首页 > 最新文献

International Journal of Construction Management最新文献

英文 中文
Limitations of the conventional project delivery (CPD) approach in producing quality design documentation: insights from the Ghanaian construction industry 传统项目交付(CPD)方法在编制高质量设计文件方面的局限性:加纳建筑业的启示
IF 3.9 Q1 Engineering Pub Date : 2024-01-09 DOI: 10.1080/15623599.2023.2295610
P. Agbaxode, Ehsan Saghatforoush, Sitsabo Dlamini, J. K. Korsah
{"title":"Limitations of the conventional project delivery (CPD) approach in producing quality design documentation: insights from the Ghanaian construction industry","authors":"P. Agbaxode, Ehsan Saghatforoush, Sitsabo Dlamini, J. K. Korsah","doi":"10.1080/15623599.2023.2295610","DOIUrl":"https://doi.org/10.1080/15623599.2023.2295610","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-01-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139444732","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Integrating creating shared value into competitive strategies: case studies of Chinese international construction companies 将创造共享价值纳入竞争战略:中国国际建筑公司案例研究
IF 3.9 Q1 Engineering Pub Date : 2024-01-05 DOI: 10.1080/15623599.2023.2299529
Hui Guo, M. Ye, Weisheng Lu
{"title":"Integrating creating shared value into competitive strategies: case studies of Chinese international construction companies","authors":"Hui Guo, M. Ye, Weisheng Lu","doi":"10.1080/15623599.2023.2299529","DOIUrl":"https://doi.org/10.1080/15623599.2023.2299529","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-01-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139383419","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analysing multifaceted barriers to modular construction in sustainable building projects: a comprehensive evaluation using multi-criteria decision making 分析可持续建筑项目中模块化施工的多方面障碍:利用多重标准决策进行综合评估
IF 3.9 Q1 Engineering Pub Date : 2024-01-04 DOI: 10.1080/15623599.2023.2299557
Ali Hassan Ali, Ahmed Farouk Kineber, N. Elshaboury, Mehrdad Arashpour, Ahmed Osama Daoud
{"title":"Analysing multifaceted barriers to modular construction in sustainable building projects: a comprehensive evaluation using multi-criteria decision making","authors":"Ali Hassan Ali, Ahmed Farouk Kineber, N. Elshaboury, Mehrdad Arashpour, Ahmed Osama Daoud","doi":"10.1080/15623599.2023.2299557","DOIUrl":"https://doi.org/10.1080/15623599.2023.2299557","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139384309","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Determinants of the integrity climate of public organizations – a procurement perspective 公共组织廉政氛围的决定因素--采购视角
IF 3.9 Q1 Engineering Pub Date : 2024-01-02 DOI: 10.1080/15623599.2023.2299525
G. Bhagat, K. N. Jha
{"title":"Determinants of the integrity climate of public organizations – a procurement perspective","authors":"G. Bhagat, K. N. Jha","doi":"10.1080/15623599.2023.2299525","DOIUrl":"https://doi.org/10.1080/15623599.2023.2299525","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2024-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139452902","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Investigating the determinants of construction project complexity impacting project success: an India perspective 调查影响项目成功的建筑项目复杂性的决定因素:印度视角
IF 3.9 Q1 Engineering Pub Date : 2023-12-29 DOI: 10.1080/15623599.2023.2295609
P. Yadav, Virendra Kumar Paul
{"title":"Investigating the determinants of construction project complexity impacting project success: an India perspective","authors":"P. Yadav, Virendra Kumar Paul","doi":"10.1080/15623599.2023.2295609","DOIUrl":"https://doi.org/10.1080/15623599.2023.2295609","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139145555","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Challenges and opportunities in the Real Estate Act, 2016, India: a focus on judicial appellate and redevelopment projects 印度 2016 年《房地产法》的挑战与机遇:关注司法上诉和重建项目
IF 3.9 Q1 Engineering Pub Date : 2023-12-11 DOI: 10.1080/15623599.2023.2290423
Kushal Vilas Datrange, Rohit R. Salgude, U. S. Agrawal
{"title":"Challenges and opportunities in the Real Estate Act, 2016, India: a focus on judicial appellate and redevelopment projects","authors":"Kushal Vilas Datrange, Rohit R. Salgude, U. S. Agrawal","doi":"10.1080/15623599.2023.2290423","DOIUrl":"https://doi.org/10.1080/15623599.2023.2290423","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-12-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138980869","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Impact of poor communication on dispute occurrence in the construction industry: a preliminary exploratory study of Yemen construction industry 沟通不畅对建筑业纠纷发生的影响:对也门建筑业的初步探索性研究
IF 3.9 Q1 Engineering Pub Date : 2023-12-10 DOI: 10.1080/15623599.2022.2092388
Y. Gamil, Ismail Abd Rahman
