首页 > 最新文献

Journal of Financial Management of Property and Construction最新文献

英文 中文
Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects 预制预制体积建筑项目关键成功标准的评估
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2021-02-01 DOI: 10.1108/JFMPC-03-2020-0013
I. Y. Wuni, G. Shen, R. Osei-Kyei
PurposePrefabricated prefinished volumetric construction (PPVC) is a game-changing construction method that transforms the fragmented site-based construction of buildings into an integrated production, integration and assembly of value-added volumetric building components. Where circumstances merit, the effective implementation of PPVC leverages significant gains in time, cost, quality, productivity and sustainability performance of construction projects. As PPVC is increasingly becoming mainstream, it is imperative to identify the critical success criteria (CSC) for measuring PPVC project success. The purpose of this study is to identify, rank and benchmark the CSC for measuring PPVC project success.Design/methodology/approachThis study adopted a quantitative research design where the potential CSC for PPVC projects were evaluated. A comprehensive literature and pilot expert review identified 18 CSC for measuring PPVC project success. Based on a questionnaire survey of international PPVC experts, the 18 CSC were analyzed and prioritized using mean score analysis and weighting function.FindingsBased on mean index assessment, the top five CSC for PPVC projects were identified as adherence to project schedules, meeting project quality specification, meeting safety requirements, client and owner satisfaction and cost savings and profitability. Further analysis grouped the 18 CSC into six principal success criteria (PSC), comprising time performance, cost performance, quality performance, environmental and safety performance, stakeholder satisfaction and supply chain performance. Based on weighted analysis of the six PSCs, quality performance, time performance and environmental and safety performance obtained the highest weights.Research limitations/implicationsThe research results are limited by the following limitations. First, although adequate, the sample size was relatively smaller. Second, the generalized analysis overlooked the geospatial sensitivities of the CSC.Originality/valueThe results constitute the first exclusive quantitative ranking and prioritization of the CSC for PPVC projects. The outputs of this study will enable practitioners to reliably and accurately evaluate the performance levels of PPVC projects. A framework of the CSC for measuring the success of PPVC projects was developed.
目的预制预制体积建筑(PPVC)是一种改变游戏规则的建筑方法,它将分散的基于现场的建筑施工转变为增值体积建筑组件的集成生产、集成和组装。在情况允许的情况下,PPVC的有效实施利用了建设项目在时间、成本、质量、生产力和可持续性方面的显著收益。随着PPVC越来越成为主流,确定衡量PPVC项目成功的关键成功标准(CSC)势在必行。本研究的目的是确定、排序和基准CSC,以衡量PPVC项目的成功。设计/方法/方法本研究采用了定量研究设计,对PPVC项目的潜在CSC进行了评估。综合文献和试点专家评审确定了衡量PPVC项目成功的18个CSC。基于对国际PPVC专家的问卷调查,采用平均分分析和加权函数对18名CSC进行了分析和排序。结果根据平均指数评估,PPVC项目的前五名CSC被确定为遵守项目进度、满足项目质量规范、满足安全要求、客户和业主满意度以及成本节约和盈利能力。进一步的分析将18个CSC分为六个主要成功标准(PSC),包括时间绩效、成本绩效、质量绩效、环境和安全绩效、利益相关者满意度和供应链绩效。根据对六个PSC的加权分析,质量性能、时间性能和环境安全性能获得了最高的权重。研究局限性/含义研究结果受到以下局限性的限制。首先,尽管足够,但样本量相对较小。其次,广义分析忽略了CSC的地理空间敏感性。原始性/价值。结果构成了CSC对PPVC项目的第一个排他性定量排名和优先级。这项研究的成果将使从业者能够可靠、准确地评估PPVC项目的绩效水平。制定了CSC的框架,用于衡量PPVC项目的成功。
{"title":"Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects","authors":"I. Y. Wuni, G. Shen, R. Osei-Kyei","doi":"10.1108/JFMPC-03-2020-0013","DOIUrl":"https://doi.org/10.1108/JFMPC-03-2020-0013","url":null,"abstract":"\u0000Purpose\u0000Prefabricated prefinished volumetric construction (PPVC) is a game-changing construction method that transforms the fragmented site-based construction of buildings into an integrated production, integration and assembly of value-added volumetric building components. Where circumstances merit, the effective implementation of PPVC leverages significant gains in time, cost, quality, productivity and sustainability performance of construction projects. As PPVC is increasingly becoming mainstream, it is imperative to identify the critical success criteria (CSC) for measuring PPVC project success. The purpose of this study is to identify, rank and benchmark the CSC for measuring PPVC project success.\u0000\u0000\u0000Design/methodology/approach\u0000This study adopted a quantitative research design where the potential CSC for PPVC projects were evaluated. A comprehensive literature and pilot expert review identified 18 CSC for measuring PPVC project success. Based on a questionnaire survey of international PPVC experts, the 18 CSC were analyzed and prioritized using mean score analysis and weighting function.\u0000\u0000\u0000Findings\u0000Based on mean index assessment, the top five CSC for PPVC projects were identified as adherence to project schedules, meeting project quality specification, meeting safety requirements, client and owner satisfaction and cost savings and profitability. Further analysis grouped the 18 CSC into six principal success criteria (PSC), comprising time performance, cost performance, quality performance, environmental and safety performance, stakeholder satisfaction and supply chain performance. Based on weighted analysis of the six PSCs, quality performance, time performance and environmental and safety performance obtained the highest weights.\u0000\u0000\u0000Research limitations/implications\u0000The research results are limited by the following limitations. First, although adequate, the sample size was relatively smaller. Second, the generalized analysis overlooked the geospatial sensitivities of the CSC.\u0000\u0000\u0000Originality/value\u0000The results constitute the first exclusive quantitative ranking and prioritization of the CSC for PPVC projects. The outputs of this study will enable practitioners to reliably and accurately evaluate the performance levels of PPVC projects. A framework of the CSC for measuring the success of PPVC projects was developed.\u0000","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.9,"publicationDate":"2021-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47381335","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Streamlining the management of payment delays: the case of Sri Lankan Government building construction projects 简化付款延误的管理:以斯里兰卡政府大楼建设项目为例
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2021-02-01 DOI: 10.1108/JFMPC-05-2020-0041
