In this era of Industry 4.0, technology is advancing rapidly, and various applications are emerging to help traders optimize their product procurement. One such application is the forecasting or prediction system. Serba Serbi Online Shop Tanjungpinang is a shop that requires this system to manage its inventory successfully. As the shop offers a wide variety of goods, managing inventory has become challenging. The capital spent on inventory has increased, and unsold goods are piling up in the warehouse. To overcome this issue, the shop needs to calculate the amount of inventory required to reduce the stock build-up in the warehouse. The prediction method used for this purpose is the least square method. This method uses periodic or time-series data, which requires past sales data to predict future sales. Historical sales data is necessary to develop an inventory prediction system. The sales data for a single item from July 2022 to May 2023 was analyzed using the Least Square method. Based on this analysis, the predicted sales for June is 144.64, rounded to 145. The accuracy of the prediction results were tested, and the best accuracy was obtained from the prediction using 3 months of data, with an error rate of 5.47%. The prediction with the highest error rate was obtained from using 9 months of data, with an error rate of 10.65%. On average, the prediction accuracy is 0.02154%, which is considered very good.
{"title":"INVENTORY PREDICTION SYSTEM USING THE LEAST SQUARE METHOD AT THE SERBA SERBI ONLINE SHOP TANJUNGPINANG","authors":"Hendi Setiawan, Nanny Raras Setyoningrum, Danandjaya Saputra, Merry Merry","doi":"10.59562/metrik.v21i1.1284","DOIUrl":"https://doi.org/10.59562/metrik.v21i1.1284","url":null,"abstract":"In this era of Industry 4.0, technology is advancing rapidly, and various applications are emerging to help traders optimize their product procurement. One such application is the forecasting or prediction system. Serba Serbi Online Shop Tanjungpinang is a shop that requires this system to manage its inventory successfully. As the shop offers a wide variety of goods, managing inventory has become challenging. The capital spent on inventory has increased, and unsold goods are piling up in the warehouse. To overcome this issue, the shop needs to calculate the amount of inventory required to reduce the stock build-up in the warehouse. The prediction method used for this purpose is the least square method. This method uses periodic or time-series data, which requires past sales data to predict future sales. Historical sales data is necessary to develop an inventory prediction system. The sales data for a single item from July 2022 to May 2023 was analyzed using the Least Square method. Based on this analysis, the predicted sales for June is 144.64, rounded to 145. The accuracy of the prediction results were tested, and the best accuracy was obtained from the prediction using 3 months of data, with an error rate of 5.47%. The prediction with the highest error rate was obtained from using 9 months of data, with an error rate of 10.65%. On average, the prediction accuracy is 0.02154%, which is considered very good.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"36 8","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139528457","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2024-01-10DOI: 10.59562/metrik.v21i1.657
Umar Muhammad, Irvawansyah, Dirham Muhammad
Weather conditions are important to know because they have an impact on various human activities, such as agriculture, infrastructure, hydrology, and more. Several factors affect the weather, including wind speed, temperature, and air humidity. However, in this study, a mini weather station was designed to provide information not only on wind speed, temperature, and humidity but also on solar radiation. The research employed several sensors, including the DHT11, anemometer, and pyranometer. The research results indicate that the DHT11 error indoors is 1.4%, but it increases to 9% outdoors. The pyranometer shows a 3.62% error from direct solar radiation measurements. However, the wind speed sensor is still unstable, suggesting the need for improvement in future research.
