低迷经济下半导体工厂维护挑战与BKM

T. Massie
{"title":"低迷经济下半导体工厂维护挑战与BKM","authors":"T. Massie","doi":"10.1109/ASMC.2002.1001609","DOIUrl":null,"url":null,"abstract":"The challenge of staying competitive in the current business environment towards opportunities requires creativity and new extreme thinking. Teamwork and taking risks are imperative to success. Our Novellus equipment maintenance team in the IBM Microelectronics Division Burlington is continually finding creative methodologies over and above the Best Known Methods (BKM) to drive towards better business decisions that translate directly into productivity improvements. Whereas Mean Time to Repair (MTR) could go up due to increased in-house solutions, every effort is driven towards maintaining the equipment availability at target. In this presentation, I will discuss the methodologies the maintenance team deployed to stay at productivity target and yet manage the cost of ownership at reduced spending. Primarily, I will show hardware and software examples that the team saw to be opportunities for improvement.","PeriodicalId":64779,"journal":{"name":"半导体技术","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2002-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Semiconductor fab maintenance challenge and BKM in downturn economy\",\"authors\":\"T. Massie\",\"doi\":\"10.1109/ASMC.2002.1001609\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The challenge of staying competitive in the current business environment towards opportunities requires creativity and new extreme thinking. Teamwork and taking risks are imperative to success. Our Novellus equipment maintenance team in the IBM Microelectronics Division Burlington is continually finding creative methodologies over and above the Best Known Methods (BKM) to drive towards better business decisions that translate directly into productivity improvements. Whereas Mean Time to Repair (MTR) could go up due to increased in-house solutions, every effort is driven towards maintaining the equipment availability at target. In this presentation, I will discuss the methodologies the maintenance team deployed to stay at productivity target and yet manage the cost of ownership at reduced spending. Primarily, I will show hardware and software examples that the team saw to be opportunities for improvement.\",\"PeriodicalId\":64779,\"journal\":{\"name\":\"半导体技术\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"半导体技术\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.1109/ASMC.2002.1001609\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"半导体技术","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/ASMC.2002.1001609","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在当前的商业环境中保持竞争力的挑战需要创造力和新的极端思维。团队合作和冒险是成功的必要条件。我们在IBM伯灵顿微电子部门的Novellus设备维护团队不断寻找超越最佳已知方法(BKM)的创造性方法,以推动更好的业务决策,从而直接转化为生产力的提高。虽然由于内部解决方案的增加,平均维修时间(MTR)可能会增加,但所有努力都是为了保持设备的可用性。在本演讲中,我将讨论维护团队部署的方法,以保持生产力目标,并在减少支出的情况下管理拥有成本。首先,我将展示团队认为是改进机会的硬件和软件示例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Semiconductor fab maintenance challenge and BKM in downturn economy
The challenge of staying competitive in the current business environment towards opportunities requires creativity and new extreme thinking. Teamwork and taking risks are imperative to success. Our Novellus equipment maintenance team in the IBM Microelectronics Division Burlington is continually finding creative methodologies over and above the Best Known Methods (BKM) to drive towards better business decisions that translate directly into productivity improvements. Whereas Mean Time to Repair (MTR) could go up due to increased in-house solutions, every effort is driven towards maintaining the equipment availability at target. In this presentation, I will discuss the methodologies the maintenance team deployed to stay at productivity target and yet manage the cost of ownership at reduced spending. Primarily, I will show hardware and software examples that the team saw to be opportunities for improvement.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
8436
期刊最新文献
A manufacturable shallow trench isolation process for sub-0.2 um DRAM technologies Ultra-dilute silicon wafer clean chemistry for fabrication of RF microwave devices Planarization yield limiters for wafer-scale 3D ICs Statistical modeling and analysis of wafer test fail counts An approach for improving yield with intentional defects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1