首页 > 最新文献

Journal of Legal Affairs and Dispute Resolution in Engineering and Construction最新文献

英文 中文
Using Mindfulness to Avoid Accepting Falsely Perceived Problem-Solving Solutions 利用正念避免接受错误感知的问题解决方案
IF 2.5 Q1 Social Sciences Pub Date : 2023-05-01 DOI: 10.1061/jladah.ladr-966
Joshua V. D. Owens
{"title":"Using Mindfulness to Avoid Accepting Falsely Perceived Problem-Solving Solutions","authors":"Joshua V. D. Owens","doi":"10.1061/jladah.ladr-966","DOIUrl":"https://doi.org/10.1061/jladah.ladr-966","url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46367907","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A Procedure for Rebalancing Unbalanced Bidding in Unit Price Contracts 单价合同中不平衡投标的再平衡程序
IF 2.5 Q1 Social Sciences Pub Date : 2023-05-01 DOI: 10.1061/jladah.ladr-939
K. Hyari
{"title":"A Procedure for Rebalancing Unbalanced Bidding in Unit Price Contracts","authors":"K. Hyari","doi":"10.1061/jladah.ladr-939","DOIUrl":"https://doi.org/10.1061/jladah.ladr-939","url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46050146","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Assessing the Functionality of Transboundary Water Compacts, Decrees, and Agreements in the United States 评估美国跨界水契约、法令和协议的功能
IF 2.5 Q1 Social Sciences Pub Date : 2023-05-01 DOI: 10.1061/jladah.ladr-935
N. Grigg
{"title":"Assessing the Functionality of Transboundary Water Compacts, Decrees, and Agreements in the United States","authors":"N. Grigg","doi":"10.1061/jladah.ladr-935","DOIUrl":"https://doi.org/10.1061/jladah.ladr-935","url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43600832","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Protest Denied: A Qualitative Meta-Analysis of Failed Challenges to Government Contracting 拒绝抗议:对政府合同失败挑战的定性元分析
IF 2.5 Q1 Social Sciences Pub Date : 2023-05-01 DOI: 10.1061/jladah.ladr-925
Young Joo Kim, M. Skibniewski
{"title":"Protest Denied: A Qualitative Meta-Analysis of Failed Challenges to Government Contracting","authors":"Young Joo Kim, M. Skibniewski","doi":"10.1061/jladah.ladr-925","DOIUrl":"https://doi.org/10.1061/jladah.ladr-925","url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48072375","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analysis of the Six Preliminary Injunctions Granted in Legal Challenges to COVID-19 Vaccine Mandates for Federal Contractors 对联邦承包商新冠肺炎疫苗授权法律挑战中批准的六项初步禁令的分析
IF 2.5 Q1 Social Sciences Pub Date : 2023-05-01 DOI: 10.1061/jladah.ladr-919
M. Herrmann
In September 2021, the Biden administration issued an executive order requiring companies that enter into federal contracts to require and verify that their employees are vaccinated against COVID-19. The executive order has since been challenged in multiple federal district courts. As of the date of submission, six preliminary injunctions have been issued, temporarily ceasing enforcement of the order. This paper is an analysis and summary of the arguments presented and legal reasoning of the courts based on the published court opinions. The key issue common among all six cases was whether the executive order exceeded the scope of authority granted under the Federal Property and Administrative Services Act. The courts reached slightly different conclusions on this issue and had different reasoning, but all issued temporary injunctions. Although most of the injunctions were limited to the plaintiff states, the most notable preliminary injunction was issued by the Southern District of Georgia and was the only one to be issued nationwide. The inclusion of the Associated Builders and Contractors as a plaintiff in that case played a key role in the scope of the injunction being issued on a nationwide scale. Appeals are pending in all cases but given the broad scope of the mandate and the current status of the pandemic, the government faces a difficult appeal. © 2023 American Society of Civil Engineers.
