Pub Date : 2023-07-27DOI: 10.29313/bcsme.v3i2.7858
Muhammad Afif Zahrandika, Yuliadi, N. F. Isniarno
Abstract. Slope stability is an important factor in planning an open pit mine. A stable slope design will have a major impact on mine economics and production. This study aims to determine the stability of the slopes in the research location area and provide recommendations for optimal mine slope geometry based on the values of the Safety Factor (SF), Probability of Failure (PoF), and Strength Reduction Factor (SRF). Analysis activities were carried out using 2 methods, namely the limit equilibrium method accompanied by probabilistic analysis to determine the PoF value of the mine slope and using the finite element method. Based on the research results, it is known that the constituent rocks on the slopes of the Kedongdong quarry mine are trass stones. On a single slope the recommended mine slope geometry is H= 5 m and Ꝋ= 50o, H= 6 m and Ꝋ= 45o, H= 8 m and Ꝋ= 40o, H= 10 m and Ꝋ= 35o. On the actual overall slope an analysis of 2 sections was carried out, namely section A-A' and section E-E "from the results of the analysis of both sections in a safe condition. On the overall slope of the final pit, 2 sections were analyzed, namely section B-B' and section F-F' and from the results of the analysis both sections were in an unsafe condition, so a recommendation was given that section B-B' angle was changed from 47o to 37o while for section F-F' the angle was changed from 50o to 35o so that a safe FK value was obtained. Abstrak. Kestabilan lereng merupakan salah satu faktor penting dalam merencanakan tambang terbuka. Desain lereng yang stabil akan berdampak besar terhadap keekonomian dan produksi tambang. Penelitian ini bertujuan untuk mengetahui kestabilan lereng pada daerah lokasi penelitian dan memberikan rekomendasi geometri lereng tambang yang optimal dengan berdasarkan pada nilai Faktor Keamanan (FK), Probability of Failure (PoF), dan Strength Reduction Factor (SRF). Kegiatan analisis dilakukan dengan menggunakan 2 metode yaitu metode kesetimbangan batas disertai dengan analisis probabilistik untuk mengetahui nilai PoF dari lereng tambang dan menggunakan metode elemen hingga. Berdasarkan hasil penelitian diketahui bahwa batuan penyusun pada lereng tambang kuari kedongdong yaitu batu trass. Pada lereng tunggal geometri lereng tambang yang di rekomendasikan yaitu H= 5 m dan Ꝋ= 50o, H= 6 m dan Ꝋ= 45o, H= 8 m dan Ꝋ= 40o, H= 10 m dan Ꝋ= 35o. Pada lereng keseluruhan aktual dilakukan analisis terhadap 2 section yaitu section A-A’ dan section E-E” dari hasil analisis kedua section berada dalam kondisi aman. Pada lereng keseluruhan final pit dilakukan analisis terhadap 2 section yaitu section B-B’ dan section F-F’ dan dari hasil analisis kedua section berada dalam kondisi tidak aman, sehingga diberikan rekomendasi yaitu section B-B’ sudut diubah dari 47o menjadi 37o sedangkan untuk section F-F’ sudut diubah dari 50o menjadi 35o sehingga diperoleh nilai FK yang aman.
摘要。边坡稳定性是露天矿山规划的重要因素。稳定的边坡设计对矿山的经济效益和生产具有重要的影响。本研究旨在根据安全系数(SF)、破坏概率(PoF)和强度折减系数(SRF)的取值,确定研究区域内边坡的稳定性,并为优化矿山边坡几何形状提供建议。采用极限平衡法结合概率分析法确定矿山边坡的PoF值和采用有限元法进行分析。研究结果表明,科洞洞采石场边坡的组成岩为渣石。在单一边坡上,推荐的矿山边坡几何形状为H= 5 m和 = 500, H= 6 m和 = 450, H= 8 m和 = 400, H= 10 m和 = 350。对实际总边坡进行了2个断面的分析,分别是a - a’和E-E’,这是根据安全条件下两段的分析结果得出的。对终坑整体边坡进行了B-B′段和F-F′段2段的分析,分析结果表明,两段均处于不安全状态,建议将B-B′段的角由47°改为37°,将F-F′段的角由50°改为35°,以获得安全的FK值。Abstrak。Kestabilan leeng merupakan salah satu fakto penting dalam merencanakan tambang terbuka。杨德昌稳定了经济增长和经济增长的关系。Penelitian ini bertujuan untuk mengetahui kestabilan leeng dandaerah lokasi Penelitian danmembericrekomendasi leeng tambang yang最优的dengan berdasarkan pada nilai因子Keamanan (FK),失效概率(PoF),强度折减因子(SRF)。Kegiatan analysis dilakukan dengan menggunakan 2方法yitu方法kesetimbangan batas disertai dengan分析概率untuk mengetahui nilai PoF dari leeng tambang dan menggunakan方法元素兴伽。Berdasarkan hasil penelitian diketahui bahwa batuan penyusun pada leeng tambang kuari kedongdong yitu batu trass。8米段 = 400米段,10米段 = 350米段。Pada lereng keseluruhan实际dilakukan分析terhadap 2断面yyitu断面A-A ' dan断面E-E ' dari hasil分析kedua断面berada dalam kondisi aman。Pada leeng keseluruhan最终坑dilakukan分析terhadap 2段yitu段B-B段' dan段F-F ' dan dari分析kedua段berada dalam kondisi tiak aman, sehinga diubah dari 47o menjadi 37o sedangkan untuk段F-F ' sudut diubah dari 500o menjadi 35o sehinga diperoleh nilai FK yang aman。
{"title":"Analisis Kestabilan Lereng Tambang Kuari Batu Trass di PT. Indocement Tunggal Prakarsa Desa Kedongdong Kidul Kecamatan Dukupuntang Kabupaten Cirebon Provinsi Jawa Barat","authors":"Muhammad Afif Zahrandika, Yuliadi, N. F. Isniarno","doi":"10.29313/bcsme.v3i2.7858","DOIUrl":"https://doi.org/10.29313/bcsme.v3i2.7858","url":null,"abstract":"Abstract. Slope stability is an important factor in planning an open pit mine. A stable slope design will have a major impact on mine economics and production. This study aims to determine the stability of the slopes in the research location area and provide recommendations for optimal mine slope geometry based on the values of the Safety Factor (SF), Probability of Failure (PoF), and Strength Reduction Factor (SRF). Analysis activities were carried out using 2 methods, namely the limit equilibrium method accompanied by probabilistic analysis to determine the PoF value of the mine slope and using the finite element method. Based on the research results, it is known that the constituent rocks on the slopes of the Kedongdong quarry mine are trass stones. On a single slope the recommended mine slope geometry is H= 5 m and Ꝋ= 50o, H= 6 m and Ꝋ= 45o, H= 8 m and Ꝋ= 40o, H= 10 m and Ꝋ= 35o. On the actual overall slope an analysis of 2 sections was carried out, namely section A-A' and section E-E \"from the results of the analysis of both sections in a safe condition. On the overall slope of the final pit, 2 sections were analyzed, namely section B-B' and section F-F' and from the results of the analysis both sections were in an unsafe condition, so a recommendation was given that section B-B' angle was changed from 47o to 37o while for section F-F' the angle was changed from 50o to 35o so that a safe FK value was obtained. \u0000Abstrak. Kestabilan lereng merupakan salah satu faktor penting dalam merencanakan tambang terbuka. Desain lereng yang stabil akan berdampak besar terhadap keekonomian dan produksi tambang. Penelitian ini bertujuan untuk mengetahui kestabilan