首页 > 最新文献

Journal of Civil Engineering Science and Technology (CI-TECH)最新文献

英文 中文
The Effect of Ecentric Load on The Carrying Capacity Rectangular Foundation on Clay 偏心荷载对粘土矩形地基承载力的影响
Pub Date : 2022-10-31 DOI: 10.33005/ci-tech.v3i2.62
Querida Addisty Prasetyo, Adinda Misela, Miladatul Khofifah, Apta Kania Damayanti, Himatul Farichah
TThe foundation is part of the structure that directly functions to transmit the load from the weight of the structure above it to the ground. In this study, a rectangular foundation is used which is placed on clay soil with 3 variations in dimensions and 7 variations in eccentricity loading. This data will be used in finding the ultimate bearing capacity value. The purpose of this study was to determine the effect of eccentricity loads on the bearing capacity of rectangular foundations on clay soil types. The method used is the Meyerhof method (1963). The results obtained are the magnitude of the value of the bearing capacity of the foundation in each variation of its dimensions which is influenced by the eccentricity of the load. The conclusion of this study is that the bearing capacity of the foundation can be viewed from the coordinates of the axis of the foundation which is affected by the eccentricity of the load. The greater the eccentricity of the load received by the y-axis, the greater the value of the ultimate bearing capacity of the foundation. Meanwhile, the greater the eccentricity load received by the x-axis, the smaller the ultimate bearing capacity value.
基础是结构的一部分,其直接作用是将上面结构的重量传递给地面。在本研究中,矩形基础被放置在具有3种尺寸变化和7种偏心加载变化的粘土上。这些数据将用于计算极限承载力值。本研究的目的是确定偏心荷载对粘土地基矩形基础承载力的影响。所使用的方法是Meyerhof方法(1963)。所得到的结果是受荷载偏心影响的基础在其各尺寸变化中的承载力值的大小。本研究的结论是,基础承载力可以从受荷载偏心影响的基础轴线坐标来看待。y轴所受荷载偏心越大,基础极限承载力取值越大。同时,受x轴偏心载荷越大,极限承载力值越小。
{"title":"The Effect of Ecentric Load on The Carrying Capacity Rectangular Foundation on Clay","authors":"Querida Addisty Prasetyo, Adinda Misela, Miladatul Khofifah, Apta Kania Damayanti, Himatul Farichah","doi":"10.33005/ci-tech.v3i2.62","DOIUrl":"https://doi.org/10.33005/ci-tech.v3i2.62","url":null,"abstract":"\u0000 \u0000 \u0000 \u0000TThe foundation is part of the structure that directly functions to transmit the load from the weight of the structure above it to the ground. In this study, a rectangular foundation is used which is placed on clay soil with 3 variations in dimensions and 7 variations in eccentricity loading. This data will be used in finding the ultimate bearing capacity value. The purpose of this study was to determine the effect of eccentricity loads on the bearing capacity of rectangular foundations on clay soil types. The method used is the Meyerhof method (1963). The results obtained are the magnitude of the value of the bearing capacity of the foundation in each variation of its dimensions which is influenced by the eccentricity of the load. The conclusion of this study is that the bearing capacity of the foundation can be viewed from the coordinates of the axis of the foundation which is affected by the eccentricity of the load. The greater the eccentricity of the load received by the y-axis, the greater the value of the ultimate bearing capacity of the foundation. Meanwhile, the greater the eccentricity load received by the x-axis, the smaller the ultimate bearing capacity value. \u0000 \u0000 \u0000 \u0000","PeriodicalId":221750,"journal":{"name":"Journal of Civil Engineering Science and Technology (CI-TECH)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121131761","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Modal Choice Probability Study from Bus to Train At Jombang – Babat Railway Line Reactivation Design 忠巴线活化设计中巴士转火车的模式选择概率研究
Pub Date : 2022-10-31 DOI: 10.33005/ci-tech.v3i2.64
Nugroho Utomo, Fithri Estikhamah
Currently, the transportation mode which connects Jombang City to Babat City in Lamongan Regency on trip is still using bus. This current transportation mode is under appropriated to serving passengers because there are lack of comfortable, unclean, and long headway time approximately 2 – 3 hours for a same routes. Based on these problems, research about intermodal transportation and modal choice probability is suitable. Intermodal transport is designed to revitalize train routes from Jombang to Babat City. A modal choice probability study obtains the number of predicted passengers which can be switched from the existing transportation mode (bus) to the designed transportation mode (train) by using the Stated Preference method. By creating intermodal transportation, obtained train circulation time plan was 303,49 minutes, the headway time plan was 118,6 minutes, the rolling stock plan requirements are three sets of trains and the ticket price plan is IDR 11.500/passenger. According to the difference between train and bus ticket price when the price of train ticket is lower than bus the result of modal choice probability is 0,88. According to the difference between train and bus travel time when train travel time is faster by 42 minutes than bus the result is 0,87. Then due to departure frequency between train and bus when the number of train departures is more thanfive times per day, the probability analysis results is 0,83.
