Study on causes of delay and cost overruns in heritage renovation of Bhaktapur

Umesh Sukamani, Hari Mohan Shrestha
{"title":"Study on causes of delay and cost overruns in heritage renovation of Bhaktapur","authors":"Umesh Sukamani, Hari Mohan Shrestha","doi":"10.3126/JSCE.V5I0.22368","DOIUrl":null,"url":null,"abstract":"A fresh and present look at the performance and delivery of heritage projects is required because few studies have been conducted to explore the specific project management and participant issues that contributed failed elements (time and cost) in heritage projects. The major contribution of this research is in the guidance for improvement to help avoid delays and cost overruns in future heritage renovation projects. Bhaktapur municipality is rich in heritage; here the tourism market is one of the source of economy. Bhaktapur municipality has been selected for this study because many of the heritage renovation projects have been completed each year. Most of heritage renovations have been done with the help of users committee and amanat. Tourism has become an important economic factor for the region. So the heritage renovation is studied with the impact of the delay in the works. The research design for this study is more qualitative than quantitative. The main causes of delay have been found as difficulties in financing projects and poor managerial skills. Similarly, the causes of the cost overruns have been found as material cost increased due to inflation.","PeriodicalId":36368,"journal":{"name":"AIUB Journal of Science and Engineering","volume":"109 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AIUB Journal of Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/JSCE.V5I0.22368","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Mathematics","Score":null,"Total":0}
引用次数: 1

Abstract

A fresh and present look at the performance and delivery of heritage projects is required because few studies have been conducted to explore the specific project management and participant issues that contributed failed elements (time and cost) in heritage projects. The major contribution of this research is in the guidance for improvement to help avoid delays and cost overruns in future heritage renovation projects. Bhaktapur municipality is rich in heritage; here the tourism market is one of the source of economy. Bhaktapur municipality has been selected for this study because many of the heritage renovation projects have been completed each year. Most of heritage renovations have been done with the help of users committee and amanat. Tourism has become an important economic factor for the region. So the heritage renovation is studied with the impact of the delay in the works. The research design for this study is more qualitative than quantitative. The main causes of delay have been found as difficulties in financing projects and poor managerial skills. Similarly, the causes of the cost overruns have been found as material cost increased due to inflation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
巴克塔普尔遗产改造工程延误及超支原因研究
由于很少有研究探讨导致文物项目失败因素(时间和成本)的具体项目管理和参与者问题,因此需要对文物项目的表现和交付进行新鲜和现实的审视。本研究的主要贡献在于对未来文物修复项目的改进提供指导,以避免延误和成本超支。巴克塔普尔市拥有丰富的遗产;旅游市场是这里的经济来源之一。巴克塔普尔市之所以被选中进行这项研究,是因为每年都有许多遗产修复项目完成。大部分的文物修复都是在用户委员会和amanat的帮助下完成的。旅游业已成为该地区重要的经济因素。因此,从工程延误的影响出发,对文物修复进行了研究。本研究的研究设计是定性多于定量的。发现拖延的主要原因是项目筹资困难和管理技能差。同样,由于通货膨胀导致材料成本增加,也发现了成本超支的原因。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
AIUB Journal of Science and Engineering
AIUB Journal of Science and Engineering Mathematics-Mathematics (miscellaneous)
CiteScore
1.00
自引率
0.00%
发文量
3
期刊最新文献
STUDI KARAKTERISTIK ASPAL BUTON DAERAH KABUNGKA KECAMATAN PASARWAJO KABUPATEN BUTON, SULAWESI TENGGARA DITRIBUSI PERGERAKAN PENUMPANG MENGGUNAKAN KAPAL FEERY DENGAN METODE DETROIT DI PROVINSI MALUKU UTARA STUDI INTERPRETASI LAPISAN BAWAH PERMUKAAN TANAH DENGAN METODE GEOLISTRIK DI JALAN LINTAS SUBAIM-BULI KECAMATAN WASILE TIMUR KABUPATEN HALMAHERA TIMUR convoHER2: A Deep Neural Network for Multi-Stage Classification of HER2 Breast Cancer ANALISIS SISTEM PENYARINGAN AIR BERSIH PADA AIR SUMUR WARGA DI KELURAHAN FITU KOTA TERNATE SELATAN
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1