Critical Success Factors of Building Materials Availability at Construction Sites Using a Qualitative Approach 使用定性方法的建筑工地建筑材料可用性的关键成功因素
Pub Date : 2023-06-28 DOI: 10.22452/jpmp.vol3no1.2
Hanafi, M.H., Abdullah, S., Hasan, R., Ahmad, H., Rauzana, A.
One of the most important elements in carrying out construction activities is the maintenance of the status of availability of construction materials at the construction site. If it fails to be prepared and maintained, the workers will not be able to perform their tasks. In fact, the motivation to perform a task will be lost and it will take a long time to return. Therefore, the objective of this paper is to identify the critical success factors of material availability at the construction site. A qualitative study in the form of interviews was conducted to thirty-eight construction contractors, including fifteen suppliers who met the selection criteria of this study. The results of the study revealed six critical success factors of material availability on the construction site. These factors include the contractor's current financial status; relationship (tolerance) between contractor and supplier; work planning and scheduling; good communication between main contractors and sub-contractors, and suppliers; availability of building materials in supplier's storage; and the availability of machines, machinery and trucks. All these critical success factors that have been obtained support the findings of previous studies in the context of the availability of materials at the construction site.
在进行建筑活动时,最重要的因素之一是维护建筑工地建筑材料的可用性状况。如果没有做好准备和维护,工人将无法执行他们的任务。事实上,执行任务的动机将会丢失,并且需要很长时间才能恢复。因此,本文的目的是确定施工现场材料可用性的关键成功因素。本文以访谈的形式对38家建筑承包商进行了定性研究,其中包括15家符合本研究选择标准的供应商。研究结果揭示了施工现场材料可用性的六个关键成功因素。这些因素包括承包商目前的财务状况;承包商和供应商之间的关系(公差);工作计划和调度;与总承包商、分包商、供应商之间的良好沟通;供应商仓库中建筑材料的可用性;以及机器、机械和卡车的可用性。所有这些已获得的关键成功因素都支持了先前关于建筑工地材料可用性的研究结果。
{"title":"Critical Success Factors of Building Materials Availability at Construction Sites Using a Qualitative Approach","authors":"Hanafi, M.H., Abdullah, S., Hasan, R., Ahmad, H., Rauzana, A.","doi":"10.22452/jpmp.vol3no1.2","DOIUrl":"https://doi.org/10.22452/jpmp.vol3no1.2","url":null,"abstract":"One of the most important elements in carrying out construction activities is the maintenance of the status of availability of construction materials at the construction site. If it fails to be prepared and maintained, the workers will not be able to perform their tasks. In fact, the motivation to perform a task will be lost and it will take a long time to return. Therefore, the objective of this paper is to identify the critical success factors of material availability at the construction site. A qualitative study in the form of interviews was conducted to thirty-eight construction contractors, including fifteen suppliers who met the selection criteria of this study. The results of the study revealed six critical success factors of material availability on the construction site. These factors include the contractor's current financial status; relationship (tolerance) between contractor and supplier; work planning and scheduling; good communication between main contractors and sub-contractors, and suppliers; availability of building materials in supplier's storage; and the availability of machines, machinery and trucks. All these critical success factors that have been obtained support the findings of previous studies in the context of the availability of materials at the construction site.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126183608","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Factors Influencing the Passenger Satisfaction at Public Transport in Kuala Lumpur, Malaysia 影响马来西亚吉隆坡公共交通乘客满意度的因素
Pub Date : 2023-06-28 DOI: 10.22452/jpmp.vol3no1.4
Hoo, W.C., Waheeda, A., Reesha, A.
The aim of this study is to identify and analyse the factors influencing passenger satisfaction on public transport in Kuala Lumpur, Malaysia. Despite efforts to improve the quality and accessibility of public transportation systems in the city, passenger satisfaction levels remain a concern. Understanding the key factors that contribute to passenger satisfaction is crucial for policymakers and transportation authorities to enhance the overall quality of public transport services. Therefore, this study seeks to investigate the various factors that significantly influence passenger satisfaction in Kuala Lumpur's public transport system. By addressing such factors as service quality, timeliness, value for money, and environmental attitude and their impact on the level of satisfaction, the study intends to provide valuable insights and recommendations to improve the passenger experience and promote the usage of public transportation. This will ultimately contribute to sustainable urban mobility and enhanced transportation infrastructure in the city. The research draws support from a developed service quality model. Data was collected from the Greater Kuala Lumpur area using non-probability sampling methods, utilising a Google Form questionnaire for respondents to complete independently. The respondents themselves administered the questionnaire, with 400 samples collected. Through linear regressions conducted within the SPSS programme, the hypotheses were evaluated and tested. The findings indicate a strong correlation between passenger satisfaction and key factors such as service quality, timeliness, value for money, and environmental attitude. By investigating these factors, the research seeks to provide insights and recommendations for improving the public transportation system in Kuala Lumpur to enhance passenger satisfaction and meet the evolving needs of the population.
