Smart Location-Based Construction Planning of Large-Scale Projects in the Integrated BIM Environment BIM集成环境下大型项目基于智能位置的施工规划
Pub Date : 2023-07-06 DOI: 10.5592/co/senet.2022.15
Veljko Janjić, Igor Osmokrović, Jovan Marković, Igor Peško, Mirjana Terzić
Construction industry records unsatisfying results in terms of execution delays and budget overruns, which are result of insufficient planning, miscommunication, and efficiency issues, while it is among the least digitized sectors. Quality proven design, detailed construction schedule with precise data, and well-implemented progress monitoring process are the foundations of successful data-driven construction management. Integrated Building Information Modelling (BIM) is recognized as the technology that will most likely highly impact the industry. BIM increases the effort in the early phases of project design, improving stakeholders’ communication, early identifying and resolving design issues therefore preventing potential losses. Further, at the most cost-intensive project execution phase, BIM is often inadequately implemented or neglected, losing the huge potential of applying the BIM tools and methods for improving construction management processes. This paper analyses development of detailed construction schedule which considers multiple domains that need to be included in the planning process. Traditionally, especially for large-scale projects, it is an effort-intensive process that requires knowledge, focus and vast data inputs. Contrary to the construction industry, productivity in the manufacturing sector is quite enviable. Therefore, authors analyzed the assembly line concepts and Lean principles, applied in manufacturing, fitting them into the BIM environment to improve construction scheduling. The paper presents an advanced BIM model-derived location-based construction planning methodology (BIM-LBP) for development of construction schedules in the integrated 4D and 5D BIM environment making the most of available BIM model data.
建筑行业在执行延迟和预算超支方面的结果令人不满意,这是由于规划不足、沟通不畅和效率问题造成的,而它是数字化程度最低的行业之一。经过质量验证的设计,详细的施工进度计划和精确的数据,以及实施良好的进度监控过程是成功的数据驱动施工管理的基础。集成建筑信息模型(BIM)被认为是最有可能对行业产生重大影响的技术。BIM增加了项目设计早期阶段的工作量,改善了利益相关者的沟通,及早发现和解决设计问题,从而防止潜在的损失。此外,在成本最密集的项目执行阶段,BIM往往没有得到充分实施或被忽视,从而失去了应用BIM工具和方法改善施工管理流程的巨大潜力。本文分析了详细施工进度计划的制定,该计划考虑了规划过程中需要考虑的多个领域。传统上,特别是对于大型项目,这是一个需要知识、专注和大量数据输入的努力密集型过程。与建筑业相反,制造业的生产率相当令人羡慕。因此,作者分析了装配线概念和精益原则,并将其应用于制造业,将其融入BIM环境中,以改善施工进度。本文提出了一种先进的BIM模型衍生的基于位置的施工规划方法(BIM- lbp),用于在集成的4D和5D BIM环境中开发施工进度,充分利用可用的BIM模型数据。
{"title":"Smart Location-Based Construction Planning of Large-Scale Projects in the Integrated BIM Environment","authors":"Veljko Janjić, Igor Osmokrović, Jovan Marković, Igor Peško, Mirjana Terzić","doi":"10.5592/co/senet.2022.15","DOIUrl":"https://doi.org/10.5592/co/senet.2022.15","url":null,"abstract":"Construction industry records unsatisfying results in terms of execution delays and budget overruns, which are result of insufficient planning, miscommunication, and efficiency issues, while it is among the least digitized sectors. Quality proven design, detailed construction schedule with precise data, and well-implemented progress monitoring process are the foundations of successful data-driven construction management. Integrated Building Information Modelling (BIM) is recognized as the technology that will most likely highly impact the industry. BIM increases the effort in the early phases of project design, improving stakeholders’ communication, early identifying and resolving design issues therefore preventing potential losses. Further, at the most cost-intensive project execution phase, BIM is often inadequately implemented or neglected, losing the huge potential of applying the BIM tools and methods for improving construction management processes. This paper analyses development of detailed construction schedule which considers multiple domains that need to be included in the planning process. Traditionally, especially for large-scale projects, it is an effort-intensive process that requires knowledge, focus and vast data inputs. Contrary to the construction industry, productivity in the manufacturing sector is quite enviable. Therefore, authors analyzed the assembly line concepts and Lean principles, applied in manufacturing, fitting them into the BIM environment to improve construction scheduling. The paper presents an advanced BIM model-derived location-based construction planning methodology (BIM-LBP) for development of construction schedules in the integrated 4D and 5D BIM environment making the most of available BIM model data.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"85068660","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Project Management Process Digitalization Heatmap in EU Funded Research and Development Projects 欧盟资助的研究和发展项目的项目管理过程数字化热图
Pub Date : 2023-07-06 DOI: 10.5592/co/senet.2022.14
Miro Hegedic, Petar Gregurić, Darko Liović, Jakov Bošnjak
