The electricity crises of California, Brazil and Chile: lessons to the Chilean market 加州、巴西和智利的电力危机:给智利市场的教训
D. Watts, R. Ariztía
Many countries have deregulated their electricity markets, boosting competition and participation of private enterprises in generation. The recent electricity crises of Chile, California and Brazil, and the problems that other countries have faced, have interrupted the development of these reforms. In this paper the fundamentals of each market are analyzed, as well as each deregulated legislation. The authors also studied the crises, and the influence on them of each legislation. They found that besides circumstantial situations in each case, there are common aspects in the three crises. In all of them they found that the price signals in shortage situations were wrong, and that the performance of the regulators was deficient. They conclude that a deregulated electricity market will not work properly in a scarcity situation if consumers are isolated from the real cost of energy, and if it does not have independent regulators, that are not influenced by short-term political interests. Finally, based on the study, they propose improvements to the Chilean electricity legislation.
许多国家放松了对电力市场的管制,促进了私营企业在发电领域的竞争和参与。最近智利、加利福尼亚和巴西的电力危机,以及其他国家所面临的问题,已经中断了这些改革的发展。本文分析了每个市场的基本原理,以及每个放松管制的立法。作者还研究了危机,以及每项立法对危机的影响。他们发现,除了各自的具体情况外,三次危机还有一些共同之处。在所有这些案例中,他们都发现短缺情况下的价格信号是错误的,监管机构的表现是有缺陷的。他们得出的结论是,如果消费者与能源的实际成本隔绝,如果没有不受短期政治利益影响的独立监管机构,那么放松管制的电力市场将无法在短缺的情况下正常运作。最后,在研究的基础上,他们提出了改进智利电力立法的建议。
{"title":"The electricity crises of California, Brazil and Chile: lessons to the Chilean market","authors":"D. Watts, R. Ariztía","doi":"10.1109/LESCPE.2002.1020659","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020659","url":null,"abstract":"Many countries have deregulated their electricity markets, boosting competition and participation of private enterprises in generation. The recent electricity crises of Chile, California and Brazil, and the problems that other countries have faced, have interrupted the development of these reforms. In this paper the fundamentals of each market are analyzed, as well as each deregulated legislation. The authors also studied the crises, and the influence on them of each legislation. They found that besides circumstantial situations in each case, there are common aspects in the three crises. In all of them they found that the price signals in shortage situations were wrong, and that the performance of the regulators was deficient. They conclude that a deregulated electricity market will not work properly in a scarcity situation if consumers are isolated from the real cost of energy, and if it does not have independent regulators, that are not influenced by short-term political interests. Finally, based on the study, they propose improvements to the Chilean electricity legislation.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117053045","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 21
A new tabu search algorithm for the long-term hydro scheduling problem 长期调度问题的一种新的禁忌搜索算法
A. Mantawy, S. Soliman, M. El-Hawary
A new efficient algorithm to solve the long-term hydro scheduling problem (LTHSP) is presented in this paper. The algorithm is based on using the short-term memory of the tabu search (TS) approach to solve the nonlinear optimization problem in continuous variables of the LTHSP. The paper introduces new rules for generating feasible solutions with an adaptive step vector adjustment. Moreover an approximated tabu list for the continuous variables has been designed. The proposed implementation contributes to the enhancement of speed and convergence of the original tabu search algorithm (TSA). A significant reduction in the objective function over previous classical optimization methods and a simulated annealing algorithm has been achieved. Moreover the proposed TS requires less iterations to converge than simulated annealing. The proposed algorithm has been applied successfully to solve a system with four series cascaded reservoirs. Numerical results show an improvement in the solution compared to previously obtained results.