B. Perera, K. G. Dewagoda
PurposeDelayed payments have been long standing, pressing issue in construction projects, especially in Government-funded construction projects. The root causes and the consequences of delayed payments must be identified before implementing strategies to mitigate the consequences of such delayed payments. However, these causes and consequences and the parties responsible for managing the delayed payments have not been identified so far. Therefore, the purpose of this study is to investigate the management of payment delays in Government-funded construction projects.Design/methodology/approachThe study used a mixed approach comprising four case studies and a questionnaire survey. The empirical data collected from the case studies and the questionnaire survey were analysed using manual content analysis and mean rating, respectively.FindingsThe study identified the most significant causes and the most significant consequences of delayed payments that occur in Government-funded construction projects. It also revealed the strategies that clients, consultants, contractors and other parties can adopt to mitigate the adverse consequences of such delayed payments.Originality/valueThis study identified the most significant causes of delayed payments in Government-funded construction projects, the most significant consequences of such delayed payments and the most suitable strategies the clients, consultants and contractors can adopt to mitigate the consequences of such delayed payments. Thus, this study supports streamlining the management of payment delays in Government construction projects and identifies the roles that different parties must play in managing payment delays in Government building projects, which is an under-researched area.
在建设项目中,特别是在政府资助的建设项目中,延迟付款是一个长期存在的紧迫问题。在实施减轻这种延迟付款后果的战略之前,必须查明延迟付款的根本原因和后果。然而,这些原因和后果以及负责管理延迟付款的各方迄今尚未查明。因此,本研究的目的是探讨政府资助建设项目的付款延迟管理。设计/方法/方法本研究采用混合方法,包括四个案例研究和问卷调查。案例研究和问卷调查收集的实证数据分别采用手工内容分析法和平均评分法进行分析。研究发现,在政府资助的建设项目中,延迟付款的最重要原因和最重要的后果。它还揭示了客户、顾问、承包商和其他各方可以采取的策略,以减轻这种延迟付款的不利后果。原创性/价值本研究确定了政府资助建设项目中延迟付款的最重要原因,这种延迟付款的最重要后果以及客户,顾问和承包商可以采取的最合适的策略来减轻这种延迟付款的后果。因此,本研究支持简化政府建设项目付款延迟的管理,并确定不同各方在管理政府建筑项目付款延迟中必须发挥的作用,这是一个研究不足的领域。
{"title":"Streamlining the management of payment delays: the case of Sri Lankan Government building construction projects","authors":"B. Perera, K. G. Dewagoda","doi":"10.1108/JFMPC-05-2020-0041","DOIUrl":"https://doi.org/10.1108/JFMPC-05-2020-0041","url":null,"abstract":"\u0000Purpose\u0000Delayed payments have been long standing, pressing issue in construction projects, especially in Government-funded construction projects. The root causes and the consequences of delayed payments must be identified before implementing strategies to mitigate the consequences of such delayed payments. However, these causes and consequences and the parties responsible for managing the delayed payments have not been identified so far. Therefore, the purpose of this study is to investigate the management of payment delays in Government-funded construction projects.\u0000\u0000\u0000Design/methodology/approach\u0000The study used a mixed approach comprising four case studies and a questionnaire survey. The empirical data collected from the case studies and the questionnaire survey were analysed using manual content analysis and mean rating, respectively.\u0000\u0000\u0000Findings\u0000The study identified the most significant causes and the most significant consequences of delayed payments that occur in Government-funded construction projects. It also revealed the strategies that clients, consultants, contractors and other parties can adopt to mitigate the adverse consequences of such delayed payments.\u0000\u0000\u0000Originality/value\u0000This study identified the most significant causes of delayed payments in Government-funded construction projects, the most significant consequences of such delayed payments and the most suitable strategies the clients, consultants and contractors can adopt to mitigate the consequences of such delayed payments. Thus, this study supports streamlining the management of payment delays in Government construction projects and identifies the roles that different parties must play in managing payment delays in Government building projects, which is an under-researched area.\u0000","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.9,"publicationDate":"2021-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43555070","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
Impact of the banking sector reform in the construction sector 银行业改革对建筑业的影响
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2021-02-01 DOI: 10.1108/JFMPC-03-2020-0012
N. Saka, A. Olanipekun
PurposeBanking sector reforms can impact the development of the real sector. However, there is very little known about this impact on the construction sector in a developing country context. This study aims to evaluate the impact of the banking sector reform on the construction output (CNS) using the banking sector reform in Nigeria in 2005 (2005 Banking Sector Reform Programme [BSRP]) as a case.Design/methodology/approachThis study used econometric methodology comprising unit root test for stationarity, Johansen test for cointegration, analysis of variance (ANOVA) and the analysis of covariance. Time series data covering a period from 1981 to 2017 (37 years) about the banking and construction sector performances are analyzed using ten-time series equations.FindingsThe ANOVA estimates reveal that the 2005 BSRP positively impacted the CNS and construction sector growth rate. However, the ANOVA estimates reveal that the gross domestic product (GDP) and bank total loan had a positive impact on CNS in the period (1981–2017) before and after the 2005 BSRP, and consequently removing the effect of the 2005 BSRP on CNS.Practical implicationsThis paper concludes that the banking sector reform has a positive impact on CNS in the Nigerian construction industry. The impact is greater and lasting when the reform is directly targeted at improving CNS.Originality/valueThis study provides empirical evidence of the dependence between banking sector reform and construction sector performance in a developing country context. Also, this study demonstrates the relationship between GDP, banking sector reform and construction sector performance in a developing country context.
