Measuring project progress by work sampling

M. Hailey
{"title":"Measuring project progress by work sampling","authors":"M. Hailey","doi":"10.1109/PICMET.1991.183631","DOIUrl":null,"url":null,"abstract":"The authors relate how independent systems for measuring project progress and resource performance were used in aiding both the client and contractors in planning work force size and scheduling to reduce cost and improve both efficiency and effectiveness. Goaded by comments from the prime contractor, the consultants set about the determine if they could combine the independent systems. To the surprise of everyone, the consultants were able to independently forecast job progress using only the results from the performance measurement system. A math model was developed and statistical analysis was used to validate the results.<<ETX>>","PeriodicalId":22349,"journal":{"name":"Technology Management : the New International Language","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1991-10-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technology Management : the New International Language","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICMET.1991.183631","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The authors relate how independent systems for measuring project progress and resource performance were used in aiding both the client and contractors in planning work force size and scheduling to reduce cost and improve both efficiency and effectiveness. Goaded by comments from the prime contractor, the consultants set about the determine if they could combine the independent systems. To the surprise of everyone, the consultants were able to independently forecast job progress using only the results from the performance measurement system. A math model was developed and statistical analysis was used to validate the results.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
通过工作抽样来衡量项目进度
作者介绍了如何使用独立的系统来衡量项目进度和资源绩效,以帮助客户和承包商规划劳动力规模和时间表,以降低成本,提高效率和效益。在主承包商评论的激励下,顾问们开始决定他们是否可以将独立的系统结合起来。令所有人惊讶的是,顾问们能够仅使用绩效评估系统的结果独立预测工作进度。建立了数学模型,并用统计分析对结果进行了验证
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Defining the modernization capabilities of the small and medium-sized businesses Knowledge building and concurrent engineering in manufacturing automation Measuring project progress by work sampling An empirical investigation of the relationship between science, technology, and total factor productivity growth rate Strategic technology planning-developing roadmaps for competitive advantage
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1