lereng pada daerah lokasi penelitian dan memberikan rekomendasi geometri lereng tambang yang optimal dengan berdasarkan pada nilai Faktor Keamanan (FK), Probability of Failure (PoF), dan Strength Reduction Factor (SRF). Kegiatan analisis dilakukan dengan menggunakan 2 metode yaitu metode kesetimbangan batas disertai dengan analisis probabilistik untuk mengetahui nilai PoF dari lereng tambang dan menggunakan metode elemen hingga. Berdasarkan hasil penelitian diketahui bahwa batuan penyusun pada lereng tambang kuari kedongdong yaitu batu trass. Pada lereng tunggal geometri lereng tambang yang di rekomendasikan yaitu H= 5 m dan Ꝋ= 50o, H= 6 m dan Ꝋ= 45o, H= 8 m dan Ꝋ= 40o, H= 10 m dan Ꝋ= 35o. Pada lereng keseluruhan aktual dilakukan analisis terhadap 2 section yaitu section A-A’ dan section E-E” dari hasil analisis kedua section berada dalam kondisi aman. Pada lereng keseluruhan final pit dilakukan analisis terhadap 2 section yaitu section B-B’ dan section F-F’ dan dari hasil analisis kedua section berada dalam kondisi tidak aman, sehingga diberikan rekomendasi yaitu section B-B’ sudut diubah dari 47o menjadi 37o sedangkan untuk section F-F’ sudut diubah dari 50o menjadi 35o sehingga diperoleh nilai FK yang aman.","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"37 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122631098","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-27DOI: 10.29313/bcsme.v3i2.8004
Muhammad Hilal Fadilah, Yuliadi, Iswandaru
Abstract. PT Indocement is a cement processing plant in West Java with the largest capacity in Indonesia and the largest integrated in the world, namely PT Indocement Tunggal Prakarsa Tbk. By implementing many security management systems for each job, namely SMK3 (K3 management system), ISO 9001 (product quality standards), ISO 14001 (Environmental management system), OHSAS 18001 and ISO 17025. PT Indocement Tunggal Prakarsa Tbk is the first company in Asia Southeast which received Certified Emission Reductions (CER) under the Clean Development Mechanism (CDM) framework. Paving the road is done to minimize the occurrence of subsidence on the mine road. The proctor test is carried out to determine the optimum water content in a soil, in various types of road construction materials, of course, they have different water content for absorption, both porosity and permeability. Having a water content value will help in laboratory CBR testing to get a percent value of CBR. Knowing the CBR value of mine roads is very important because the safety of mine roads is very crucial, if there is no evaluation it will cause productivity to become unstable and can cause losses. CBR testing was carried out on rock samples that were scattered to become soil, laboratory CBR testing was carried out without immersion. The CBR values obtained from the 5 samples were quarry claystone c 16.65, sandstone 77.4%, andesite 97%, quarry claystone b1 47%, siltstone 13.7%. Abstrak. PT Indocement merupakan pabrik pengolahan semen di Jawa Barat dengan kapasitas terbesar di Indonesia dan terintegrasi terbesar di dunia adalah PT Indocement Tunggal Prakarsa Tbk. Dengan menerapkan banyak sistem manajemen pengamanan pada setiap pekerjaan yakni SMK3 (sistem manajemen K3), ISO 9001 (Standar kualitas produk), ISO 14001 (sistem manajemen Lingkungan Hidup), OHSAS 18001 dan ISO 17025. PT Indocement Tunggal Prakarsa Tbk adalah perusahaan pertama di Asia Tenggara yang menerima Emisi Reduksi yang disertifikasi (Certified Emission Reductions/CER) dalam kerangka Mekanisme Pembangunan Bersih (Clean Development Mechanism/CDM). Proctor test dilakukan untuk mengetahui kadar air optimum pada suatu tanah, dalam berbagai jenis material penyusun jalan tentunya memiliki kadar air yang berbeda untuk daya serap baik itu porositas maupun permeabilitasnya. Dengan adanya nilai kadar air akan membantu dalam pengujian CBR Laboratorium untuk mendapatkan nilai persen dari CBR. Mengetahui nilai CBR jalan tambang sangat penting dikarenakan keamanan jalan tambang sangat krusial, jika tidak adanya evaluasi akan menyebabkan produktivitas tidak menjadi stabil dan bisa membuat kerugian. Pengujian CBR yang dilakukan pada sampel batuan yang diberaikan menjadi tanah, dilakukan pengujian CBR laboratorium tanpa adanya rendaman. Nilai CBR yang didapatkan dari ke 5 sampel yaitu ada batulempung kuari c 16,65, batupasir 77,4%, batu andesit 97%, batulempung kuari b1 47%, batulanau 13,7%.
摘要。PT Indocement是西爪哇的一家水泥加工厂,是印度尼西亚最大的水泥加工厂,也是世界上最大的水泥加工厂,即PT Indocement Tunggal Prakarsa Tbk。通过为每个工作实施多个安全管理体系,即SMK3 (K3管理体系)、ISO 9001(产品质量标准)、ISO 14001(环境管理体系)、OHSAS 18001和ISO 17025。东嘉公司是东南亚地区第一家在清洁发展机制框架下获得减排量认证的公司。铺路是为了尽量减少矿路沉陷的发生。普罗克特试验是为了确定一种土壤的最佳含水量,在各种类型的道路施工材料中,当然它们具有不同的吸水率,孔隙率和渗透率。在实验室CBR测试中,有一个含水量值将有助于得到CBR的百分比值。了解矿山道路的CBR值是非常重要的,因为矿山道路的安全是至关重要的,如果不进行评估,就会导致生产不稳定,造成损失。对分散成土的岩样进行CBR试验,室内不浸水进行CBR试验。5个样品的CBR值分别为:采石粘土c 16.65,砂岩77.4%,安山岩97%,采石粘土b1 47%,粉砂岩13.7%。Abstrak。印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚印度尼西亚。邓安山山体系管理SMK3(体系管理K3)、ISO 9001(标准质量管理)、ISO 14001(体系管理灵昆山山)、OHSAS 18001和ISO 17025。PT文件Tunggal Prakarsa Tbk adalah perusahaan pertama di Asia Tenggara yang menerima Emisi Reduksi yang disertifikasi(认证减排/CER) dalam kerangka Mekanisme Pembangunan Bersih(清洁发展机制/CDM)。Proctor测试dilakukan untuk mengetahui kadar air最优pada suatu tanah, dalam berbagai jenis材料penyusun jalan tentenya memoriliki kadar air yang berbeda untuk daya serap baiktu porositas maupun渗透率nya。登干,adanya nilai, kadar, air, akan, membantu, dalam,企鹅CBR实验室,mendapatkan nilai,人,CBR。中国日报网:中国日报网讯:中国日报网讯:中国日报网讯:中国日报网讯:中国日报网讯:企鹅CBR yang dilakukan paada样品batuan yang diberaikan menjadi tanah, dilakukan企鹅CBR实验室tanpa adanya rendaman。Nilai CBR yang didapatkan dari检测了5个样品yyitu ada batulempung kuari c 16,65, batupasir 77,4%, batuandesit 97%, batulempung kuari b1 47%, batulanau 13,7%。
