首页 > 最新文献

Nuclear Instruments and Methods最新文献

英文 中文
Intense low energy heavy ion beams from a tandem dynamitron 来自串联动力加速器的强低能重离子束
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90865-X
K. Brand

A second injector has been installed in front of the established one to be used mainly for heavy ion beams. The high resolution 90° analyzing magnet (M/ΔM = 100) is mounted on a rotary mount to allow for the simultaneous installation of different types of ion sources. Better ion optics of the new injector together with terminal cryopumping lead to improved transmission through the accelerator system.

第二个注入器已经安装在现有的注入器前面,主要用于重离子束。高分辨率90°分析磁铁(M/ΔM = 100)安装在旋转支架上,允许同时安装不同类型的离子源。新型注入器具有更好的离子光学性能,加上末端低温泵浦,通过加速器系统的传输得到了改善。
{"title":"Intense low energy heavy ion beams from a tandem dynamitron","authors":"K. Brand","doi":"10.1016/0029-554X(81)90865-X","DOIUrl":"10.1016/0029-554X(81)90865-X","url":null,"abstract":"<div><p>A second injector has been installed in front of the established one to be used mainly for heavy ion beams. The high resolution 90° analyzing magnet (<em>M</em>/<em>ΔM</em> = 100) is mounted on a rotary mount to allow for the simultaneous installation of different types of ion sources. Better ion optics of the new injector together with terminal cryopumping lead to improved transmission through the accelerator system.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 187-194"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90865-X","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"74903885","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Improved performance of the Munich MP tandem: A status report 改进的慕尼黑MP串联性能:状态报告
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90853-3
H. Münzer, L. Rohrer, S.J. Skorka

Operating experience and some of the modifications introduced during the last two years are reported. During the past year the terminal voltage obtained in test runs, the voltage used during experiments and the operating efficiency of the accelerator have improved considerably. The spectrum of ions available in routine operations has been extended to include 14C, 30Si, 36S, 48Ca and 60Ni beams.

报告了过去两年的操作经验和一些改进。在过去的一年中,试验中得到的终端电压、实验中使用的电压和加速器的工作效率都有了很大的提高。常规操作中可用的离子光谱已扩展到包括14C, 30Si, 36S, 48Ca和60Ni光束。
{"title":"Improved performance of the Munich MP tandem: A status report","authors":"H. Münzer,&nbsp;L. Rohrer,&nbsp;S.J. Skorka","doi":"10.1016/0029-554X(81)90853-3","DOIUrl":"10.1016/0029-554X(81)90853-3","url":null,"abstract":"<div><p>Operating experience and some of the modifications introduced during the last two years are reported. During the past year the terminal voltage obtained in test runs, the voltage used during experiments and the operating efficiency of the accelerator have improved considerably. The spectrum of ions available in routine operations has been extended to include <sup>14</sup>C, <sup>30</sup>Si, <sup>36</sup>S, <sup>48</sup>Ca and <sup>60</sup>Ni beams.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 87-91"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90853-3","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76851071","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Rebuilding of the Bucharest FN tandem after the earthquake of March 1977 1977年3月地震后重建布加勒斯特FN串联
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90856-9
S. Dobrescu

The effects of a strong earthquake on the Bucharest FN tandem are described. A brief analysis of seismic phenomena in connection with a tandem is made. The configuration of the rebuilt accelerator system and the performances of the tandem after the rebuilding are given.

描述了强震对布加勒斯特FN串联的影响。简要分析了与串联有关的地震现象。给出了改造后的加速系统的结构及改造后串联的性能。
{"title":"Rebuilding of the Bucharest FN tandem after the earthquake of March 1977","authors":"S. Dobrescu","doi":"10.1016/0029-554X(81)90856-9","DOIUrl":"10.1016/0029-554X(81)90856-9","url":null,"abstract":"<div><p>The effects of a strong earthquake on the Bucharest FN tandem are described. A brief analysis of seismic phenomena in connection with a tandem is made. The configuration of the rebuilt accelerator system and the performances of the tandem after the rebuilding are given.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 103-105"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90856-9","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72829752","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Status report of the laboratorio nazionale del Sud 南方国家实验室的状态报告
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90848-X
E. Migneco

The present status of the tandem project at the Laboratorio Nazionale del Sud (LNS) is described.

