Reasonable production scheduling plays a vital role in the production of precast component factories. However, previous static scheduling models no longer fit actual production. In particular, some factors will cause errors in the actual delivery time of the components, including the lack or redundancy of processes in the model, resource constraints required by the core processes, and differences in transportation schemes. Moreover, the optimization goal of simply pursuing the minimization of fines from order delivery underestimates companies’ emphases on reputation. Therefore, this study proposes an improved model for precast component production scheduling considering resource constraints. The number of production processes is adjusted to eight, and three resource constraints for mold, steel, and concrete are added. An enterprise decision-making coefficient is introduced into the optimization object function, and the constraints of the transportation scheme are improved. Finally, a real case study is conducted to verify the applicability of the model. Compared with previous models, the developed model fills the gap in considering production resource constraints and enterprise decisions in precast production, can better meet diverse production conditions and business needs of factories for scheduling, and help give full play to the advantages of prefabricated construction.
{"title":"IMPROVED EIGHT-PROCESS MODEL OF PRECAST COMPONENT PRODUCTION SCHEDULING CONSIDERING RESOURCE CONSTRAINTS","authors":"Minhao Ruan, Feng Xu","doi":"10.3846/jcem.2022.16454","DOIUrl":"https://doi.org/10.3846/jcem.2022.16454","url":null,"abstract":"Reasonable production scheduling plays a vital role in the production of precast component factories. However, previous static scheduling models no longer fit actual production. In particular, some factors will cause errors in the actual delivery time of the components, including the lack or redundancy of processes in the model, resource constraints required by the core processes, and differences in transportation schemes. Moreover, the optimization goal of simply pursuing the minimization of fines from order delivery underestimates companies’ emphases on reputation. Therefore, this study proposes an improved model for precast component production scheduling considering resource constraints. The number of production processes is adjusted to eight, and three resource constraints for mold, steel, and concrete are added. An enterprise decision-making coefficient is introduced into the optimization object function, and the constraints of the transportation scheme are improved. Finally, a real case study is conducted to verify the applicability of the model. Compared with previous models, the developed model fills the gap in considering production resource constraints and enterprise decisions in precast production, can better meet diverse production conditions and business needs of factories for scheduling, and help give full play to the advantages of prefabricated construction.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3,"publicationDate":"2022-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49162022","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Customers’ preferences for prefabricated building or conventional cast-in-situ building directly affect the decision-making process for strategic selection of building developers. This study utilizes a Hotelling model integrating game theory, including the market share function, product price function, and profit function of duopoly building developers to contribute a new approach to assist decision makers in their selection of developers for their projects. By analyzing different strategy combinations and the income matrix, we obtained the strategy combinations of duopoly building developers and the income matrix strategies, market share, optimal price and maximum profit. Managerial implications were discussed for government and building developers. Finally, we presented the research contribution as well as future research direction.
{"title":"IMPACT OF CONSUMER PREFERENCE ON THE DECISION-MAKING OF PREFABRICATED BUILDING DEVELOPERS","authors":"Yanhu Han, Xiaobo Xu, Yu Zhao, Xiao-Ping Wang, Zeyu Chen, Jia Liu","doi":"10.3846/jcem.2022.15777","DOIUrl":"https://doi.org/10.3846/jcem.2022.15777","url":null,"abstract":"Customers’ preferences for prefabricated building or conventional cast-in-situ building directly affect the decision-making process for strategic selection of building developers. This study utilizes a Hotelling model integrating game theory, including the market share function, product price function, and profit function of duopoly building developers to contribute a new approach to assist decision makers in their selection of developers for their projects. By analyzing different strategy combinations and the income matrix, we obtained the strategy combinations of duopoly building developers and the income matrix strategies, market share, optimal price and maximum profit. Managerial implications were discussed for government and building developers. Finally, we presented the research contribution as well as future research direction.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3,"publicationDate":"2022-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49107297","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Younguk Choi, Chan Young Park, Changjun Lee, Sungmin Yun, S. Han
Modularization, which allows for pre-assembly away from a construction site, has been known to be more cost-effective than stick-built; however, contractors have difficulty ascertaining the benefits and adopting it. Calculating the benefits and costs of adopting modularization precedes decision making. However, modular cost estimation is challenging since relevant information in the early stages of a project and historical data about industrial modularization both have limited availability. To solve this problem, this study developed a conceptual cost estimation framework for industrial modular projects by converting stick-built project information. The framework is composed of eight steps based on two approaches. This study conducted a case study to demonstrate the applicability of the framework, which compared the project cost of modularization scenarios 1 and 2 with that of the stick-built version of the ongoing project. In addition, the estimated modular cost was compared with the engineers’ estimation to verify the accuracy of the framework. The contributions of this study are in identifying and quantifying the factors influencing the differences in cost between the modularization and stick-built versions, and developing the conceptual cost estimation framework for an industrial modular project. This framework is expected to support deciding on adopting modularization, budgeting, and project viability.
