B. Anthouard, Valeria Borodin, Quentin Christ, S. Dauzére-Pérés, Renaud Roussel
{"title":"基于仿真的半导体制造中时间约束隧道运营管理方法*主题:IE:工业工程","authors":"B. Anthouard, Valeria Borodin, Quentin Christ, S. Dauzére-Pérés, Renaud Roussel","doi":"10.1109/asmc54647.2022.9792488","DOIUrl":null,"url":null,"abstract":"Semiconductor manufacturing processes include more and more (queue) time constraints, often spanning multiple operations, which impact both production efficiency and quality. This paper presents a discrete-event simulation-based approach to support operators who manage lots under time constraints in a high-mix manufacturing environment. After motivating and stating the problem of managing time constraints, the main characteristics and capabilities of the proposed approach are presented. The approach is then validated with respect to the ground truth. Computational experiments conducted on industrial instances are discussed before providing conclusions and perspectives.","PeriodicalId":436890,"journal":{"name":"2022 33rd Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Simulation-Based Approach for Operational Management of Time Constraint Tunnels in Semiconductor Manufacturing : *Topic: IE: Industrial Engineering\",\"authors\":\"B. Anthouard, Valeria Borodin, Quentin Christ, S. Dauzére-Pérés, Renaud Roussel\",\"doi\":\"10.1109/asmc54647.2022.9792488\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Semiconductor manufacturing processes include more and more (queue) time constraints, often spanning multiple operations, which impact both production efficiency and quality. This paper presents a discrete-event simulation-based approach to support operators who manage lots under time constraints in a high-mix manufacturing environment. After motivating and stating the problem of managing time constraints, the main characteristics and capabilities of the proposed approach are presented. The approach is then validated with respect to the ground truth. Computational experiments conducted on industrial instances are discussed before providing conclusions and perspectives.\",\"PeriodicalId\":436890,\"journal\":{\"name\":\"2022 33rd Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)\",\"volume\":\"78 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 33rd Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/asmc54647.2022.9792488\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 33rd Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/asmc54647.2022.9792488","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Simulation-Based Approach for Operational Management of Time Constraint Tunnels in Semiconductor Manufacturing : *Topic: IE: Industrial Engineering
Semiconductor manufacturing processes include more and more (queue) time constraints, often spanning multiple operations, which impact both production efficiency and quality. This paper presents a discrete-event simulation-based approach to support operators who manage lots under time constraints in a high-mix manufacturing environment. After motivating and stating the problem of managing time constraints, the main characteristics and capabilities of the proposed approach are presented. The approach is then validated with respect to the ground truth. Computational experiments conducted on industrial instances are discussed before providing conclusions and perspectives.