介绍了国家南方实验室(LNS)串联项目的现状。
{"title":"Status report of the laboratorio nazionale del Sud","authors":"E. Migneco","doi":"10.1016/0029-554X(81)90848-X","DOIUrl":"10.1016/0029-554X(81)90848-X","url":null,"abstract":"<div><p>The present status of the tandem project at the Laboratorio Nazionale del Sud (LNS) is described.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 55-59"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90848-X","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77302532","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
The argentine 20 MV tandem accelerator project 阿根廷20 MV串联加速器项目
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90863-6
E. Perez Ferreira, M.A.J. Mariscotti, E. Ventura, A. Ceballos, N. Fazzini, A. Filevich, H. González, R. Requejo, R. Ribarich, J.J. Rossi, E. Achterberg, D. Camin, J. Nicolai, S. Tau

A 20 MV tandem accelerator laboratory is currently under construction in Argentina. The facility is planned to be completed by the end of 1982.

目前正在阿根廷建设一个20毫伏串联加速器实验室。该设施计划于1982年年底完工。
{"title":"The argentine 20 MV tandem accelerator project","authors":"E. Perez Ferreira,&nbsp;M.A.J. Mariscotti,&nbsp;E. Ventura,&nbsp;A. Ceballos,&nbsp;N. Fazzini,&nbsp;A. Filevich,&nbsp;H. González,&nbsp;R. Requejo,&nbsp;R. Ribarich,&nbsp;J.J. Rossi,&nbsp;E. Achterberg,&nbsp;D. Camin,&nbsp;J. Nicolai,&nbsp;S. Tau","doi":"10.1016/0029-554X(81)90863-6","DOIUrl":"10.1016/0029-554X(81)90863-6","url":null,"abstract":"<div><p>A 20 MV tandem accelerator laboratory is currently under construction in Argentina. The facility is planned to be completed by the end of 1982.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 161-172"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90863-6","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76496267","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
The IAE Peking HI-13 tandem accelerator IAE北京HI-13串联加速器
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90862-4
Yu Ju-xian

A new tandem accelerator laboratory is under construction at the Institute of Atomic Energy in Peking. This institute was built in 1958 and equipped with a reactor, cyclotron, electrostatic accelerator and some other facilities to meet the increasing interest in nuclear study and its application in China. The project of this tandem laboratory was approved in 1978. A 13 MV tandem accelerator will be provided by the High Voltage Engineering Corporation of Burlington, Massachusetts, USA, and a Q3D magnetic spectrometer by AB Scanditronix, Sweden. Some auxiliary systems, experimental equipment and the tank of the tandem are being designed and manufactured in China.

北京原子能研究所正在建设一个新的串联加速器实验室。该所建于1958年,配备了反应堆、回旋加速器、静电加速器和其他一些设施,以满足中国对核研究及其应用日益增长的兴趣。这个串联实验室的项目于1978年获得批准。一台13 MV串联加速器将由美国马萨诸塞州伯灵顿的高压工程公司提供,一台Q3D磁谱仪将由瑞典AB scanitronix公司提供。一些辅助系统、实验设备和串联油箱正在国内设计和制造。
{"title":"The IAE Peking HI-13 tandem accelerator","authors":"Yu Ju-xian","doi":"10.1016/0029-554X(81)90862-4","DOIUrl":"10.1016/0029-554X(81)90862-4","url":null,"abstract":"<div><p>A new tandem accelerator laboratory is under construction at the Institute of Atomic Energy in Peking. This institute was built in 1958 and equipped with a reactor, cyclotron, electrostatic accelerator and some other facilities to meet the increasing interest in nuclear study and its application in China. The project of this tandem laboratory was approved in 1978. A 13 MV tandem accelerator will be provided by the High Voltage Engineering Corporation of Burlington, Massachusetts, USA, and a Q3D magnetic spectrometer by AB Scanditronix, Sweden. Some auxiliary systems, experimental equipment and the tank of the tandem are being designed and manufactured in China.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 157-159"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90862-4","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80149834","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Initial commissioning progress on the Daresbury 30 MV tandem 达斯伯里30mv串联的初始调试进展
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90844-2
T.W. Aitken