{"title":"CONCEPTUAL COST ESTIMATION FRAMEWORK FOR MODULAR PROJECTS: A CASE STUDY ON PETROCHEMICAL PLANT CONSTRUCTION","authors":"Younguk Choi, Chan Young Park, Changjun Lee, Sungmin Yun, S. Han","doi":"10.3846/jcem.2022.16234","DOIUrl":"https://doi.org/10.3846/jcem.2022.16234","url":null,"abstract":"Modularization, which allows for pre-assembly away from a construction site, has been known to be more cost-effective than stick-built; however, contractors have difficulty ascertaining the benefits and adopting it. Calculating the benefits and costs of adopting modularization precedes decision making. However, modular cost estimation is challenging since relevant information in the early stages of a project and historical data about industrial modularization both have limited availability. To solve this problem, this study developed a conceptual cost estimation framework for industrial modular projects by converting stick-built project information. The framework is composed of eight steps based on two approaches. This study conducted a case study to demonstrate the applicability of the framework, which compared the project cost of modularization scenarios 1 and 2 with that of the stick-built version of the ongoing project. In addition, the estimated modular cost was compared with the engineers’ estimation to verify the accuracy of the framework. The contributions of this study are in identifying and quantifying the factors influencing the differences in cost between the modularization and stick-built versions, and developing the conceptual cost estimation framework for an industrial modular project. This framework is expected to support deciding on adopting modularization, budgeting, and project viability.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3,"publicationDate":"2022-02-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43163891","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Hong-Jie Sun, Wenzhe Tang, C. Duffield, Lihai Zhang, F. Hui
67.9% of Chinese international construction projects are seriously delayed, which creates the potential for instability in its rapidly growing share of global contracting markets. A greater understanding of the reasons behind the challenges confronting international contractors is urgently required such that improvements can be developed that ultimately will benefit many countries. This study aims to investigate the time performance of international projects in developing countries and to explore the root causes of time overrun. Based on both quantitative and qualitative analysis of 112 case study projects, collected from 12 of the largest Chinse state-owned enterprises (SOEs), this study identifies the distinctive characteristics of three types of projects (late, acceptable, early) classified based on their time performances. It is established that time performance is significantly related to the contractor’s adaptability and project complexity. The results reveal the root causes of construction delays in international project delivery, which provides a structured and in-depth understanding of both internal and external time performance influential factors. The above findings provide sound basis for guiding practitioners in choosing appropriate strategies to improve project time performance, such as encouraging cross-cultural dialogues, integrating global resources and establishing long-term global partnerships with stakeholders.
{"title":"HOW TO GET INTERNATIONAL CONSTRUCTION PROJECTS DELIVERED ON TIME: FROM CHINESE CONTRACTORS’ PERSPECTIVE","authors":"Hong-Jie Sun, Wenzhe Tang, C. Duffield, Lihai Zhang, F. Hui","doi":"10.3846/jcem.2022.16381","DOIUrl":"https://doi.org/10.3846/jcem.2022.16381","url":null,"abstract":"67.9% of Chinese international construction projects are seriously delayed, which creates the potential for instability in its rapidly growing share of global contracting markets. A greater understanding of the reasons behind the challenges confronting international contractors is urgently required such that improvements can be developed that ultimately will benefit many countries. This study aims to investigate the time performance of international projects in developing countries and to explore the root causes of time overrun. Based on both quantitative and qualitative analysis of 112 case study projects, collected from 12 of the largest Chinse state-owned enterprises (SOEs), this study identifies the distinctive characteristics of three types of projects (late, acceptable, early) classified based on their time performances. It is established that time performance is significantly related to the contractor’s adaptability and project complexity. The results reveal the root causes of construction delays in international project delivery, which provides a structured and in-depth understanding of both internal and external time performance influential factors. The above findings provide sound basis for guiding practitioners in choosing appropriate strategies to improve project time performance, such as encouraging cross-cultural dialogues, integrating global resources and establishing long-term global partnerships with stakeholders.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3,"publicationDate":"2022-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43157742","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
The performance of a construction project can be severely harmed by its participants’ rent-seeking. In order to prevent such attempt, this research integrates the evolutionary game theory with system dynamics method to simulate the impact of the change of some factors that may cause/reduce rent-seeking. Based on the analysis of the behavioral characteristics and interactive relationships of the main participants (the owner, supervisor, and contractor), an evolutionary game model is constructed and simulated with the method of system dynamics based on the replication dynamic equation of the mixed strategy solution of the three-party static game model. By assigning the parameters of project scale, supervision likelihood, supervision success rate, supervision cost, and penalty intensity, the interaction mechanism of the participants on each factor is revealed through a case-based simulation. The results show that the impacts of these factors on participants’ rent-seeking decisions are significantly different. Furthermore, some management suggestions are provided to prevent rent-seeking for project owner according to the research conclusions. This research can help the project owners take proper measures to prevent rent-seeking of the supervisors and the contractors to improve the performances of the projects.