银行业改革可以影响实体部门的发展。但是,对发展中国家的建筑部门的这种影响知之甚少。本研究旨在以2005年尼日利亚银行业改革(2005年银行业改革计划[BSRP])为例,评估银行业改革对建筑产出(CNS)的影响。本研究采用计量经济学方法,包括平稳性的单位根检验、协整检验、方差分析(ANOVA)和协方差分析。本文使用10个时间序列方程分析了1981年至2017年(37年)银行和建筑行业业绩的时间序列数据。方差分析结果显示,2005年BSRP对CNS和建筑行业的增长率产生了积极影响。然而,方差分析估计显示,在2005年BSRP前后(1981-2017年),国内生产总值(GDP)和银行贷款总额对CNS产生了积极影响,从而消除了2005年BSRP对CNS的影响。本文的结论是银行业改革对尼日利亚建筑业的CNS产生了积极的影响。当改革直接以提高中枢神经系统为目标时,其影响更大、更持久。原创性/价值本研究提供了发展中国家背景下银行业改革与建筑业绩效之间依赖关系的实证证据。此外,本研究还展示了在发展中国家背景下GDP、银行业改革和建筑业绩效之间的关系。
{"title":"Impact of the banking sector reform in the construction sector","authors":"N. Saka, A. Olanipekun","doi":"10.1108/JFMPC-03-2020-0012","DOIUrl":"https://doi.org/10.1108/JFMPC-03-2020-0012","url":null,"abstract":"\u0000Purpose\u0000Banking sector reforms can impact the development of the real sector. However, there is very little known about this impact on the construction sector in a developing country context. This study aims to evaluate the impact of the banking sector reform on the construction output (CNS) using the banking sector reform in Nigeria in 2005 (2005 Banking Sector Reform Programme [BSRP]) as a case.\u0000\u0000\u0000Design/methodology/approach\u0000This study used econometric methodology comprising unit root test for stationarity, Johansen test for cointegration, analysis of variance (ANOVA) and the analysis of covariance. Time series data covering a period from 1981 to 2017 (37 years) about the banking and construction sector performances are analyzed using ten-time series equations.\u0000\u0000\u0000Findings\u0000The ANOVA estimates reveal that the 2005 BSRP positively impacted the CNS and construction sector growth rate. However, the ANOVA estimates reveal that the gross domestic product (GDP) and bank total loan had a positive impact on CNS in the period (1981–2017) before and after the 2005 BSRP, and consequently removing the effect of the 2005 BSRP on CNS.\u0000\u0000\u0000Practical implications\u0000This paper concludes that the banking sector reform has a positive impact on CNS in the Nigerian construction industry. The impact is greater and lasting when the reform is directly targeted at improving CNS.\u0000\u0000\u0000Originality/value\u0000This study provides empirical evidence of the dependence between banking sector reform and construction sector performance in a developing country context. Also, this study demonstrates the relationship between GDP, banking sector reform and construction sector performance in a developing country context.\u0000","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.9,"publicationDate":"2021-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44513420","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
An analysis of the impact of jurisdictional fragmentation on property taxes in Ghana 加纳司法管辖区分散对财产税的影响分析
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2021-01-21 DOI: 10.1108/JFMPC-07-2020-0048
F. Oppong
PurposeFollowing decades of weak financial capacity of local governments in raising enough revenues to finance their budgets, this paper aims to examine the impact of jurisdictional fragmentation on property taxes in Ghana. Since independence in 1957, many local governments in Ghana are yet to build their fiscal capacity to collect enough own source revenues to support their local budgets. All local government laws in Ghana have assigned property taxes to local governments.Design/methodology/approachThe paper uses quantitative econometric techniques with local level panel data from 2010 to 2016 to examine the impact of fragmenting assemblies in Ghana.FindingsThe paper finds that fragmenting local governments have an overall negative effect on property taxes in district assemblies in Ghana. However, fragmentation of metropolitan assemblies has an overall positive effect on property taxes, relative to district assemblies. In the case of municipal assemblies, fragmentation has a net positive effect on property taxes but an overall marginally negative effect, relative to district assemblies. Also, the paper finds that grants, capital expenditure and administrative expenditure of local governments do not impact on the collection of property tax revenues in all types of assemblies in Ghana.Originality/valueThe paper concludes that relative to metropolitan assemblies, fragmenting districts assemblies is not congruent with government efforts to promote the collection of property taxes in Ghana.
