Identification of Errors Relating to Technical Conditions of Tender Documentation for Construction Works 建筑工程投标文件技术条件错误的识别
Pub Date : 2023-07-06 DOI: 10.5592/co/senet.2022.13
Michal Mikulík, Tomáš Hanák
The construction industry is often criticised for not meeting project constraints relating to the iron triangle (costs, time and quality). Available literature gives a number of reasons why deviations from the initial plan occur. This paper deals with a specific issue: technical conditions of tender documentation for construction works. The objective is to identify errors relating to these technical conditions within the Czech construction industry. Qualitative data were collected through semi-structured interviews with experts in the field and compared with the information included in the analysed set of publications. The results obtained include a list containing varied ranges of individual errors relating to project documentation and the list of works, supplies and services. This list could potentially be used in consequent research as a base for creating methodological recommendations that would help to reduce the negative impact of these errors on projects and thus contribute to better processing of technical conditions of tender documentation for construction works in practice.
建筑业经常被批评不能满足与铁三角(成本、时间和质量)有关的项目限制。现有文献给出了许多偏离最初计划的原因。本文研究了建筑工程招标文件的技术条件问题。目的是查明捷克建筑业中与这些技术条件有关的错误。定性数据是通过与该领域专家的半结构化访谈收集的,并与分析的出版物中包含的信息进行比较。所得结果包括一份清单,其中载有与项目文件有关的各种个别错误,以及工程、用品和服务清单。这份清单可能会在随后的研究中用作制定方法建议的基础,这些建议将有助于减少这些错误对项目的负面影响,从而有助于在实践中更好地处理建筑工程投标文件的技术条件。
{"title":"Identification of Errors Relating to Technical Conditions of Tender Documentation for Construction Works","authors":"Michal Mikulík, Tomáš Hanák","doi":"10.5592/co/senet.2022.13","DOIUrl":"https://doi.org/10.5592/co/senet.2022.13","url":null,"abstract":"The construction industry is often criticised for not meeting project constraints relating to the iron triangle (costs, time and quality). Available literature gives a number of reasons why deviations from the initial plan occur. This paper deals with a specific issue: technical conditions of tender documentation for construction works. The objective is to identify errors relating to these technical conditions within the Czech construction industry. Qualitative data were collected through semi-structured interviews with experts in the field and compared with the information included in the analysed set of publications. The results obtained include a list containing varied ranges of individual errors relating to project documentation and the list of works, supplies and services. This list could potentially be used in consequent research as a base for creating methodological recommendations that would help to reduce the negative impact of these errors on projects and thus contribute to better processing of technical conditions of tender documentation for construction works in practice.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82129638","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Clash Detection Based on IFC/BIM Models - Case Studies Process Parameterization 基于IFC/BIM模型的冲突检测-案例研究过程参数化
Pub Date : 2023-07-06 DOI: 10.5592/ce/senet.2022.8
M. Juszczyk, D. Wieczorek, Hanna Pacyno, Anna Dzienniak
Construction is a complex process, that includes and generates a huge amount of data. Information management, cooperation between the branches and the coordination of partially delivered models is a non-trivial and responsible task that involves various groups of stakeholders and requires the involvement of various teams. Building Information Modelling (BIM) brings indisputable benefits to construction process, specifically in terms of managing design process and design verification. Clash detection process allows for significant reduction of cost overruns or unforeseen delays. As an element of BIM models checking and coordination between the branches it makes possible elimination of errors which are often the potential causes of problems. The purpose of this manuscript is to resume and discuss briefly clash detection process itself and present three case studies based on different BIM models both monodiscipline and multi-discipline. The different methodologies, depending on assumed parameters of process accuracy, produced various results in terms of reported number of clashes. The number clashes reported in the study ranges from 0 to few thousands depending on models’ complexity and assumed accuracy. Additionally, the duration of individual clash detections was measured. The obtained results range from t < 1 sec for residential building model to t = 1 min and 20 sec for industrial structure model. In order to be able to achieve the goal of the paper, an application developed in Poland – BIM Vision IFC viewer was selected for clash detection analysis.