本研究的目的是识别和分析影响马来西亚吉隆坡公共交通乘客满意度的因素。尽管努力提高城市公共交通系统的质量和可达性,乘客满意度仍然是一个问题。了解影响乘客满意度的关键因素,对政策制定者和交通部门提高公共交通服务的整体质量至关重要。因此,本研究旨在探讨影响吉隆坡公共交通系统乘客满意度的各种因素。通过分析服务质量、及时性、物有所值和环保态度等因素及其对满意度的影响,本研究旨在为改善乘客体验和促进公共交通的使用提供有价值的见解和建议。这最终将有助于可持续的城市交通和增强城市的交通基础设施。本研究从已开发的服务质量模型中获得支持。数据是从大吉隆坡地区收集的,使用非概率抽样方法,利用谷歌表格问卷供受访者独立完成。受访者自己管理问卷,收集了400个样本。通过在SPSS程序中进行的线性回归,对假设进行了评估和检验。研究结果表明,乘客满意度与服务质量、及时性、物有所值和环保态度等关键因素之间存在很强的相关性。通过调查这些因素,本研究旨在为改善吉隆坡的公共交通系统提供见解和建议,以提高乘客满意度,满足人口不断变化的需求。
{"title":"Factors Influencing the Passenger Satisfaction at Public Transport in Kuala Lumpur, Malaysia","authors":"Hoo, W.C., Waheeda, A., Reesha, A.","doi":"10.22452/jpmp.vol3no1.4","DOIUrl":"https://doi.org/10.22452/jpmp.vol3no1.4","url":null,"abstract":"The aim of this study is to identify and analyse the factors influencing passenger satisfaction on public transport in Kuala Lumpur, Malaysia. Despite efforts to improve the quality and accessibility of public transportation systems in the city, passenger satisfaction levels remain a concern. Understanding the key factors that contribute to passenger satisfaction is crucial for policymakers and transportation authorities to enhance the overall quality of public transport services. Therefore, this study seeks to investigate the various factors that significantly influence passenger satisfaction in Kuala Lumpur's public transport system. By addressing such factors as service quality, timeliness, value for money, and environmental attitude and their impact on the level of satisfaction, the study intends to provide valuable insights and recommendations to improve the passenger experience and promote the usage of public transportation. This will ultimately contribute to sustainable urban mobility and enhanced transportation infrastructure in the city. The research draws support from a developed service quality model. Data was collected from the Greater Kuala Lumpur area using non-probability sampling methods, utilising a Google Form questionnaire for respondents to complete independently. The respondents themselves administered the questionnaire, with 400 samples collected. Through linear regressions conducted within the SPSS programme, the hypotheses were evaluated and tested. The findings indicate a strong correlation between passenger satisfaction and key factors such as service quality, timeliness, value for money, and environmental attitude. By investigating these factors, the research seeks to provide insights and recommendations for improving the public transportation system in Kuala Lumpur to enhance passenger satisfaction and meet the evolving needs of the population.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"65 2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127390787","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Digitalization Among the Quantity Surveyors: Strategies to Embracing the Change 工料测量师的数字化:拥抱变革的策略
Pub Date : 2023-06-28 DOI: 10.22452/jpmp.vol3no1.3
Yi, Y.Q., Abdul-Majid, A.S., Aziz, N.M., Yang, L.W.
Quantity Surveyors all around the world have been adopting digital technologies due to their tremendous benefits. However, digitalization among quantity surveyors in Malaysia is slow due to low technology adoption. Therefore, this study aims to identify the barriers to digitalization in the quantity surveying profession and recommend strategies to minimize those barriers. A quantitative approach was applied with questionnaires serving as the data collection instrument. The questionnaires were distributed to 671 registered quantity surveyors in Malaysia, which were obtained through the random sampling method. About 134 of the response received and the findings were analyzed using descriptive analysis. Findings revealed the top four categories of barriers are: (1) financial constraints (2) lack of education (3) technical inadequacy and (4) time restrictions. A total of 11 strategies were proposed to minimize the respective barrier to increase the adoption of digitalization. Findings from this study provide insight into the barriers faced by the QS in implementing digitization, which lead to the proposal of strategies to embrace the change. The proposed strategy can act as a foundation for QS to prepare themselves, upgrading and planning the suitable step to thrive in tomorrow’s construction industry. The research has expanded the existing studies on digitalization in the quantity surveying profession, particularly in Malaysia, and assisted researchers, construction industry practitioners, and policymakers, especially in developing countries views.