{"title":"ENVIRONMENTAL CONDITION MEASUREMENT SYSTEM WITH A MINI WEATHER STATION USING ESP32","authors":"Umar Muhammad, Irvawansyah, Dirham Muhammad","doi":"10.59562/metrik.v21i1.657","DOIUrl":"https://doi.org/10.59562/metrik.v21i1.657","url":null,"abstract":"Weather conditions are important to know because they have an impact on various human activities, such as agriculture, infrastructure, hydrology, and more. Several factors affect the weather, including wind speed, temperature, and air humidity. However, in this study, a mini weather station was designed to provide information not only on wind speed, temperature, and humidity but also on solar radiation. The research employed several sensors, including the DHT11, anemometer, and pyranometer. The research results indicate that the DHT11 error indoors is 1.4%, but it increases to 9% outdoors. The pyranometer shows a 3.62% error from direct solar radiation measurements. However, the wind speed sensor is still unstable, suggesting the need for improvement in future research.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"15 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139439175","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-12-30DOI: 10.59562/metrik.v21i1.561
Rito Cipta, Sigitta Hariyono, Arif Rahman, Arif Nursetyo, Firman Ardy Prasetyo
The objective of this study is to develop an audit strategy for information system security at XYZ General Hospital, perform a comprehensive security assessment of the REMPEYEK (Electronic Service Medical Record) information system, and provide recommendations for improvement. Quantitative research is a methodology that involves the collection of data through direct assessment of the individuals or entities under investigation. In addition, the COBIT 5 tool is employed to analyze the gathered data in order to acquire a quantitative capability analysis. This study examines the COBIT 5 framework's relevance to the identification of business objectives for information system security in the context of the Rempeyek information system. The identified problems and obstacles in the system include inadequate budget management, insufficient coordination between Diklitbang and the units involved in application development, and a misalignment between information technology systems and security measures. The findings of the assessment on the maturity of the information system security indicate that the DSS05 and APO13 domains have achieved a level 2 status, known as "Managed Process." The capability values for these domains are recorded as 2.02 and 2.68, respectively. This suggests that the relevant procedures have been effectively executed, supervised, and regulated.
{"title":"ANALYSIS MATURITY LEVEL MEDICAL SERVICES ELECTRONIC USING COBIT 5 FRAMEWORK (CASE STUDY: RSUD XYZ)","authors":"Rito Cipta, Sigitta Hariyono, Arif Rahman, Arif Nursetyo, Firman Ardy Prasetyo","doi":"10.59562/metrik.v21i1.561","DOIUrl":"https://doi.org/10.59562/metrik.v21i1.561","url":null,"abstract":"The objective of this study is to develop an audit strategy for information system security at XYZ General Hospital, perform a comprehensive security assessment of the REMPEYEK (Electronic Service Medical Record) information system, and provide recommendations for improvement. Quantitative research is a methodology that involves the collection of data through direct assessment of the individuals or entities under investigation. In addition, the COBIT 5 tool is employed to analyze the gathered data in order to acquire a quantitative capability analysis. This study examines the COBIT 5 framework's relevance to the identification of business objectives for information system security in the context of the Rempeyek information system. The identified problems and obstacles in the system include inadequate budget management, insufficient coordination between Diklitbang and the units involved in application development, and a misalignment between information technology systems and security measures. The findings of the assessment on the maturity of the information system security indicate that the DSS05 and APO13 domains have achieved a level 2 status, known as \"Managed Process.\" The capability values for these domains are recorded as 2.02 and 2.68, respectively. This suggests that the relevant procedures have been effectively executed, supervised, and regulated.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"201 ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139140521","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-12-10DOI: 10.59562/metrik.v21i1.1135
Haripuddin Haripuddin, Andi Zauqi, Muhammad Yusuf Mappeasse, Massikki Massikki
Piko Hydro Power Plant (PLTPH) is one of the power plants that uses water as an energy source. Piko hydro is included in the category of hydropower with small power because there is no need to use too large a water discharge to produce power. The tool developed in this study is a Piko Hydro Power Plant by Utilizing Irrigation Flow. The purpose of the research is to determine the results of the development of Piko Hydro Power Plant equipment, the electrical energy produced, and the response of the community. The research method used is quantitative descriptive with the type of Research and Development (R & D) research and prototype development model consisting of 4 steps, namely needs analysis, building prototypes, installing, and evaluating. The research data obtained by making observations, questionnaires/questionnaires, and documentation. The results showed that the pico hydro power plant worked well, indicated by the excellent product validation value. The waterwheel at the plant has a maximum power of 308 watts. In the development with the application of the MPPT type charger control regulator, results were obtained able to stabilize the electrical energy produced and increase the power capability of the power plant with the help of backup battery supply. For the results of the responses of the people of Kasambang Village, Mamuju Regency as many as 15 respondents, very decent results were obtained.