建设是一个复杂的过程,它包含并产生了大量的数据。信息管理、分支之间的合作以及部分交付模型的协调是一项重要且负责任的任务,它涉及到各种涉众组,并需要各种团队的参与。建筑信息模型(BIM)给施工过程带来了无可争辩的好处,特别是在管理设计过程和设计验证方面。冲突检测过程可以显著减少成本超支或不可预见的延迟。作为BIM模型的一个元素,分支之间的检查和协调使得消除错误成为可能,而错误往往是问题的潜在原因。这份手稿的目的是恢复和简要讨论冲突检测过程本身,并提出三个案例研究基于不同的BIM模型,包括单学科和多学科。不同的方法取决于假定的过程准确性参数,就报告的冲突次数而言产生了不同的结果。根据模型的复杂性和假设的准确性,研究中报告的冲突数量从0到几千不等。此外,测量了单个碰撞检测的持续时间。所得结果从住宅建筑模型的t < 1秒到产业结构模型的t = 1分20秒不等。为了能够实现本文的目标,选择了在波兰开发的应用程序- BIM Vision IFC查看器进行冲突检测分析。
{"title":"Clash Detection Based on IFC/BIM Models - Case Studies Process Parameterization","authors":"M. Juszczyk, D. Wieczorek, Hanna Pacyno, Anna Dzienniak","doi":"10.5592/ce/senet.2022.8","DOIUrl":"https://doi.org/10.5592/ce/senet.2022.8","url":null,"abstract":"Construction is a complex process, that includes and generates a huge amount of data. Information management, cooperation between the branches and the coordination of partially delivered models is a non-trivial and responsible task that involves various groups of stakeholders and requires the involvement of various teams. Building Information Modelling (BIM) brings indisputable benefits to construction process, specifically in terms of managing design process and design verification. Clash detection process allows for significant reduction of cost overruns or unforeseen delays. As an element of BIM models checking and coordination between the branches it makes possible elimination of errors which are often the potential causes of problems. The purpose of this manuscript is to resume and discuss briefly clash detection process itself and present three case studies based on different BIM models both monodiscipline and multi-discipline. The different methodologies, depending on assumed parameters of process accuracy, produced various results in terms of reported number of clashes. The number clashes reported in the study ranges from 0 to few thousands depending on models’ complexity and assumed accuracy. Additionally, the duration of individual clash detections was measured. The obtained results range from t < 1 sec for residential building model to t = 1 min and 20 sec for industrial structure model. In order to be able to achieve the goal of the paper, an application developed in Poland – BIM Vision IFC viewer was selected for clash detection analysis.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83774508","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Artificial Intelligence Adoption in Project Management: Are We Still Far from Practical Implementation? 人工智能在项目管理中的应用:我们离实际实施还很远吗?
Pub Date : 2023-07-06 DOI: 10.5592/ce/senet.2022.3
C. Mariani, M. Mancini
The era of Digital transformation is proposing the usage of computer science in completely new ways and areas of application mainly the continuous interaction with human beings. This phenomenon is fostering the possibility to test those applications in a very wide range of the worldwide population giving the chance to speed up the process of new needs identification and implementation. Artificial Intelligence is following exactly this path emerging as one of the most promising hypotheses for improving many processes that still suffer from inefficiency and inaccuracy. Nevertheless, AI adoption is at the very infant stage. The paper aims at presenting a state of the art of AI application and its potentialities in the project management field through a wide literature review followed by a discussion and identification of new trends both in academic research and industrial applications. The result shows that in almost all knowledge areas, AI implementation can help to reduce the time spent on repetitive, low-value-added tasks, allowing the project manager to focus on managing the team and creating added value for the company. Nevertheless, many challenges still remain. On the one hand, the field must be ready for a change in project managers’ roles and professional and educational paths. On the other hand, the need for large amounts of data to achieve acceptable levels of accuracy in the predictive models makes the use of AI techniques still partially distant from practice.
