On reducing test time and meeting deadlines in real-time systems

T. R. Sarnaik, Arun Kumar Somani
{"title":"On reducing test time and meeting deadlines in real-time systems","authors":"T. R. Sarnaik, Arun Kumar Somani","doi":"10.1109/ATS.1992.224416","DOIUrl":null,"url":null,"abstract":"The authors investigate methods for reducing the time to test the suspected faulty units in a real-time system. They provide a clue to the tester about possible faulty locations within each unit. Hence only a fraction of the resources within a unit need to be tested. This is accomplished by keeping track of the resources used, called the hardware utilization vector (HUV), when a program is executing. The authors demonstrate the average reduction in test time of cache and memory subsystems and improvement in meeting deadlines under the presence of faults.<<ETX>>","PeriodicalId":208029,"journal":{"name":"Proceedings First Asian Test Symposium (ATS `92)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings First Asian Test Symposium (ATS `92)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ATS.1992.224416","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The authors investigate methods for reducing the time to test the suspected faulty units in a real-time system. They provide a clue to the tester about possible faulty locations within each unit. Hence only a fraction of the resources within a unit need to be tested. This is accomplished by keeping track of the resources used, called the hardware utilization vector (HUV), when a program is executing. The authors demonstrate the average reduction in test time of cache and memory subsystems and improvement in meeting deadlines under the presence of faults.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在实时系统中减少测试时间和满足截止日期
作者研究了在实时系统中减少疑似故障单元测试时间的方法。它们为测试人员提供了关于每个单元中可能出现故障的位置的线索。因此,一个单元中只有一小部分资源需要测试。这是通过在程序执行时跟踪所使用的资源(称为硬件利用矢量(HUV))来实现的。作者证明了在存在故障的情况下,缓存和内存子系统的测试时间平均减少,并且在满足截止日期方面有所提高。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Localization and aftereffect of automatic test generation A practical approach for the diagnosis of a MIMD network A complement-based fast algorithm to generate universal test sets for combinational function blocks A control constrained test scheduling approach for VLSI circuits Techniques for reducing hardware requirement of self checking combinational circuits
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1