{"title":"RENT-SEEKING DECISIONS OF THE MAIN PARTICIPANTS IN CONSTRUCTION PROJECTS BASED ON EVOLUTIONARY-GAME AND SYSTEM DYNAMICS","authors":"Weiwei Zuo, Qiankun Wang, Peng Li","doi":"10.3846/jcem.2022.16159","DOIUrl":"https://doi.org/10.3846/jcem.2022.16159","url":null,"abstract":"The performance of a construction project can be severely harmed by its participants’ rent-seeking. In order to prevent such attempt, this research integrates the evolutionary game theory with system dynamics method to simulate the impact of the change of some factors that may cause/reduce rent-seeking. Based on the analysis of the behavioral characteristics and interactive relationships of the main participants (the owner, supervisor, and contractor), an evolutionary game model is constructed and simulated with the method of system dynamics based on the replication dynamic equation of the mixed strategy solution of the three-party static game model. By assigning the parameters of project scale, supervision likelihood, supervision success rate, supervision cost, and penalty intensity, the interaction mechanism of the participants on each factor is revealed through a case-based simulation. The results show that the impacts of these factors on participants’ rent-seeking decisions are significantly different. Furthermore, some management suggestions are provided to prevent rent-seeking for project owner according to the research conclusions. This research can help the project owners take proper measures to prevent rent-seeking of the supervisors and the contractors to improve the performances of the projects.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3,"publicationDate":"2022-01-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46056726","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
The main structure of the Baishihu suspension bridge was connected to the anchor foundations by three main steel cables. The wooden pedestrian deck was fixed to the main steel cables using steel beams and was stabilized by two stabilizing cables. The stabilizing cables and bridge body were joined by 44 steel connecting rods. Therefore, the slope stability at the anchorage foundations of the main steel cables, as well as the performance monitoring and analysis of the main steel cables and stabilizing cables, are critical to the overall performance of the suspension bridge. This paper discusses the performance monitoring and analysis of the steel cable deflection and cable strength for this bridge, as well as the main considerations and results of the stability analysis of the bridge abutments and side slopes of the two banks. Water-level observation wells, inclinometers, and tiltmeters monitoring were used to record reference data for the analysis of the slope stability performance. Additionally, the three-dimensional dynamic analysis program VFIFE was used to analyze the deformation and motion of the bridge. The final steady-state results were used to compare the static design value and monitoring data. The dynamic response before the final steady state was also observed.