目的在地方政府几十年来在筹集足够的收入来资助预算方面的财政能力薄弱之后,本文旨在研究管辖权分散对加纳财产税的影响。自1957年独立以来,加纳的许多地方政府尚未建立财政能力,以收集足够的自有收入来支持地方预算。加纳的所有地方政府法律都将财产税分配给了地方政府。设计/方法/方法本文使用定量计量经济技术和2010年至2016年的地方一级面板数据来研究加纳议会分裂的影响。发现地方政府分裂对加纳地区议会的财产税有总体负面影响。然而,相对于地区议会,大都市议会的分散对财产税有着总体的积极影响。就市政议会而言,相对于地区议会,分裂对财产税有净的积极影响,但总体上略有负面影响。此外,本文还发现,地方政府的拨款、资本支出和行政支出不会影响加纳所有类型集会的财产税收入,分散地区议会与加纳政府促进征收财产税的努力并不一致。
{"title":"An analysis of the impact of jurisdictional fragmentation on property taxes in Ghana","authors":"F. Oppong","doi":"10.1108/JFMPC-07-2020-0048","DOIUrl":"https://doi.org/10.1108/JFMPC-07-2020-0048","url":null,"abstract":"\u0000Purpose\u0000Following decades of weak financial capacity of local governments in raising enough revenues to finance their budgets, this paper aims to examine the impact of jurisdictional fragmentation on property taxes in Ghana. Since independence in 1957, many local governments in Ghana are yet to build their fiscal capacity to collect enough own source revenues to support their local budgets. All local government laws in Ghana have assigned property taxes to local governments.\u0000\u0000\u0000Design/methodology/approach\u0000The paper uses quantitative econometric techniques with local level panel data from 2010 to 2016 to examine the impact of fragmenting assemblies in Ghana.\u0000\u0000\u0000Findings\u0000The paper finds that fragmenting local governments have an overall negative effect on property taxes in district assemblies in Ghana. However, fragmentation of metropolitan assemblies has an overall positive effect on property taxes, relative to district assemblies. In the case of municipal assemblies, fragmentation has a net positive effect on property taxes but an overall marginally negative effect, relative to district assemblies. Also, the paper finds that grants, capital expenditure and administrative expenditure of local governments do not impact on the collection of property tax revenues in all types of assemblies in Ghana.\u0000\u0000\u0000Originality/value\u0000The paper concludes that relative to metropolitan assemblies, fragmenting districts assemblies is not congruent with government efforts to promote the collection of property taxes in Ghana.\u0000","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.9,"publicationDate":"2021-01-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48122926","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Does ownership structure and market sentiment affect the performance of IPOs in India in short run? A dynamic panel data analysis 股权结构和市场情绪是否会在短期内影响印度IPO的表现?动态面板数据分析
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2021-01-21 DOI: 10.1108/JFMPC-10-2019-0077
H. Singla
PurposeThis study aims to compare the short-run performance of construction and non-construction initial public offerings (IPOs) that are offered in India during 2006–2015. The study also attempts to investigate the impact of ownership structure (i.e. concentrated ownership in the hand of promoters and institutional ownership) and market sentiment on the performance of construction sector IPOs in short run.Design/methodology/approachA total of 281 IPOs were listed at National Stock Exchange, India, during the study period, and 44 of those were from construction sector. The short-run performance of these construction and non-construction IPOs was compared using two indicators, i.e. monthly stock return (SR) and excess return over market benchmark (MAR). To examine the effect of concentrated ownership in the hand of promoters, institutional ownership and market sentiment on IPO performance, systematic dynamic panel regression model was developed.FindingsThe IPOs of construction firms perform significantly better than the non-construction firms. The performance of construction IPOs is significantly driven by the lag effect. This suggests a significant informational inefficiency, which results in a delayed reaction by investors. The market sentiment has a positive influence on the performance of construction sector IPOs, whereas the institutional holding has a negative influence.Originality/valueTo the best of the author’s knowledge, this study is the first attempt to examine the performance of construction sector IPOs in short run. The study uses systematic dynamic panel data regression, which provides better and reliable estimates.
目的本研究旨在比较印度2006-2015年期间建筑业和非建筑业首次公开募股(IPO)的短期表现。该研究还试图调查所有权结构(即发起人手中的集中所有权和机构所有权)和市场情绪对建筑业IPO短期业绩的影响。设计/方法/方法在研究期间,共有281家首次公开募股在印度国家证券交易所上市,其中44家来自建筑业。使用两个指标,即月度股票回报率(SR)和超过市场基准的超额回报率(MAR),对这些建筑和非建筑IPO的短期表现进行了比较。为了考察发起人集中持股、机构持股和市场情绪对IPO业绩的影响,建立了系统的动态面板回归模型。发现建筑公司的首次公开募股表现明显好于非建筑公司。建筑业IPO的表现在很大程度上受到滞后效应的驱动。这表明信息效率低下,导致投资者反应迟缓。市场情绪对建筑行业IPO的表现有积极影响,而机构持股则有负面影响。原创性/价值据作者所知,本研究首次尝试检验建筑业IPO在短期内的表现。该研究使用了系统的动态面板数据回归,提供了更好和可靠的估计。
{"title":"Does ownership structure and market sentiment affect the performance of IPOs in India in short run? A dynamic panel data analysis","authors":"H. Singla","doi":"10.1108/JFMPC-10-2019-0077","DOIUrl":"https://doi.org/10.1108/JFMPC-10-2019-0077","url":null,"abstract":"\u0000Purpose\u0000This study aims to compare the short-run performance of construction and non-construction initial public offerings (IPOs) that are offered in India during 2006–2015. The study also attempts to investigate the impact of ownership structure (i.e. concentrated ownership in the hand of promoters and institutional ownership) and market sentiment on the performance of construction sector IPOs in short run.\u0000\u0000\u0000Design/methodology/approach\u0000A total of 281 IPOs were listed at National Stock Exchange, India, during the study period, and 44 of those were from construction sector. The short-run performance of these construction and non-construction IPOs was compared using two indicators, i.e. monthly stock return (SR) and excess return over market benchmark (MAR). To examine the effect of concentrated ownership in the hand of promoters, institutional ownership and market sentiment on IPO performance, systematic dynamic panel regression model was developed.\u0000\u0000\u0000Findings\u0000The IPOs of construction firms perform significantly better than the non-construction firms. The performance of construction IPOs is significantly driven by the lag effect. This suggests a significant informational inefficiency, which results in a delayed reaction by investors. The market sentiment has a positive influence on the performance of construction sector IPOs, whereas the institutional holding has a negative influence.\u0000\u0000\u0000Originality/value\u0000To the best of the author’s knowledge, this study is the first attempt to examine the performance of construction sector IPOs in short run. The study uses systematic dynamic panel data regression, which provides better and reliable estimates.\u0000","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.9,"publicationDate":"2021-01-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44080902","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Impact of social media usage on performance of construction businesses (CBs) in Abuja, Nigeria 社交媒体使用对尼日利亚阿布贾建筑企业(CBs)绩效的影响
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2021-01-18 DOI: 10.1108/JFMPC-05-2020-0042
L. Oyewobi, Olufemi Seth Olorunyomi, R. Jimoh, J. Rotimi