目前,连接中邦市和拉蒙干县巴巴特市的交通方式仍然是巴士。目前这种交通方式不适合为乘客提供服务,因为同样的路线缺乏舒适,不干净,并且前进时间长,大约需要2 - 3小时。基于这些问题,对多式联运和模式选择概率进行研究是合适的。多式联运旨在振兴从仲邦到巴巴特市的火车路线。通过模式选择概率研究,利用陈述偏好法,得到了从现有交通方式(公共汽车)切换到设计交通方式(火车)的预测乘客数量。通过创建多式联运,得到列车循环时间计划为303.49分钟,车头时间计划为118.6分钟,车辆计划要求为3组列车,票价计划为11.500印尼盾/人次。根据火车票价与公共汽车票价的差异,当火车票价低于公共汽车票价时,模式选择概率的结果为0,88。根据火车和公共汽车出行时间之差,当火车出行时间比公共汽车快42分钟时,结果为0,87。然后,由于火车和公共汽车之间的发车频率,当火车发车次数大于每天5次时,概率分析结果为0,83。
{"title":"Modal Choice Probability Study from Bus to Train At Jombang – Babat Railway Line Reactivation Design","authors":"Nugroho Utomo, Fithri Estikhamah","doi":"10.33005/ci-tech.v3i2.64","DOIUrl":"https://doi.org/10.33005/ci-tech.v3i2.64","url":null,"abstract":"Currently, the transportation mode which connects Jombang City to Babat City in Lamongan Regency on trip is still using bus. This current transportation mode is under appropriated to serving passengers because there are lack of comfortable, unclean, and long headway time approximately 2 – 3 hours for a same routes. Based on these problems, research about intermodal transportation and modal choice probability is suitable. Intermodal transport is designed to revitalize train routes from Jombang to Babat City. A modal choice probability study obtains the number of predicted passengers which can be switched from the existing transportation mode (bus) to the designed transportation mode (train) by using the Stated Preference method. By creating intermodal transportation, obtained train circulation time plan was 303,49 minutes, the headway time plan was 118,6 minutes, the rolling stock plan requirements are three sets of trains and the ticket price plan is IDR 11.500/passenger. According to the difference between train and bus ticket price when the price of train ticket is lower than bus the result of modal choice probability is 0,88. According to the difference between train and bus travel time when train travel time is faster by 42 minutes than bus the result is 0,87. Then due to departure frequency between train and bus when the number of train departures is more thanfive times per day, the probability analysis results is 0,83.","PeriodicalId":221750,"journal":{"name":"Journal of Civil Engineering Science and Technology (CI-TECH)","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125258878","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analysis Of Theissen Method With IDW Plotting In Kediri City 克迪里市IDW标绘Theissen法分析
Pub Date : 2022-10-31 DOI: 10.33005/ci-tech.v3i2.60
Sony Susanto, S. Winarto, Romadhon
Rain that falls on the ground is one of the water sources that must be preserved. Great haste can also result in catastrophes, so a mapping estimate is required to determine the flow in a few years using a geographic information system and the isohyet approach with the Arcview application. This investigation’s stage is searching for data in SHP format in the Kediri metropolitan area. The area is plotted using the IDW method by entering precipitation data and coordinates. Then the rainfall relief according to the BMKG classification is obtained using the isohyet approach mapping, indicating that the maximum rainfall level for 2017-2021 will be rather high to moderate. Illustrates a trend in annual maximum rainfall loss.  