本文提出了一种新的求解长期水电调度问题的高效算法。该算法利用禁忌搜索(TS)方法的短时记忆来解决LTHSP的连续变量非线性优化问题。本文引入了一种新的自适应阶跃矢量平差生成可行解的规则。此外,还设计了连续变量的近似禁忌表。提出的实现有助于提高原禁忌搜索算法(TSA)的速度和收敛性。与以往的经典优化方法和模拟退火算法相比,实现了目标函数的显著减小。此外,与模拟退火相比,所提出的TS需要更少的迭代来收敛。该算法已成功地应用于一个具有四个串联级联油藏的系统。数值结果表明,与先前得到的结果相比,该解有了改进。
{"title":"A new tabu search algorithm for the long-term hydro scheduling problem","authors":"A. Mantawy, S. Soliman, M. El-Hawary","doi":"10.1109/LESCPE.2002.1020663","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020663","url":null,"abstract":"A new efficient algorithm to solve the long-term hydro scheduling problem (LTHSP) is presented in this paper. The algorithm is based on using the short-term memory of the tabu search (TS) approach to solve the nonlinear optimization problem in continuous variables of the LTHSP. The paper introduces new rules for generating feasible solutions with an adaptive step vector adjustment. Moreover an approximated tabu list for the continuous variables has been designed. The proposed implementation contributes to the enhancement of speed and convergence of the original tabu search algorithm (TSA). A significant reduction in the objective function over previous classical optimization methods and a simulated annealing algorithm has been achieved. Moreover the proposed TS requires less iterations to converge than simulated annealing. The proposed algorithm has been applied successfully to solve a system with four series cascaded reservoirs. Numerical results show an improvement in the solution compared to previously obtained results.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"120900058","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 51
Improved branch-based voltage stability proximity indices. Part I: Theoretical background 改进了基于支路的电压稳定接近指标。第一部分:理论背景
A.S. Quintela, C. Castro
In this paper improved branch-based voltage stability proximity indices are proposed. Their computation does not require the use of equivalents nor matrix handling, being straightforward and fast. They can be a very useful tool for power systems operators and planners both to evaluate systems operating conditions, and to determine system reinforcement actions. Also, the indices can be used to compare different operating situations as far as voltage stability is concerned.
本文提出了一种改进的基于支路的电压稳定接近指标。它们的计算不需要使用等价物或矩阵处理,简单快捷。对于电力系统操作员和规划者来说,它们是一个非常有用的工具,可以评估系统运行状况,并确定系统加固行动。此外,就电压稳定性而言,这些指标可用于比较不同的操作情况。
{"title":"Improved branch-based voltage stability proximity indices. Part I: Theoretical background","authors":"A.S. Quintela, C. Castro","doi":"10.1109/LESCPE.2002.1020675","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020675","url":null,"abstract":"In this paper improved branch-based voltage stability proximity indices are proposed. Their computation does not require the use of equivalents nor matrix handling, being straightforward and fast. They can be a very useful tool for power systems operators and planners both to evaluate systems operating conditions, and to determine system reinforcement actions. Also, the indices can be used to compare different operating situations as far as voltage stability is concerned.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"195 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132757198","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
A Monte Carlo technique for the evaluation of voltage sags in series capacitor compensated radial distribution systems 用蒙特卡罗技术评估串联电容补偿径向配电系统电压跌落
S. Faried, S. Aboreshaid
Voltage sags, also known as dips, are important to industrial reliability. This paper presents a Monte Carlo based approach to evaluate the maximum voltage sag magnitudes in series capacitor compensated radial distribution systems. In this context, investigations have been conducted on a sample distribution system model taking into consideration the uncertainty of several factors associated with the practical operation of a power system. The Power System Blockset of MATLAB is used in the simulation studies.
电压跌落,也称为电压跌落,对工业可靠性非常重要。本文提出了一种基于蒙特卡罗的方法来评估串联电容补偿的径向配电系统的最大电压跌落幅度。在此背景下,考虑到与电力系统实际运行相关的几个因素的不确定性,对一个样本配电系统模型进行了研究。仿真研究采用了MATLAB中的电力系统块集。
{"title":"A Monte Carlo technique for the evaluation of voltage sags in series capacitor compensated radial distribution systems","authors":"S. Faried, S. Aboreshaid","doi":"10.1109/LESCPE.2002.1020665","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020665","url":null,"abstract":"Voltage sags, also known as dips, are important to industrial reliability. This paper presents a Monte Carlo based approach to evaluate the maximum voltage sag magnitudes in series capacitor compensated radial distribution systems. In this context, investigations have been conducted on a sample distribution system model taking into consideration the uncertainty of several factors associated with the practical operation of a power system. The Power System Blockset of MATLAB is used in the simulation studies.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"44 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115731437","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
FERC Order 2000
H. Yamin, K. Al-Tallaq, S. M. Shahidehpour
This paper discusses FERC order 2000 and the necessity for the formulation of the Regional Transmission Organizations (RTOs). The advantages, problems and implications of RTOs are discussed. RTOs are beneficial in terms of market operation as well as system operation. No doubt that RTOs will affect some participants' interests. However, with so many benefits to the participants and to the system reliability, voluntarism should not be over emphasized and RTOs should be implemented in a more active way.