Today, EU projects represent a significant factor in growth and progress of the Croatian economy. Since Croatia joined the European Union, it has utilised a significant amount of HRK for research and development projects. Research and development projects have a long lead time—over four years on average—from the beginning of the idea to the end of implementation. Several stakeholders are involved in the process, including institutions, academia, SMEs, and consulting firms. The level of readiness of the process for digitalisation varies depending on the project lifecycle phase. Since digitalisation is widely recognized as the key to success in service businesses, this study aims to establish a digitalisation heatmap for administrative and operational processes in the EU-funded research and development project lifecycle and recognize opportunities for digitalisation of the process. Data were collected through an empirical study of EU-funded project. Taken together, these findings suggest that there is a potential for further digitisation of the process, especially for consultants in the implementation phase and communication with the client as well as in state institutions. Further research should focus on identified subprocesses to successfully develop a methodology to increase digitisation readiness and on extraordinary circumstances that result in changes of lesser or greater significance to the project.
今天,欧盟项目是克罗地亚经济增长和进步的一个重要因素。自从克罗地亚加入欧洲联盟以来,它已将大量人权资源用于研究和发展项目。研究和开发项目有很长的准备时间——从想法的开始到实施的结束,平均要4年以上。几个利益相关者参与了这个过程,包括机构、学术界、中小企业和咨询公司。数字化过程的准备程度取决于项目生命周期阶段。由于数字化被广泛认为是服务业成功的关键,本研究旨在为欧盟资助的研发项目生命周期中的行政和运营流程建立数字化热图,并识别流程数字化的机会。通过对欧盟资助项目的实证研究收集数据。综上所述,这些发现表明,这一过程有进一步数字化的潜力,特别是对于实施阶段的顾问以及与客户和国家机构的沟通而言。进一步的研究应该集中在确定的子过程上,以成功地开发一种方法来增加数字化准备,以及导致对项目或多或少意义变化的特殊情况。
{"title":"Project Management Process Digitalization Heatmap in EU Funded Research and Development Projects","authors":"Miro Hegedic, Petar Gregurić, Darko Liović, Jakov Bošnjak","doi":"10.5592/co/senet.2022.14","DOIUrl":"https://doi.org/10.5592/co/senet.2022.14","url":null,"abstract":"Today, EU projects represent a significant factor in growth and progress of the Croatian economy. Since Croatia joined the European Union, it has utilised a significant amount of HRK for research and development projects. Research and development projects have a long lead time—over four years on average—from the beginning of the idea to the end of implementation. Several stakeholders are involved in the process, including institutions, academia, SMEs, and consulting firms. The level of readiness of the process for digitalisation varies depending on the project lifecycle phase. Since digitalisation is widely recognized as the key to success in service businesses, this study aims to establish a digitalisation heatmap for administrative and operational processes in the EU-funded research and development project lifecycle and recognize opportunities for digitalisation of the process. Data were collected through an empirical study of EU-funded project. Taken together, these findings suggest that there is a potential for further digitisation of the process, especially for consultants in the implementation phase and communication with the client as well as in state institutions. Further research should focus on identified subprocesses to successfully develop a methodology to increase digitisation readiness and on extraordinary circumstances that result in changes of lesser or greater significance to the project.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87235024","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Impact of Project Manager and Team Member Characteristics on Their Personal Growth and Satisfaction 项目经理和团队成员特征对其个人成长和满意度的影响
Pub Date : 2023-07-06 DOI: 10.5592/co/senet.2022.12
Ivana Primorac, Zlata Dolaček - Alduk, Ivana Šandrk Nukić
Numerous studies have been conducted which prove that a satisfied employee contributes to efficient business, i.e., a project success. One of the key determinants of project success are the essential characteristics of the project manager and their impact on the personal development and satisfaction of employees as well as the resulting success of the project. The attitudes of employees of 5 construction design companies on the characteristics of project managers and project’s performance were examined and analyzed using the factor analysis and multiple linear regression analysis. The research refers to employees working on large infrastructure projects that are considered to be important for a country due to their effects on the development of that country, its economy, and the lives of its inhabitants. Therefore, the results of this research are also considered particularly important. Based on the established correlation between the major project manager and team member traits this research aims to define how their combination affects personal development and satisfaction of individuals as well as the fact that the project was finished on schedule and with profit. Research has shown that the success of a project is more strongly influenced by the project manager's attributes than the team member characteristics in terms of personal development and satisfaction.
