A Power Delivery Network and Cell Placement Aware IR-Drop Mitigation Technique: Harvesting Unused Timing Slacks to Schedule Useful Skews

Lakshmi Bhamidipati, B. Gunna, H. Homayoun, Avesta Sasan
{"title":"A Power Delivery Network and Cell Placement Aware IR-Drop Mitigation Technique: Harvesting Unused Timing Slacks to Schedule Useful Skews","authors":"Lakshmi Bhamidipati, B. Gunna, H. Homayoun, Avesta Sasan","doi":"10.1109/ISVLSI.2017.55","DOIUrl":null,"url":null,"abstract":"This paper, presents a novel technique for reducing the intensity of IR hot-spots by leveraging the unused timing slacks to schedule useful skews. The peak current minimization problem is reformulated into a collection of smaller problems of reducing the peak current of each via-stack in the on-chip Power Delivery Network (PDN). In addition to timing information, it considers the PDN and cell placement information while scheduling the clock arrival times. Hence, while reducing the peak current, it effectively reduces the intensity the IR hot- spots. Application of the proposed solution to a selected number of IWLS benchmarks reduces the peak IR-drop by ±35%, and peak current by ±37%.","PeriodicalId":187936,"journal":{"name":"2017 IEEE Computer Society Annual Symposium on VLSI (ISVLSI)","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE Computer Society Annual Symposium on VLSI (ISVLSI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISVLSI.2017.55","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

This paper, presents a novel technique for reducing the intensity of IR hot-spots by leveraging the unused timing slacks to schedule useful skews. The peak current minimization problem is reformulated into a collection of smaller problems of reducing the peak current of each via-stack in the on-chip Power Delivery Network (PDN). In addition to timing information, it considers the PDN and cell placement information while scheduling the clock arrival times. Hence, while reducing the peak current, it effectively reduces the intensity the IR hot- spots. Application of the proposed solution to a selected number of IWLS benchmarks reduces the peak IR-drop by ±35%, and peak current by ±37%.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
电力输送网络和小区放置感知ir下降缓解技术:收集未使用的时间松弛来调度有用的倾斜
本文提出了一种利用未使用的时序松弛来调度有用的偏斜来降低红外热点强度的新技术。在片上电力传输网络(PDN)中,峰值电流最小化问题被重新表述为降低每个过孔堆栈的峰值电流的更小问题的集合。除了定时信息外,它还在调度时钟到达时间时考虑PDN和单元放置信息。因此,在降低峰值电流的同时,有效地降低了红外热点的强度。将所提出的解决方案应用于选定数量的IWLS基准测试,可将峰值ir下降降低±35%,峰值电流降低±37%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Power Delivery Network and Cell Placement Aware IR-Drop Mitigation Technique: Harvesting Unused Timing Slacks to Schedule Useful Skews On Tolerating Faults of TSV/Microbumps for Power Delivery Networks in 3D IC Assessing Self-Repair on FPGAs with Biologically Realistic Astrocyte-Neuron Networks AEGLE's Cloud Infrastructure for Resource Monitoring and Containerized Accelerated Analytics Voltage Noise Analysis with Ring Oscillator Clocks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1