Abstract The Yemeni construction industry has been declining in it progress since early 2011 when the political unrest started, and many projects have been financially suffering and suspended or failed to achieve the primary plans. Disputed has been associated with the declination and in fact dispute in construction industry is a chronic and common issue for all countries. Many construction projects have been delayed or even failed due to dispute, misunderstanding and incongruities among construction parties. Many researchers have viewed this issue from the perspective of unclear contract terms and unclear distributions of responsibilities. However, this study aims to scrutinize the issue from the standpoint of poor and lack of communication among Yemeni construction parties. The study implements qualitative interviews with ten construction experts to share their views and uncover the issue. The method of analysis is based on the transformation of interviewed data into transcriptions and extraction and thematic analysis. The study found that poor communication is a major cause of dispute in the Yemeni construction industry, improper management of communication and its channels as the leading cause of the initial occurrence of dispute. Furthermore, the study found that integration with other success factors can bring about strategies to avoid dispute. The outcomes of this study are very useful in developing initiatives to minimize the issue and insuring successful and organized communication among construction parties which lead to successful project completion.
自2011年初政治动荡开始以来,也门建筑业的进展一直在下降,许多项目都遭受了财政困难,暂停或未能实现主要计划。争议一直与经济的衰退联系在一起,事实上,建筑行业的争议是世界各国长期存在的共同问题。由于建设方之间的纠纷、误解和不协调,许多建设项目被推迟甚至失败。许多研究者从合同条款不明确和责任分配不明确的角度来看待这一问题。然而,本研究旨在从也门建筑方之间沟通不良和缺乏的角度来审视这个问题。本研究对10位建筑专家进行了定性访谈,以分享他们的观点并揭示问题。分析方法是基于访谈数据转换成转录和提取和专题分析。研究发现,沟通不畅是也门建筑业发生纠纷的主要原因,沟通及其渠道管理不当是最初发生纠纷的主要原因。此外,研究发现,与其他成功因素的整合可以带来避免纠纷的策略。本研究的结果对于制定举措以尽量减少问题,并确保施工方之间成功和有组织的沟通,从而成功完成项目非常有用。
{"title":"Impact of poor communication on dispute occurrence in the construction industry: a preliminary exploratory study of Yemen construction industry","authors":"Y. Gamil, Ismail Abd Rahman","doi":"10.1080/15623599.2022.2092388","DOIUrl":"https://doi.org/10.1080/15623599.2022.2092388","url":null,"abstract":"Abstract The Yemeni construction industry has been declining in it progress since early 2011 when the political unrest started, and many projects have been financially suffering and suspended or failed to achieve the primary plans. Disputed has been associated with the declination and in fact dispute in construction industry is a chronic and common issue for all countries. Many construction projects have been delayed or even failed due to dispute, misunderstanding and incongruities among construction parties. Many researchers have viewed this issue from the perspective of unclear contract terms and unclear distributions of responsibilities. However, this study aims to scrutinize the issue from the standpoint of poor and lack of communication among Yemeni construction parties. The study implements qualitative interviews with ten construction experts to share their views and uncover the issue. The method of analysis is based on the transformation of interviewed data into transcriptions and extraction and thematic analysis. The study found that poor communication is a major cause of dispute in the Yemeni construction industry, improper management of communication and its channels as the leading cause of the initial occurrence of dispute. Furthermore, the study found that integration with other success factors can bring about strategies to avoid dispute. The outcomes of this study are very useful in developing initiatives to minimize the issue and insuring successful and organized communication among construction parties which lead to successful project completion.","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138585380","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Trends in BIM-based plugins development for construction activities: a systematic review 基于 BIM 的建筑活动插件开发趋势:系统回顾
IF 3.9 Q1 Engineering Pub Date : 2023-12-10 DOI: 10.1080/15623599.2022.2093815
Ali Saad, Saheed Ajayi, H. Alaka
Abstract With the emergence of vast technological advancements in the construction industry to address construction issues, BIM is foreseen as a potential utilization environment. To expand BIM performance in addressing contemporary construction issues, there is currently an uprising trend of plugin development. This paper reports a systematic review of BIM-based plugins, by exploring their nature, areas of application, and their implication on productivity and efficiency. Using a systematic review approach, the study narrows down vast literature and critically analyses 34 developed plugins from 34 different articles. Findings suggest that custom-build plugins are excelling in vast areas utilizing key construction processes like automation, including Health and Safety and Lifecycle assessments, as they are proven to drive productivity and efficiency towards cost and time savings as well as error minimization. Moreover, based on the commonalities between the extracted plugin systems, a framework that could facilitate a better understanding of the programming dynamics in developing BIM-based plugins is presented. Value: This paper offers future research of the insights needed to better understand the directions of BIM-based plugin development and captures BIM evolvement towards more problem-solving potentials.