已经进行了大量的研究,证明一个满意的员工有助于高效的业务,即项目的成功。项目成功的关键决定因素之一是项目经理的基本特征及其对个人发展和员工满意度以及项目最终成功的影响。运用因子分析和多元线性回归分析,对5家建筑设计公司员工对项目经理特征和项目绩效的态度进行了考察和分析。该研究指的是从事大型基础设施项目的员工,这些项目被认为对一个国家的发展、经济和居民生活有重要影响。因此,本研究的结果也被认为特别重要。基于主要项目经理和团队成员特征之间建立的相关性,本研究旨在定义它们的组合如何影响个人发展和个人满意度,以及项目如期完成和盈利的事实。研究表明,在个人发展和满意度方面,项目经理的属性比团队成员的特征对项目成功的影响更大。
{"title":"Impact of Project Manager and Team Member Characteristics on Their Personal Growth and Satisfaction","authors":"Ivana Primorac, Zlata Dolaček - Alduk, Ivana Šandrk Nukić","doi":"10.5592/co/senet.2022.12","DOIUrl":"https://doi.org/10.5592/co/senet.2022.12","url":null,"abstract":"Numerous studies have been conducted which prove that a satisfied employee contributes to efficient business, i.e., a project success. One of the key determinants of project success are the essential characteristics of the project manager and their impact on the personal development and satisfaction of employees as well as the resulting success of the project. The attitudes of employees of 5 construction design companies on the characteristics of project managers and project’s performance were examined and analyzed using the factor analysis and multiple linear regression analysis. The research refers to employees working on large infrastructure projects that are considered to be important for a country due to their effects on the development of that country, its economy, and the lives of its inhabitants. Therefore, the results of this research are also considered particularly important. Based on the established correlation between the major project manager and team member traits this research aims to define how their combination affects personal development and satisfaction of individuals as well as the fact that the project was finished on schedule and with profit. Research has shown that the success of a project is more strongly influenced by the project manager's attributes than the team member characteristics in terms of personal development and satisfaction.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75450351","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Concept of a System Supporting the Acceptance of Flats using BIM 基于BIM的公寓验收支持系统的构想
Pub Date : 2023-07-06 DOI: 10.5592/ce/senet.2022.26
Krzysztof Zima, E. Mitera-Kiełbasa
The aim of the article is to present a system supporting the technical acceptance process of flats in multi-family buildings based on a plugin to IFC viewer and BIM model. A system based on a plugin for a free IFC file viewer - BIMvision was shown. The system is aimed at supporting the identification of defects in individual rooms, assessing their significance along with estimating the time and cost of defect repairs. Then, the plugin allows to collect and add descriptions of the acceptance or non-acceptance of a building element in the IFC file of the building BIM model. The system is based on historical data on the occurrence of construction defects, which facilitates the identification of defects during commissioning. A helpful module is the chatbot module, which suggests where and what defects occur most often after asking a series of questions about the type of object, rooms, their location in the building and etc. The result of the plugin activities is also the planned time of removing defects from the database created as a result of measurements of the time of works on the construction site and the planned cost from the database of costs of removing defects. The article presents the concept of such system along with an explanation of the operation principles all its individual modules.