{"title":"Prosedur Penentuan Nilai California Bearing Ratio (CBR) untuk Jalan Tambang di PT Indocement Tunggal Prakarsa Desa Palimanan, Kecamatan Gempol, Kabupaten Cirebon, Provinsi Jawa Barat","authors":"Muhammad Hilal Fadilah, Yuliadi, Iswandaru","doi":"10.29313/bcsme.v3i2.8004","DOIUrl":"https://doi.org/10.29313/bcsme.v3i2.8004","url":null,"abstract":"Abstract. PT Indocement is a cement processing plant in West Java with the largest capacity in Indonesia and the largest integrated in the world, namely PT Indocement Tunggal Prakarsa Tbk. By implementing many security management systems for each job, namely SMK3 (K3 management system), ISO 9001 (product quality standards), ISO 14001 (Environmental management system), OHSAS 18001 and ISO 17025. PT Indocement Tunggal Prakarsa Tbk is the first company in Asia Southeast which received Certified Emission Reductions (CER) under the Clean Development Mechanism (CDM) framework. Paving the road is done to minimize the occurrence of subsidence on the mine road. The proctor test is carried out to determine the optimum water content in a soil, in various types of road construction materials, of course, they have different water content for absorption, both porosity and permeability. Having a water content value will help in laboratory CBR testing to get a percent value of CBR. Knowing the CBR value of mine roads is very important because the safety of mine roads is very crucial, if there is no evaluation it will cause productivity to become unstable and can cause losses. CBR testing was carried out on rock samples that were scattered to become soil, laboratory CBR testing was carried out without immersion. The CBR values obtained from the 5 samples were quarry claystone c 16.65, sandstone 77.4%, andesite 97%, quarry claystone b1 47%, siltstone 13.7%. \u0000Abstrak. PT Indocement merupakan pabrik pengolahan semen di Jawa Barat dengan kapasitas terbesar di Indonesia dan terintegrasi terbesar di dunia adalah PT Indocement Tunggal Prakarsa Tbk. Dengan menerapkan banyak sistem manajemen pengamanan pada setiap pekerjaan yakni SMK3 (sistem manajemen K3), ISO 9001 (Standar kualitas produk), ISO 14001 (sistem manajemen Lingkungan Hidup), OHSAS 18001 dan ISO 17025. PT Indocement Tunggal Prakarsa Tbk adalah perusahaan pertama di Asia Tenggara yang menerima Emisi Reduksi yang disertifikasi (Certified Emission Reductions/CER) dalam kerangka Mekanisme Pembangunan Bersih (Clean Development Mechanism/CDM). Proctor test dilakukan untuk mengetahui kadar air optimum pada suatu tanah, dalam berbagai jenis material penyusun jalan tentunya memiliki kadar air yang berbeda untuk daya serap baik itu porositas maupun permeabilitasnya. Dengan adanya nilai kadar air akan membantu dalam pengujian CBR Laboratorium untuk mendapatkan nilai persen dari CBR. Mengetahui nilai CBR jalan tambang sangat penting dikarenakan keamanan jalan tambang sangat krusial, jika tidak adanya evaluasi akan menyebabkan produktivitas tidak menjadi stabil dan bisa membuat kerugian. Pengujian CBR yang dilakukan pada sampel batuan yang diberaikan menjadi tanah, dilakukan pengujian CBR laboratorium tanpa adanya rendaman. Nilai CBR yang didapatkan dari ke 5 sampel yaitu ada batulempung kuari c 16,65, batupasir 77,4%, batu andesit 97%, batulempung kuari b1 47%, batulanau 13,7%.","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114624648","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-27DOI: 10.29313/bcsme.v3i2.7418
Zharfan Ghana, Yunus Ashari, N. F. Isniarno
Abstract. CV Brilliant Ningrat is a company engaged in rock mining with sirtu commodities in Leles District, Garut Regency, West Java Province. In determining the location of the Crushing Plant, supporting data is needed which will strengthen the arguments in determining the location of the Crushing Plant. In this study the supporting data is the soil bearing capacity of the Terzaghi method. The soil bearing capacity of the Terzaghi method plays a role in calculating the foundation to be stepped on by the Crushing Plant. To obtain supporting data using the soil bearing capacity of the Terzaghi method, data are needed in the form of soil density (ρ), soil cohesion (C) and soil inward shear angle (ϕ). The results of testing the soil samples, obtained the largest soil density (ρ) value of 1.67 gr/cm3, the largest soil cohesion (C) value of 0.016 and the largest soil shear angle (ϕ) value of 15.86o. This value will be included in the soil bearing capacity of the Terzaghi method and will produce a value of 8.74 KPa. Referring to SNI 8460:2017, the bearing capacity of the foundation permit from the bearing capacity of the soil is divided by a minimum safety factor of 3 for shallow foundations. So that the value of the permit bearing capacity is 2.91 KPa. The Crushing Plant land preparation stage uses the Cut and Fill method. Based on the results of calculating the stripping volume of the Crushing Plant obtained from the Crushing Plant Topographic Map using AutoCAD software, it shows that the area to be stripped is 85875.51 LCM consisting of top soil material of 28387.81 LCM and sirtu material of 57487.70 LCM. Abstrak. CV Brilliant Ningrat adalah perusahaan yang bergerak dibidang penambangan batuan dengan komoditi sirtu di Kecamatan Leles, Kabupaten Garut, Provinsi Jawa Barat. Pada penentuan lokasi Crushing Plant dibutuhkan data pendukung yang akan memperkuat argumentasi dalam penentuan lokasi Crushing Plant. Pada penelitian ini data yang menjadi pendukung berupa daya dukung tanah metode Terzaghi. Daya dukung tanah metode Terzaghi ini berperan untuk membuat perhitungan pondasi yang akan dipijak oleh Crushing Plant. Untuk mendapatkan data pendukung yang menggunakan daya dukung tanah metode Terzaghi diperlukan data berupa density tanah (ρ), kohesi tanah (C) dan sudut geser dalam tanah (ϕ). Hasil dari pengujian sampel tanah, didapatkan nilai density tanah (ρ) terbesar senilai 1,67 gr/cm3, kohesi tanah (C) terbesar senilai 0,016 dan sudut geser dalam tanah (ϕ) terbesar senilai 15,86o. Nilai ini akan dimasukkan kedalam daya dukung tanah metode Terzaghi dan menghasilkan nilai sebesar 8,74 KPa. Mengacu kepada SNI 8460:2017, daya dukung izin pondasi dari daya dukung tanah dibagi dengan faktor keamanan besarnya minimum 3 untuk pondasi dangkal. Sehingga nilai dari daya dukung izin sebesar 2,91 KPa. Tahap penyiapan lahan Crushing Plant menggunakan metode Cut and Fill. Berdasarkan hasil perhitungan volume pengupasan Crushing Plant yang didapatkan dari Peta Topogra
