Analisis Produktivitas Waktu Kerja Alat Berat Pada Pembangunan Lanjutan Reklamasi Dan Jalan Kawasan Kayu Merah-Kalumata

M. Sangadji, Edward Rizki Ahadian, M. Darwis
{"title":"Analisis Produktivitas Waktu Kerja Alat Berat Pada Pembangunan Lanjutan Reklamasi Dan Jalan Kawasan Kayu Merah-Kalumata","authors":"M. Sangadji, Edward Rizki Ahadian, M. Darwis","doi":"10.3387/JOSAE.V4I1.3110","DOIUrl":null,"url":null,"abstract":"The development of the construction world has resulted in the increasing need for heavy equipment for each project. Heavy equipment is a vital resource in a construction project. However, the costs required to procure heavy equipment are not cheap. Therefore, the choice of heavy equipment has a big influence on the efficiency and profitability of construction work. Productivity is used as a guide in determining the duration of each job and the number of heavy equipment to be treated. This research was conducted by observing the field to obtain the time needed by each heavy equipment in the reclamation work which then carried out the calculation of productivity. The results of the research are that the trailer/trailer truck has a productivity of 60.614 minutes, the excavator has a productivity of 21 m³/hour, the roller vibrator has a productivity of 155.625 m³/hour, the wheel loader has a productivity of 91.098 m³ hour, the water tanker has a productivity of 14.229 m³/hour, the motor grader has a productivity is 942,880 m²/hour, and the dump truck has a productivity of 26,981 m³/hour, then after analyzing the productivity of heavy equipment the next stage is calculating the time efficiency that occurs in each work item, and the mobilization work takes 17 days or less than the expected time. it has been planned in the contract document that is 28 days, in the usual piling work from the excavation source it will take 247 days or less than the time planned in the contract document which is 287 days.","PeriodicalId":36368,"journal":{"name":"AIUB Journal of Science and Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-05-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AIUB Journal of Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3387/JOSAE.V4I1.3110","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Mathematics","Score":null,"Total":0}
引用次数: 2

Abstract

The development of the construction world has resulted in the increasing need for heavy equipment for each project. Heavy equipment is a vital resource in a construction project. However, the costs required to procure heavy equipment are not cheap. Therefore, the choice of heavy equipment has a big influence on the efficiency and profitability of construction work. Productivity is used as a guide in determining the duration of each job and the number of heavy equipment to be treated. This research was conducted by observing the field to obtain the time needed by each heavy equipment in the reclamation work which then carried out the calculation of productivity. The results of the research are that the trailer/trailer truck has a productivity of 60.614 minutes, the excavator has a productivity of 21 m³/hour, the roller vibrator has a productivity of 155.625 m³/hour, the wheel loader has a productivity of 91.098 m³ hour, the water tanker has a productivity of 14.229 m³/hour, the motor grader has a productivity is 942,880 m²/hour, and the dump truck has a productivity of 26,981 m³/hour, then after analyzing the productivity of heavy equipment the next stage is calculating the time efficiency that occurs in each work item, and the mobilization work takes 17 days or less than the expected time. it has been planned in the contract document that is 28 days, in the usual piling work from the excavation source it will take 247 days or less than the time planned in the contract document which is 287 days.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
分析了后期开垦工程和红卡鲁马塔木道路上的劳动劳动效率
建筑业的发展导致每个项目对重型设备的需求不断增加。重型设备是建设项目的重要资源。然而,购买重型设备所需的费用并不便宜。因此,重型设备的选择对施工工作的效率和盈利能力有很大的影响。生产率被用作确定每项工作的持续时间和需要处理的重型设备数量的指导。本研究通过实地观察,获得各重型设备在复垦工作中所需的时间,然后进行生产率计算。研究结果表明:挂车/挂车的生产率为60.614 min,挖掘机的生产率为21 m³/h,压路机的生产率为155.625 m³/h,轮式装载机的生产率为91.098 m³/h,水车的生产率为14.229 m³/h,汽车刨平机的生产率为942,880 m²/h,自卸车的生产率为26,981 m³/h,然后在分析了重型设备的生产率之后,下一阶段是计算每个工作项目发生的时间效率,动员工作比预期时间需要17天或更短的时间。合同文件中已规划为28天,从开挖源开始正常打桩需要247天或少于合同文件中规划287天的时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
AIUB Journal of Science and Engineering
AIUB Journal of Science and Engineering Mathematics-Mathematics (miscellaneous)
CiteScore
1.00
自引率
0.00%
发文量
3
期刊最新文献
STUDI KARAKTERISTIK ASPAL BUTON DAERAH KABUNGKA KECAMATAN PASARWAJO KABUPATEN BUTON, SULAWESI TENGGARA DITRIBUSI PERGERAKAN PENUMPANG MENGGUNAKAN KAPAL FEERY DENGAN METODE DETROIT DI PROVINSI MALUKU UTARA STUDI INTERPRETASI LAPISAN BAWAH PERMUKAAN TANAH DENGAN METODE GEOLISTRIK DI JALAN LINTAS SUBAIM-BULI KECAMATAN WASILE TIMUR KABUPATEN HALMAHERA TIMUR convoHER2: A Deep Neural Network for Multi-Stage Classification of HER2 Breast Cancer ANALISIS SISTEM PENYARINGAN AIR BERSIH PADA AIR SUMUR WARGA DI KELURAHAN FITU KOTA TERNATE SELATAN
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1