本文讨论了FERC 2000号令以及建立区域输电组织的必要性。讨论了rto的优点、存在的问题和意义。rto不仅有利于市场运作,也有利于系统运作。毫无疑问,rto会影响一些参与者的利益。然而,考虑到参与者和系统可靠性的诸多好处,不应过分强调自愿性,而应以更积极的方式实施rto。
{"title":"FERC Order 2000","authors":"H. Yamin, K. Al-Tallaq, S. M. Shahidehpour","doi":"10.1109/LESCPE.2002.1020660","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020660","url":null,"abstract":"This paper discusses FERC order 2000 and the necessity for the formulation of the Regional Transmission Organizations (RTOs). The advantages, problems and implications of RTOs are discussed. RTOs are beneficial in terms of market operation as well as system operation. No doubt that RTOs will affect some participants' interests. However, with so many benefits to the participants and to the system reliability, voluntarism should not be over emphasized and RTOs should be implemented in a more active way.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"2010 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128918517","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
State of the art in optimal capacitor allocation for reactive power compensation in distribution feeders 配电网无功补偿电容器优化配置的研究现状
S. F. Mekhamer, Mohamed E. El-Hawary, Mohamed Magdy F. Mansour, M. A. Moustafa, S. A. Soliman
The application of capacitors in electric power systems is intended for the control of power flow, improvement of stability, voltage profile management, power factor correction, and loss minimization. This paper presents a review of different solution methods found in the literature and is intended as a guide for those interested in the problem or intending to do additional research in the area. The assumptions made and brief descriptions of the solution methods are presented.
电容器在电力系统中的应用是为了控制潮流,提高稳定性,电压分布管理,功率因数校正和最小化损耗。本文介绍了在文献中发现的不同解决方法的回顾,旨在为那些对该问题感兴趣或打算在该领域进行额外研究的人提供指南。提出了假设并简要说明了求解方法。
{"title":"State of the art in optimal capacitor allocation for reactive power compensation in distribution feeders","authors":"S. F. Mekhamer, Mohamed E. El-Hawary, Mohamed Magdy F. Mansour, M. A. Moustafa, S. A. Soliman","doi":"10.1109/LESCPE.2002.1020668","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020668","url":null,"abstract":"The application of capacitors in electric power systems is intended for the control of power flow, improvement of stability, voltage profile management, power factor correction, and loss minimization. This paper presents a review of different solution methods found in the literature and is intended as a guide for those interested in the problem or intending to do additional research in the area. The assumptions made and brief descriptions of the solution methods are presented.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"35 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114784407","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 37
PSO-based neural network for dynamic bandwidth re-allocation [power system communication] 基于pso的动态带宽再分配神经网络[电力系统通信]
A. Elgallad, M. El-Hawary, W. Phillips, A. Sallam
A high-speed network needs to assign a fixed bandwidth for each connection some where between its mean and peak rates. Most of the time this assigned bandwidth will not handle all the traffic received and creates traffic loss. This paper introduces a new algorithm to avoid network congestion. The algorithm mainly considers online measurements of the relative contents of each buffer in the network. An adaptive bandwidth reallocation is simply done by recalling an evolved neural network. A particle swarm optimizer (PSO) is used to adjust both weights matrix and the number of nodes for the hidden layer providing that input and output layers are fixed at one node (ratio of relative contents and bandwidth proportion respectively). The results are compared with static bandwidth allocation in terms of number of traffic drop.