PurposeMany construction businesses are currently building and keeping social media pages for their enterprises to be visible to the public to improve their social interaction, promote business interest, build trust and relationships with their targeted audience on social media. The purpose of this study is to examine the impact of social mediausage on performance of construction businesses (CBs) in Abuja, Nigeria.Design/methodology/approachThis study used a quantitative research approach by identifying constructs that reveal three aspects of organisation’s physiognomies that impact the process of espousing, implementing and using technological innovations in conducting businesses. Well-structured questionnaire was used to obtain data from 113 purposively sampled building materials’ merchant operating in Dei-Dei Market, Abuja, Nigeria. This study used partial least squares structural equation modelling technique to establish the relationship among the constructs.FindingsThe results of this study indicated that technology has significant relationship with social media adoption, whereas social media adoption has a very strong positive impact on organisation’s performance (P < 0.001) with respect to improved customer relations and services and enhanced information accessibility.Research limitations/implicationsThis study has implications for CBs that wish to adopt social media to promote their businesses by presenting to them the opportunity to understand the impact of technology, environment and organisational potential in improving business performance. This study is cross-sectional in nature, and this calls for caution in interpreting the results.Originality/valueThis paper developed and tested a conceptual framework presented to understand the interrelationships amongst the constructs, which would be of great significance to business owners in developing their social interaction and promote business interest via social media. The outcome of this research is beneficial to researchers to further study how the different social media tools could help in influencing business decisions.
目前,许多建筑企业正在为其企业建立和维护社交媒体页面,以便公众可以看到他们的企业,以改善他们的社会互动,促进商业兴趣,在社交媒体上与目标受众建立信任和关系。本研究的目的是研究社交媒体的使用对尼日利亚阿布贾建筑企业(CBs)绩效的影响。设计/方法/方法本研究采用了定量研究方法,通过确定结构,揭示了组织面相的三个方面,这些方面影响了在开展业务时支持、实施和使用技术创新的过程。采用结构合理的调查问卷,对尼日利亚阿布贾市Dei-Dei市场的113家建材商家进行了有目的的抽样调查。本研究采用偏最小二乘结构方程建模技术来建立构式之间的关系。本研究的结果表明,技术与社交媒体的采用有显著的关系,而社交媒体的采用对组织的绩效有非常强的积极影响(P < 0.001),就改善客户关系和服务以及增强信息可及性而言。研究局限/启示本研究对希望采用社交媒体来促进业务的商业广播公司有启示,向他们展示了了解技术、环境和组织潜力对提高业务绩效的影响的机会。这项研究本质上是横断面的,因此在解释结果时需要谨慎。原创性/价值本文开发并测试了一个概念框架,以理解构式之间的相互关系,这对企业主通过社交媒体发展社交互动和促进商业兴趣具有重要意义。本研究的结果有利于研究人员进一步研究不同的社交媒体工具如何帮助影响商业决策。
{"title":"Impact of social media usage on performance of construction businesses (CBs) in Abuja, Nigeria","authors":"L. Oyewobi, Olufemi Seth Olorunyomi, R. Jimoh, J. Rotimi","doi":"10.1108/JFMPC-05-2020-0042","DOIUrl":"https://doi.org/10.1108/JFMPC-05-2020-0042","url":null,"abstract":"\u0000Purpose\u0000Many construction businesses are currently building and keeping social media pages for their enterprises to be visible to the public to improve their social interaction, promote business interest, build trust and relationships with their targeted audience on social media. The purpose of this study is to examine the impact of social mediausage on performance of construction businesses (CBs) in Abuja, Nigeria.\u0000\u0000\u0000Design/methodology/approach\u0000This study used a quantitative research approach by identifying constructs that reveal three aspects of organisation’s physiognomies that impact the process of espousing, implementing and using technological innovations in conducting businesses. Well-structured questionnaire was used to obtain data from 113 purposively sampled building materials’ merchant operating in Dei-Dei Market, Abuja, Nigeria. This study used partial least squares structural equation modelling technique to establish the relationship among the constructs.\u0000\u0000\u0000Findings\u0000The results of this study indicated that technology has significant relationship with social media adoption, whereas social media adoption has a very strong positive impact on organisation’s performance (P < 0.001) with respect to improved customer relations and services and enhanced information accessibility.\u0000\u0000\u0000Research limitations/implications\u0000This study has implications for CBs that wish to adopt social media to promote their businesses by presenting to them the opportunity to understand the impact of technology, environment and organisational potential in improving business performance. This study is cross-sectional in nature, and this calls for caution in interpreting the results.\u0000\u0000\u0000Originality/value\u0000This paper developed and tested a conceptual framework presented to understand the interrelationships amongst the constructs, which would be of great significance to business owners in developing their social interaction and promote business interest via social media. The outcome of this research is beneficial to researchers to further study how the different social media tools could help in influencing business decisions.\u0000","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.9,"publicationDate":"2021-01-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48700877","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Mechanisms and challenges in financing renewable energy projects in sub-Saharan Africa: a Ghanaian perspective 撒哈拉以南非洲可再生能源项目融资的机制和挑战:加纳视角
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2021-01-01 DOI: 10.1108/JFMPC-03-2020-0014
D. Owusu-Manu, L. Mankata, C. Debrah, D. Edwards, Igor Martek
Purpose Ghana has set an objective of achieving 10% of its energy requirements through renewable sources, by 2020. However, to date, the renewable energy (RE) sector has attracted only marginal investor interest. This paper aims to identify the challenges faced in financing RE in Ghana. Design/methodology/approach A comprehensive review of literature in renewable energy finance was conducted and 12 financing challenges were identified. From this list, a questionnaire was developed asking to rank barriers. This was distributed to experts within financial institutions and 32 were returned. A factor analysis and severity index analysis were performed to identify a ranking of challenges impeding RE project financing in Ghana. Findings The challenges to RE financing fall into the three broad categories, namely, “economic, commercial and regulatory” challenges. Within these broad constraints, “long payback periods,” “limited track record” and “high upfront cost” are the most severe impediments to obtaining financing for RE. Practical implications Identifying the specific conditions that make an investment in RE unattractive, give policymakers set on achieving the 10% RE goal, a way forward in developing a targeted policy that would mitigate identified investor disincentives. Originality/value The broad range of potential barriers to investment are known. However, this study combines a specific governmental ambition – encouraging the financing of RE – with a specific set of identified barriers inhibiting that ambition. In this regard, this study identifies exactly where the government needs to act if it is to facilitate investment in RE, as is required for Ghana to reach its 10% RE target.