{"title":"THE DEVELOPMENT OF PICO HYDRO POWER PLANT BY UTILIZING IRRIGATION FLOW IN KASAMBANG VILLAGE OF MAMUJU REGENCY","authors":"Haripuddin Haripuddin, Andi Zauqi, Muhammad Yusuf Mappeasse, Massikki Massikki","doi":"10.59562/metrik.v21i1.1135","DOIUrl":"https://doi.org/10.59562/metrik.v21i1.1135","url":null,"abstract":"Piko Hydro Power Plant (PLTPH) is one of the power plants that uses water as an energy source. Piko hydro is included in the category of hydropower with small power because there is no need to use too large a water discharge to produce power. The tool developed in this study is a Piko Hydro Power Plant by Utilizing Irrigation Flow. The purpose of the research is to determine the results of the development of Piko Hydro Power Plant equipment, the electrical energy produced, and the response of the community. The research method used is quantitative descriptive with the type of Research and Development (R & D) research and prototype development model consisting of 4 steps, namely needs analysis, building prototypes, installing, and evaluating. The research data obtained by making observations, questionnaires/questionnaires, and documentation. The results showed that the pico hydro power plant worked well, indicated by the excellent product validation value. The waterwheel at the plant has a maximum power of 308 watts. In the development with the application of the MPPT type charger control regulator, results were obtained able to stabilize the electrical energy produced and increase the power capability of the power plant with the help of backup battery supply. For the results of the responses of the people of Kasambang Village, Mamuju Regency as many as 15 respondents, very decent results were obtained.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"3 7","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138982265","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-12-10DOI: 10.59562/metrik.v21i1.1136
M. Muliadi, Riska Iqbal, Ruslan Ruslan
This research is a research and development (R&D) study utilizing the prototype development model. The aim of this study is to produce a development of an internet of things-based lighting control system. The functionality testing results achieved a 100% score, indicating that the prototype is suitable for use, and the user response results obtained a 100% score with the "Very Good" category. The testing results for the response time of the lamp for on/off commands showed a duration of 0-6 seconds, and the speed of feedback notifications from Telegram was 0-6 seconds. The testing for the speed of checking the lamp status ranged between 0-6 seconds. Meanwhile, for the LDR sensor trial, it successfully achieved 100% in sending notifications about the lamp's condition when a status check command is given.
{"title":"DEVELOPMENT OF CONTROL AND MONITORING SYSTEM FOR ILLUMINATION OF THE DEPARTMENT OF ELECTRICAL ENGINEERING BASED ON THE INTERNET OF THINGS (IOT)","authors":"M. Muliadi, Riska Iqbal, Ruslan Ruslan","doi":"10.59562/metrik.v21i1.1136","DOIUrl":"https://doi.org/10.59562/metrik.v21i1.1136","url":null,"abstract":"This research is a research and development (R&D) study utilizing the prototype development model. The aim of this study is to produce a development of an internet of things-based lighting control system. The functionality testing results achieved a 100% score, indicating that the prototype is suitable for use, and the user response results obtained a 100% score with the \"Very Good\" category. The testing results for the response time of the lamp for on/off commands showed a duration of 0-6 seconds, and the speed of feedback notifications from Telegram was 0-6 seconds. The testing for the speed of checking the lamp status ranged between 0-6 seconds. Meanwhile, for the LDR sensor trial, it successfully achieved 100% in sending notifications about the lamp's condition when a status check command is given.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"4 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138585322","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-12-05DOI: 10.59562/metrik.v21i1.558
Budi Cahyo Wibowo, Muhammad Dahlan, R. Rhoedy Setiawan
Stepper motors are one of the motor variants that are widely used in the manufacturing sector. Stepper motors have the characteristic of being able to be controlled both speed and position control in an open loop control system. The method used to control the rotation of the stepper motor is to send a series of electrical pulses with a configuration of frequency values and number of electrical pulses so that the stepper motor can control the rotational speed and angular position of the motor. Acceleration-deceleration control applies a method of gradually changing the frequency of electrical pulses by increasing the frequency every 4mS until it reaches the target frequency value. By applying the acceleration-deceleration method, the stepper motor is capable of rotating at a speed of up to 3000 rpm and the motor rotation angle position is from 10o-360o precisely, this acceleration-deceleration method can rotate the motor at a controlled speed of up to 3000 rpm.