本文的目的是基于IFC查看器和BIM模型的插件,提出一个支持多户建筑公寓技术验收过程的系统。展示了一个基于免费IFC文件查看器- BIMvision插件的系统。该系统旨在支持单个房间的缺陷识别,评估其重要性以及估计缺陷修复的时间和成本。然后,插件允许在建筑BIM模型的IFC文件中收集和添加建筑元素验收或不验收的描述。该系统基于施工缺陷发生的历史数据,便于在调试过程中对缺陷进行识别。聊天机器人模块是一个有用的模块,它在询问一系列关于物体类型、房间及其在建筑物中的位置等问题后,建议最常发生缺陷的地方和哪些缺陷。插件活动的结果也是从数据库中移除缺陷的计划时间,这是由于对施工现场工作时间的测量以及从数据库中移除缺陷的成本的计划成本而创建的。本文介绍了该系统的概念,并对其各个模块的工作原理进行了说明。
{"title":"The Concept of a System Supporting the Acceptance of Flats using BIM","authors":"Krzysztof Zima, E. Mitera-Kiełbasa","doi":"10.5592/ce/senet.2022.26","DOIUrl":"https://doi.org/10.5592/ce/senet.2022.26","url":null,"abstract":"The aim of the article is to present a system supporting the technical acceptance process of flats in multi-family buildings based on a plugin to IFC viewer and BIM model. A system based on a plugin for a free IFC file viewer - BIMvision was shown. The system is aimed at supporting the identification of defects in individual rooms, assessing their significance along with estimating the time and cost of defect repairs. Then, the plugin allows to collect and add descriptions of the acceptance or non-acceptance of a building element in the IFC file of the building BIM model. The system is based on historical data on the occurrence of construction defects, which facilitates the identification of defects during commissioning. A helpful module is the chatbot module, which suggests where and what defects occur most often after asking a series of questions about the type of object, rooms, their location in the building and etc. The result of the plugin activities is also the planned time of removing defects from the database created as a result of measurements of the time of works on the construction site and the planned cost from the database of costs of removing defects. The article presents the concept of such system along with an explanation of the operation principles all its individual modules.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"78481316","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Benefits of Cost-Benefit Analysis in Construction Projects 成本效益分析在建设项目中的应用
Pub Date : 2023-07-06 DOI: 10.5592/co/senet.2022.27
Lana Lovrenčić Butković, Matej Mihić, Maja-Marija Nahod, Z. Sigmund
The European Union’s (EU) main goal, as stated in the EU Green Deal, is to achieve climate neutrality by 2050, and the construction sector plays a significant role in this achievement through efforts to make infrastructure, commercial, and private projects more sustainable. For many years, Cost-Benefit Analysis (CBA) has been used to evaluate and make decisions on co-financing large infrastructure projects funded by the EU. As a result, the EU has incorporated the CBA into its cohesion policies, major initiative objectives, major sectoral policies, and common links, such as climate change and resource efficiency. However, in order to achieve ambitious European goals, the CBA has found a much broader application and is now used for the evaluation of circular economy projects, alternative materials in construction projects, in waste management and sustainable design, or to prove the efficiency of information processes or corporate governance. This paper will give an overview of the use of CBA in assessing various construction projects, as well as categorize identified benefits that were monetized in each group of projects. Finally, the general advantages and disadvantages of using CBA when evaluating and selecting projects from various construction areas will be summarized.
正如《欧盟绿色协议》所述,欧盟的主要目标是到2050年实现气候中和,建筑业通过努力使基础设施、商业和私人项目更具可持续性,在这一成就中发挥着重要作用。多年来,成本效益分析(CBA)一直被用于评估和制定由欧盟资助的大型基础设施项目的联合融资决策。因此,欧盟已将CBA纳入其凝聚力政策、主要倡议目标、主要部门政策和共同联系,如气候变化和资源效率。然而,为了实现雄心勃勃的欧洲目标,CBA已经找到了更广泛的应用,现在用于评估循环经济项目,建筑项目中的替代材料,废物管理和可持续设计,或证明信息流程或公司治理的效率。本文将概述在评估各种建设项目中使用CBA,并对每组项目中货币化的确定收益进行分类。最后,总结了在评估和选择各个建筑领域的项目时使用CBA的总体优势和劣势。
{"title":"The Benefits of Cost-Benefit Analysis in Construction Projects","authors":"Lana Lovrenčić Butković, Matej Mihić, Maja-Marija Nahod, Z. Sigmund","doi":"10.5592/co/senet.2022.27","DOIUrl":"https://doi.org/10.5592/co/senet.2022.27","url":null,"abstract":"The European Union’s (EU) main goal, as stated in the EU Green Deal, is to achieve climate neutrality by 2050, and the construction sector plays a significant role in this achievement through efforts to make infrastructure, commercial, and private projects more sustainable. For many years, Cost-Benefit Analysis (CBA) has been used to evaluate and make decisions on co-financing large infrastructure projects funded by the EU. As a result, the EU has incorporated the CBA into its cohesion policies, major initiative objectives, major sectoral policies, and common links, such as climate change and resource efficiency. However, in order to achieve ambitious European goals, the CBA has found a much broader application and is now used for the evaluation of circular economy projects, alternative materials in construction projects, in waste management and sustainable design, or to prove the efficiency of information processes or corporate governance. This paper will give an overview of the use of CBA in assessing various construction projects, as well as categorize identified benefits that were monetized in each group of projects. Finally, the general advantages and disadvantages of using CBA when evaluating and selecting projects from various construction areas will be summarized.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84051140","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Role of Exemplary Entrepreneurship for the Projectification of Society in Germany 模范企业家精神在德国社会规划中的作用