随着建筑行业解决施工问题的巨大技术进步的出现,BIM被预见为一个潜在的利用环境。为了扩大BIM在解决当代建筑问题上的表现,目前插件开发呈上升趋势。本文通过探讨基于bim的插件的性质、应用领域及其对生产力和效率的影响,系统地回顾了基于bim的插件。采用系统回顾的方法,该研究缩小了大量文献的范围,并对34篇不同文章中的34个开发插件进行了批判性分析。调查结果表明,定制构建插件在利用自动化等关键构建过程的广泛领域表现出色,包括健康和安全以及生命周期评估,因为它们被证明可以提高生产力和效率,从而节省成本和时间,并最大限度地减少错误。此外,基于所提取的插件系统之间的共性,提出了一个框架,可以更好地理解基于bim的插件开发中的编程动态。价值:本文提供了未来研究所需的见解,以更好地理解基于BIM的插件开发方向,并捕捉到BIM向更多问题解决潜力的演变。
{"title":"Trends in BIM-based plugins development for construction activities: a systematic review","authors":"Ali Saad, Saheed Ajayi, H. Alaka","doi":"10.1080/15623599.2022.2093815","DOIUrl":"https://doi.org/10.1080/15623599.2022.2093815","url":null,"abstract":"Abstract With the emergence of vast technological advancements in the construction industry to address construction issues, BIM is foreseen as a potential utilization environment. To expand BIM performance in addressing contemporary construction issues, there is currently an uprising trend of plugin development. This paper reports a systematic review of BIM-based plugins, by exploring their nature, areas of application, and their implication on productivity and efficiency. Using a systematic review approach, the study narrows down vast literature and critically analyses 34 developed plugins from 34 different articles. Findings suggest that custom-build plugins are excelling in vast areas utilizing key construction processes like automation, including Health and Safety and Lifecycle assessments, as they are proven to drive productivity and efficiency towards cost and time savings as well as error minimization. Moreover, based on the commonalities between the extracted plugin systems, a framework that could facilitate a better understanding of the programming dynamics in developing BIM-based plugins is presented. Value: This paper offers future research of the insights needed to better understand the directions of BIM-based plugin development and captures BIM evolvement towards more problem-solving potentials.","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138584982","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
Using extreme gradient boosting (XGBoost) machine learning to predict construction cost overruns 使用极端梯度提升(XGBoost)机器学习预测建筑成本超支
IF 3.9 Q1 Engineering Pub Date : 2023-12-09 DOI: 10.1080/15623599.2023.2289754
G. H. Coffie, S. Cudjoe
{"title":"Using extreme gradient boosting (XGBoost) machine learning to predict construction cost overruns","authors":"G. H. Coffie, S. Cudjoe","doi":"10.1080/15623599.2023.2289754","DOIUrl":"https://doi.org/10.1080/15623599.2023.2289754","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138585979","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Enhancing cost estimation performance through effective organizational control: the moderating role of project complexity in construction projects 通过有效的组织控制提高成本估算绩效:建筑项目复杂性的调节作用
IF 3.9 Q1 Engineering Pub Date : 2023-12-05 DOI: 10.1080/15623599.2023.2286048
M. W. Fazil, Puteri Fadzline Muhamad Tamyez, Chia Kuang Lee
{"title":"Enhancing cost estimation performance through effective organizational control: the moderating role of project complexity in construction projects","authors":"M. W. Fazil, Puteri Fadzline Muhamad Tamyez, Chia Kuang Lee","doi":"10.1080/15623599.2023.2286048","DOIUrl":"https://doi.org/10.1080/15623599.2023.2286048","url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.9,"publicationDate":"2023-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138600809","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
International Journal of Construction Management
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1