{"title":"STEPPER MOTOR ANALYSIS USING ACCELERATION – DECELARATION METHOD BASED ON PLC (PROGRAMMABLE LOGIC CONTROL)","authors":"Budi Cahyo Wibowo, Muhammad Dahlan, R. Rhoedy Setiawan","doi":"10.59562/metrik.v21i1.558","DOIUrl":"https://doi.org/10.59562/metrik.v21i1.558","url":null,"abstract":"Stepper motors are one of the motor variants that are widely used in the manufacturing sector. Stepper motors have the characteristic of being able to be controlled both speed and position control in an open loop control system. The method used to control the rotation of the stepper motor is to send a series of electrical pulses with a configuration of frequency values and number of electrical pulses so that the stepper motor can control the rotational speed and angular position of the motor. Acceleration-deceleration control applies a method of gradually changing the frequency of electrical pulses by increasing the frequency every 4mS until it reaches the target frequency value. By applying the acceleration-deceleration method, the stepper motor is capable of rotating at a speed of up to 3000 rpm and the motor rotation angle position is from 10o-360o precisely, this acceleration-deceleration method can rotate the motor at a controlled speed of up to 3000 rpm.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"102 19","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138599772","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-08-25DOI: 10.59562/metrik.v20i3.48623
Dwi Maryanto, S. M. Siahaan, K. Wiyono
Pada Pembelajaran jarak jauh di SMK Negeri 1 Indralaya Selatan peserta didik belajar dari rumah dan ketika ada jadwal praktik secara terbatas peserta didik datang ke sekolah. Dalam pembelajaran dari rumah mayoritas peserta didik menggunakan smartphone sendiri sehingga pembelajaran online dapat terlaksana dengan cukup baik karena dibeberapa daerah masih didapati cukup sulit mendapatkan sinyal. Sebagai langkah yang diyakini mampu mengatasi permasalahan yang terjadi khususnya di masa pandemi Covid-19 adalah dengan dilakukannya sebuah pengembangan media berupa multimedia interaktif secara online. Peneliti bertujuan untuk mengembangkan Multimedia interajktif yang valid, praktis dan dapat meningkatkan hasil belajar siswa. Penelitian dilakukan dengan beberapa tahapan yakni tahap perencanaan, desain, dan pengembangan. Peneliti membuat storyboard untuk memetakan kebutuhan dan hal-hal yang akan dicantumkan pada multimedia interaktif. Setelah itu peneliti melakukan tahapan desain dengan menggunakan sofware smartapp creator. Hasil dari proses pengembangan menyatakan bahwa multimedia interaktif instalasi motor litrik sangat valid dengan skor sebesar 4,24. Berdasarkan hasil rerata keseluruhan hasil uji Beta diperolah nilai r sebesar 3,87 dengan kategori praktis. Hasil pretest dan posttest yang dilakukan pada pembelajaran instalasi motor listrik setelah menggunakan multimedia interaktif dinyatakan efektif dalam proses pembelajaran dengan ditunjukkan oleh adanya peningkatan hasil belajar sebesar 14% dari nilai rata–rata dan N-gain score sebesar 0,4 yang termasuk kategori sedang.
