systems, ~ Marine Finance, ~ Bleeding-Edge Technologies, ~ Multimodal Transport, ~ Psycho-social and Legal Aspects of Long-term Working Aboard. The journal is published in English as an open access journal, and as a classic paper journal (in limited editions). ToMS aims to present best maritime research from South East Europe, particularly the Mediterranean area. Articles will be double-blind reviewed by three reviewers. With the intention of providing an international perspective at least one of the reviewers will be from abroad. ToMS also promotes scientific collaboration with students and has a section titled Students’ ToMS. These papers also undergo strict peer reviews. Furthermore, the Journal publishes short reviews on significant papers, books and workshops in the fields of maritime science.