A report is given on the high voltage tests of the Daresbury 30 MV tandem and on the information gained on the control system and the SF6 gas plant.

本文介绍了达斯伯里30mv串联高压试验及控制系统和SF6气体装置的相关信息。
{"title":"Initial commissioning progress on the Daresbury 30 MV tandem","authors":"T.W. Aitken","doi":"10.1016/0029-554X(81)90844-2","DOIUrl":"10.1016/0029-554X(81)90844-2","url":null,"abstract":"<div><p>A report is given on the high voltage tests of the Daresbury 30 MV tandem and on the information gained on the control system and the SF<sub>6</sub> gas plant.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 5-7"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90844-2","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"91179097","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Up-grading of the Strasbourg MP 10 升级斯特拉斯堡mp10
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90850-8
M. Letournel, J.C. Oberlin, G. Heng

The project consists essentially in replacing the standard 72 in. tube sections by new 88 in. tube sections taking advantage both of the protrusion of the electrostatic field towards the dead sections and of the room left there. A first new 88 in. tube section has been tested separately up to 4.6 MV and in normal MP running conditions for three months. After some difficulties with broken tube glasses, the tests of the total upgraded machine are planned for May and June 1980.

该项目主要包括替换标准的72英寸。管段由新的88英寸。管段利用了静电场向死区和在那里留下的空间的突出。第一个新的88英寸。管段分别在4.6 MV和正常MP运行条件下进行了三个月的测试。由于玻璃管破裂,在经历了一些困难之后,计划在1980年5月和6月对升级后的机器进行试验。
{"title":"Up-grading of the Strasbourg MP 10","authors":"M. Letournel,&nbsp;J.C. Oberlin,&nbsp;G. Heng","doi":"10.1016/0029-554X(81)90850-8","DOIUrl":"10.1016/0029-554X(81)90850-8","url":null,"abstract":"<div><p>The project consists essentially in replacing the standard 72 in. tube sections by new 88 in. tube sections taking advantage both of the protrusion of the electrostatic field towards the dead sections and of the room left there. A first new 88 in. tube section has been tested separately up to 4.6 MV and in normal MP running conditions for three months. After some difficulties with broken tube glasses, the tests of the total upgraded machine are planned for May and June 1980.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 67-71"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90850-8","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84022046","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Tests of specially treated carbon stripper foils under heavy ion bombardment 重离子轰击下特殊处理脱碳箔的试验
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90869-7
E. Ranzinger, P. Maier-Komor, H. Maier, H. Münzer
{"title":"Tests of specially treated carbon stripper foils under heavy ion bombardment","authors":"E. Ranzinger, P. Maier-Komor, H. Maier, H. Münzer","doi":"10.1016/0029-554X(81)90869-7","DOIUrl":"https://doi.org/10.1016/0029-554X(81)90869-7","url":null,"abstract":"","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"128 1","pages":"211-214"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87628894","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
Accelerator mass spectrometry and radioisotope detection at the Argonne FN tandem facility 加速器质谱和放射性同位素检测在阿贡FN串联设施
Pub Date : 1981-05-15 DOI: 10.1016/0029-554X(81)90876-4
Walter Henning, Walter Kutschera, Michael Paul , Robert K. Smither, Edward J. Stephenson , Jan L. Yntema