{"title":"PENGEMBANGAN MULTIMEDIA INTERAKTIF ONLINE MATERI PENGENDALI MOTOR LISTRIK SEKOLAH MENENGAH KEJURUAN","authors":"Dwi Maryanto, S. M. Siahaan, K. Wiyono","doi":"10.59562/metrik.v20i3.48623","DOIUrl":"https://doi.org/10.59562/metrik.v20i3.48623","url":null,"abstract":"Pada Pembelajaran jarak jauh di SMK Negeri 1 Indralaya Selatan peserta didik belajar dari rumah dan ketika ada jadwal praktik secara terbatas peserta didik datang ke sekolah. Dalam pembelajaran dari rumah mayoritas peserta didik menggunakan smartphone sendiri sehingga pembelajaran online dapat terlaksana dengan cukup baik karena dibeberapa daerah masih didapati cukup sulit mendapatkan sinyal. Sebagai langkah yang diyakini mampu mengatasi permasalahan yang terjadi khususnya di masa pandemi Covid-19 adalah dengan dilakukannya sebuah pengembangan media berupa multimedia interaktif secara online. Peneliti bertujuan untuk mengembangkan Multimedia interajktif yang valid, praktis dan dapat meningkatkan hasil belajar siswa. Penelitian dilakukan dengan beberapa tahapan yakni tahap perencanaan, desain, dan pengembangan. Peneliti membuat storyboard untuk memetakan kebutuhan dan hal-hal yang akan dicantumkan pada multimedia interaktif. Setelah itu peneliti melakukan tahapan desain dengan menggunakan sofware smartapp creator. Hasil dari proses pengembangan menyatakan bahwa multimedia interaktif instalasi motor litrik sangat valid dengan skor sebesar 4,24. Berdasarkan hasil rerata keseluruhan hasil uji Beta diperolah nilai r sebesar 3,87 dengan kategori praktis. Hasil pretest dan posttest yang dilakukan pada pembelajaran instalasi motor listrik setelah menggunakan multimedia interaktif dinyatakan efektif dalam proses pembelajaran dengan ditunjukkan oleh adanya peningkatan hasil belajar sebesar 14% dari nilai rata–rata dan N-gain score sebesar 0,4 yang termasuk kategori sedang.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121748721","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-08-24DOI: 10.59562/metrik.v20i3.48604
S. Suardi, Wira Setiawan, M. U. Pawara, Andi Mursid Nugraha Arifuddin, Alamsyah Alamsyah, Widya Yulia Astin
Sistem penerangan di atas kapal penumpang kapal ro-ro 32.45 meter masih menggunakan lampu fluorescent atau biasa disebut sebagai lampu neon, lampu ini dipandang kurang efektif mengingat berbagai penelitian menyebutkan bahwa lampu fluorescent memiliki dampak negatif berupa kandungan mercury yang membahayakan lingkungan dan daya yang lebih boros dibandingkan dengan menggunakan lampu LED. tujuan dari penelitian ini adalah mengkaji tingkat penghematan daya generator untuk penerangan setelah mengganti lampu fluorescent menjadi lampu LED. metode yang digunakan dalam penelitian adalah metode lumen atau biasa disebut metode ZCM (Zonal Caviti Method). Hasil penelitian di dapatkan jumlah beban listrik penerangan pada penerangan fluorescent yang telah di akumulasikan tiap deck sebesar 24.41 kW, sedangkan penerangan dengan jenis penerangan LED di dapatkan beban listrik penerangan sebesar 12.49 kW. Sehingga dengan hasil yang tertera di atas didapatkan efisiensi daya sebesar 11.92 kW yang kemudian akan di simulasikan pada desain gambar 3D.