加纳制定了到2020年通过可再生能源实现10%的能源需求的目标。然而,到目前为止,可再生能源(RE)部门只吸引了边际投资者的兴趣。本文旨在确定加纳可再生能源融资面临的挑战。设计/方法/方法对可再生能源融资方面的文献进行了全面回顾,并确定了12项融资挑战。从这个列表中,我们开发了一份问卷,要求对障碍进行排名。这些资料分发给了金融机构内的专家,并退回了32份。进行了因素分析和严重程度指数分析,以确定阻碍加纳可再生能源项目融资的挑战排名。可再生能源融资面临的挑战可分为三大类,即“经济、商业和监管”挑战。在这些广泛的制约因素中,“投资回收期长”、“业绩记录有限”和“前期成本高”是获得可再生能源融资的最严重障碍。实际意义识别使可再生能源投资缺乏吸引力的具体条件,为政策制定者设定实现10%可再生能源目标的目标,从而制定有针对性的政策,减轻已确定的投资者阻碍因素。原创性/价值投资的各种潜在障碍是众所周知的。然而,本研究结合了政府的具体目标——鼓励可再生能源融资——以及阻碍这一目标的一系列明确障碍。在这方面,本研究准确地确定了政府在促进可再生能源投资方面需要采取的行动,这是加纳实现10%可再生能源目标所必需的。
{"title":"Mechanisms and challenges in financing renewable energy projects in sub-Saharan Africa: a Ghanaian perspective","authors":"D. Owusu-Manu, L. Mankata, C. Debrah, D. Edwards, Igor Martek","doi":"10.1108/JFMPC-03-2020-0014","DOIUrl":"https://doi.org/10.1108/JFMPC-03-2020-0014","url":null,"abstract":"Purpose Ghana has set an objective of achieving 10% of its energy requirements through renewable sources, by 2020. However, to date, the renewable energy (RE) sector has attracted only marginal investor interest. This paper aims to identify the challenges faced in financing RE in Ghana. Design/methodology/approach A comprehensive review of literature in renewable energy finance was conducted and 12 financing challenges were identified. From this list, a questionnaire was developed asking to rank barriers. This was distributed to experts within financial institutions and 32 were returned. A factor analysis and severity index analysis were performed to identify a ranking of challenges impeding RE project financing in Ghana. Findings The challenges to RE financing fall into the three broad categories, namely, “economic, commercial and regulatory” challenges. Within these broad constraints, “long payback periods,” “limited track record” and “high upfront cost” are the most severe impediments to obtaining financing for RE. Practical implications Identifying the specific conditions that make an investment in RE unattractive, give policymakers set on achieving the 10% RE goal, a way forward in developing a targeted policy that would mitigate identified investor disincentives. Originality/value The broad range of potential barriers to investment are known. However, this study combines a specific governmental ambition – encouraging the financing of RE – with a specific set of identified barriers inhibiting that ambition. In this regard, this study identifies exactly where the government needs to act if it is to facilitate investment in RE, as is required for Ghana to reach its 10% RE target.","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":"1 1","pages":""},"PeriodicalIF":1.9,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"62099448","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 14
Linking supply chain disruptions with organisational performance of construction firms: the moderating role of innovation 链接供应链中断与建筑公司的组织绩效:创新的调节作用
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2020-12-22 DOI: 10.1108/jfmpc-11-2019-0084
E. Kissi, K. Agyekum, Labaran Musah, D. Owusu-Manu, C. Debrah
PurposeSupply chain (SC) disruption, whether demand sided or supply sided, is conversely perceived to affect organisational performance of construction firms. This paper, therefore, aims to examine the linkage of supply chain disruptions with organisational performance of construction firms through the moderating role of innovation.Design/methodology/approachUsing a quantitative research, approach the views of 84 construction professionals were elicited using a structured questionnaire. Ordinary least squares were utilised to validate the hypotheses set.FindingsThe study proved that there is a negative relationship between demand-related disruption and business performance as well as project performance. Also, it was clear from the study that supply-related disruptions had a significant impact on both project performance and business performance. Although SC innovation was seen to impact business performance, it had no relationship with project performance. Generally, innovation was seen to have a moderating effect of demand and supply disruption of project performance, but it played no moderating role in business performance.Practical implicationsThe findings suggest that business firms must be innovative with the supply chain, as it moderated project success. The supply chain of a construction firm plays a very critical role on projects; hence, this study recommends that a supply chain manager ought to be innovative in their operations due to the moderating role SC innovation has on project performance and largely business performance.Originality/valueVarious studies on supply chain has been done on different sectors in the economy; however, little can be said about the construction industry on how supply chain disruptions affects business and project performance and how innovation moderates such effects.