世界各地的工料测量师都在采用数字技术,因为它们带来了巨大的好处。然而,由于技术采用率低,马来西亚工料测量师的数字化进展缓慢。因此,本研究旨在确定工料测量行业数字化的障碍,并建议减少这些障碍的策略。采用定量方法,问卷作为数据收集工具。问卷通过随机抽样的方式发放给马来西亚的671名注册工料测量师。收到了大约134份回复,并使用描述性分析对调查结果进行了分析。调查结果显示,前四类障碍是:(1)资金限制;(2)缺乏教育;(3)技术不足;(4)时间限制。共提出了11项策略,以尽量减少各自的障碍,以增加数字化的采用。本研究的结果为QS在实施数字化时面临的障碍提供了深入的见解,从而提出了拥抱变革的策略。提出的策略可以作为QS做好准备的基础,升级和规划合适的步骤,以在未来的建筑行业中茁壮成长。该研究扩展了现有的工料测量专业数字化研究,特别是在马来西亚,并协助研究人员、建筑行业从业者和政策制定者,特别是在发展中国家的观点。
{"title":"Digitalization Among the Quantity Surveyors: Strategies to Embracing the Change","authors":"Yi, Y.Q., Abdul-Majid, A.S., Aziz, N.M., Yang, L.W.","doi":"10.22452/jpmp.vol3no1.3","DOIUrl":"https://doi.org/10.22452/jpmp.vol3no1.3","url":null,"abstract":"Quantity Surveyors all around the world have been adopting digital technologies due to their tremendous benefits. However, digitalization among quantity surveyors in Malaysia is slow due to low technology adoption. Therefore, this study aims to identify the barriers to digitalization in the quantity surveying profession and recommend strategies to minimize those barriers. A quantitative approach was applied with questionnaires serving as the data collection instrument. The questionnaires were distributed to 671 registered quantity surveyors in Malaysia, which were obtained through the random sampling method. About 134 of the response received and the findings were analyzed using descriptive analysis. Findings revealed the top four categories of barriers are: (1) financial constraints (2) lack of education (3) technical inadequacy and (4) time restrictions. A total of 11 strategies were proposed to minimize the respective barrier to increase the adoption of digitalization. Findings from this study provide insight into the barriers faced by the QS in implementing digitization, which lead to the proposal of strategies to embrace the change. The proposed strategy can act as a foundation for QS to prepare themselves, upgrading and planning the suitable step to thrive in tomorrow’s construction industry. The research has expanded the existing studies on digitalization in the quantity surveying profession, particularly in Malaysia, and assisted researchers, construction industry practitioners, and policymakers, especially in developing countries views.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"42 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129356552","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Sustainable Practices Influencing Timely Delivery of Building Construction Project 影响建筑工程项目及时交付的可持续实践
Pub Date : 2023-06-28 DOI: 10.22452/jpmp.vol3no1.1
Shehu, S., Shehu, R., Aliyu, U.
It is no longer a contention as various scholars in the field of management and construction are in unison that the construction industry worldwide is a potent motivator that can induce the economic growth and development of any society. A key metric for evaluating the success of building projects around the world is timely delivery. According to earlier studies, building development projects in northern Nigeria encountered delivery schedule delays. To ensure efficiency in delivery time, this study adopts a survey that was created to evaluate sustainable practices impacting timely delivery of building construction project in Gombe state. Professionals who represented the clients, consultants, and contractors were given a total of 88 questionnaires at random, and the administration of the questionnaire received a response rate of 70.45%. The statistical software for social science was used to analyze the data and provide descriptive and inferential statistical metrics. The survey's resultsshowed that more than 70% of respondents had experienced delays in timely delivery of 1–12 months at most. The most significant sustainable practices influencing timely delivery of building projects with high relative index are the employment of skilled and competent labour; availability of materials; periodic monitoring, controlling, and updating of the progress of work; availability of effective supervision and management of staff; and availability of materials. The sustainable practices were further classified into: the economic, management, and motivational policy strategies, with a 33.30% cause-effect increase on timely completion of building construction projects. These facts lead the study to the conclusion that the problem of delays in building construction projects is obviously inescapable. Hence, this study recommends that: there should be concerted efforts in collaboration by various stakeholders involve in building construction project, and all necessary practices should be deployed towards improving timely delivery of building construction project.