摘要。CV Brilliant Ningrat是一家在西爪哇省Garut Regency的Leles区从事岩石开采和sirtu商品的公司。在确定破碎厂的位置时,需要支持数据,这将加强确定破碎厂位置的论点。本研究的支持数据为Terzaghi法的土壤承载力。Terzaghi法的土壤承载力对破碎站所踩地基的计算起着重要的作用。为了使用Terzaghi方法获得土壤承载力的支持数据,需要以土壤密度(ρ),土壤黏聚力(C)和土壤向内剪切角(ϕ)的形式提供数据。通过对土样的测试,得到最大土壤密度(ρ)值为1.67 gr/cm3,最大土壤黏聚力(C)值为0.016,最大土壤剪切角(ϕ)值为15.86。这个值将包含在Terzaghi法的土壤承载力中,将产生8.74 KPa的值。参考SNI 8460:2017,从土壤承载力中得到的基础许可承载力除以浅基础最小安全系数3。则允许承载能力为2.91 KPa。破碎厂土地准备阶段采用切填法。利用AutoCAD软件对破碎厂地形图中获得的破碎厂剥离体积进行计算,结果表明,破碎厂剥离面积为85875.51 LCM,其中表层土材料为28387.81 LCM,土土材料为57487.70 LCM。Abstrak。CV Brilliant Ningrat adalah perusahaan yang bergerak dibidang penambangan batuan dengan komoditi sirtu di Kecamatan lelees, Kabupaten Garut,爪哇巴拉省。帕达潘顿洛卡西破碎厂迪布图坎数据彭杜贡杨阿坎成员的论点是帕达潘顿洛卡西破碎厂。Pada penelitian ini数据yang menjadi pendukung berupa daya dukung tanah metode Terzaghi。大雅dukung tanah metode Terzaghi ini berperan untuk成员perhitungan pondasi yang akan dipijak oleh粉碎厂。Untuk mendapatkan data pendukung yang menggunakan daya dukung tanah metode Terzaghi diperlukan data berupa density tanah (ρ), kohesi tanah (C) dan sudut geser dalam tanah (φ)。Hasil dari pengujian sampel tanah, didapatkan nilai密度tanah (ρ) terbesar senilai 1,67 gr/cm3, kohesi tanah (C) terbesar senilai 0,016, sudut geser dalam tanah (φ) terbesar senilai 15,860。Nilai ini akan dimasukkan kedalam daya dukung tanah metode Terzaghi dan menghasilkan Nilai sebesar 8,74 KPa。Mengacu kepada SNI 8460:2017, daya dukung izin pondasi dari daya dukung tanah dibagi dengan factor for keamanan besarya最小3 untuk pondasi dangkal。sehinga nilai dari daya dukung izin sebesar 2,91 KPa。塔哈彭亚鹏拉罕破碎厂蒙古纳坎法切填。Berdasarkan hasil perhitungan volume penguin破碎厂yang didapatkan dari Peta地形破碎厂menggunakan perangkat lunak AutoCAD, menunjukkan地区yang akan dikupas sebesar 85875,51 LCM terdiri dari材料表层土sebesar 28387,81 LCM丹材料sirtu sebesar 57487,70 LCM。
{"title":"Rancangan Penentuan Lokasi Crushing Plant Sirtu CV Brilliant Ningrat di Kecamatan Leles, Kabupaten Garut, Provinsi Jawa Barat","authors":"Zharfan Ghana, Yunus Ashari, N. F. Isniarno","doi":"10.29313/bcsme.v3i2.7418","DOIUrl":"https://doi.org/10.29313/bcsme.v3i2.7418","url":null,"abstract":"Abstract. CV Brilliant Ningrat is a company engaged in rock mining with sirtu commodities in Leles District, Garut Regency, West Java Province. In determining the location of the Crushing Plant, supporting data is needed which will strengthen the arguments in determining the location of the Crushing Plant. In this study the supporting data is the soil bearing capacity of the Terzaghi method. The soil bearing capacity of the Terzaghi method plays a role in calculating the foundation to be stepped on by the Crushing Plant. To obtain supporting data using the soil bearing capacity of the Terzaghi method, data are needed in the form of soil density (ρ), soil cohesion (C) and soil inward shear angle (ϕ). The results of testing the soil samples, obtained the largest soil density (ρ) value of 1.67 gr/cm3, the largest soil cohesion (C) value of 0.016 and the largest soil shear angle (ϕ) value of 15.86o. This value will be included in the soil bearing capacity of the Terzaghi method and will produce a value of 8.74 KPa. Referring to SNI 8460:2017, the bearing capacity of the foundation permit from the bearing capacity of the soil is divided by a minimum safety factor of 3 for shallow foundations. So that the value of the permit bearing capacity is 2.91 KPa. The Crushing Plant land preparation stage uses the Cut and Fill method. Based on the results of calculating the stripping volume of the Crushing Plant obtained from the Crushing Plant Topographic Map using AutoCAD software, it shows that the area to be stripped is 85875.51 LCM consisting of top soil material of 28387.81 LCM and sirtu material of 57487.70 LCM. \u0000Abstrak. CV Brilliant Ningrat adalah perusahaan yang bergerak dibidang penambangan batuan dengan komoditi sirtu di Kecamatan Leles, Kabupaten Garut, Provinsi Jawa Barat. Pada penentuan lokasi Crushing Plant dibutuhkan data pendukung yang akan memperkuat argumentasi dalam penentuan lokasi Crushing Plant. Pada penelitian ini data yang menjadi pendukung berupa daya dukung tanah metode Terzaghi. Daya dukung tanah metode Terzaghi ini berperan untuk membuat perhitungan pondasi yang akan dipijak oleh Crushing Plant. Untuk mendapatkan data pendukung yang menggunakan daya dukung tanah metode Terzaghi diperlukan data berupa density tanah (ρ), kohesi tanah (C) dan sudut geser dalam tanah (ϕ). Hasil dari pengujian sampel tanah, didapatkan nilai density tanah (ρ) terbesar senilai 1,67 gr/cm3, kohesi tanah (C) terbesar senilai 0,016 dan sudut geser dalam tanah (ϕ) terbesar senilai 15,86o. Nilai ini akan dimasukkan kedalam daya dukung tanah metode Terzaghi dan menghasilkan nilai sebesar 8,74 KPa. Mengacu kepada SNI 8460:2017, daya dukung izin pondasi dari daya dukung tanah dibagi dengan faktor keamanan besarnya minimum 3 untuk pondasi dangkal. Sehingga nilai dari daya dukung izin sebesar 2,91 KPa. Tahap penyiapan lahan Crushing Plant menggunakan metode Cut and Fill. Berdasarkan hasil perhitungan volume pengupasan Crushing Plant yang didapatkan dari Peta Topogra","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122366026","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-27DOI: 10.29313/bcsme.v3i2.7995
Hafizh Murtadho, Yuliadi, Yunus Ashari
Abstract. PT Nusa Halmahera Minerals is a mining company engaged in the gold mining business located in Gosowong, North Maluku. Mining is carried out with Open Pit Mining System and Underground Mining System using Open Pit Mini ng and Underhand Cut and Fill types. Geotechnical conditions in the Underground Mine are the main consent for the company by considering the safety of workers. There are several factors that can affect tunnel stability, including the condition of rock lithology, rock deformation, and groundwater conditions that interfere with ground support. Based on the actual situation in the field, there are still several active headings that are disturbed due to excessive groundwater which makes the mining cycle hampered due to the rehabilitation process, the presence of groundwater affects the condition of strengthening ground support in pasta fill (backfill) so that the tunnel has the potential to experience squeezing or shrinkage and rock collapse / collapse caused by load stress on rocks due to mining activities, Based on the results of observations and calculations, the 24% paste fill mix design conditions decreased in strength to 0.771 Mpa, with a Strength Factor value of 0.95 - 6. And get a total displacement value of 0.02 - 0.38 m. Geotechnic Monitoring Lidar validation states that there is movement in the roof and wall area in the K2-16 Sill area with a velocity value of 0.151 mm per day. Mix design recommendations affect the strengthening of ground support so as to maintain an optimal mining cycle and achieve the company's target. Abstrak. PT. Nusa Halmahera Minerals merupakan perusahaan tambang yang bergerak di bidang