{"title":"PERAMALAN BEBAN PENERANGAN KAPAL RO-RO 32.45 METER MENGGUNAKAN METODE ZCM (ZONAL CAVITY METHOD)","authors":"S. Suardi, Wira Setiawan, M. U. Pawara, Andi Mursid Nugraha Arifuddin, Alamsyah Alamsyah, Widya Yulia Astin","doi":"10.59562/metrik.v20i3.48604","DOIUrl":"https://doi.org/10.59562/metrik.v20i3.48604","url":null,"abstract":"Sistem penerangan di atas kapal penumpang kapal ro-ro 32.45 meter masih menggunakan lampu fluorescent atau biasa disebut sebagai lampu neon, lampu ini dipandang kurang efektif mengingat berbagai penelitian menyebutkan bahwa lampu fluorescent memiliki dampak negatif berupa kandungan mercury yang membahayakan lingkungan dan daya yang lebih boros dibandingkan dengan menggunakan lampu LED. tujuan dari penelitian ini adalah mengkaji tingkat penghematan daya generator untuk penerangan setelah mengganti lampu fluorescent menjadi lampu LED. metode yang digunakan dalam penelitian adalah metode lumen atau biasa disebut metode ZCM (Zonal Caviti Method). Hasil penelitian di dapatkan jumlah beban listrik penerangan pada penerangan fluorescent yang telah di akumulasikan tiap deck sebesar 24.41 kW, sedangkan penerangan dengan jenis penerangan LED di dapatkan beban listrik penerangan sebesar 12.49 kW. Sehingga dengan hasil yang tertera di atas didapatkan efisiensi daya sebesar 11.92 kW yang kemudian akan di simulasikan pada desain gambar 3D.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"35 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117173188","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-08-06DOI: 10.59562/metrik.v20i3.48070
Gunawan Toto Hadiyanto, Aji Saputra
Floods that hit areas that are supposed to be areas where flooding is impossible are often caused by garbage stuck in the ditches. As one of the causes of flooding in big cities such as Batam, so it is necessary to installtion a machine to collect waste bottles and other waste in the ditches to remove the waste and bottles that are in the ditches. The utilisation of a DC motor driven machine used in cars as a wiper drive can be used and controlled to drive a garbage collector which is relatively not too heavy on the load. DC motor rotation is forwarded to the engine drive wheel using a chain. The system for lifting garbage from the gutter to the storage tanks uses a chain that has been modified into a conveyor. The use of a conveyor slot which can be adjusted from 30cm to 60 cm wide by manually shifting the wheel base is necessary to overcome the width of the gutter which sometimes varies in width. The Motor DC result shall capable of moving forward or reverse, so the machine should move forward or backward the ditch with a speed of 0.0704 – 0.0759 m/s with a success rate of lifting 75.94% waste and is capable of transporting a maximum of 3 rotational waste bottles.
{"title":"PENGGUNAAN MOTOR WIPER UNTUK MESIN PENGANGKUT SAMPAH SELOKAN","authors":"Gunawan Toto Hadiyanto, Aji Saputra","doi":"10.59562/metrik.v20i3.48070","DOIUrl":"https://doi.org/10.59562/metrik.v20i3.48070","url":null,"abstract":"Floods that hit areas that are supposed to be areas where flooding is impossible are often caused by garbage stuck in the ditches. As one of the causes of flooding in big cities such as Batam, so it is necessary to installtion a machine to collect waste bottles and other waste in the ditches to remove the waste and bottles that are in the ditches. The utilisation of a DC motor driven machine used in cars as a wiper drive can be used and controlled to drive a garbage collector which is relatively not too heavy on the load. DC motor rotation is forwarded to the engine drive wheel using a chain. The system for lifting garbage from the gutter to the storage tanks uses a chain that has been modified into a conveyor. The use of a conveyor slot which can be adjusted from 30cm to 60 cm wide by manually shifting the wheel base is necessary to overcome the width of the gutter which sometimes varies in width. The Motor DC result shall capable of moving forward or reverse, so the machine should move forward or backward the ditch with a speed of 0.0704 – 0.0759 m/s with a success rate of lifting 75.94% waste and is capable of transporting a maximum of 3 rotational waste bottles.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-08-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129116493","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-08-05DOI: 10.59562/metrik.v20i3.48662