管理和建设领域的学者一致认为,世界范围内的建筑业是一个强有力的动力,可以诱导任何社会的经济增长和发展,这已不再是一个争论。评估世界各地建设项目成功的一个关键指标是及时交付。根据早期的研究,尼日利亚北部的建筑开发项目遇到了交付时间表的延误。为了确保交付时间的效率,本研究采用了一项调查,该调查旨在评估影响贡贝州建筑建设项目及时交付的可持续实践。代表客户、顾问和承包商的专业人员随机发放了88份问卷,问卷管理的回复率为70.45%。使用社会科学统计软件对数据进行分析,并提供描述性和推断性统计指标。调查结果显示,超过70%的受访者曾经历过最多1-12个月的准时交货延迟。影响高相对指数建筑项目及时交付的最重要的可持续做法是雇用熟练和称职的劳动力;材料的可得性;定期监督、控制和更新工作进度;对工作人员是否有有效的监督和管理;材料的可用性。可持续实践进一步分为:经济、管理和激励政策策略,对按时完成建筑建设项目的因果效应增加了33.30%。这些事实使研究得出这样的结论:建筑建设项目的延误问题显然是不可避免的。因此,本研究建议:参与建筑工程的各持份者应齐心协力,并采取一切必要的措施,以改善建筑工程的及时交付。
{"title":"Sustainable Practices Influencing Timely Delivery of Building Construction Project","authors":"Shehu, S., Shehu, R., Aliyu, U.","doi":"10.22452/jpmp.vol3no1.1","DOIUrl":"https://doi.org/10.22452/jpmp.vol3no1.1","url":null,"abstract":"It is no longer a contention as various scholars in the field of management and construction are in unison that the construction industry worldwide is a potent motivator that can induce the economic growth and development of any society. A key metric for evaluating the success of building projects around the world is timely delivery. According to earlier studies, building development projects in northern Nigeria encountered delivery schedule delays. To ensure efficiency in delivery time, this study adopts a survey that was created to evaluate sustainable practices impacting timely delivery of building construction project in Gombe state. Professionals who represented the clients, consultants, and contractors were given a total of 88 questionnaires at random, and the administration of the questionnaire received a response rate of 70.45%. The statistical software for social science was used to analyze the data and provide descriptive and inferential statistical metrics. The survey's resultsshowed that more than 70% of respondents had experienced delays in timely delivery of 1–12 months at most. The most significant sustainable practices influencing timely delivery of building projects with high relative index are the employment of skilled and competent labour; availability of materials; periodic monitoring, controlling, and updating of the progress of work; availability of effective supervision and management of staff; and availability of materials. The sustainable practices were further classified into: the economic, management, and motivational policy strategies, with a 33.30% cause-effect increase on timely completion of building construction projects. These facts lead the study to the conclusion that the problem of delays in building construction projects is obviously inescapable. Hence, this study recommends that: there should be concerted efforts in collaboration by various stakeholders involve in building construction project, and all necessary practices should be deployed towards improving timely delivery of building construction project.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"434 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131478194","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Role of 5D Building Information Modelling in Construction Project Cost Management: An Overview and Future Directions 5D建筑信息模型在工程造价管理中的作用:综述及未来发展方向
Pub Date : 2023-06-28 DOI: 10.22452/jpmp.vol3no1.5
Mustafa, M.H., M. F.A., Chia, L.K.
The significance of 5D BIM in construction project cost management is increasing as the construction industry has experienced significant technological advancements. Despite the growing importance of 5D BIM in construction project cost management, there is still a lack of comprehensive understanding regarding its full potential and the necessary skills and training required by professionals in utilizing this technology. Thus, there is a need to explore the benefits, challenges, and best practices of implementing 5D BIM in cost management, as well as the role of professionals in utilizing it for optimal results. This paper aims to address this knowledge gap through a systematic literature review and provide insights into the future of 5D BIM in construction project cost management. The paper discusses the benefits, challenges, and best practices of implementing 5D BIM in cost management. Furthermore, it examines the role of professionals in utilising 5D BIM for cost management, including the necessary skills, training, and team-building strategies. Additionally, the paper delves into the future of 5D BIM in cost management, exploring emerging trends and technological advancements. The conclusion summarises the key points and highlights the insights into future research directions.
