放置成本函数之间的相互作用

M. Sarrafzadeh, Maogang Wang
{"title":"放置成本函数之间的相互作用","authors":"M. Sarrafzadeh, Maogang Wang","doi":"10.1109/ICVC.1999.820812","DOIUrl":null,"url":null,"abstract":"In this paper, we focus on the physical design problems and their interaction with higher- and lower-levels. We propose to study the interaction between various cost functions in placement. In particular, we will consider, net-cut, wire-length, congestion, and timing. We show that minimizing wire-length may (and in general, will) create locally congested regions. We demonstrate that most other congestion related objectives are ill behaved and they should only be used in a post processing step. Using a post processing stage is found to be more effective than optimizing the congestion in one step. For the relationship between wire-length and net-cut, we demonstrate that they are correlated differently in different hierarchical levels.","PeriodicalId":13415,"journal":{"name":"ICVC '99. 6th International Conference on VLSI and CAD (Cat. No.99EX361)","volume":"1 1","pages":"32-36"},"PeriodicalIF":0.0000,"publicationDate":"1999-10-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Interaction among cost functions in placement\",\"authors\":\"M. Sarrafzadeh, Maogang Wang\",\"doi\":\"10.1109/ICVC.1999.820812\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we focus on the physical design problems and their interaction with higher- and lower-levels. We propose to study the interaction between various cost functions in placement. In particular, we will consider, net-cut, wire-length, congestion, and timing. We show that minimizing wire-length may (and in general, will) create locally congested regions. We demonstrate that most other congestion related objectives are ill behaved and they should only be used in a post processing step. Using a post processing stage is found to be more effective than optimizing the congestion in one step. For the relationship between wire-length and net-cut, we demonstrate that they are correlated differently in different hierarchical levels.\",\"PeriodicalId\":13415,\"journal\":{\"name\":\"ICVC '99. 6th International Conference on VLSI and CAD (Cat. No.99EX361)\",\"volume\":\"1 1\",\"pages\":\"32-36\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-10-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ICVC '99. 6th International Conference on VLSI and CAD (Cat. No.99EX361)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICVC.1999.820812\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ICVC '99. 6th International Conference on VLSI and CAD (Cat. No.99EX361)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICVC.1999.820812","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

在本文中,我们重点讨论了物理设计问题及其与高层和低层的相互作用。我们建议研究放置中各种成本函数之间的相互作用。特别是,我们将考虑网切、线长、拥塞和定时。我们表明,最小化线路长度可能(并且通常会)造成局部拥堵区域。我们证明了大多数其他与拥塞相关的目标行为不佳,它们应该只在后处理步骤中使用。使用后处理阶段被发现比在一步优化拥塞更有效。对于线长与网切之间的关系,我们证明了它们在不同层次上的相关性是不同的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Interaction among cost functions in placement
In this paper, we focus on the physical design problems and their interaction with higher- and lower-levels. We propose to study the interaction between various cost functions in placement. In particular, we will consider, net-cut, wire-length, congestion, and timing. We show that minimizing wire-length may (and in general, will) create locally congested regions. We demonstrate that most other congestion related objectives are ill behaved and they should only be used in a post processing step. Using a post processing stage is found to be more effective than optimizing the congestion in one step. For the relationship between wire-length and net-cut, we demonstrate that they are correlated differently in different hierarchical levels.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Plasma induced charging damage on thin gate oxide A 1.25-GBaud CMOS transceiver with on-chip terminator and voltage mode driver for Gigabit Ethernet 1000Base-X A sense amplifier-based CMOS flip-flop with an enhanced output transition time for high-performance microprocessors Comparison of the characteristics of tunneling oxide and tunneling ON for p-channel nano-crystal memory Double precharge TSPC for high-speed dual-modulus prescaler
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1