高速网络需要在平均速率和峰值速率之间为每个连接分配固定带宽。大多数情况下,分配的带宽不能处理接收到的所有流量,并造成流量丢失。本文介绍了一种避免网络拥塞的新算法。该算法主要考虑在线测量网络中每个缓冲区的相对内容。一个自适应的带宽重新分配是简单地通过调用一个进化的神经网络来完成的。在输入层和输出层固定在一个节点(相对内容比和带宽比)的情况下,使用粒子群优化器(PSO)对隐藏层的权重矩阵和节点数进行调整。将结果与静态带宽分配进行了流量下降次数的比较。
{"title":"PSO-based neural network for dynamic bandwidth re-allocation [power system communication]","authors":"A. Elgallad, M. El-Hawary, W. Phillips, A. Sallam","doi":"10.1109/LESCPE.2002.1020673","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020673","url":null,"abstract":"A high-speed network needs to assign a fixed bandwidth for each connection some where between its mean and peak rates. Most of the time this assigned bandwidth will not handle all the traffic received and creates traffic loss. This paper introduces a new algorithm to avoid network congestion. The algorithm mainly considers online measurements of the relative contents of each buffer in the network. An adaptive bandwidth reallocation is simply done by recalling an evolved neural network. A particle swarm optimizer (PSO) is used to adjust both weights matrix and the number of nodes for the hidden layer providing that input and output layers are fixed at one node (ratio of relative contents and bandwidth proportion respectively). The results are compared with static bandwidth allocation in terms of number of traffic drop.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114526425","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
Five level diode clamped voltage source inverter and its application in reactive power compensation 五电平二极管箝位电压源逆变器及其在无功补偿中的应用
S. Kincic, A. Chandra, S. Babic
This paper deals with multilevel diode clamped voltage source inverter applied as STATCOM. The authors use "offline" optimization of switching angles together with fundamental frequency modulation switching strategy (FFM). They show that reactive power compensation is achieved by controlling the exchange of active power between the DC side of the inverter and the AC system. Moreover, they show that it is not possible to achieve the proper compensation during unbalanced conditions of the system while an FFM switching strategy is used together with "offline" optimization of switching angles. Simulation and experimental results are presented.
本文研究了多电平二极管箝位电压源逆变器在STATCOM中的应用。作者将开关角度的“离线”优化与基频调制开关策略(FFM)结合使用。他们表明,无功补偿是通过控制逆变器直流侧与交流系统之间的有功功率交换来实现的。此外,他们还表明,当FFM切换策略与切换角度的“离线”优化一起使用时,不可能在系统不平衡状态下实现适当的补偿。给出了仿真和实验结果。
{"title":"Five level diode clamped voltage source inverter and its application in reactive power compensation","authors":"S. Kincic, A. Chandra, S. Babic","doi":"10.1109/LESCPE.2002.1020671","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020671","url":null,"abstract":"This paper deals with multilevel diode clamped voltage source inverter applied as STATCOM. The authors use \"offline\" optimization of switching angles together with fundamental frequency modulation switching strategy (FFM). They show that reactive power compensation is achieved by controlling the exchange of active power between the DC side of the inverter and the AC system. Moreover, they show that it is not possible to achieve the proper compensation during unbalanced conditions of the system while an FFM switching strategy is used together with \"offline\" optimization of switching angles. Simulation and experimental results are presented.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116670243","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 21
Fuzzy expert system using load shedding for voltage instability control 模糊专家系统在电压不稳定控制中的应用
A. Sallam, A.M. Khafaga
Application of a fuzzy expert system to the power system gives a common goal in the management of power systems specially for managing the system against voltage instability. Attempts are made in this paper to control voltage instability by load shedding using a fuzzy technique as a fuzzy controller. The fuzzy logic and fuzzy set theory are applied to the problem formulated in the study system. The results of applying the proposed technique to the test system verifies its robustness and feasibility to calculate the optimum and minimum ratio of load shedding as a control to depress the voltage instability problem.