usaha pertambangan emas yang berlokasi di Gosowong, Maluku Utara. Penambangan dilakukan dengan Sistem Tambang Terbuka dan Sistem Tambang Bawah Tanah menggunakan jenis Open Pit Mining dan Underhand Cut and Fill. Kondisi geoteknik pada Tambang Bawah Tanah merupakan consent utama bagi perusahaan dengan mempertimbangkan keselamatan para pekerja. Terdapat beberapa faktor yang dapat mempengaruhi kestabilan terowongan, diantaranya kondisi lithology batuan, adanya deformasi batuan, dan kondisi air tanah yang mengganggu terhadap ground supporting. Berdasarkan keadaan aktual di lapangan masih terdapat beberapa heading aktif yang terganggu akibat adanya air tanah yang berlebih sehingga membuat siklus penambangan terhambat akibat adanya proses rehab, adanya air tanah berpengaruh terhadap kondisi penguatan ground support pada pasta fill (backfill) sehingga terowongan berpotensi mengalami squeezing atau penyusutan dan runtuhnan batuan/collapse yang diakibatkan oleh load stress pada batuan akibat aktivitas penambangan tersebut. Berdasarkan hasil pengamatan dan perhitungan kondisi mix design pasta fill 24% mengalami penurunan kekuatan menjadi 0,771 Mpa, dengan nilai Strength Factor sebesar 0.95 – 6. Dan mendapatkan nilai total displacement sebesar 0.02 – 0.38 m. Validasi Geotechnic Monitoring Lidar menyatakan adanya pergeraka
摘要PT Nusa Halmahera Minerals是一家从事金矿开采业务的矿业公司,位于北马鲁古Gosowong。采矿采用露天采矿系统和地下采矿系统,采用露天小型采矿和下手充填采矿方式。考虑到工人的安全,地下矿山的岩土条件是公司的主要同意。影响隧道稳定性的因素有很多,包括岩石岩性条件、岩石变形条件和地下水条件对地面支护的干扰。根据现场实际情况,目前仍有几个活动巷道因地下水过多而受到干扰,使开采周期因恢复过程而受到阻碍,地下水的存在影响了面状充填体(回填体)地基支护的加强条件,使巷道有可能发生挤压或收缩,以及因采矿活动对岩石产生荷载应力而引起的塌落/坍塌。根据观测和计算结果,24%膏体充填配合比设计条件下强度降低至0.771 Mpa,强度系数为0.95 ~ 6。得到总位移值为0.02 ~ 0.38 m。Geotechnic Monitoring Lidar验证表明,K2-16井区的顶板和墙体区域存在移动,速度值为0.151 mm / d。配合比设计建议影响地面支护的加强,从而保持最佳开采周期,实现公司目标。Abstrak。PT. Nusa Halmahera Minerals merupakan perusahaan tambang yang bergerak di bidang usaha pertambangan emas yang berlokasi di Gosowong, Maluku Utara。Penambangan dilakukan dengan system Tambang Terbuka dan system Tambang Bawah Tanah menggunakan jenis露天采矿矿山井下开采和充填。Kondisi geoteknik pada Tambang Bawah Tanah merupakan consent utama bagi perusahaan dengan成员pertimbangkan keselamatan para pekerja。Terdapat beberapa faktor yang dapat mempengaruhi kestabilan terowongan, diantaranya kondisi岩性batuan, adanya变形batuan, dankondisi空气tanah yang mengganggu terhadap地面支撑。中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:中文翻译为:Berdasarkan hasil pengamatan dan perhitungan kondisi设计面食填充24% mengalami penurunan kekuatan menjadi 0,771 Mpa,强度因子sebesar 0.95 - 6。丹门达帕坎尼莱总位移为0.02 - 0.38米。Validasi岩土监测激光雷达menyatakan adanya pergerakan pada区域屋顶和墙壁di区域K2-16仍在dengan nilai速度0.151 mm / harinya。建议混合设计berpengaruh terhadap企鹅地面支撑sehinga mampu menjaga siklus penambangan yang最佳dan menapai目标dari perusahaan。
{"title":"Karakteristik Fisik dan Mekanik Pasta Fill Sebagai Material Backfill Pada Proses Ground Support Di Underground Kencana, PT. Nusa Halmahera Minerals, Provinsi Maluku Utara","authors":"Hafizh Murtadho, Yuliadi, Yunus Ashari","doi":"10.29313/bcsme.v3i2.7995","DOIUrl":"https://doi.org/10.29313/bcsme.v3i2.7995","url":null,"abstract":"Abstract. PT Nusa Halmahera Minerals is a mining company engaged in the gold mining business located in Gosowong, North Maluku. Mining is carried out with Open Pit Mining System and Underground Mining System using Open Pit Mini ng and Underhand Cut and Fill types. Geotechnical conditions in the Underground Mine are the main consent for the company by considering the safety of workers. There are several factors that can affect tunnel stability, including the condition of rock lithology, rock deformation, and groundwater conditions that interfere with ground support. Based on the actual situation in the field, there are still several active headings that are disturbed due to excessive groundwater which makes the mining cycle hampered due to the rehabilitation process, the presence of groundwater affects the condition of strengthening ground support in pasta fill (backfill) so that the tunnel has the potential to experience squeezing or shrinkage and rock collapse / collapse caused by load stress on rocks due to mining activities, Based on the results of observations and calculations, the 24% paste fill mix design conditions decreased in strength to 0.771 Mpa, with a Strength Factor value of 0.95 - 6. And get a total displacement value of 0.02 - 0.38 m. Geotechnic Monitoring Lidar validation states that there is movement in the roof and wall area in the K2-16 Sill area with a velocity value of 0.151 mm per day. Mix design recommendations affect the strengthening of ground support so as to maintain an optimal mining cycle and achieve the company's target. \u0000Abstrak. PT. Nusa Halmahera Minerals merupakan perusahaan tambang yang bergerak di bidang usaha pertambangan emas yang berlokasi di Gosowong, Maluku Utara. Penambangan dilakukan dengan Sistem Tambang Terbuka dan Sistem Tambang Bawah Tanah menggunakan jenis Open Pit Mining dan Underhand Cut and Fill. Kondisi geoteknik pada Tambang Bawah Tanah merupakan consent utama bagi perusahaan dengan mempertimbangkan keselamatan para pekerja. Terdapat beberapa faktor yang dapat mempengaruhi kestabilan terowongan, diantaranya kondisi lithology batuan, adanya deformasi batuan, dan kondisi air tanah yang mengganggu terhadap ground supporting. Berdasarkan keadaan aktual di lapangan masih terdapat beberapa heading aktif yang terganggu akibat adanya air tanah yang berlebih sehingga membuat siklus penambangan terhambat akibat adanya proses rehab, adanya air tanah berpengaruh terhadap kondisi penguatan ground support pada pasta fill (backfill) sehingga terowongan berpotensi mengalami squeezing atau penyusutan dan runtuhnan batuan/collapse yang diakibatkan oleh load stress pada batuan akibat aktivitas penambangan tersebut. Berdasarkan hasil pengamatan dan perhitungan kondisi mix design pasta fill 24% mengalami penurunan kekuatan menjadi 0,771 Mpa, dengan nilai Strength Factor sebesar 0.95 – 6. Dan mendapatkan nilai total displacement sebesar 0.02 – 0.38 m. Validasi Geotechnic Monitoring Lidar menyatakan adanya pergeraka","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"30 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133926427","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-27DOI: 10.29313/bcsme.v3i2.7800
V. Gunawan, N. F. Isniarno, Iswandaru