Pub Date : 2023-07-06 DOI: 10.5592/ce/senet.2022.9
Reinhard Wagner, M. Radujković
Large-scale projects in Germany are often delivered too late and with excessive costs. This is partly due to lagging projectification in the public sector and also because there is a lack of exemplary entrepreneurship. Therefore, this paper explores the role of exemplary entrepreneurship in the projectification of society in Germany, utilizing the example of Elon Musk and Tesla´s fourth Gigafactory near Berlin. Building on qualitative and quantitative research on the projectification of society in Germany with reference to institutional theory, findings from an explanatory case study are compared, and the insights are discussed. For instance, the reputation of the entrepreneur, Elon Musk, is that of an innovator who can overcome well-established rules in Germany and contribute to a significant acceleration of large-scale projects by making courageous decisions. Upcoming projects in Germany are already using Elon Musk's success story as a role model for their own approach. Although this case study is only one example of a large-scale project managed in an entrepreneurial way and further case studies should explore the interrelationship, it shows that projectification of society in general and the performant realization of projects, in particular, can benefit from it. As a result, promising behaviors and approaches for implementing similar projects can be induced, providing a boost to the projectification of society overall.
德国的大型项目往往交付得太晚,成本过高。这部分是由于公共部门的项目滞后,也因为缺乏模范的企业家精神。因此,本文以埃隆·马斯克和特斯拉在柏林附近的第四个超级工厂为例,探讨了模范企业家精神在德国社会投影中的作用。在对德国社会投射的定性和定量研究的基础上,参考制度理论,对解释性案例研究的结果进行了比较,并讨论了见解。例如,企业家埃隆·马斯克(Elon Musk)的声誉是一个创新者,他可以克服德国的既定规则,并通过勇敢的决策为大型项目的显著加速做出贡献。德国即将开展的项目已经将埃隆·马斯克的成功故事作为他们自己方法的榜样。虽然这个案例研究只是一个以企业方式管理的大型项目的例子,进一步的案例研究应该探索相互关系,但它表明,社会的总体规划,特别是项目的绩效实现,可以从中受益。因此,可以诱导实施类似项目的有希望的行为和方法,从而促进整个社会的投影。
{"title":"The Role of Exemplary Entrepreneurship for the Projectification of Society in Germany","authors":"Reinhard Wagner, M. Radujković","doi":"10.5592/ce/senet.2022.9","DOIUrl":"https://doi.org/10.5592/ce/senet.2022.9","url":null,"abstract":"Large-scale projects in Germany are often delivered too late and with excessive costs. This is partly due to lagging projectification in the public sector and also because there is a lack of exemplary entrepreneurship. Therefore, this paper explores the role of exemplary entrepreneurship in the projectification of society in Germany, utilizing the example of Elon Musk and Tesla´s fourth Gigafactory near Berlin. Building on qualitative and quantitative research on the projectification of society in Germany with reference to institutional theory, findings from an explanatory case study are compared, and the insights are discussed. For instance, the reputation of the entrepreneur, Elon Musk, is that of an innovator who can overcome well-established rules in Germany and contribute to a significant acceleration of large-scale projects by making courageous decisions. Upcoming projects in Germany are already using Elon Musk's success story as a role model for their own approach. Although this case study is only one example of a large-scale project managed in an entrepreneurial way and further case studies should explore the interrelationship, it shows that projectification of society in general and the performant realization of projects, in particular, can benefit from it. As a result, promising behaviors and approaches for implementing similar projects can be induced, providing a boost to the projectification of society overall.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82960665","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Efficiency Versus Efectiveness in Earthworks Based on Time Study Analysis 基于时间研究分析的土方工程效率与效益
Pub Date : 2023-07-06 DOI: 10.5592/co/senet.2022.22
M. Šopić, Antonio Bogdan, I. Marović
Construction generally takes place in very variable and dynamic conditions due to the presence of machinery, transport of materials, movement of workers, and the progress of construction. In order to solve the problem of site variable and dynamic conditions, two major research topics may stand out, more precisely, off-site performance planning and on-site performance tracking and monitoring. Earthworks commonly involve extensive utilization of various construction machines, mainly excavators and tipper (or dump) trucks. Tracking and monitoring of earthworks, based on collected quality data from the construction site, are necessary to detect discrepancies between the planned and actual work efficiency of construction machinery. The main topic of this paper is the time study analysis of one of the standard technological processes in earthworks – loading and transporting materials by tipper trucks. On-site data were obtained using the stopwatch method with the purpose of determining the actual work efficiency of the tipper truck. This paper aims to propose a research framework for clear insight into the progress effectiveness of earthworks and the actual work efficiency of the tipper truck. The purpose of applying the research framework is to form a base for tracking and monitoring the work of tipper trucks so the right decisions can be made in a timely manner. Such can enhance earthworks progress by using the appropriate number of tipper trucks and their better utilization.