M. Nur, Hendri Louis Latif, W. Wahyudi
Penelitian ini bertujuan untuk menganalisis proses pelaksanaan pembelajaran aircraft maintenance procedure menggunakan timer sistem pencampuran cat pesawat berbasis mikrokontroler mega 2560 dimana sebuah perangkat yang digunakan dalam proses pencampuran cat untuk pesawat dan menghasilkan timer pencampuran painting pesawat berbasis mikrokontroler Promini yang valid, praktis, dan efektif. Metode penelitian ini menggunakan Riset and Development (R&D) dengan model 4D. Model 4D adalah sebuah pendekatan penelitian yang mengacu pada empat dimensi, yaitu Define (Mendefinisikan) dimana peneliti menganalisis kebutuhan pentingnya dilakukannya pengembangan, Design (Merancang) peneliti melakukan perancangan media beserta perangkat-perangkat yang berkaitan dengan media, Develop (Mengembangkan) peneliti memastikan produk yang dikembangkan layak untuk dipergunakan atau di uji cobakan di lapangan yang didasarkan oleh penilaian para ahli, dan Deploy (Menerapkan) peneliti mengimplementasikan produk yang telah dirancang dan telah layak ke taruna untuk dapat memperoleh data kepraktisan dan keefektifan penggunaan media. Hasil penelitian ini menunjukkan bahwa media yang dikembangkan pada aspek media dan materi berada pada kategori sangat valid untuk dipergunakan. Implementasi media trainer mendapat respon peserta didik yang berada pada kategori sangat praktis dalam penggunaanya dan hasil nilai tes taruna setelah implementasi mengalami peningkatan berada pada kategori tinggi. Kesimpulan data tersebut menyatakan bahwa media yang telah dikembangkan dinyatakan valid/layak untuk digunakan serta praktis dan efektif dalam penggunaanya.
{"title":"PENGEMBANGAN MEDIA TIMER PENCAMPURAN PAINTING PESAWAT BERBASIS MIKROKONTROLER PROMINI DI HANGGAR POLTEKBANG MAKASSAR","authors":"M. Nur, Hendri Louis Latif, W. Wahyudi","doi":"10.59562/metrik.v20i3.48662","DOIUrl":"https://doi.org/10.59562/metrik.v20i3.48662","url":null,"abstract":"Penelitian ini bertujuan untuk menganalisis proses pelaksanaan pembelajaran aircraft maintenance procedure menggunakan timer sistem pencampuran cat pesawat berbasis mikrokontroler mega 2560 dimana sebuah perangkat yang digunakan dalam proses pencampuran cat untuk pesawat dan menghasilkan timer pencampuran painting pesawat berbasis mikrokontroler Promini yang valid, praktis, dan efektif. Metode penelitian ini menggunakan Riset and Development (R&D) dengan model 4D. Model 4D adalah sebuah pendekatan penelitian yang mengacu pada empat dimensi, yaitu Define (Mendefinisikan) dimana peneliti menganalisis kebutuhan pentingnya dilakukannya pengembangan, Design (Merancang) peneliti melakukan perancangan media beserta perangkat-perangkat yang berkaitan dengan media, Develop (Mengembangkan) peneliti memastikan produk yang dikembangkan layak untuk dipergunakan atau di uji cobakan di lapangan yang didasarkan oleh penilaian para ahli, dan Deploy (Menerapkan) peneliti mengimplementasikan produk yang telah dirancang dan telah layak ke taruna untuk dapat memperoleh data kepraktisan dan keefektifan penggunaan media. Hasil penelitian ini menunjukkan bahwa media yang dikembangkan pada aspek media dan materi berada pada kategori sangat valid untuk dipergunakan. Implementasi media trainer mendapat respon peserta didik yang berada pada kategori sangat praktis dalam penggunaanya dan hasil nilai tes taruna setelah implementasi mengalami peningkatan berada pada kategori tinggi. Kesimpulan data tersebut menyatakan bahwa media yang telah dikembangkan dinyatakan valid/layak untuk digunakan serta praktis dan efektif dalam penggunaanya.","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"366 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115903077","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}