数字化转型时代提出了计算机科学在全新方式和应用领域的应用,主要是与人类的持续互动。这一现象促进了在世界范围内广泛的人口中检验这些应用的可能性,从而有机会加快查明和执行新需要的进程。人工智能正沿着这条道路发展,成为最有希望改善许多仍然存在效率低下和不准确的流程的假设之一。然而,人工智能的采用还处于非常初级的阶段。本文旨在通过广泛的文献综述,介绍人工智能应用的现状及其在项目管理领域的潜力,然后讨论和确定学术研究和工业应用中的新趋势。结果表明,在几乎所有的知识领域,人工智能的实施可以帮助减少在重复、低附加值任务上花费的时间,使项目经理能够专注于管理团队并为公司创造附加值。然而,许多挑战仍然存在。一方面,该领域必须为项目经理的角色以及专业和教育路径的变化做好准备。另一方面,为了在预测模型中达到可接受的精度水平,需要大量数据,这使得人工智能技术的使用仍然部分远离实践。
{"title":"Artificial Intelligence Adoption in Project Management: Are We Still Far from Practical Implementation?","authors":"C. Mariani, M. Mancini","doi":"10.5592/ce/senet.2022.3","DOIUrl":"https://doi.org/10.5592/ce/senet.2022.3","url":null,"abstract":"The era of Digital transformation is proposing the usage of computer science in completely new ways and areas of application mainly the continuous interaction with human beings. This phenomenon is fostering the possibility to test those applications in a very wide range of the worldwide population giving the chance to speed up the process of new needs identification and implementation. Artificial Intelligence is following exactly this path emerging as one of the most promising hypotheses for improving many processes that still suffer from inefficiency and inaccuracy. Nevertheless, AI adoption is at the very infant stage. The paper aims at presenting a state of the art of AI application and its potentialities in the project management field through a wide literature review followed by a discussion and identification of new trends both in academic research and industrial applications. The result shows that in almost all knowledge areas, AI implementation can help to reduce the time spent on repetitive, low-value-added tasks, allowing the project manager to focus on managing the team and creating added value for the company. Nevertheless, many challenges still remain. On the one hand, the field must be ready for a change in project managers’ roles and professional and educational paths. On the other hand, the need for large amounts of data to achieve acceptable levels of accuracy in the predictive models makes the use of AI techniques still partially distant from practice.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76540536","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Public Administrators' Maintenance Management Practices under the Impact of Material Price Fluctuations 物资价格波动影响下公共管理者的维修管理实践
Pub Date : 2023-07-06 DOI: 10.5592/ce/senet.2022.7
Ksenija Štrok Tijanić, M. Šopić, D. Car-Pušić, I. Marović
In the second half of 2020, there was a strong increase in building material prices on world markets, which continued in 2021. Given the unstable geopolitical and epidemiological circumstances, future price fluctuations are unknown. Construction projects are sensitive to such oscillations as contracts and plans are concluded at a time when price changes cannot be predicted with certainty. Given the degree of environmental construction, maintenance projects of existing buildings are becoming increasingly important. Public-funded institution maintenance projects under regional and local self-governments are particularly at risk. Public administrators make maintenance decisions based on existing priority systems and available budgets, which are already limited and pressured due to rising material prices. To mitigate the disturbances, this paper aims to analyze fluctuations in the market of frequently used maintenance materials and provide support to public administrators, i.e., decision-makers, in the form of maintenance management recommendations, in the context of activating the price increases risk. The research consists of two parts, a review of the theoretical background and the processing of material cost data. From the available literature, insight was gained into the current way of planning, budgeting, and way of maintenance performing of public institutions in the Republic of Croatia. The problem of fluctuation in construction material prices and its impact on maintenance was recognized. Often used maintenance materials prices data were collected and analyzed, the resulting changes were graphically and numerically presented, and the problems these changes cause within the maintenance process were identified. Finally, recommendations were made to mitigate the identified disorders that public administrators will be able to apply.