由于机械的存在、材料的运输、工人的移动和施工的进度,施工通常发生在非常多变和动态的条件下。为了解决现场可变和动态条件的问题,两大研究课题可能会脱颖而出,更准确地说,场外性能规划和现场性能跟踪与监测。土方工程通常涉及大量使用各种建筑机械,主要是挖掘机和自卸车。根据从施工现场收集的质量数据,对土方工程进行跟踪和监测,以发现工程机械的计划工作效率与实际工作效率之间的差异。本文的主要课题是对土方工程中自卸车装卸物料这一标准工艺流程进行时间研究分析。采用秒表法获取现场数据,以确定自卸车的实际工作效率。本文旨在提出一个研究框架,以便清晰地了解土方工程的进度有效性和自卸车的实际工作效率。应用研究框架的目的是为跟踪和监测自卸车的工作形成一个基础,以便及时做出正确的决策。使用适当数目的自卸车及善用自卸车,可加快土方工程的进度。
{"title":"Efficiency Versus Efectiveness in Earthworks Based on Time Study Analysis","authors":"M. Šopić, Antonio Bogdan, I. Marović","doi":"10.5592/co/senet.2022.22","DOIUrl":"https://doi.org/10.5592/co/senet.2022.22","url":null,"abstract":"Construction generally takes place in very variable and dynamic conditions due to the presence of machinery, transport of materials, movement of workers, and the progress of construction. In order to solve the problem of site variable and dynamic conditions, two major research topics may stand out, more precisely, off-site performance planning and on-site performance tracking and monitoring. Earthworks commonly involve extensive utilization of various construction machines, mainly excavators and tipper (or dump) trucks. Tracking and monitoring of earthworks, based on collected quality data from the construction site, are necessary to detect discrepancies between the planned and actual work efficiency of construction machinery. The main topic of this paper is the time study analysis of one of the standard technological processes in earthworks – loading and transporting materials by tipper trucks. On-site data were obtained using the stopwatch method with the purpose of determining the actual work efficiency of the tipper truck. This paper aims to propose a research framework for clear insight into the progress effectiveness of earthworks and the actual work efficiency of the tipper truck. The purpose of applying the research framework is to form a base for tracking and monitoring the work of tipper trucks so the right decisions can be made in a timely manner. Such can enhance earthworks progress by using the appropriate number of tipper trucks and their better utilization.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80011984","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Importance of Project Management in the Early Stages of a BIM-Led Project: A Case Study of the Construction of Judicial Square in Zagreb bim主导项目前期项目管理的重要性——以萨格勒布司法广场建设为例
Pub Date : 2023-07-06 DOI: 10.5592/co/senet.2022.21
Romano Perić, M. Vukomanović, Hrvoje Krstić
Currently in the Republic of Croatia (RH) there are insufficient regulations that would indicate the implementation of public projects by using BIM, despite the fact that this is a global trend and obligation for public contracting authorities in many countries. Public investments, especially projects whose capex is (co)financed by grants, while opex is nationally financed, have to be planned and designed in a way to have optimally balanced opex and capex within life cycle of the project i.e. building. The paper presents case study - positive example of recognizing the benefits arising from the implementation of integrated platform of information modelling on a public project "Judicial Square in Zagreb". After the timely involvement of the project management team in the early stages of the project (creation of the procurement strategy and the tender phase for designing), the Ministry of Justice and Administration of RH adopted a strategy for realization of the project on an BIM platform in order to enable effective and sustainable assets management in the operational phase. The paper concludes that, despite the lack of regulation in RH and the still lack of understanding of the benefits that BIM brings, it is possible to apply BIM on public projects in RH autonomously. By creating national guidelines, i.e. a national framework and platform for the application of BIM, it is possible to create preconditions for its cogent application in all public projects in RH i.e. to enable the creation and adoption of a national strategy that would determine the manner and period in which BIM would be implemented as an obligation on public projects.