落在地上的雨水是必须保存的水源之一。过于匆忙也可能导致灾难,因此需要使用地理信息系统和Arcview应用程序的等雨量线方法进行地图估计,以确定几年内的流量。本次调查的阶段是在Kediri大都市区寻找SHP格式的数据。通过输入降水数据和坐标,使用IDW方法绘制该区域。然后利用等雨量线方法作图得到BMKG分类下的降雨量起伏,表明2017-2021年最大降雨量将处于较高至中等水平。图示年最大降雨量损失的趋势。
{"title":"Analysis Of Theissen Method With IDW Plotting In Kediri City","authors":"Sony Susanto, S. Winarto, Romadhon","doi":"10.33005/ci-tech.v3i2.60","DOIUrl":"https://doi.org/10.33005/ci-tech.v3i2.60","url":null,"abstract":"Rain that falls on the ground is one of the water sources that must be preserved. Great haste can also result in catastrophes, so a mapping estimate is required to determine the flow in a few years using a geographic information system and the isohyet approach with the Arcview application. This investigation’s stage is searching for data in SHP format in the Kediri metropolitan area. The area is plotted using the IDW method by entering precipitation data and coordinates. Then the rainfall relief according to the BMKG classification is obtained using the isohyet approach mapping, indicating that the maximum rainfall level for 2017-2021 will be rather high to moderate. Illustrates a trend in annual maximum rainfall loss. \u0000 ","PeriodicalId":221750,"journal":{"name":"Journal of Civil Engineering Science and Technology (CI-TECH)","volume":"113 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117281991","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Estimated Cost And Productivity Of Heavy Equipment Dump Truck On The Blitar / Malang Sp 5 Purwodadi Sta 8 + 450 – 8 + 500 Bts Road Project Blitar / Malang Sp 5 Purwodadi Sta 8 + 450 - 8 + 500 Bts公路项目重型设备自卸卡车的成本和生产率估算
Pub Date : 2022-10-31 DOI: 10.33005/ci-tech.v3i2.59
Fajar Romadhon, Moch. Zaenuri Arifin, Sony Susanto, B. Subiyanto, Titin Widya Risni, Amanda Rodriko Ferijiyansyah
Developments in areas such as roads, buildings, bridges, canals, and other developments are currently developing in the Purwodadi area. One of the jobs, namely the excavation process with a large scale of work, needs to be taken into account in terms of time, cost, and selection of equipment types. During the project, the costs incurred must also be taken into account. This is necessary to complete the work more easily, quickly, and efficiently. Dump trucks are medium to long-distance material transport vehicles. This research aims to determine the dump truck's productivity, the work's budget, and the time required to complete the regular excavation work for STA 8+450 – 8+500 on the BTS BLITAR/MALANG SP 5 PURWODADI road construction project. The research method used is a survey and observation method during the project and calculating the estimated Budget Plan for the rental of heavy equipment Dump Trucks. The results obtained are the number of heavy equipment used in carrying out ordinary excavations and embankments is two units of Dump Trucks with a capacity of 4 m3 with each productivity of 52 m3/hour, which requires 617 cycles to transport material from the excavation area to the stockpile area. Based on the analysis, the estimated cost for the heavy equipment budget for dump trucks is Rp. 5,610.000,00 (Five Million Six Hundred and Ten Thousand Rupiah).