供应链(SC)中断,无论是需求方还是供应方,都被相反地认为会影响建筑公司的组织绩效。因此,本文旨在通过创新的调节作用来研究供应链中断与建筑公司组织绩效的联系。设计/方法/方法采用定量研究的方法,采用结构化问卷调查的方式征求了84名建筑专业人员的意见。利用普通最小二乘来验证假设集。研究结果证明,需求相关中断与业务绩效以及项目绩效之间存在负相关关系。此外,从研究中可以清楚地看出,供应相关的中断对项目绩效和业务绩效都有重大影响。虽然供应链创新被认为会影响企业绩效,但它与项目绩效没有关系。一般来说,创新被认为对项目绩效的需求和供应中断有调节作用,但对企业绩效没有调节作用。实际意义研究结果表明,商业公司必须创新供应链,因为它调节了项目的成功。建筑企业的供应链在项目中起着至关重要的作用;因此,本研究建议,由于供应链创新对项目绩效和主要业务绩效的调节作用,供应链管理者应该在运营中创新。关于供应链的各种研究已经在经济的不同部门进行;然而,关于建筑行业供应链中断如何影响业务和项目绩效以及创新如何缓和这种影响,几乎没有什么可说的。
{"title":"Linking supply chain disruptions with organisational performance of construction firms: the moderating role of innovation","authors":"E. Kissi, K. Agyekum, Labaran Musah, D. Owusu-Manu, C. Debrah","doi":"10.1108/jfmpc-11-2019-0084","DOIUrl":"https://doi.org/10.1108/jfmpc-11-2019-0084","url":null,"abstract":"\u0000Purpose\u0000Supply chain (SC) disruption, whether demand sided or supply sided, is conversely perceived to affect organisational performance of construction firms. This paper, therefore, aims to examine the linkage of supply chain disruptions with organisational performance of construction firms through the moderating role of innovation.\u0000\u0000\u0000Design/methodology/approach\u0000Using a quantitative research, approach the views of 84 construction professionals were elicited using a structured questionnaire. Ordinary least squares were utilised to validate the hypotheses set.\u0000\u0000\u0000Findings\u0000The study proved that there is a negative relationship between demand-related disruption and business performance as well as project performance. Also, it was clear from the study that supply-related disruptions had a significant impact on both project performance and business performance. Although SC innovation was seen to impact business performance, it had no relationship with project performance. Generally, innovation was seen to have a moderating effect of demand and supply disruption of project performance, but it played no moderating role in business performance.\u0000\u0000\u0000Practical implications\u0000The findings suggest that business firms must be innovative with the supply chain, as it moderated project success. The supply chain of a construction firm plays a very critical role on projects; hence, this study recommends that a supply chain manager ought to be innovative in their operations due to the moderating role SC innovation has on project performance and largely business performance.\u0000\u0000\u0000Originality/value\u0000Various studies on supply chain has been done on different sectors in the economy; however, little can be said about the construction industry on how supply chain disruptions affects business and project performance and how innovation moderates such effects.\u0000","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.9,"publicationDate":"2020-12-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44536128","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 8
Exploring collaboration within social housing retrofit practice for an ageing population: a single case study in the West of Scotland 探索老龄化人口社会住房改造实践中的合作:苏格兰西部的单一案例研究
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2020-12-01 DOI: 10.1108/JFMPC-04-2020-0020
D. Rodger, Nicola Callaghan, C. Thomson
PurposeSustainably addressing the social and economic demands from an ageing population is a major global challenge, with significant implications for policy and practice. This is resultant of the increasing demand for housing adaptations to prevent increased pressure upon acute health services. Through the lens of institutional theory, this paper aims to explore the levels of joined-up retrofit practice within a Scottish social housing provider, under a constructivist approach.Design/methodology/approachAn exploratory single case study of a Scottish local authority was undertaken. Within this, nine key stakeholders were interviewed, taking a hierarchical approach, from director to repair and maintenance staff. Results were analysed by using Braun and Clarke’s six stages of thematic analysis.FindingsThere is a need for greater levels of integration within retrofit practice to not only improve the health and well-being of the older population but also increase efficiency and economic savings within public services. Currently, there are key issues surrounding silo-based decision-making, poor data infrastructure, power struggles and a dereliction of built environment knowledge and expertise, preventing both internal and external collaboration. However, housing, energy and health have interlinking agendas which are integral to achieving ageing in place. Therefore, there must be system-wide recognition of the potential benefits of improved cross-sector collaboration, preventing unintended consequences whilst providing socioeconomic outcomes.Originality/valueThis research provides a new perspective surrounding retrofit practice within the context of an ageing population. It highlights the requirement for improved cross sector collaboration and the social and economic cost of poor quality practice.