目前在克罗地亚共和国(RH),没有足够的法规表明使用BIM实施公共项目,尽管这是一个全球趋势和义务,在许多国家的公共承包当局。公共投资,特别是那些资本支出由拨款(co)资助,而运营支出由国家资助的项目,必须以一种在项目(即建筑)的生命周期内实现运营支出和资本支出最佳平衡的方式进行规划和设计。本文提出了案例研究-认识到在“萨格勒布司法广场”公共项目中实施信息建模综合平台所带来的好处的积极例子。项目管理团队及时参与了项目的早期阶段(制定采购战略和设计招标阶段),法务部和RH行政部门采用了在BIM平台上实现项目的战略,以便在运营阶段实现有效和可持续的资产管理。本文的结论是,尽管RH缺乏监管,并且仍然缺乏对BIM带来的好处的理解,但在RH的公共项目中自主应用BIM是可能的。通过制定国家指导方针,即BIM应用的国家框架和平台,有可能为其在RH的所有公共项目中有说服力的应用创造先决条件,即能够制定和采用国家战略,确定BIM作为公共项目义务实施的方式和期限。
{"title":"The Importance of Project Management in the Early Stages of a BIM-Led Project: A Case Study of the Construction of Judicial Square in Zagreb","authors":"Romano Perić, M. Vukomanović, Hrvoje Krstić","doi":"10.5592/co/senet.2022.21","DOIUrl":"https://doi.org/10.5592/co/senet.2022.21","url":null,"abstract":"Currently in the Republic of Croatia (RH) there are insufficient regulations that would indicate the implementation of public projects by using BIM, despite the fact that this is a global trend and obligation for public contracting authorities in many countries. Public investments, especially projects whose capex is (co)financed by grants, while opex is nationally financed, have to be planned and designed in a way to have optimally balanced opex and capex within life cycle of the project i.e. building. The paper presents case study - positive example of recognizing the benefits arising from the implementation of integrated platform of information modelling on a public project \"Judicial Square in Zagreb\". After the timely involvement of the project management team in the early stages of the project (creation of the procurement strategy and the tender phase for designing), the Ministry of Justice and Administration of RH adopted a strategy for realization of the project on an BIM platform in order to enable effective and sustainable assets management in the operational phase. The paper concludes that, despite the lack of regulation in RH and the still lack of understanding of the benefits that BIM brings, it is possible to apply BIM on public projects in RH autonomously. By creating national guidelines, i.e. a national framework and platform for the application of BIM, it is possible to create preconditions for its cogent application in all public projects in RH i.e. to enable the creation and adoption of a national strategy that would determine the manner and period in which BIM would be implemented as an obligation on public projects.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80953484","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Integration of Infrastructure with the Society in the Operation Phase: A Multiple Case Study Approach 基础设施运营阶段与社会的融合:多案例研究方法
Pub Date : 2023-07-06 DOI: 10.5592/co/senet.2022.20
Johan Ninan, M. Hertogh, G. J. Scheurwater
The later stages of an infrastructure project occupy a significant period of its lifecycle. Even though majority of the expenses for the project are in the construction phase, the value for the society is realized only in the operation phase. Projects are often remembered for how they serve the community in the later stages more than their efficiency during the construction phase due to its long lifecycle. There is a need to understand how projects integrate with the society after its construction, especially considering the inability of the planners to create a design considering all future scenarios. In the proposed research, we employ a multiple case study research considering the Oresund bridge connecting Denmark with Sweden and the Port of Rotterdam in the Netherlands. We observe how during the operation phase the infrastructure acts as an enabler, adapt to changing needs of the society, and diversify its impacts. This study has significant implications to society as it explores how to extract value from already constructed infrastructure assets.