2021年9月,拜登政府发布了一项行政命令,要求签订联邦合同的公司要求并核实其员工接种了新冠肺炎疫苗。此后,该行政命令在多个联邦地区法院受到质疑。截至提交之日,已发布六项初步禁令,暂时停止执行该命令。本文根据已发表的法院意见,对法院提出的论点和法律推理进行了分析和总结。所有六起案件中共同的关键问题是,行政命令是否超出了《联邦财产和行政服务法》赋予的权力范围。法院在这个问题上得出了略有不同的结论,也有不同的理由,但都发布了临时禁令。尽管大多数禁令仅限于原告州,但最引人注目的初步禁令是由佐治亚州南区发布的,也是唯一一个在全国范围内发布的禁令。联合建筑商和承包商作为该案的原告,在全国范围内发布禁令的范围中发挥了关键作用。所有案件的上诉都悬而未决,但考虑到任务的广泛范围和疫情的现状,政府面临着艰难的上诉。©2023美国土木工程师学会。
{"title":"Analysis of the Six Preliminary Injunctions Granted in Legal Challenges to COVID-19 Vaccine Mandates for Federal Contractors","authors":"M. Herrmann","doi":"10.1061/jladah.ladr-919","DOIUrl":"https://doi.org/10.1061/jladah.ladr-919","url":null,"abstract":"In September 2021, the Biden administration issued an executive order requiring companies that enter into federal contracts to require and verify that their employees are vaccinated against COVID-19. The executive order has since been challenged in multiple federal district courts. As of the date of submission, six preliminary injunctions have been issued, temporarily ceasing enforcement of the order. This paper is an analysis and summary of the arguments presented and legal reasoning of the courts based on the published court opinions. The key issue common among all six cases was whether the executive order exceeded the scope of authority granted under the Federal Property and Administrative Services Act. The courts reached slightly different conclusions on this issue and had different reasoning, but all issued temporary injunctions. Although most of the injunctions were limited to the plaintiff states, the most notable preliminary injunction was issued by the Southern District of Georgia and was the only one to be issued nationwide. The inclusion of the Associated Builders and Contractors as a plaintiff in that case played a key role in the scope of the injunction being issued on a nationwide scale. Appeals are pending in all cases but given the broad scope of the mandate and the current status of the pandemic, the government faces a difficult appeal. © 2023 American Society of Civil Engineers.","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48411528","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Contractors’ Claims in an EPC and Turnkey Contract: Lessons Learned from a Hydropower Project EPC和交钥匙合同中承包商的索赔:从水电项目中吸取的经验教训
IF 2.5 Q1 Social Sciences Pub Date : 2023-05-01 DOI: 10.1061/jladah.ladr-915
Sushmit Sharma Bhattarai, K. Kisi, R. Kayastha
This study focuses on the contractor's claims on a hydropower project contracted under an international engineering procurement and construction (EPC) and turnkey contract in Nepal. The contractor faced challenges from the mobilization phase and submitted multiple claims to the employer for time extensions and additional overhead costs. This study identified 80 claims for a time extension and additional overhead costs. Through content analysis, this study grouped these claims under six categories: natural disaster, strike, unforeseen risk, material shortage, payment, and the COVID-19 pandemic. First, the study analyzed the claim type, outcome, and decision criteria of the claims. Next, the analysis presented decisions based on general conditions of contract (GCC) and the particular conditions of contract (PCC) clauses. The study found that the employer granted a time extension to most of the claims under natural disaster under force majeure and rejected most of the claims under the other five groups. Finally, the study presents findings and lessons learned from the case study, including the relevant GCC and PCC clauses used in claims resolution. The findings and lessons learned from this case study could help employers and international EPC contractors who want to build hydropower projects in Nepal. © 2022 American Society of Civil Engineers.