随着建筑行业的技术进步,5D BIM在建筑项目成本管理中的意义越来越大。尽管5D BIM在建筑项目成本管理中的重要性日益增加,但对于其全部潜力以及专业人员使用该技术所需的必要技能和培训,仍然缺乏全面的了解。因此,有必要探索在成本管理中实施5D BIM的好处、挑战和最佳实践,以及专业人员在利用它获得最佳结果方面的作用。本文旨在通过系统的文献综述来解决这一知识缺口,并为5D BIM在建筑项目成本管理中的未来提供见解。本文讨论了在成本管理中实施5D BIM的好处、挑战和最佳实践。此外,它还考察了专业人员在利用5D BIM进行成本管理方面的作用,包括必要的技能、培训和团队建设策略。此外,本文还深入探讨了5D BIM在成本管理中的未来,探讨了新兴趋势和技术进步。结语部分总结了本文的研究重点,并对未来的研究方向进行了展望。
{"title":"The Role of 5D Building Information Modelling in Construction Project Cost Management: An Overview and Future Directions","authors":"Mustafa, M.H., M. F.A., Chia, L.K.","doi":"10.22452/jpmp.vol3no1.5","DOIUrl":"https://doi.org/10.22452/jpmp.vol3no1.5","url":null,"abstract":"The significance of 5D BIM in construction project cost management is increasing as the construction industry has experienced significant technological advancements. Despite the growing importance of 5D BIM in construction project cost management, there is still a lack of comprehensive understanding regarding its full potential and the necessary skills and training required by professionals in utilizing this technology. Thus, there is a need to explore the benefits, challenges, and best practices of implementing 5D BIM in cost management, as well as the role of professionals in utilizing it for optimal results. This paper aims to address this knowledge gap through a systematic literature review and provide insights into the future of 5D BIM in construction project cost management. The paper discusses the benefits, challenges, and best practices of implementing 5D BIM in cost management. Furthermore, it examines the role of professionals in utilising 5D BIM for cost management, including the necessary skills, training, and team-building strategies. Additionally, the paper delves into the future of 5D BIM in cost management, exploring emerging trends and technological advancements. The conclusion summarises the key points and highlights the insights into future research directions.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132822816","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Nonverbal Communication in the Construction Industry: A Literature Review 建筑业中的非语言交际:文献综述
Pub Date : 2022-12-30 DOI: 10.22452/jpmp.vol2no2.3
M. M, S. H., Hanid. M
The construction industry (CI) is the environment of the project, which is complex, fragmented, and dynamic in nature and involves many parties. It is proven that most of the problems in CI occur due to poor communication. Based on previous research, nonverbal communication (NVC) constitutes a large part of the communication process. However, the nonverbal side of communication and its influence on organizational outcomes is rarely put in the spot light of research. Therefore, this study aims to provide insight into clues and patterns of nonverbal behavior that correlate with leadership, performance, and productivity in a project setting. This study highlights the importance of attention to NVC in the construction sector.
建筑行业(CI)是一个复杂的、碎片化的、动态的、涉及多方的项目环境。事实证明,CI中的大多数问题都是由于沟通不畅而产生的。从以往的研究来看,非语言交际在交际过程中占有很大的比重。然而,沟通的非语言方面及其对组织结果的影响却很少成为研究的焦点。因此,本研究旨在提供线索和非语言行为的模式,相关的领导力,绩效和生产力的项目设置。这项研究强调了在建筑行业关注NVC的重要性。
{"title":"Nonverbal Communication in the Construction Industry: A Literature Review","authors":"M. M, S. H., Hanid. M","doi":"10.22452/jpmp.vol2no2.3","DOIUrl":"https://doi.org/10.22452/jpmp.vol2no2.3","url":null,"abstract":"The construction industry (CI) is the environment of the project, which is complex, fragmented, and dynamic in nature and involves many parties. It is proven that most of the problems in CI occur due to poor communication. Based on previous research, nonverbal communication (NVC) constitutes a large part of the communication process. However, the nonverbal side of communication and its influence on organizational outcomes is rarely put in the spot light of research. Therefore, this study aims to provide insight into clues and patterns of nonverbal behavior that correlate with leadership, performance, and productivity in a project setting. This study highlights the importance of attention to NVC in the construction sector.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"47 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123187588","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Dispute Occurrences During Construction Stages of Building Project: A Systematic Literature Review 建筑工程施工阶段纠纷的发生:系统的文献综述
Pub Date : 2022-12-30 DOI: 10.22452/jpmp.vol2no2.1
Muhammuddin Muhammuddin, N. N., M. Danuri, Hanid Hanid, Mahanim Mahanim
Disputes arise during construction phases have a negative impact on the outcomes of projects. It is widely known from earlier studies that dispute is one of the factors contributing to the abandonment of building projects in Malaysia. Thus, there is a need to investigate the root causes of it because it leads to delay which affects the overall project performance and loss of money. The study on this research domain in Malaysian construction projects has only been conducted in the general context of the construction industry, without specializing in any specific type of projects or focusing on the phases of project. Hence, this paper aims to investigates the occurrences of dispute throughout the entire process of building construction project based on the traditional approach of project procurement, i.e., starting from the initiation stage until the defect liability period. This study was using systematic literature review and was conducted through searches of relevant publications from multiple electronic sources to review information using specific criteria. The results were presented in two major themes to serve as a theoretical base for the development of framework to minimise occurrence of construction dispute in building projects.