Abstract. PT Bumi Kalimantan Lestari (BKL) is a mining company in Indonesia engaged in the mining industry sector, especially andesite. In each mining activity, the management of the stages from exploration to production is carried out properly in accordance with the guidelines for implementing good mining principles in order to achieve the production targets that have been planned. PT BKL has a production target in March of 14,500 BCM with actual production of 12,825 BCM. To obtain accurate production calculations, the photogrammetric method is used. The photogrammetric method is science and technology used to obtain information about physical objects and the environment by using the principles of photography and electromagnetic images to determine characteristics such as size, shape and position of objects used as observations or research. This aerial photo shoot uses Unmanned Aerial Vehicle (UAV) technology, which is an unmanned aircraft that can perform photogrammetry automatically in the air. Field data acquisition process uses Unmanned Aerial Vehicle (UAV) technology, this data processing technique uses photogrammetric techniques with flight path planning stages, Ground Control Point (GCP) point measurements and Benchmark points which are then tied to BIG's CORS points to produce higher control point accuracy, Dense Cloud Point to produce Digital Terrain Model (DTM), and orthophoto. The calculation of the volume of minerals using the close-range photogrammetry method in the resulting model has a volume difference with the actual production results, namely 1,536 BCM with a percentage of 11.9%. Abstrak. PT Bumi Kalimantan Lestari (BKL) merupakan salah satu perusahaan tambang di Indonesia yang bergerak dalam sektor industri pertambangan khususnya batu andesit. Dalam setiap kegiatan pertambangannya, pengelolaan tahapan mulai dari eksplorasi hingga produksi dilakukan secara baik sesuai pedoman pelaksanaan kaidah pertambangan yang baik guna mencapai target produksi yang sudah direncanakan. PT BKL memiliki target produksi pada bulan Maret sebesar 14.500 BCM dengan produksi aktual 12.825 BCM. Untuk mendapatkan perhitungan produksi yang akurat dilakukan menggunakan metode fotogrametri. Metode fotogrametri merupakan ilmu pengetahuan dan teknologi yang digunakan untuk memperoleh informasi tentang fisik obyek dan lingkungan dengan menggunakan prinsip fotografi dan gambar elektromagnetik untuk menentukan karakteristik seperti ukuran, bentuk dan posisi obyek yang dijadikan sebagai pengamatan atau penelitian. Pemotretan foto udara ini menggunakan teknologi Unmanned Aerial Vehicle (UAV) yaitu pesawat tanpa awak yang bisa melakukan fotogrametri secara otomatis di udara. Proses akuisisi data lapangan menggunakan teknologi Unmanned Aerial Vehicel (UAV), teknik pengolahan data ini menggunakan teknik fotogrametri dengan tahapan perencanaan jalur terbang, pengukuran titik Ground Control Point (GCP) dan titik Benchmark yang kemudian diikatkan dengan titik CORS m
摘要。PT Bumi Kalimantan Lestari (BKL)是印度尼西亚一家从事采矿行业的矿业公司,特别是安山岩。在每项采矿活动中,从勘探到生产各阶段的管理都是按照执行良好采矿原则的指导方针适当进行的,以便实现所计划的生产目标。PT BKL 3月份的生产目标为14,500 BCM,实际产量为12,825 BCM。为了获得精确的产量计算,采用了摄影测量法。摄影测量法是利用摄影原理和电磁图像来确定观测或研究对象的大小、形状和位置等特征,从而获得物理对象和环境信息的科学技术。这次航拍使用了无人驾驶飞行器(UAV)技术,这是一种可以在空中自动进行摄影测量的无人驾驶飞机。现场数据采集过程使用无人机(UAV)技术,该数据处理技术使用飞行路径规划阶段的摄影测量技术,地面控制点(GCP)点测量和基准点,然后与BIG的CORS点绑定以产生更高的控制点精度,密集云点产生数字地形模型(DTM)和正射影像仪。所得模型中使用近景摄影测量法计算的矿物体积与实际生产结果存在体积差异,即1536 BCM,百分比为11.9%。Abstrak。PT Bumi Kalimantan Lestari (BKL) merupakan salah satu perusahaan tambang di印度尼西亚yang bergerak dalam部门工业pertambangan khususnya batu和esi。Dalam setiap kegiatan pertambangannya, pengelolaan tahapan mulai dari eksplorashingga produksi dilakukan secara baik sesuan pelaksanaan kaidah pertambangan yang baik guna mencapan目标produksi yang sudah direncanakan。PT BKL memiliki的目标产品是在中国市场上销售的14500亿立方米,而实际产品是12825亿立方米。Untuk mendapatkan perhitungan产品duksi yang akurat dilakukan menggunakan方法摄影。杨Metode fotogrametri merupakan ilmu pengetahuan丹各种digunakan为她memperoleh informasi tentang fisik obyek丹lingkungan dengan menggunakan prinsip fotografi丹gambar elektromagnetik为她menentukan karakteristik seperti ukuran, bentuk丹posisi obyek杨dijadikan sebagai pengamatan atau penelitian。无人驾驶飞行器(UAV) yitu pesawat tanpa awak yang bisa melakukan摄影技术(无人机)本文主要介绍了企鹅地面控制点(GCP)、企鹅地面控制点(GCP)、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点、企鹅地面控制点。Perhitungan体积bahan galian menggunakan方法fotogamejak dekat pada模型yang dihasilkan memoriliki selish体积dengan hasil产品dengan实际yyitu sebesar 1.536 BCM dengan百分比为11.9%。
{"title":"Analisis Volumetrik Bahan Galian Tertambang dengan Menggunakan Metode Fotogrametri di PT Bumi Kalimantan Lestari, Kecamatan Baleendah, Kabupaten Bandung, Provinsi Jawa Barat","authors":"V. Gunawan, N. F. Isniarno, Iswandaru","doi":"10.29313/bcsme.v3i2.7800","DOIUrl":"https://doi.org/10.29313/bcsme.v3i2.7800","url":null,"abstract":"Abstract. PT Bumi Kalimantan Lestari (BKL) is a mining company in Indonesia engaged in the mining industry sector, especially andesite. In each mining activity, the management of the stages from exploration to production is carried out properly in accordance with the guidelines for implementing good mining principles in order to achieve the production targets that have been planned. PT BKL has a production target in March of 14,500 BCM with actual production of 12,825 BCM. To obtain accurate production calculations, the photogrammetric method is used. The photogrammetric method is science and technology used to obtain information about physical objects and the environment by using the principles of photography and electromagnetic images to determine characteristics such as size, shape and position of objects used as observations or research. This aerial photo shoot uses Unmanned Aerial Vehicle (UAV) technology, which is an unmanned aircraft that can perform photogrammetry automatically in the air. Field data acquisition process uses Unmanned Aerial Vehicle (UAV) technology, this data processing technique uses photogrammetric techniques with flight path planning stages, Ground Control Point (GCP) point measurements and Benchmark points which are then tied to BIG's CORS points to produce higher control point accuracy, Dense Cloud Point to produce Digital Terrain Model (DTM), and orthophoto. The calculation of the volume of minerals using the close-range photogrammetry method in the resulting model has a volume difference with the actual production results, namely 1,536 BCM with