The Argonne FN tandem accelerator and standard components of its experimental heavy-ion research facility have been used as a highly-sensitive mass spectrometer to detect several long-lived radioisotopes and measure their concentrations by counting accelerated ions. Background beams from isobaric nuclei have been eliminated by combining the dispersion from the energy loss in a uniform Al foil stack with the momentum resolution of an Enge split-pole magnetic spectrograph. Radioisotope concentrations in the following ranges have been measured: 14C/12C = 10−12 to 10−13, 26Al/27Al = 10−10 to 10−12, 32Si/Si = 10−8 to 10−14, 36Cl/Cl = 10−10 to 10−11. Particular emphasis was placed on exploring to what extent the technique of identifying and counting individual ions in an accelerator beam can be conveniently used to determine nuclear quantities of interest when the measurement involves very low radioisotope concentrations. We are able to demonstrate the usefulness of this method by measuring the 26Mg(p, n)26 Al(7.2 × 105 yr) cross section at proton energies in the astrophysically interesting range just above threshold, and by accurately determining the previously poorly known half-life of 32Si.

阿贡FN串联加速器及其实验重离子研究设施的标准组件已被用作高灵敏度质谱仪,用于检测几种长寿命放射性同位素,并通过计数加速离子来测量它们的浓度。通过将均匀铝箔堆中能量损失的色散与恩格分裂极磁摄谱仪的动量分辨率相结合,消除了来自等压核的背景光束。测量了以下范围的放射性同位素浓度:14C/12C = 10−12至10−13,26Al/27Al = 10−10至10−12,32Si/Si = 10−8至10−14,36Cl/Cl = 10−10至10−11。特别强调的是探索在何种程度上,当测量涉及非常低的放射性同位素浓度时,识别和计数加速器束中单个离子的技术可以方便地用于确定感兴趣的核量。我们能够通过测量质子能量在刚好高于阈值的天体物理学有趣范围内的26Mg(p, n) 26al (7.2 × 105 yr)的横截面,并通过准确地确定以前鲜为人知的32Si的半衰期,来证明这种方法的有效性。
{"title":"Accelerator mass spectrometry and radioisotope detection at the Argonne FN tandem facility","authors":"Walter Henning,&nbsp;Walter Kutschera,&nbsp;Michael Paul ,&nbsp;Robert K. Smither,&nbsp;Edward J. Stephenson ,&nbsp;Jan L. Yntema","doi":"10.1016/0029-554X(81)90876-4","DOIUrl":"10.1016/0029-554X(81)90876-4","url":null,"abstract":"<div><p>The Argonne FN tandem accelerator and standard components of its experimental heavy-ion research facility have been used as a highly-sensitive mass spectrometer to detect several long-lived radioisotopes and measure their concentrations by counting accelerated ions. Background beams from isobaric nuclei have been eliminated by combining the dispersion from the energy loss in a uniform Al foil stack with the momentum resolution of an Enge split-pole magnetic spectrograph. Radioisotope concentrations in the following ranges have been measured: <sup>14</sup>C/<sup>12</sup>C = 10<sup>−12</sup> to 10<sup>−13</sup>, <sup>26</sup>Al/<sup>27</sup>Al = 10<sup>−10</sup> to 10<sup>−12</sup>, <sup>32</sup>Si/Si = 10<sup>−8</sup> to 10<sup>−14</sup>, <sup>36</sup>Cl/Cl = 10<sup>−10</sup> to 10<sup>−11</sup>. Particular emphasis was placed on exploring to what extent the technique of identifying and counting individual ions in an accelerator beam can be conveniently used to determine nuclear quantities of interest when the measurement involves very low radioisotope concentrations. We are able to demonstrate the usefulness of this method by measuring the <sup>26</sup>Mg(p, n)<sup>26</sup> Al(7.2 × 10<sup>5</sup> yr) cross section at proton energies in the astrophysically interesting range just above threshold, and by accurately determining the previously poorly known half-life of <sup>32</sup>Si.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 247-268"},"PeriodicalIF":0.0,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90876-4","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89232950","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 12
期刊
Nuclear Instruments and Methods
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1