基础设施项目的后期阶段占据了其生命周期的重要时期。尽管项目的大部分费用都在建设阶段,但其对社会的价值只有在运营阶段才能实现。由于项目的生命周期很长,人们通常会记住它们在后期阶段如何为社区服务,而不是在构建阶段的效率。有必要了解项目建设后如何与社会融合,特别是考虑到规划者无法创造一个考虑到所有未来情景的设计。在拟议的研究中,我们采用了一个多案例研究,考虑到连接丹麦和瑞典的厄勒海峡大桥和荷兰的鹿特丹港。我们观察在运作阶段,基础设施如何发挥推动者的作用,适应不断变化的社会需求,并使其影响多样化。这项研究对社会具有重要意义,因为它探讨了如何从已经建成的基础设施资产中提取价值。
{"title":"Integration of Infrastructure with the Society in the Operation Phase: A Multiple Case Study Approach","authors":"Johan Ninan, M. Hertogh, G. J. Scheurwater","doi":"10.5592/co/senet.2022.20","DOIUrl":"https://doi.org/10.5592/co/senet.2022.20","url":null,"abstract":"The later stages of an infrastructure project occupy a significant period of its lifecycle. Even though majority of the expenses for the project are in the construction phase, the value for the society is realized only in the operation phase. Projects are often remembered for how they serve the community in the later stages more than their efficiency during the construction phase due to its long lifecycle. There is a need to understand how projects integrate with the society after its construction, especially considering the inability of the planners to create a design considering all future scenarios. In the proposed research, we employ a multiple case study research considering the Oresund bridge connecting Denmark with Sweden and the Port of Rotterdam in the Netherlands. We observe how during the operation phase the infrastructure acts as an enabler, adapt to changing needs of the society, and diversify its impacts. This study has significant implications to society as it explores how to extract value from already constructed infrastructure assets.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83420745","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Potentials, Challenges and Success Factors of BIM for Design to Production for Modular Housing: An Expert Perspective BIM在模块化住宅设计到生产中的潜力、挑战和成功因素:专家视角
Pub Date : 2023-07-06 DOI: 10.5592/ce/senet.2022.2
Sophia S. Pibal, Iva Kovacic, Robin Jakoubek, Manuel Jungmann
At the same time as the digital transformation of the AEC industry, industrial housing construction is also experiencing a revival due to the increasing demand for affordable housing. However, the potential of digital technologies in the design and construction processes of modular housing is not yet sufficiently explored. For the development of novel tools, this study focuses on stakeholders involved in planning and production, as expert knowledge represents an essential component of research to address both requirements and existing gaps in the industry. The aim is to answer the research question of which potentials and challenges BIM for Design to Production faces from an experts' point of view. In this study, 8 expert interviews were conducted with manufacturers and construction companies to identify the challenges and status of digitalization and modular construction as well as future potentials. Concluding, the potentials, challenges, preliminary key performance indicators and success factors for the implementation of BIM for design to production in modular construction and residential construction are presented from an experts' perspective.
在AEC行业数字化转型的同时,由于对经济适用房的需求不断增加,工业住宅建设也在经历复苏。然而,数字技术在模块化住房的设计和建造过程中的潜力尚未得到充分的探索。对于新工具的开发,本研究侧重于参与计划和生产的利益相关者,因为专家知识代表了解决行业需求和现有差距的研究的重要组成部分。目的是从专家的角度回答研究问题,从设计到生产的BIM面临哪些潜力和挑战。在本研究中,对制造商和建筑公司进行了8位专家访谈,以确定数字化和模块化建筑的挑战和现状以及未来的潜力。最后,从专家的角度提出了BIM在模块化建筑和住宅建设中从设计到生产的潜力、挑战、初步关键绩效指标和成功因素。
{"title":"Potentials, Challenges and Success Factors of BIM for Design to Production for Modular Housing: An Expert Perspective","authors":"Sophia S. Pibal, Iva Kovacic, Robin Jakoubek, Manuel Jungmann","doi":"10.5592/ce/senet.2022.2","DOIUrl":"https://doi.org/10.5592/ce/senet.2022.2","url":null,"abstract":"At the same time as the digital transformation of the AEC industry, industrial housing construction is also experiencing a revival due to the increasing demand for affordable housing. However, the potential of digital technologies in the design and construction processes of modular housing is not yet sufficiently explored. For the development of novel tools, this study focuses on stakeholders involved in planning and production, as expert knowledge represents an essential component of research to address both requirements and existing gaps in the industry. The aim is to answer the research question of which potentials and challenges BIM for Design to Production faces from an experts' point of view. In this study, 8 expert interviews were conducted with manufacturers and construction companies to identify the challenges and status of digitalization and modular construction as well as future potentials. Concluding, the potentials, challenges, preliminary key performance indicators and success factors for the implementation of BIM for design to production in modular construction and residential construction are presented from an experts' perspective.","PeriodicalId":64912,"journal":{"name":"建设监理","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"85983118","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
建设监理
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1