a percentage of 11.9%. \u0000Abstrak. PT Bumi Kalimantan Lestari (BKL) merupakan salah satu perusahaan tambang di Indonesia yang bergerak dalam sektor industri pertambangan khususnya batu andesit. Dalam setiap kegiatan pertambangannya, pengelolaan tahapan mulai dari eksplorasi hingga produksi dilakukan secara baik sesuai pedoman pelaksanaan kaidah pertambangan yang baik guna mencapai target produksi yang sudah direncanakan. PT BKL memiliki target produksi pada bulan Maret sebesar 14.500 BCM dengan produksi aktual 12.825 BCM. Untuk mendapatkan perhitungan produksi yang akurat dilakukan menggunakan metode fotogrametri. Metode fotogrametri merupakan ilmu pengetahuan dan teknologi yang digunakan untuk memperoleh informasi tentang fisik obyek dan lingkungan dengan menggunakan prinsip fotografi dan gambar elektromagnetik untuk menentukan karakteristik seperti ukuran, bentuk dan posisi obyek yang dijadikan sebagai pengamatan atau penelitian. Pemotretan foto udara ini menggunakan teknologi Unmanned Aerial Vehicle (UAV) yaitu pesawat tanpa awak yang bisa melakukan fotogrametri secara otomatis di udara. Proses akuisisi data lapangan menggunakan teknologi Unmanned Aerial Vehicel (UAV), teknik pengolahan data ini menggunakan teknik fotogrametri dengan tahapan perencanaan jalur terbang, pengukuran titik Ground Control Point (GCP) dan titik Benchmark yang kemudian diikatkan dengan titik CORS m","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129231470","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-27DOI: 10.29313/bcsme.v3i2.7875
Chaerunisa Azzahra, Yuliadi, Iswandaru
Abstract. PT Indocement Tunggal Prakarsa Tbk (ITP) is a cement producer in West Java with the second largest capacity in Indonesia and the largest integration in the world. In addition to producing cement, Indocement also produces ready-mix concrete, and manages aggregate and trass mines. this company has several Palimanan Quarries, including Kuari D. The condition of the rocks constituent on the slope has different structural conditions and complex geological structures. it is necessary to conduct geotechnical studies to analyze the geometry of the slopes of mine openings that have been planned by the company. Activities that need to be studied is recognize the physical properties, mechanics of rocks and rock mass classes. Data Processing Techniques that have been collected by calculating RQD and RMR on the mass of rocks that make up the slope based on the value of the sturdy position measured in the field for classifying rock mass. Software to determine potential avalanche types and making slope models with references to slope design geometry in the area using the help of software. After being studied, the rocks in the research area in Kuari D are limestone rocks with layer inserts in the form of Claystone Geotechnical mapping results obtained Rock Quality Design (RQD) 90-100%, Geological Strength Index (GSI) 42-55, and Rock Mass Rating (RMR) mapping results have good conditions with a range between 60-77. Stereographic analysis of the results of mapping weak or sturdy fields face of Kuari slope D has the potential in the form of wedge. Abstrak. PT Indocement Tunggal Prakarsa Tbk (ITP) merupakan salah satu produsen semen di Jawa Barat dengan kapasitas terbesar kedua di Indonesia dan terintegrasi terbesar di dunia. Selain memproduksi semen Indocement juga memproduksi beton siap pakai, serta mengelola tambang agregat dan trass. perusahaan ini memiliki beberapa Kuari Palimanan, diantaranya yaitu Kuari D. Kondisi batuan – batuan penyusun pada lereng memiliki kondisi struktur yang berbeda – beda dan kompleks akan struktur geologi. sehingga perlu dilakukan studi geoteknik untuk menganalisa geometri lereng bukaan tambang yang telah di rencanakan oleh pihak perusahaan. Kegiatan yang perlu dikaji yaitu mengenali sifat fisik, mekanik batuan dan kelas massa batuan. Teknik Pengolahan Data yang telah dikumpulkan yaitu dengan perhitungan RQD dan RMR terhadap massa batuan penyusun lereng berdasarkan nilai kedudukan kekar yang diukur pada lapangan untuk pengkelasan massa batuan. Mengetahui potensi jenis longsoran dan pembuatan model lereng dengan acuan dari geometri desain lereng pada daerah tersebut dengan menggunakan bantuan beberapa peragkat lunak. Setelah dikaji Batuan didaerah penelitian pada Kuari D merupakan batuan batugamping dengan sisipan lapisan berupa Batulempung Hasil pemetaan geoteknik didapatkan Rock Quality Design (RQD) 90 – 100 %, Geological Strength Index (GSI) 42-55, dan Rock Mass Rating (RMR) hasil pemetaan memiliki kondisi baik dengan ran
摘要。PT Indocement Tunggal Prakarsa Tbk (ITP)是西爪哇省的一家水泥生产商,是印度尼西亚第二大水泥生产商,也是世界上规模最大的水泥生产商。除了生产水泥,Indocement还生产预拌混凝土,并经营骨料和垃圾矿山。该公司拥有包括Kuari d在内的几个Palimanan采石场,边坡上的岩石组成条件不同,地质构造复杂。有必要进行岩土工程研究,以分析公司已规划的矿山开口的斜坡几何形状。需要研究的活动是认识岩石的物理性质、力学和岩体类别。根据现场测量的岩体坚固位置值,计算构成边坡的岩体的RQD和RMR,从而对岩体进行分类,所收集的数据处理技术。软件确定潜在的雪崩类型,并参考该地区的边坡设计几何图形,利用软件的帮助下制作边坡模型。经研究,夸里D研究区岩石为灰岩,以粘土岩的形式嵌层。岩土填图结果岩体质量设计(RQD)为90 ~ 100%,地质强度指数(GSI)为42 ~ 55,岩体等级(RMR)填图结果为60 ~ 77,条件较好。对夸日坡D面弱或强场填图结果的立体分析表明,该面具有楔形形式的潜力。Abstrak。PT文档Tunggal Prakarsa Tbk (ITP) merupakan salah satu生产的精液在爪哇巴拉特登和kapasitas terbesar kedua印度尼西亚和terintegrasi terbesar duia。Selain memproksi semen Indocement juga memproksi beton siap pakai, serta mengelola tambang和垃圾。perusahaan ini memoriliki beberapa Kuari Palimanan, diantaranya yitu Kuari D. Kondisi batuan - batuan penyusun padleeng memoriliki Kondisi strucktur yang berbeda - beda dan kompleks akan构造地质学。兴嘉perlu dilakakan研究地质技术,untuk孟山都的几何,但在坦邦,杨telah di rencanakan oleh pihak perushaan。Kegiatan yang perlu dikaji yaitmengenali sifat fisik, mekanik batuan dankelas massa batuan。Teknik Pengolahan数据yang telah dikumpulkan yitu dengan perhitungan RQD dan RMR terhadap massa batuan penyusun leeng berdaisarkan nilai kedudukan kekar yang diukur padapangan untuk pengkelaasan massa batuan。孟格塔辉潜力jenis longsoran dan penbuatan模型,lerengan acan dari几何设计,lerenga pada daerah terak,但dunan menggunakan bantuan beberapa peragkat lunak。Setelah dikaji Batuan didaerah penelitian paada Kuari D merupakan Batuan batugamping dengan sisipan lapisan berupa Batulempung Hasil pemetaan geoteknik didapatkan岩石质量设计(RQD) 90 - 100%,地质强度指数(GSI) 42-55,岩石质量等级(RMR) Hasil pemetaan memiliki kondisi baik dengan range antara 60 - 77。立体构型分析是一种有效的方法,它能有效地促进人体的生长发育。