在施工阶段产生的纠纷对项目的结果有负面影响。从早期的研究中众所周知,争议是导致马来西亚建筑项目被放弃的因素之一。因此,有必要调查它的根本原因,因为它会导致延迟,从而影响整个项目的绩效和金钱损失。对马来西亚建筑项目中这一研究领域的研究仅在建筑行业的一般背景下进行,而没有专门研究任何特定类型的项目或侧重于项目的各个阶段。因此,本文旨在以传统的项目采购方法,即从启动阶段到缺陷责任期,研究建筑施工项目整个过程中纠纷的发生情况。本研究采用系统文献综述的方法,通过检索多个电子来源的相关出版物,使用特定标准对信息进行审查。研究结果分为两个主要主题,作为开发框架的理论基础,以尽量减少建筑项目中建筑纠纷的发生。
{"title":"Dispute Occurrences During Construction Stages of Building Project: A Systematic Literature Review","authors":"Muhammuddin Muhammuddin, N. N., M. Danuri, Hanid Hanid, Mahanim Mahanim","doi":"10.22452/jpmp.vol2no2.1","DOIUrl":"https://doi.org/10.22452/jpmp.vol2no2.1","url":null,"abstract":"Disputes arise during construction phases have a negative impact on the outcomes of projects. It is widely known from earlier studies that dispute is one of the factors contributing to the abandonment of building projects in Malaysia. Thus, there is a need to investigate the root causes of it because it leads to delay which affects the overall project performance and loss of money. The study on this research domain in Malaysian construction projects has only been conducted in the general context of the construction industry, without specializing in any specific type of projects or focusing on the phases of project. Hence, this paper aims to investigates the occurrences of dispute throughout the entire process of building construction project based on the traditional approach of project procurement, i.e., starting from the initiation stage until the defect liability period. This study was using systematic literature review and was conducted through searches of relevant publications from multiple electronic sources to review information using specific criteria. The results were presented in two major themes to serve as a theoretical base for the development of framework to minimise occurrence of construction dispute in building projects.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"02 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129982703","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Impact of Traditional Procurement System on Construction Project Delivery 传统采购制度对建设项目交付的影响
Pub Date : 2022-12-30 DOI: 10.22452/jpmp.vol2no2.2
Reuben A. Okereke, Nneka Mercyjane Ihekweme, Matin Adegboyega
Poor project performance issues have been a problem in the construction industry. A large number of projects have failed to meet their goal as a result of the choice of procurement adopted. The traditional method is the commonly used procurement method in the construction industries of the world, and its sequential and linear nature has serious implications on project time, cost and quality baseline performance. The purpose of this study was to determine the impact of the traditional procurement system on construction project delivery. The specific objectives of this study were; to assess the influence of the traditional procurement system on construction project parameters, and to determine the factors responsible for the poor bottom lines of traditionally procure construction projects. This study was achieved using a structured questionnaire administered to construction experts using a purposive sampling method. With a reliability index of over 0.800, the data gathered were analysed using appropriate descriptive tools. It was found that projects delivered through the traditional procurement system have the greatest impact on project time parameters, more on cost and quality parameters. Also, poor time, cost and quality performance are caused by major factors such as rework, poor original planning/unrealistic scheduling, poor communication among project participants, lack of competent staff and inadequate proper training of available staff, and design and documentation issues. Project clients and consultants should be careful in project procurement selection to ensure that maximum value and goals are met
项目绩效不佳的问题一直是建筑业的一个问题。由于采购方式的选择,许多项目未能达到其目标。传统方法是世界建筑业常用的采购方法,其顺序和线性性质对项目时间、成本和质量基准绩效有严重影响。本研究的目的是确定传统采购制度对建筑项目交付的影响。本研究的具体目的是:评估传统采购制度对建设项目参数的影响,确定导致传统采购建设项目底线不佳的因素。本研究采用有目的的抽样方法对建筑专家进行结构化问卷调查。可靠性指数超过0.800,使用适当的描述性工具对收集的数据进行分析。通过传统采购系统交付的项目对项目时间参数的影响最大,对成本和质量参数的影响更大。此外,时间、成本和质量表现差是由返工、原始计划不佳/不切实际的调度、项目参与者之间沟通不畅、缺乏有能力的人员和对现有人员的适当培训不足以及设计和文件问题等主要因素造成的。项目客户和顾问应谨慎选择项目采购,以确保实现最大价值和目标
{"title":"Impact of Traditional Procurement System on Construction Project Delivery","authors":"Reuben A. Okereke, Nneka Mercyjane Ihekweme, Matin Adegboyega","doi":"10.22452/jpmp.vol2no2.2","DOIUrl":"https://doi.org/10.22452/jpmp.vol2no2.2","url":null,"abstract":"Poor project performance issues have been a problem in the construction industry. A large number of projects have failed to meet their goal as a result of the choice of procurement adopted. The traditional method is the commonly used procurement method in the construction industries of the world, and its sequential and linear nature has serious implications on project time, cost and quality baseline performance. The purpose of this study was to determine the impact of the traditional procurement system on construction project delivery. The specific objectives of this study were; to assess the influence of the traditional procurement system on construction project parameters, and to determine the factors responsible for the poor bottom lines of traditionally procure construction