Purwodadi地区目前正在进行道路、建筑、桥梁、运河等领域的开发和其他开发。其中一项作业,即工作量较大的挖掘过程,在时间、成本、设备类型的选择等方面都需要考虑。在项目过程中,所产生的费用也必须考虑在内。这对于更容易、快速和有效地完成工作是必要的。自卸车是中长途物资运输车辆。本研究旨在确定在BTS BLITAR/MALANG SP 5 PURWODADI公路建设项目中,完成STA 8+450 - 8+500定期开挖工作所需的自卸车生产率、工作预算和时间。采用的研究方法是项目期间的调查观察法,并计算重型设备自卸车租赁的估计预算计划。结果表明,在进行普通挖掘和路堤时使用的重型设备数量为2辆自卸卡车,容量为4立方米,每辆生产率为52立方米/小时,需要617个循环才能将材料从挖掘区运输到储存区。根据分析,自卸卡车重型设备预算的估计成本为5,610,000,000卢比(五百六十万卢比)。
{"title":"Estimated Cost And Productivity Of Heavy Equipment Dump Truck On The Blitar / Malang Sp 5 Purwodadi Sta 8 + 450 – 8 + 500 Bts Road Project","authors":"Fajar Romadhon, Moch. Zaenuri Arifin, Sony Susanto, B. Subiyanto, Titin Widya Risni, Amanda Rodriko Ferijiyansyah","doi":"10.33005/ci-tech.v3i2.59","DOIUrl":"https://doi.org/10.33005/ci-tech.v3i2.59","url":null,"abstract":"Developments in areas such as roads, buildings, bridges, canals, and other developments are currently developing in the Purwodadi area. One of the jobs, namely the excavation process with a large scale of work, needs to be taken into account in terms of time, cost, and selection of equipment types. During the project, the costs incurred must also be taken into account. This is necessary to complete the work more easily, quickly, and efficiently. Dump trucks are medium to long-distance material transport vehicles. This research aims to determine the dump truck's productivity, the work's budget, and the time required to complete the regular excavation work for STA 8+450 – 8+500 on the BTS BLITAR/MALANG SP 5 PURWODADI road construction project. The research method used is a survey and observation method during the project and calculating the estimated Budget Plan for the rental of heavy equipment Dump Trucks. The results obtained are the number of heavy equipment used in carrying out ordinary excavations and embankments is two units of Dump Trucks with a capacity of 4 m3 with each productivity of 52 m3/hour, which requires 617 cycles to transport material from the excavation area to the stockpile area. Based on the analysis, the estimated cost for the heavy equipment budget for dump trucks is Rp. 5,610.000,00 (Five Million Six Hundred and Ten Thousand Rupiah).","PeriodicalId":221750,"journal":{"name":"Journal of Civil Engineering Science and Technology (CI-TECH)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125642749","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Effect of Increasing Vehicle Volume on Some Roads in Surabaya Post Pandemic 大流行后泗水部分道路增加车辆数量的影响
Pub Date : 2022-10-31 DOI: 10.33005/ci-tech.v3i2.66
I. Sholichin, Achmad Dzulfiqar Alfiansyah
Population growth and economic development in Indonesia affect the increase in the volume of vehicles. In the era of the pandemic, Indonesia's population growth has increased, so the need for vehicles also increases. The increase in the volume of vehicles, causes congestion in various areas. The WFH (Work From Home) policy, due to the Covid-19 pandemic, has reduced the use of vehicles in traffic. Two years after the pandemic, in 2022, the volume of vehicles in traffic will be higher due to activities that have started to return to normal. The abolition of the WFH (Work From Home) policy has resulted in school offices, tourist attractions, and other infrastructure making the activities of the Indonesian people and economy rise slowly. Although the economy in Indonesia has not increased significantly or can be called unstable, the purchasing power of motorized vehicles has increased. From the results of the research carried out above, it is known that the capacity of Darmo road and Pemuda road has increased the DS value (degree of saturation) in the post-pandemic period compared to the pandemic conditions during the PSBB period. The increasing community activities caused the increased DS value (degree of saturation). This resulted in traffic on Jalan Darmo, Pemuda, and Ahmad Yani becoming more congested than during the pandemic.  