可持续地满足人口老龄化的社会和经济需求是一项重大的全球挑战,对政策和实践具有重大影响。这是对住房改造需求不断增加的结果,以防止急性卫生服务压力增加。通过制度理论的视角,本文旨在探索在建构主义方法下,苏格兰社会住房提供者内部联合改造实践的水平。设计/方法/方法对苏格兰地方当局进行了探索性的单一案例研究。在此过程中,从主管到维修和维护人员,九名关键利益相关者接受了采访,采取了分级方法。使用Braun和Clarke的六个阶段的主题分析对结果进行了分析。发现在改造实践中需要更大程度的整合,不仅要改善老年人的健康和福祉,还要提高公共服务的效率和经济节约。目前,存在一些关键问题,包括基于筒仓的决策、糟糕的数据基础设施、权力斗争以及对建筑环境知识和专业知识的忽视,阻碍了内部和外部合作。然而,住房、能源和卫生有着相互关联的议程,这些议程对于实现老龄化是不可或缺的。因此,必须在全系统范围内认识到改进跨部门合作的潜在好处,在提供社会经济成果的同时防止意外后果。独创性/价值这项研究为人口老龄化背景下的改造实践提供了一个新的视角。它强调了改进跨部门合作的必要性以及低质量做法的社会和经济成本。
{"title":"Exploring collaboration within social housing retrofit practice for an ageing population: a single case study in the West of Scotland","authors":"D. Rodger, Nicola Callaghan, C. Thomson","doi":"10.1108/JFMPC-04-2020-0020","DOIUrl":"https://doi.org/10.1108/JFMPC-04-2020-0020","url":null,"abstract":"\u0000Purpose\u0000Sustainably addressing the social and economic demands from an ageing population is a major global challenge, with significant implications for policy and practice. This is resultant of the increasing demand for housing adaptations to prevent increased pressure upon acute health services. Through the lens of institutional theory, this paper aims to explore the levels of joined-up retrofit practice within a Scottish social housing provider, under a constructivist approach.\u0000\u0000\u0000Design/methodology/approach\u0000An exploratory single case study of a Scottish local authority was undertaken. Within this, nine key stakeholders were interviewed, taking a hierarchical approach, from director to repair and maintenance staff. Results were analysed by using Braun and Clarke’s six stages of thematic analysis.\u0000\u0000\u0000Findings\u0000There is a need for greater levels of integration within retrofit practice to not only improve the health and well-being of the older population but also increase efficiency and economic savings within public services. Currently, there are key issues surrounding silo-based decision-making, poor data infrastructure, power struggles and a dereliction of built environment knowledge and expertise, preventing both internal and external collaboration. However, housing, energy and health have interlinking agendas which are integral to achieving ageing in place. Therefore, there must be system-wide recognition of the potential benefits of improved cross-sector collaboration, preventing unintended consequences whilst providing socioeconomic outcomes.\u0000\u0000\u0000Originality/value\u0000This research provides a new perspective surrounding retrofit practice within the context of an ageing population. It highlights the requirement for improved cross sector collaboration and the social and economic cost of poor quality practice.\u0000","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":"1 1","pages":""},"PeriodicalIF":1.9,"publicationDate":"2020-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42180257","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Planning the maintenance of green building materials for sustainable development: a building information modelling approach 规划绿色建筑材料的维护以促进可持续发展:一种建筑信息建模方法
IF 1.9 Q3 BUSINESS, FINANCE Pub Date : 2020-12-01 DOI: 10.1108/jfmpc-07-2020-0047
Z. Ismail
PurposeMost green building (GB) materials, which are used widely in the construction sector in Malaysia, perform poorly in terms of energy efficiency and sustainability. Nevertheless, during maintenance planning of these materials, the focus is often directed towards comfort and design instead. However, as GB material construction projects grow in scale and complexity, interconnections between the activities and processes can be noticed during problematic planning performance management to monitor the GB material components for corrective and preventive maintenance actions.Design/methodology/approachThe concept of GB material maintenance planning for sustainable development and the main features of information and communication technology tools and techniques are based on analysis of literature reviews of GB material scenarios.FindingsThe results show how decision-making support in maintenance planning can be unsuccessful and how planning decisions can frame the content of an integrated system to analyse information and reduce risks of GB material failure.Originality/valueThe paper concludes that implementing a research framework for developing such a system can help improve the sustainable performance of maintenance planning of GB material economic, social and environmental issues.
目的马来西亚建筑业广泛使用的大多数绿色建筑材料在能源效率和可持续性方面表现不佳。然而,在这些材料的维护计划中,重点往往是舒适性和设计。然而,随着GB材料建设项目的规模和复杂性的增长,在有问题的规划绩效管理过程中,可以注意到活动和过程之间的相互联系,以监控GB材料组件的纠正和预防性维护行动。设计/方法论/方法可持续发展GB材料维护规划的概念以及信息和通信技术工具和技术的主要特征是基于对GB材料场景的文献综述的分析。结果表明,维护计划中的决策支持可能不成功,以及计划决策如何构建集成系统的内容,以分析信息并降低GB材料故障的风险。原创性/价值本文得出结论,实施开发此类系统的研究框架有助于提高GB物质经济、社会和环境问题维修计划的可持续性。
{"title":"Planning the maintenance of green building materials for sustainable development: a building information modelling approach","authors":"Z. Ismail","doi":"10.1108/jfmpc-07-2020-0047","DOIUrl":"https://doi.org/10.1108/jfmpc-07-2020-0047","url":null,"abstract":"\u0000Purpose\u0000Most green building (GB) materials, which are used widely in the construction sector in Malaysia, perform poorly in terms of energy efficiency and sustainability. Nevertheless, during maintenance planning of these materials, the focus is often directed towards comfort and design instead. However, as GB material construction projects grow in scale and complexity, interconnections between the activities and processes can be noticed during problematic planning performance management to monitor the GB material components for corrective and preventive maintenance actions.\u0000\u0000\u0000Design/methodology/approach\u0000The concept of GB material maintenance planning for sustainable development and the main features of information and communication technology tools and techniques are based on analysis of literature reviews of GB material scenarios.\u0000\u0000\u0000Findings\u0000The results show how decision-making support in maintenance planning can be unsuccessful and how planning decisions can frame the content of an integrated system to analyse information and reduce risks of GB material failure.\u0000\u0000\u0000Originality/value\u0000The paper concludes that implementing a research framework for developing such a system can help improve the sustainable performance of maintenance planning of GB material economic, social and environmental issues.\u0000","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.9,"publicationDate":"2020-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44652727","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
期刊
Journal of Financial Management of Property and Construction
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1