Darren Aaberge, K. Mockler, Dieu Van Dinh, R. Belleau, Tim Donovan, R. Hewlitt
{"title":"通过新的自动测试设备功能,满足1 Gbps并行RapidIO/spl reg/接口的测试挑战","authors":"Darren Aaberge, K. Mockler, Dieu Van Dinh, R. Belleau, Tim Donovan, R. Hewlitt","doi":"10.1109/VTS.2005.55","DOIUrl":null,"url":null,"abstract":"This paper describes an approach to testing the 1 Gbps Parallel RapidIO/spl reg/ interface specifications. The unique test requirements for this bus require the application of new test techniques as well as new ATE capabilities. ATE performance attributes important for parallel source-synchronous buses will be identified and presented with methods to measure these attributes.","PeriodicalId":268324,"journal":{"name":"23rd IEEE VLSI Test Symposium (VTS'05)","volume":"210 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Meeting the test challenges of the 1 Gbps parallel RapidIO/spl reg/ interface with new automatic test equipment capabilities\",\"authors\":\"Darren Aaberge, K. Mockler, Dieu Van Dinh, R. Belleau, Tim Donovan, R. Hewlitt\",\"doi\":\"10.1109/VTS.2005.55\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes an approach to testing the 1 Gbps Parallel RapidIO/spl reg/ interface specifications. The unique test requirements for this bus require the application of new test techniques as well as new ATE capabilities. ATE performance attributes important for parallel source-synchronous buses will be identified and presented with methods to measure these attributes.\",\"PeriodicalId\":268324,\"journal\":{\"name\":\"23rd IEEE VLSI Test Symposium (VTS'05)\",\"volume\":\"210 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"23rd IEEE VLSI Test Symposium (VTS'05)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/VTS.2005.55\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"23rd IEEE VLSI Test Symposium (VTS'05)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/VTS.2005.55","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Meeting the test challenges of the 1 Gbps parallel RapidIO/spl reg/ interface with new automatic test equipment capabilities
This paper describes an approach to testing the 1 Gbps Parallel RapidIO/spl reg/ interface specifications. The unique test requirements for this bus require the application of new test techniques as well as new ATE capabilities. ATE performance attributes important for parallel source-synchronous buses will be identified and presented with methods to measure these attributes.