本研究的重点是承包商在尼泊尔根据国际工程采购和建设(EPC)和交钥匙合同承包的水电项目的索赔。承包商面临着动员阶段的挑战,并向雇主提出了多次延期和额外间接费用的索赔。这项研究确定了80项要求延期和额外间接费用的索赔。通过内容分析,本研究将这些索赔分为六类:自然灾害、罢工、不可预见风险、物资短缺、付款和COVID-19大流行。首先,本研究分析了索赔的类型、结果和判定标准。接下来,分析提出了基于合同一般条件(GCC)和合同特殊条件(PCC)条款的决定。研究发现,雇主批准了自然灾害和不可抗力下的大多数索赔的延期,而拒绝了其他五个类别下的大多数索赔。最后,研究报告介绍了从案例研究中获得的结论和经验教训,包括在索赔解决中使用的相关GCC和PCC条款。本案例研究的结论和经验教训可以帮助希望在尼泊尔建设水电项目的雇主和国际EPC承包商。©2022美国土木工程师学会。
{"title":"Contractors’ Claims in an EPC and Turnkey Contract: Lessons Learned from a Hydropower Project","authors":"Sushmit Sharma Bhattarai, K. Kisi, R. Kayastha","doi":"10.1061/jladah.ladr-915","DOIUrl":"https://doi.org/10.1061/jladah.ladr-915","url":null,"abstract":"This study focuses on the contractor's claims on a hydropower project contracted under an international engineering procurement and construction (EPC) and turnkey contract in Nepal. The contractor faced challenges from the mobilization phase and submitted multiple claims to the employer for time extensions and additional overhead costs. This study identified 80 claims for a time extension and additional overhead costs. Through content analysis, this study grouped these claims under six categories: natural disaster, strike, unforeseen risk, material shortage, payment, and the COVID-19 pandemic. First, the study analyzed the claim type, outcome, and decision criteria of the claims. Next, the analysis presented decisions based on general conditions of contract (GCC) and the particular conditions of contract (PCC) clauses. The study found that the employer granted a time extension to most of the claims under natural disaster under force majeure and rejected most of the claims under the other five groups. Finally, the study presents findings and lessons learned from the case study, including the relevant GCC and PCC clauses used in claims resolution. The findings and lessons learned from this case study could help employers and international EPC contractors who want to build hydropower projects in Nepal. © 2022 American Society of Civil Engineers.","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48795012","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
A Path to Establishing Delay and Disruption Claims for Contracts Entered into Prior to the Start of the COVID-19 Pandemic 为COVID-19大流行开始前签订的合同确定延误和中断索赔的途径
IF 2.5 Q1 Social Sciences Pub Date : 2023-05-01 DOI: 10.1061/jladah.ladr-918
M. Herrmann
{"title":"A Path to Establishing Delay and Disruption Claims for Contracts Entered into Prior to the Start of the COVID-19 Pandemic","authors":"M. Herrmann","doi":"10.1061/jladah.ladr-918","DOIUrl":"https://doi.org/10.1061/jladah.ladr-918","url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43890672","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
LADR Is Ranked in Quartile 1 in the SCImago Journal and Country Rank LADR在SCImago期刊和国家排名中排名四分之一
IF 2.5 Q1 Social Sciences Pub Date : 2023-05-01 DOI: 10.1061/jladah.ladr-955
Amarjit Singh, U. Quapp
{"title":"LADR Is Ranked in Quartile 1 in the SCImago Journal and Country Rank","authors":"Amarjit Singh, U. Quapp","doi":"10.1061/jladah.ladr-955","DOIUrl":"https://doi.org/10.1061/jladah.ladr-955","url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41594998","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Issues Encountered in the Valuation of Interim Payment Process in Construction Projects 建设项目期中付款过程计价中应注意的问题
IF 2.5 Q1 Social Sciences Pub Date : 2023-02-01 DOI: 10.1061/(asce)la.1943-4170.0000596
N. Mustaffa, Roselan Nayan, Farah Azwanee Aminuddin, Siti Suhana Judi
{"title":"Issues Encountered in the Valuation of Interim Payment Process in Construction Projects","authors":"N. Mustaffa, Roselan Nayan, Farah Azwanee Aminuddin, Siti Suhana Judi","doi":"10.1061/(asce)la.1943-4170.0000596","DOIUrl":"https://doi.org/10.1061/(asce)la.1943-4170.0000596","url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42035356","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Legal Topics at the Fourth European and Mediterranean Structural Engineering and Construction Conference 第四届欧洲和地中海结构工程和建筑会议的法律议题
IF 2.5 Q1 Social Sciences Pub Date : 2023-02-01 DOI: 10.1061/(asce)la.1943-4170.0000590
U. Quapp, K. Holschemacher
{"title":"Legal Topics at the Fourth European and Mediterranean Structural Engineering and Construction Conference","authors":"U. Quapp, K. Holschemacher","doi":"10.1061/(asce)la.1943-4170.0000590","DOIUrl":"https://doi.org/10.1061/(asce)la.1943-4170.0000590","url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":null,"pages":null},"PeriodicalIF":2.5,"publicationDate":"2023-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44646587","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1