{"title":"CASE STUDY ON PERFORMANCE MONITORING AND STABILITY ANALYSIS OF BAISHIHU SUSPENSION BRIDGE AND SIDE SLOPE","authors":"Chihcheng Chen, B. Shih, C. Jeng","doi":"10.3846/jcem.2022.15783","DOIUrl":"https://doi.org/10.3846/jcem.2022.15783","url":null,"abstract":"The main structure of the Baishihu suspension bridge was connected to the anchor foundations by three main steel cables. The wooden pedestrian deck was fixed to the main steel cables using steel beams and was stabilized by two stabilizing cables. The stabilizing cables and bridge body were joined by 44 steel connecting rods. Therefore, the slope stability at the anchorage foundations of the main steel cables, as well as the performance monitoring and analysis of the main steel cables and stabilizing cables, are critical to the overall performance of the suspension bridge. This paper discusses the performance monitoring and analysis of the steel cable deflection and cable strength for this bridge, as well as the main considerations and results of the stability analysis of the bridge abutments and side slopes of the two banks. Water-level observation wells, inclinometers, and tiltmeters monitoring were used to record reference data for the analysis of the slope stability performance. Additionally, the three-dimensional dynamic analysis program VFIFE was used to analyze the deformation and motion of the bridge. The final steady-state results were used to compare the static design value and monitoring data. The dynamic response before the final steady state was also observed.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3,"publicationDate":"2022-01-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44321273","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
J. B. Yap, Canwin Guan Ying Lam, M. Skitmore, N. Talebian
The adoption rate of new technologies is still relatively low in the construction industry, particularly for mitigating occupational safety and health (OSH) risks, which is traditionally a largely labor-intensive activity in developing countries, occupying ill-afforded non-productive management resources. However, understanding why this is the case is a relatively unresearched area in developing countries such as Malaysia. In aiming to help redress this situation, this study explored the major barriers involved, firstly by a detailed literature review to identify the main barriers hampering the adoption of new technologies for safety science and management in construction. Then, a questionnaire survey of Malaysian construction practitioners was used to prioritize these barriers. A factor analysis further identified six major dimensions underlying the barriers, relating to the lack of OSH regulations and legislation, technological limitations, lack of genuine organizational commitment, prohibitive costs, poor safety culture within the construction industry, and privacy and data security concerns. Taken together, the findings provide a valuable reference to assist industry practitioners and researchers regarding the critical barriers to the adoption of new technologies for construction safety management in Malaysia and other similar developing countries, and bridge the identified knowledge gap concerning the dimensionality of the barriers.
{"title":"BARRIERS TO THE ADOPTION OF NEW SAFETY TECHNOLOGIES IN CONSTRUCTION: A DEVELOPING COUNTRY CONTEXT","authors":"J. B. Yap, Canwin Guan Ying Lam, M. Skitmore, N. Talebian","doi":"10.3846/jcem.2022.16014","DOIUrl":"https://doi.org/10.3846/jcem.2022.16014","url":null,"abstract":"The adoption rate of new technologies is still relatively low in the construction industry, particularly for mitigating occupational safety and health (OSH) risks, which is traditionally a largely labor-intensive activity in developing countries, occupying ill-afforded non-productive management resources. However, understanding why this is the case is a relatively unresearched area in developing countries such as Malaysia. In aiming to help redress this situation, this study explored the major barriers involved, firstly by a detailed literature review to identify the main barriers hampering the adoption of new technologies for safety science and management in construction. Then, a questionnaire survey of Malaysian construction practitioners was used to prioritize these barriers. A factor analysis further identified six major dimensions underlying the barriers, relating to the lack of OSH regulations and legislation, technological limitations, lack of genuine organizational commitment, prohibitive costs, poor safety culture within the construction industry, and privacy and data security concerns. Taken together, the findings provide a valuable reference to assist industry practitioners and researchers regarding the critical barriers to the adoption of new technologies for construction safety management in Malaysia and other similar developing countries, and bridge the identified knowledge gap concerning the dimensionality of the barriers.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":"1 1","pages":""},"PeriodicalIF":4.3,"publicationDate":"2022-01-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41455249","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Celebrating the 55th anniversary of the Journal of Civil Engineering and Management: editor’s introduction. Journal of Civil Engineering and Management, 28(1), 1–5.
庆祝《土木工程与管理杂志》创刊55周年:编者简介。土木工程与管理杂志,28(1),1-5。
{"title":"CELEBRATING THE 55TH ANNIVERSARY OF THE JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT: EDITOR’S INTRODUCTION","authors":"A. Kaklauskas, E. Zavadskas, I. Ubarte","doi":"10.3846/jcem.2022.16155","DOIUrl":"https://doi.org/10.3846/jcem.2022.16155","url":null,"abstract":"Celebrating the 55th anniversary of the Journal of Civil Engineering and Management: editor’s introduction. Journal of Civil Engineering and Management, 28(1), 1–5.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3,"publicationDate":"2022-01-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49177545","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Lelin Lv, Huimin Li, Zhuofu Wang, Chengyi Zhang, Ran Qiao
Major infrastructure projects (MIPs) possess significant strategic positions in the national economy and social development. However, recently, the rent-seeking behavior between supervision units and project contractors has intensified in project construction. This paper aims to study the behavior decision-making of stakeholders in rent-seeking behavior supervision system of MIPs. In the complex and uncertain environment of MIPs, game players have cognitive bias and value perception preference. Therefore, this study introduced prospect theory and constructed the perceived return matrix and evolutionary game model of MIP rent-seeking behavior supervision among project owners, supervision units, and project contractors. From the perspective of risk perception theory, the reasons for the behavioral tendencies of game participants and the conditions for the steady state of strategy selection were explored through system dynamics simulations. The results showed that the stable state of the optimal strategy in the rent-seeking behavior supervision system of MIPs is related to the cognitive bias of the game players and is influenced by the level of regulation cost, the intensity of punishment and the size of accident losses. The contribution of this study lies in providing theoretical basis and decision support for constructing a long-term preventive mechanism for rent-seeking activities in MIPs.