印度尼西亚的人口增长和经济发展影响了车辆数量的增加。在大流行时期,印度尼西亚的人口增长有所增加,因此对车辆的需求也有所增加。车辆数量的增加导致了各个地区的拥堵。由于Covid-19大流行,WFH(在家工作)政策减少了交通中的车辆使用。大流行两年后,即2022年,由于活动开始恢复正常,交通车辆数量将会增加。WFH(在家工作)政策的废除导致了学校办公室、旅游景点和其他基础设施的建设,使得印尼人民的活动和经济增长缓慢。虽然印尼的经济并没有明显的增长或者可以说是不稳定的,但是机动车的购买力已经增加了。从上述研究结果可知,与PSBB期间的大流行条件相比,大流行后时期的Darmo公路和Pemuda公路的通行能力增加了DS值(饱和度)。群落活动的增加导致DS值(饱和度)的增加。这导致Jalan Darmo、Pemuda和Ahmad Yani的交通比大流行期间更加拥挤。
{"title":"The Effect of Increasing Vehicle Volume on Some Roads in Surabaya Post Pandemic","authors":"I. Sholichin, Achmad Dzulfiqar Alfiansyah","doi":"10.33005/ci-tech.v3i2.66","DOIUrl":"https://doi.org/10.33005/ci-tech.v3i2.66","url":null,"abstract":"Population growth and economic development in Indonesia affect the increase in the volume of vehicles. In the era of the pandemic, Indonesia's population growth has increased, so the need for vehicles also increases. The increase in the volume of vehicles, causes congestion in various areas. The WFH (Work From Home) policy, due to the Covid-19 pandemic, has reduced the use of vehicles in traffic. Two years after the pandemic, in 2022, the volume of vehicles in traffic will be higher due to activities that have started to return to normal. The abolition of the WFH (Work From Home) policy has resulted in school offices, tourist attractions, and other infrastructure making the activities of the Indonesian people and economy rise slowly. Although the economy in Indonesia has not increased significantly or can be called unstable, the purchasing power of motorized vehicles has increased. From the results of the research carried out above, it is known that the capacity of Darmo road and Pemuda road has increased the DS value (degree of saturation) in the post-pandemic period compared to the pandemic conditions during the PSBB period. The increasing community activities caused the increased DS value (degree of saturation). This resulted in traffic on Jalan Darmo, Pemuda, and Ahmad Yani becoming more congested than during the pandemic. \u0000 ","PeriodicalId":221750,"journal":{"name":"Journal of Civil Engineering Science and Technology (CI-TECH)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117125256","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Road Performance Analysis Using PCE MC Value 0.17 on Rungkut Madya Road 基于PCE MC值0.17的龙库特马迪亚公路道路性能分析
Pub Date : 2022-10-31 DOI: 10.33005/ci-tech.v3i2.65
Maharani Putri Dewanty, Nita Jesika Panjaitan, Shafira Amalia Putri, Mawinda Oktrify Awati, Achmad Dzulfiqar Alfiansyah
Passenger Car Equivalent (PCE) is a conversion factor from various types of vehicles into passenger car units (pc). The PCE value in the 2014 Indonesian Road Capacity Guidelines called PKJI 2014 has a long period with the present. The purpose of this study is to prove that there is a change in current traffic characteristics with the traffic characteristics described in the PKJI 2014. To prove this, the study was conducted by comparing road performance using the PCE MC value according to the PKJI 2014 with research that has been done previously with the results of PCE MC using the modified average headway time method showing 0.17 results. The location of this research was carried out on the Rungkut Madya road (2/2 UD), Surabaya City, East Java, Indonesia. The results obtained from this study are the use of PCE MC according to the PKJI 2014, resulting in a theoretical speed value close to the actual speed value compared to using modified PCE MC. So that the calculation of the performance of the Rungkut Madya road or other roads with similar characteristics does not require modification of the PCE MC value.