projects. This study was achieved using a structured questionnaire administered to construction experts using a purposive sampling method. With a reliability index of over 0.800, the data gathered were analysed using appropriate descriptive tools. It was found that projects delivered through the traditional procurement system have the greatest impact on project time parameters, more on cost and quality parameters. Also, poor time, cost and quality performance are caused by major factors such as rework, poor original planning/unrealistic scheduling, poor communication among project participants, lack of competent staff and inadequate proper training of available staff, and design and documentation issues. Project clients and consultants should be careful in project procurement selection to ensure that maximum value and goals are met","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128124083","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Project Delivery Method for Construction Projects: Review of Malaysian Public Sector Practice 建设项目的项目交付方法:马来西亚公共部门实践回顾
Pub Date : 2022-06-30 DOI: 10.22452/jpmp.vol2no1.1
Mohd Noor. M.I, M. F.A., SB Abd-Karim
Appropriate project delivery method (PDM) is vital to ensure good performance of construction project. For decades, numerous researches have been conducted to develop a structured and descriptive decision-making framework for selecting an appropriate PDM. However, the adoption of structured and descriptive decision-making in selecting PDM in the construction industry is still understudied, especially in the Malaysian public sector. Thus, this paper attempts to investigate the practices and constraints of the Malaysian public sector in PDM selection for construction projects. This paper adopts an interpretive approach by conducting in-depth literature reviews of the numerous related researches, government policy and guidelines of PDM selection. This paper also assesses the effectiveness of the current PDM selection practices based on previous study findings and reports on PDM performance. Findings indicate that the traditional delivery method is prevalent PDM in most Malaysian public-funded construction projects. The Malaysian public sector has practised authoritarian and prescriptive decision-making governed by the government procurement guidelines in selecting PDM, which intentionally preserves political interests. Inappropriate PDM selection in project execution has produced an unconvincing performance by showing optimism bias on the expected outcome. The Malaysian public sector needs to improve the decision-making process by introducing a structured and descriptive PDM selection framework to derive better outcomes and convincing results. Thus, this paper is significant in improvising the decision-making mechanism in selecting appropriate PDM for the Malaysian public construction project.
合适的项目交付方式是保证建设项目良好绩效的关键。几十年来,已经进行了大量的研究,以开发一个结构化和描述性的决策框架,以选择合适的PDM。然而,在建筑行业中选择PDM的结构化和描述性决策的采用仍未得到充分研究,特别是在马来西亚的公共部门。因此,本文试图调查马来西亚公共部门在建筑项目PDM选择中的做法和限制。本文采用解释性的方法,对大量相关研究、政府政策和PDM选择指南进行了深入的文献综述。本文还根据以往的研究结果和关于PDM性能的报告,评估了当前PDM选择实践的有效性。调查结果表明,传统的交付方式是普遍的PDM在大多数马来西亚公共资助的建设项目。马来西亚公共部门在选择PDM时实行了专制和规范的决策,受政府采购指导方针的支配,有意维护政治利益。在项目执行中,不恰当的PDM选择通过对预期结果的乐观偏见产生了不令人信服的表现。马来西亚公共部门需要通过引入结构化和描述性PDM选择框架来改进决策过程,以获得更好的结果和令人信服的结果。因此,本文对完善马来西亚公共建设项目选择合适PDM的决策机制具有重要意义。
{"title":"Project Delivery Method for Construction Projects: Review of Malaysian Public Sector Practice","authors":"Mohd Noor. M.I, M. F.A., SB Abd-Karim","doi":"10.22452/jpmp.vol2no1.1","DOIUrl":"https://doi.org/10.22452/jpmp.vol2no1.1","url":null,"abstract":"Appropriate project delivery method (PDM) is vital to ensure good performance of construction project. For decades, numerous researches have been conducted to develop a structured and descriptive decision-making framework for selecting an appropriate PDM. However, the adoption of structured and descriptive decision-making in selecting PDM in the construction industry is still understudied, especially in the Malaysian public sector. Thus, this paper attempts to investigate the practices and constraints of the Malaysian public sector in PDM selection for construction projects. This paper adopts an interpretive approach by conducting in-depth literature reviews of the numerous related researches, government policy and guidelines of PDM selection. This paper also assesses the effectiveness of the current PDM selection practices based on previous study findings and reports on PDM performance. Findings indicate that the traditional delivery method is prevalent PDM in most Malaysian public-funded construction projects. The Malaysian public sector has practised authoritarian and prescriptive decision-making governed by the government procurement guidelines in selecting PDM, which intentionally preserves political interests. Inappropriate PDM selection in project execution has produced an unconvincing performance by showing optimism bias on the expected outcome. The Malaysian public sector needs to improve the decision-making process by introducing a structured and descriptive PDM selection framework to derive better outcomes and convincing results. Thus, this paper is significant in improvising the decision-making mechanism in selecting appropriate PDM for the Malaysian public construction project.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130140034","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Role of Construction Cost Management Practices on Construction Organisations’ Strategic Performance 工程造价管理实践对建筑组织战略绩效的作用