将模糊专家系统应用到电力系统中,为电力系统管理提供了一个共同的目标,特别是对电压不稳定的管理。本文尝试用模糊技术作为模糊控制器,通过减载来控制电压不稳定。将模糊逻辑和模糊集合理论应用于研究系统中制定的问题。将该技术应用于测试系统,验证了其鲁棒性和可行性,可以计算出最优和最小减载比作为抑制电压不稳定问题的控制。
{"title":"Fuzzy expert system using load shedding for voltage instability control","authors":"A. Sallam, A.M. Khafaga","doi":"10.1109/LESCPE.2002.1020678","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020678","url":null,"abstract":"Application of a fuzzy expert system to the power system gives a common goal in the management of power systems specially for managing the system against voltage instability. Attempts are made in this paper to control voltage instability by load shedding using a fuzzy technique as a fuzzy controller. The fuzzy logic and fuzzy set theory are applied to the problem formulated in the study system. The results of applying the proposed technique to the test system verifies its robustness and feasibility to calculate the optimum and minimum ratio of load shedding as a control to depress the voltage instability problem.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"96 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123021452","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 30
Unit commitment using the ant colony search algorithm 单位承诺使用蚁群搜索算法
N. Sisworahardjo, A. El-Keib
The paper presents an ant colony search algorithm (ACSA)-based approach to solve the unit commitment (UC) problem. This ACSA algorithm is a relatively new meta-heuristic for solving hard combinatorial optimization problems. It is a population-based approach that uses exploitation of positive feedback, distributed computation as well as a constructive greedy heuristic. Positive feedback is for fast discovery of good solutions, distributed computation avoids early convergence, and the greedy heuristic helps find adequate solutions in the early stages of the search process. The ACSA was inspired from natural behavior of the ant colonies on how they find the food source and bring them back to their nest by building the unique trail formation. The UC problem solved using the proposed approach is subject to real power balance, real power operating limits of generating units, spinning reserve, start up cost, and minimum up and down time constraints. The proposed approach determines the search space of multi-stage scheduling followed by considering the unit transition related constraints during the process of state transition. The paper describes the proposed approach and presents test results on a 10-unit test system that demonstrates its effectiveness in solving the UC problem.
提出了一种基于蚁群搜索算法(ACSA)的机组承诺问题求解方法。ACSA算法是一种较新的求解组合优化问题的元启发式算法。这是一种基于人口的方法,利用了正反馈、分布式计算以及建设性的贪婪启发式。正反馈是为了快速发现好的解决方案,分布式计算避免了早期收敛,贪婪启发式有助于在搜索过程的早期阶段找到适当的解决方案。ACSA的灵感来自蚁群的自然行为,它们如何通过建立独特的步道来寻找食物来源并将它们带回巢穴。采用该方法解决的UC问题受实际功率平衡、发电机组实际功率运行限制、旋转储备、启动成本和最小上下时间约束。该方法确定了多阶段调度的搜索空间,并考虑了状态转移过程中与单元转移相关的约束。本文介绍了该方法,并给出了一个10单元测试系统的测试结果,证明了该方法在解决UC问题方面的有效性。
{"title":"Unit commitment using the ant colony search algorithm","authors":"N. Sisworahardjo, A. El-Keib","doi":"10.1109/LESCPE.2002.1020658","DOIUrl":"https://doi.org/10.1109/LESCPE.2002.1020658","url":null,"abstract":"The paper presents an ant colony search algorithm (ACSA)-based approach to solve the unit commitment (UC) problem. This ACSA algorithm is a relatively new meta-heuristic for solving hard combinatorial optimization problems. It is a population-based approach that uses exploitation of positive feedback, distributed computation as well as a constructive greedy heuristic. Positive feedback is for fast discovery of good solutions, distributed computation avoids early convergence, and the greedy heuristic helps find adequate solutions in the early stages of the search process. The ACSA was inspired from natural behavior of the ant colonies on how they find the food source and bring them back to their nest by building the unique trail formation. The UC problem solved using the proposed approach is subject to real power balance, real power operating limits of generating units, spinning reserve, start up cost, and minimum up and down time constraints. The proposed approach determines the search space of multi-stage scheduling followed by considering the unit transition related constraints during the process of state transition. The paper describes the proposed approach and presents test results on a 10-unit test system that demonstrates its effectiveness in solving the UC problem.","PeriodicalId":127699,"journal":{"name":"LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings","volume":"96 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122538991","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 90
期刊
LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1