乘用车当量(PCE)是从各种类型的车辆转换成乘用车单位(pc)的换算系数。2014年印尼道路通行能力指南(PKJI 2014)中的PCE值与现在有很长的一段时间。本研究的目的是证明当前交通特征与PKJI 2014中描述的交通特征存在变化。为了证明这一点,本研究将根据PKJI 2014使用PCE MC值进行的道路性能与之前使用修正平均车头时法使用PCE MC结果进行的研究进行了比较,结果显示0.17。这项研究的地点是在印度尼西亚东爪哇泗水市的Rungkut Madya路(2/2 UD)进行的。本研究得到的结果是根据PKJI 2014使用PCE MC,与使用修改后的PCE MC相比,得到的理论速度值接近实际速度值,因此在计算Rungkut Madya道路或其他具有类似特征的道路的性能时,不需要修改PCE MC值。
{"title":"Road Performance Analysis Using PCE MC Value 0.17 on Rungkut Madya Road","authors":"Maharani Putri Dewanty, Nita Jesika Panjaitan, Shafira Amalia Putri, Mawinda Oktrify Awati, Achmad Dzulfiqar Alfiansyah","doi":"10.33005/ci-tech.v3i2.65","DOIUrl":"https://doi.org/10.33005/ci-tech.v3i2.65","url":null,"abstract":"Passenger Car Equivalent (PCE) is a conversion factor from various types of vehicles into passenger car units (pc). The PCE value in the 2014 Indonesian Road Capacity Guidelines called PKJI 2014 has a long period with the present. The purpose of this study is to prove that there is a change in current traffic characteristics with the traffic characteristics described in the PKJI 2014. To prove this, the study was conducted by comparing road performance using the PCE MC value according to the PKJI 2014 with research that has been done previously with the results of PCE MC using the modified average headway time method showing 0.17 results. The location of this research was carried out on the Rungkut Madya road (2/2 UD), Surabaya City, East Java, Indonesia. The results obtained from this study are the use of PCE MC according to the PKJI 2014, resulting in a theoretical speed value close to the actual speed value compared to using modified PCE MC. So that the calculation of the performance of the Rungkut Madya road or other roads with similar characteristics does not require modification of the PCE MC value.","PeriodicalId":221750,"journal":{"name":"Journal of Civil Engineering Science and Technology (CI-TECH)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115986736","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Effect of Differences In Soil Nailing Length On The Value Of Safety Factor (Case Study: D.I. Batang Sinamar Project) 土钉长度差异对安全系数值的影响(以D.I.巴塘新港工程为例)
Pub Date : 2022-10-31 DOI: 10.33005/ci-tech.v3i2.61
Fitria Wahyuni, Ragil Purnamasari, Jannatul Firdausi Nuzula
Construction of irrigation canals in the Batang Sinamar area, Sumatra, is carried out in the highlands. The soil on the slope is known to have soft soil consistency. So, it is necessary to analyze the reinforcement design for slopes with soft soil conditions to avoid problems in the future. In this plan, design analysis is carried out using soil nailing, which is planned with different depths, namely 8 meters and 10 meters. Reinforcement analysis will be carried out with the FEM program. From the analysis results, a comparison of the effectiveness of the design will be carried out in terms of cost analysis and the method of implementation. From the analysis results, it was found that the length of soil nailing of 8 meters was more effective in terms of the safety factor value, cost analysis, and duration of the implementation method.