Pub Date : 2022-06-30 DOI: 10.22452/jpmp.vol2no1.2
Reuben A. Okereke, Mohammed Zakariyau, E. Eze
Cost management practices have remained a vital aspect of project management functions. Despite the efforts of project management, construction projects are still being delivered above budget, with schedule overrun, poor quality and amongst other problems. Poor cost management approaches have been blamed for these problems. Effective cost management improves project performance and the strategic performance of construction organisations. This study aims to assess the role of cost management practice on construction firms' strategic performance in Nigeria. The objectives of the study are to determine the benefits of cost management of the project on the competitive position of construction firms, and the factors influencing cost management strategies of construction firms. This study adopted a well-structured questionnaire administered to construction professionals via electronic means and using snowball sampling technique in the six states of the south-south geopolitical zone of Nigeria. With a response rate of 65.48% and a reliability of index of over 0.70, the gathered data were analysed using frequency, percentage, and relative importance index (RII). It was found that major factors influencing construction cost management are; experience and competence of the project managers, weak management support and control, poor project communications, external economic environment, and lack of use of project management tools (technology). Also, effective cost management was found to play a critical role in the strategic performance of construction organisations; with most benefits being in the areas of waste and expenses reduction, improves operational efficiency need, helps to predict future expenses, ensures procurement effectiveness, and improve profit maximization. Project managers should continuously upgrade their skills for effective cost management to boost the strategic competitive position of their firms.
成本管理实践仍然是项目管理职能的一个重要方面。尽管项目管理人员做出了努力,但建设项目仍然超出预算交付,出现进度超支、质量差等问题。人们将这些问题归咎于糟糕的成本管理方法。有效的成本管理可以提高项目绩效和建筑组织的战略绩效。本研究旨在评估成本管理实践对尼日利亚建筑公司战略绩效的作用。研究的目的是确定项目成本管理对建筑公司竞争地位的好处,以及影响建筑公司成本管理策略的因素。本研究采用结构良好的调查问卷,通过电子手段和滚雪球抽样技术在尼日利亚南南地缘政治区的六个州对建筑专业人员进行调查。采用频率、百分比和相对重要性指数(RII)对收集到的数据进行分析,应答率为65.48%,信度指数大于0.70。研究发现,影响工程造价管理的主要因素有:项目经理的经验和能力,管理支持和控制薄弱,项目沟通不良,外部经济环境,缺乏项目管理工具(技术)的使用。此外,有效的成本管理被发现在建筑组织的战略绩效中起着关键作用;大多数的好处是在浪费和费用减少的领域,提高运营效率的需求,有助于预测未来的费用,确保采购的有效性,并提高利润最大化。项目经理应不断提高其有效的成本管理技能,以提高其公司的战略竞争地位。
{"title":"The Role of Construction Cost Management Practices on Construction Organisations’ Strategic Performance","authors":"Reuben A. Okereke, Mohammed Zakariyau, E. Eze","doi":"10.22452/jpmp.vol2no1.2","DOIUrl":"https://doi.org/10.22452/jpmp.vol2no1.2","url":null,"abstract":"Cost management practices have remained a vital aspect of project management functions. Despite the efforts of project management, construction projects are still being delivered above budget, with schedule overrun, poor quality and amongst other problems. Poor cost management approaches have been blamed for these problems. Effective cost management improves project performance and the strategic performance of construction organisations. This study aims to assess the role of cost management practice on construction firms' strategic performance in Nigeria. The objectives of the study are to determine the benefits of cost management of the project on the competitive position of construction firms, and the factors influencing cost management strategies of construction firms. This study adopted a well-structured questionnaire administered to construction professionals via electronic means and using snowball sampling technique in the six states of the south-south geopolitical zone of Nigeria. With a response rate of 65.48% and a reliability of index of over 0.70, the gathered data were analysed using frequency, percentage, and relative importance index (RII). It was found that major factors influencing construction cost management are; experience and competence of the project managers, weak management support and control, poor project communications, external economic environment, and lack of use of project management tools (technology). Also, effective cost management was found to play a critical role in the strategic performance of construction organisations; with most benefits being in the areas of waste and expenses reduction, improves operational efficiency need, helps to predict future expenses, ensures procurement effectiveness, and improve profit maximization. Project managers should continuously upgrade their skills for effective cost management to boost the strategic competitive position of their firms.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"34 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116173489","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
期刊
Journal of Project Management Practice
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1