2020年下半年,世界市场上的建筑材料价格强劲上涨,并在2021年继续上涨。鉴于不稳定的地缘政治和流行病学情况,未来的价格波动是未知的。建筑项目对这种波动很敏感,因为合同和计划是在价格变化无法确定预测的时候签订的。鉴于环境建设的程度,既有建筑的维护工程变得越来越重要。区域和地方自治政府的公共资金机构维护项目尤其面临风险。公共行政人员根据现有的优先系统和现有预算作出维修决定,由于材料价格上涨,这些预算已经受到限制和压力。为了缓解这些干扰,本文旨在分析常用维修材料的市场波动,并在激活价格上涨风险的背景下,以维修管理建议的形式为公共管理者即决策者提供支持。本研究分为理论背景综述和材料成本数据处理两部分。从现有文献中,深入了解了克罗地亚共和国公共机构目前的规划、预算编制和维持运作的方式。认识到建筑材料价格波动的问题及其对维修的影响。收集和分析了常用维修材料的价格数据,以图形和数字形式呈现了由此产生的变化,并确定了这些变化在维修过程中引起的问题。最后,提出了建议,以减轻公共行政人员将能够适用的已查明的混乱。
{"title":"Public Administrators' Maintenance Management Practices under the Impact of Material Price Fluctuations","authors":"Ksenija Štrok Tijanić, M. Šopić, D. Car-Pušić, I. Marović","doi":"10.5592/ce/senet.2022.7","DOIUrl":"https://doi.org/10.5592/ce/senet.2022.7","url":null,"abstract":"In the second half of 2020, there was a strong increase in building material prices on world markets, which continued in 2021. Given the unstable geopolitical and epidemiological circumstances, future price fluctuations are unknown. Construction projects are sensitive to such oscillations as contracts and plans are concluded at a time when price changes cannot be predicted with certainty. Given the degree of environmental construction, maintenance projects of existing buildings are becoming increasingly important. Public-funded institution maintenance projects under regional and local self-governments are particularly at risk. Public administrators make maintenance decisions based on existing priority systems and available budgets, which are already limited and pressured due to rising material prices. To mitigate the disturbances, this paper aims to analyze fluctuations in the market of frequently used maintenance materials and provide support to public administrators, i.e., decision-makers, in the form of maintenance management recommendations, in the context of activating the price increases risk. The research consists of two parts, a review of the theoretical background and the processing of material cost data. From the available literature, insight was gained into the current way of planning, budgeting, and way of maintenance performing of public institutions in the Republic of Croatia. The problem of fluctuation in construction material prices and its impact on maintenance was recognized. Often used maintenance materials prices data were collected and analyzed, the resulting changes were graphically and numerically presented, and the problems these changes cause within the maintenance process were identified. Finally, recommendations were made to mitigate the identified disorders that public administrators will be able to apply.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76699605","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Framework for Research on Communication in Multicultural Projects: The Case of Pelješac Bridge 多元文化项目中的传播研究框架:以Pelješac Bridge为例
Pub Date : 2023-07-06 DOI: 10.5592/ce/senet.2022.11
A. Cerić, Ivona Ivić
The growing globalisation of construction projects is inflecting a series of challenges related to language, culture, religion, legal and regulatory regulations for construction organisations. The emergence of multicultural teams has highlighted the importance of social skills, trust, cooperation and communication in construction projects. The importance of communication for the success of projects has been highlighted numerous times in existing literature. However, effective communication management in the current multicultural environment remains a challenge for construction project participants. In this study for research on communication in multicultural projects, the case of Peljašac Bridge, which is one of the most important projects in Croatia, is presented. The total value of the project is estimated to be 420 million euros, of which 357 million euros will be covered by the European Union funds. The main contractor, China Road and Bridge Corporation, is a state-owned Chinese firm. According to the proposed framework, a multicultural dimension of this project is required for the research of communication in multicultural teams. The experiences gained in this project will be highly significant for similar future projects.