在苏门答腊岛巴塘西纳玛地区的灌溉渠建设是在高地进行的。已知斜坡上的土壤具有软土一致性。因此,有必要对软土边坡的加固设计进行分析,以避免今后出现类似问题。本方案采用土钉法进行设计分析,规划深度分别为8米和10米。用有限元程序进行配筋分析。从分析结果出发,从成本分析和实施方法两方面对设计的有效性进行比较。从分析结果来看,从实施方法的安全系数值、成本分析、工期等方面来看,8米的土钉长度更为有效。
{"title":"The Effect of Differences In Soil Nailing Length On The Value Of Safety Factor (Case Study: D.I. Batang Sinamar Project)","authors":"Fitria Wahyuni, Ragil Purnamasari, Jannatul Firdausi Nuzula","doi":"10.33005/ci-tech.v3i2.61","DOIUrl":"https://doi.org/10.33005/ci-tech.v3i2.61","url":null,"abstract":"\u0000 \u0000 \u0000 \u0000Construction of irrigation canals in the Batang Sinamar area, Sumatra, is carried out in the highlands. The soil on the slope is known to have soft soil consistency. So, it is necessary to analyze the reinforcement design for slopes with soft soil conditions to avoid problems in the future. In this plan, design analysis is carried out using soil nailing, which is planned with different depths, namely 8 meters and 10 meters. Reinforcement analysis will be carried out with the FEM program. From the analysis results, a comparison of the effectiveness of the design will be carried out in terms of cost analysis and the method of implementation. From the analysis results, it was found that the length of soil nailing of 8 meters was more effective in terms of the safety factor value, cost analysis, and duration of the implementation method. \u0000 \u0000 \u0000 \u0000","PeriodicalId":221750,"journal":{"name":"Journal of Civil Engineering Science and Technology (CI-TECH)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133800400","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Comparative Analysis of The Cost of Conventional and Precast Concrete Slabs on High-Rise Building Projects 高层建筑工程中常规混凝土板与预制混凝土板造价的比较分析
Pub Date : 2022-10-31 DOI: 10.33005/ci-tech.v3i2.63
Diah Kurniawati Ningtyas, Arilia Regita Tri Cahyani, Z. R. Kamandang, Muh. Darul Muttaqin, Rizky Nur Cahyanto
Construction processes, particularly floor slab systems, can be executed using precast/precast methods as technology advances. Compared to traditional methods, which need more time and production expenses, precast/precast methods are more cost-effective for floor slab formwork, neater, and have a more consistent finish. This study is based on an eight-floor building project with 92 residential units on a 3,500 m2 plot of land and a 1,700 m2 building size. This investigation used two technologies: conventional precast slab and full slab precast. The purpose of this research is to compare the most cost-effective strategy for reducing production costs on floor slab work for the construction of the case study. Based on the calculation results, the full slab precast method is 14.31% or around Rp. 980,508,000 is more economical than the conventional method. For the conventional method, the total cost is Rp. 3,914,657,000 while for the precast method, the result is Rp. 2,934,149,000.
随着技术的进步,建筑过程,特别是楼板系统,可以使用预制/预制方法来执行。与需要更多时间和生产费用的传统方法相比,预制/预制方法对楼板模板更具成本效益,更整洁,并且具有更一致的光洁度。本研究基于一个8层的建筑项目,该项目有92个住宅单元,地块面积为3500平方米,建筑面积为1700平方米。本研究采用两种技术:常规预制板和全板预制。本研究的目的是比较最具成本效益的策略,以降低楼板施工的生产成本为例进行研究。计算结果表明,全板坯预制法比常规方法节约14.31%,即980,508,000卢比左右。对于常规方法,总成本为Rp. 3,914,657,000,而对于预制方法,结果为Rp. 2,934,149,000。
{"title":"Comparative Analysis of The Cost of Conventional and Precast Concrete Slabs on High-Rise Building Projects","authors":"Diah Kurniawati Ningtyas, Arilia Regita Tri Cahyani, Z. R. Kamandang, Muh. Darul Muttaqin, Rizky Nur Cahyanto","doi":"10.33005/ci-tech.v3i2.63","DOIUrl":"https://doi.org/10.33005/ci-tech.v3i2.63","url":null,"abstract":"\u0000Construction processes, particularly floor slab systems, can be executed using precast/precast methods as technology advances. Compared to traditional methods, which need more time and production expenses, precast/precast methods are more cost-effective for floor slab formwork, neater, and have a more consistent finish. This study is based on an eight-floor building project with 92 residential units on a 3,500 m2 plot of land and a 1,700 m2 building size. This investigation used two technologies: conventional precast slab and full slab precast. The purpose of this research is to compare the most cost-effective strategy for reducing production costs on floor slab work for the construction of the case study. Based on the calculation results, the full slab precast method is 14.31% or around Rp. 980,508,000 is more economical than the conventional method. For the conventional method, the total cost is Rp. 3,914,657,000 while for the precast method, the result is Rp. 2,934,149,000. \u0000","PeriodicalId":221750,"journal":{"name":"Journal of Civil Engineering Science and Technology (CI-TECH)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117083735","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
期刊
Journal of Civil Engineering Science and Technology (CI-TECH)
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1