{"title":"有模具约束的并联机床调度","authors":"Chen Xianzhang, Wang Chengyao","doi":"10.1109/SICE.1999.788717","DOIUrl":null,"url":null,"abstract":"This paper addresses the problem of scheduling n grouped jobs on m identical parallel machines with objective of minimizing the sum tardiness, subject to the constraints that each model number is only one and has different matching with each machine. A heuristic approach based on list scheduling is presented. Some conditions are presented which can break the sequence of assigning jobs. The results show that it can get a satisfactory solution.","PeriodicalId":103164,"journal":{"name":"SICE '99. Proceedings of the 38th SICE Annual Conference. International Session Papers (IEEE Cat. No.99TH8456)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-07-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Scheduling on the parallel machines with mould constraint\",\"authors\":\"Chen Xianzhang, Wang Chengyao\",\"doi\":\"10.1109/SICE.1999.788717\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper addresses the problem of scheduling n grouped jobs on m identical parallel machines with objective of minimizing the sum tardiness, subject to the constraints that each model number is only one and has different matching with each machine. A heuristic approach based on list scheduling is presented. Some conditions are presented which can break the sequence of assigning jobs. The results show that it can get a satisfactory solution.\",\"PeriodicalId\":103164,\"journal\":{\"name\":\"SICE '99. Proceedings of the 38th SICE Annual Conference. International Session Papers (IEEE Cat. No.99TH8456)\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-07-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SICE '99. Proceedings of the 38th SICE Annual Conference. International Session Papers (IEEE Cat. No.99TH8456)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SICE.1999.788717\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SICE '99. Proceedings of the 38th SICE Annual Conference. International Session Papers (IEEE Cat. No.99TH8456)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SICE.1999.788717","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Scheduling on the parallel machines with mould constraint
This paper addresses the problem of scheduling n grouped jobs on m identical parallel machines with objective of minimizing the sum tardiness, subject to the constraints that each model number is only one and has different matching with each machine. A heuristic approach based on list scheduling is presented. Some conditions are presented which can break the sequence of assigning jobs. The results show that it can get a satisfactory solution.