建筑项目的日益全球化正在影响一系列与语言、文化、宗教、法律和建筑组织监管条例相关的挑战。多元文化团队的出现凸显了社会技能、信任、合作和沟通在建筑项目中的重要性。在现有文献中,沟通对项目成功的重要性已经被多次强调。然而,在当前多元文化环境下,有效的沟通管理仍然是建设项目参与者面临的挑战。在这个研究多元文化项目中的交流的研究中,提出了Peljašac Bridge的案例,这是克罗地亚最重要的项目之一。该项目的总价值估计为4.2亿欧元,其中3.57亿欧元将由欧盟基金支付。主要承包商中国路桥公司是一家中国国有企业。根据提出的框架,本项目需要一个多元文化的维度来研究多元文化团队中的沟通。在这个项目中获得的经验将对今后类似的项目非常重要。
{"title":"Framework for Research on Communication in Multicultural Projects: The Case of Pelješac Bridge","authors":"A. Cerić, Ivona Ivić","doi":"10.5592/ce/senet.2022.11","DOIUrl":"https://doi.org/10.5592/ce/senet.2022.11","url":null,"abstract":"The growing globalisation of construction projects is inflecting a series of challenges related to language, culture, religion, legal and regulatory regulations for construction organisations. The emergence of multicultural teams has highlighted the importance of social skills, trust, cooperation and communication in construction projects. The importance of communication for the success of projects has been highlighted numerous times in existing literature. However, effective communication management in the current multicultural environment remains a challenge for construction project participants. In this study for research on communication in multicultural projects, the case of Peljašac Bridge, which is one of the most important projects in Croatia, is presented. The total value of the project is estimated to be 420 million euros, of which 357 million euros will be covered by the European Union funds. The main contractor, China Road and Bridge Corporation, is a state-owned Chinese firm. According to the proposed framework, a multicultural dimension of this project is required for the research of communication in multicultural teams. The experiences gained in this project will be highly significant for similar future projects.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"74163930","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A Comprehensive Literature Review of Research Trends of Applying AI to Construction Project Management 人工智能在建筑项目管理中的应用研究趋势综述
Pub Date : 2023-07-06 DOI: 10.5592/ce/senet.2022.16
Iman Merdžanović, M. Vukomanović, Darija Ivandić Vidović
Artificial Intelligence (AI) is universally reaching every industry thus far, it is coming to the fore in construction industry by redesigning project world and altering the role of project managers. It provides the ability for computers to simulate human-like thinking and is comprised of machine learning, Internet of things (IoT), automation, natural language processing and robotics. In construction industry, AI is affecting project planning, time and cost management, optimization of resources as well as post-construction activities. Along with assessing teamwork patterns and making recommendations, it also has an impact on the workforce and how individuals handle projects. Despite a broad range of research papers written about this theme there are still not so much of practical applications conducted in practice. Therefore, the aim of this study is to provide an overview of using AI in Project Management and to show how it is affecting construction industry along with exhibiting future trends. This article will also show positive and negative sides of AI in Project Management and how does it manage competencies. It will propose possible utilitarian solutions including a critical review over the research topic. The outcomes of this study contribute to the body of knowledge on AI in project management through a comprehensive investigation of literature and provide guidelines for further research on the phenomenon of AI in project management.