{"title":"EVOLUTIONARY GAME ANALYSIS FOR RENT-SEEKING BEHAVIOR SUPERVISION OF MAJOR INFRASTRUCTURE PROJECTS BASED ON PROSPECT THEORY","authors":"Lelin Lv, Huimin Li, Zhuofu Wang, Chengyi Zhang, Ran Qiao","doi":"10.3846/jcem.2021.15852","DOIUrl":"https://doi.org/10.3846/jcem.2021.15852","url":null,"abstract":"Major infrastructure projects (MIPs) possess significant strategic positions in the national economy and social development. However, recently, the rent-seeking behavior between supervision units and project contractors has intensified in project construction. This paper aims to study the behavior decision-making of stakeholders in rent-seeking behavior supervision system of MIPs. In the complex and uncertain environment of MIPs, game players have cognitive bias and value perception preference. Therefore, this study introduced prospect theory and constructed the perceived return matrix and evolutionary game model of MIP rent-seeking behavior supervision among project owners, supervision units, and project contractors. From the perspective of risk perception theory, the reasons for the behavioral tendencies of game participants and the conditions for the steady state of strategy selection were explored through system dynamics simulations. The results showed that the stable state of the optimal strategy in the rent-seeking behavior supervision system of MIPs is related to the cognitive bias of the game players and is influenced by the level of regulation cost, the intensity of punishment and the size of accident losses. The contribution of this study lies in providing theoretical basis and decision support for constructing a long-term preventive mechanism for rent-seeking activities in MIPs.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46467609","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Integrated Project Delivery (IPD) is regarded as an effective project delivery method that can deal with the challenge of the rapid development of the architecture, engineering, and construction (AEC) industry. In the IPD team, the alliance profit is not distributed fairly and effectively due to uncertainty, preventing the achievement of the IPD project goals. This study focuses on optimizing the profit distribution among stakeholders in IPD projects and uses quadratic programming models to solve fuzzy cooperative games in the IPD. A payoff function is used in the fuzzy alliance to determine the characteristics of the interval-valued fuzzy numbers, and different weights of the alliance and the efficiency of the player’s participation in the IPD are considered in the profit distribution. A case study is conducted, and the results of the proposed method are compared with those of crisp cooperative games. The results show that the fuzzy cooperative game increases the profit of participants in IPD projects. It is more practical to use weight fuzzy cooperative games than crisp games to express imputation. Moreover, the quadratic programming models and methods result in a fair and efficient profit distribution scheme in IPD projects.
{"title":"PROFIT DISTRIBUTION IN IPD PROJECTS BASED ON WEIGHT FUZZY COOPERATIVE GAMES","authors":"Shuwen Guo, Junwu Wang","doi":"10.3846/jcem.2021.16156","DOIUrl":"https://doi.org/10.3846/jcem.2021.16156","url":null,"abstract":"Integrated Project Delivery (IPD) is regarded as an effective project delivery method that can deal with the challenge of the rapid development of the architecture, engineering, and construction (AEC) industry. In the IPD team, the alliance profit is not distributed fairly and effectively due to uncertainty, preventing the achievement of the IPD project goals. This study focuses on optimizing the profit distribution among stakeholders in IPD projects and uses quadratic programming models to solve fuzzy cooperative games in the IPD. A payoff function is used in the fuzzy alliance to determine the characteristics of the interval-valued fuzzy numbers, and different weights of the alliance and the efficiency of the player’s participation in the IPD are considered in the profit distribution. A case study is conducted, and the results of the proposed method are compared with those of crisp cooperative games. The results show that the fuzzy cooperative game increases the profit of participants in IPD projects. It is more practical to use weight fuzzy cooperative games than crisp games to express imputation. Moreover, the quadratic programming models and methods result in a fair and efficient profit distribution scheme in IPD projects.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48295629","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}