迄今为止,人工智能(AI)已广泛应用于各个行业,它通过重新设计项目世界和改变项目经理的角色,在建筑行业脱颖而出。它为计算机提供模拟人类思维的能力,由机器学习、物联网(IoT)、自动化、自然语言处理和机器人技术组成。在建筑行业,人工智能正在影响项目规划、时间和成本管理、资源优化以及施工后活动。除了评估团队模式和提出建议外,它还会影响员工队伍和个人处理项目的方式。尽管关于这一主题的研究论文范围广泛,但在实践中进行的实际应用仍然不多。因此,本研究的目的是概述在项目管理中使用人工智能,并展示它如何影响建筑行业以及展示未来趋势。本文还将展示人工智能在项目管理中的积极和消极方面,以及它如何管理能力。它将提出可能的功利主义解决方案,包括对研究主题的批判性审查。本研究的结果通过对文献的全面调查,有助于构建项目管理中人工智能的知识体系,并为进一步研究项目管理中人工智能现象提供指导。
{"title":"A Comprehensive Literature Review of Research Trends of Applying AI to Construction Project Management","authors":"Iman Merdžanović, M. Vukomanović, Darija Ivandić Vidović","doi":"10.5592/ce/senet.2022.16","DOIUrl":"https://doi.org/10.5592/ce/senet.2022.16","url":null,"abstract":"Artificial Intelligence (AI) is universally reaching every industry thus far, it is coming to the fore in construction industry by redesigning project world and altering the role of project managers. It provides the ability for computers to simulate human-like thinking and is comprised of machine learning, Internet of things (IoT), automation, natural language processing and robotics. In construction industry, AI is affecting project planning, time and cost management, optimization of resources as well as post-construction activities. Along with assessing teamwork patterns and making recommendations, it also has an impact on the workforce and how individuals handle projects. Despite a broad range of research papers written about this theme there are still not so much of practical applications conducted in practice. Therefore, the aim of this study is to provide an overview of using AI in Project Management and to show how it is affecting construction industry along with exhibiting future trends. This article will also show positive and negative sides of AI in Project Management and how does it manage competencies. It will propose possible utilitarian solutions including a critical review over the research topic. The outcomes of this study contribute to the body of knowledge on AI in project management through a comprehensive investigation of literature and provide guidelines for further research on the phenomenon of AI in project management.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83828196","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Can “Lean Project Management” Be Standardized Throughout the Organization? “精益项目管理”能否在整个组织内标准化?
Pub Date : 2022-01-01 DOI: 10.1007/978-3-658-35572-2_5
Rainer Erne
{"title":"Can “Lean Project Management” Be Standardized Throughout the Organization?","authors":"Rainer Erne","doi":"10.1007/978-3-658-35572-2_5","DOIUrl":"https://doi.org/10.1007/978-3-658-35572-2_5","url":null,"abstract":"","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72400188","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Why an Additional Book on Project Management? 为什么要再写一本关于项目管理的书?
Pub Date : 2022-01-01 DOI: 10.1007/978-3-658-35572-2_1
Rainer Erne
{"title":"Why an Additional Book on Project Management?","authors":"Rainer Erne","doi":"10.1007/978-3-658-35572-2_1","DOIUrl":"https://doi.org/10.1007/978-3-658-35572-2_1","url":null,"abstract":"","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76799522","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
What Are the Key Ideas of ‘Lean’? “精益”的关键思想是什么?
Pub Date : 2022-01-01 DOI: 10.1007/978-3-658-35572-2_3
Rainer Erne
{"title":"What Are the Key Ideas of ‘Lean’?","authors":"Rainer Erne","doi":"10.1007/978-3-658-35572-2_3","DOIUrl":"https://doi.org/10.1007/978-3-658-35572-2_3","url":null,"abstract":"","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73055970","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
How Can Projects Be Managed in a ‘Lean’ Way? 如何以“精益”的方式管理项目?
Pub Date : 2022-01-01 DOI: 10.1007/978-3-658-35572-2_4
Rainer Erne
{"title":"How Can Projects Be Managed in a ‘Lean’ Way?","authors":"Rainer Erne","doi":"10.1007/978-3-658-35572-2_4","DOIUrl":"https://doi.org/10.1007/978-3-658-35572-2_4","url":null,"abstract":"","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76381548","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
建设监理
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1