{"title":"Analisis Faktor Keamanan Kuari D di PT. Indocement Tunggal Prakarsan TBK Desa Palimanan, Kecamatan Gempol, Kabupaten Cirebon, Provinsi Jawa Barat","authors":"Chaerunisa Azzahra, Yuliadi, Iswandaru","doi":"10.29313/bcsme.v3i2.7875","DOIUrl":"https://doi.org/10.29313/bcsme.v3i2.7875","url":null,"abstract":"Abstract. PT Indocement Tunggal Prakarsa Tbk (ITP) is a cement producer in West Java with the second largest capacity in Indonesia and the largest integration in the world. In addition to producing cement, Indocement also produces ready-mix concrete, and manages aggregate and trass mines. this company has several Palimanan Quarries, including Kuari D. The condition of the rocks constituent on the slope has different structural conditions and complex geological structures. it is necessary to conduct geotechnical studies to analyze the geometry of the slopes of mine openings that have been planned by the company. Activities that need to be studied is recognize the physical properties, mechanics of rocks and rock mass classes. Data Processing Techniques that have been collected by calculating RQD and RMR on the mass of rocks that make up the slope based on the value of the sturdy position measured in the field for classifying rock mass. Software to determine potential avalanche types and making slope models with references to slope design geometry in the area using the help of software. After being studied, the rocks in the research area in Kuari D are limestone rocks with layer inserts in the form of Claystone Geotechnical mapping results obtained Rock Quality Design (RQD) 90-100%, Geological Strength Index (GSI) 42-55, and Rock Mass Rating (RMR) mapping results have good conditions with a range between 60-77. Stereographic analysis of the results of mapping weak or sturdy fields face of Kuari slope D has the potential in the form of wedge. \u0000Abstrak. PT Indocement Tunggal Prakarsa Tbk (ITP) merupakan salah satu produsen semen di Jawa Barat dengan kapasitas terbesar kedua di Indonesia dan terintegrasi terbesar di dunia. Selain memproduksi semen Indocement juga memproduksi beton siap pakai, serta mengelola tambang agregat dan trass. perusahaan ini memiliki beberapa Kuari Palimanan, diantaranya yaitu Kuari D. Kondisi batuan – batuan penyusun pada lereng memiliki kondisi struktur yang berbeda – beda dan kompleks akan struktur geologi. sehingga perlu dilakukan studi geoteknik untuk menganalisa geometri lereng bukaan tambang yang telah di rencanakan oleh pihak perusahaan. Kegiatan yang perlu dikaji yaitu mengenali sifat fisik, mekanik batuan dan kelas massa batuan. Teknik Pengolahan Data yang telah dikumpulkan yaitu dengan perhitungan RQD dan RMR terhadap massa batuan penyusun lereng berdasarkan nilai kedudukan kekar yang diukur pada lapangan untuk pengkelasan massa batuan. Mengetahui potensi jenis longsoran dan pembuatan model lereng dengan acuan dari geometri desain lereng pada daerah tersebut dengan menggunakan bantuan beberapa peragkat lunak. Setelah dikaji Batuan didaerah penelitian pada Kuari D merupakan batuan batugamping dengan sisipan lapisan berupa Batulempung Hasil pemetaan geoteknik didapatkan Rock Quality Design (RQD) 90 – 100 %, Geological Strength Index (GSI) 42-55, dan Rock Mass Rating (RMR) hasil pemetaan memiliki kondisi baik dengan ran","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116889877","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-27DOI: 10.29313/bcsme.v3i2.7924
Tessar Ilham Topani, Zaenal, Noor Fauzi
Abstract. Research activities were carried out at PT Bukit Asam Tbk. Is one of the companies engaged in the coal mining industry. Mining activities in this company use an Open Mining System with the type of Area Mining. The company has a production target of 700,000 tons / month, while 325,000 tons / month specifically for BWE 205 and the production target has not been achieved. The mechanical equipment used is one unit Bucket Wheel Excavator, one unit Belt Wagon, one unit Cable Rail Car, one unit Hooper Car. This unit is located in stockpile A OPB 1 and is used as a loading tool. The production target is not achieved predicted due to the age of the old equipment, so there is a decrease in productivity. In this study will look for solutions so that production is achieved, it is necessary to make efforts to improve work efficiency by minimizing the obstacles that occur. The operation of the tool will affect the amount of production, namely with the right excavation method will increase the amount of production, if continuous will increase the amount of production is very significant. The factors that can affect loading production are: filling factor, time and number of bucket revolutions, drag time and work efficiency. From the observations, the results obtained for one bucket rotation were 11.91 seconds with a total spill of 71-78 times. With a work efficiency of 47%. The actual production produced of 166,785 tons / month, after the improvement of production results reached 377,153 tons / month. Efforts made to increase work efficiency and reduce time constraints are sought using several factors, the solution is obtained by paying attention to the factors of man, machine, method, material, and environment. Abstrak. Kegiatan penelitian dilakukan di PT Bukit Asam Tbk. Adalah salah satu perusahaan yang bergerak di bidang industri pertambangan batubara. Kegiatan penambangan di perusahaan ini menggunakan Sistem Tambang Terbuka dengan tipe Area Mining. Perusahaan ini memiliki target produksi sebesar 700.000 ton/bulan, sedangkan 325.000 ton/bulan khusus untuk di BWE 205 dan target produksi tersebut belum tercapai. Alat mekanis yang digunakan adalah satu unit Bucket Wheel Excavator, Satu unit Belt Wagon, satu unit Cable Rail Car, satu unit Hooper Car. Unit ini berada di stockpile A OPB 1 dan digunakan sebagai alat muat. Target produksi tidak tercapai diprediksi karena umur alat yang sudah tua, sehingga ada penurunan produktivitas. Pada penelitian ini akan mencari bagaimana solusi agar produksinya tercapai, maka perlu dilakukan upaya perbaikan efisiensi kerja dengan memperkecil hambatan-hambatan yang terjadi. Pengoperasian dari alat akan mempengaruhi jumlah produksi, dengan metode penggalian yang tepat akan menambah jumlah produksi, walaupun tidak besar, namun jika kontinu akan menambah jumlah produksi yang sangat signifikan. Adapun faktor-faktor yang dapat mempengaruhi produksi pemuatan adalah : faktor pengisian, waktu dan jumlah putaran bucket, waktu
摘要。研究活动在武吉阿萨姆Tbk进行。是从事煤炭开采行业的公司之一。该公司的采矿活动采用区域采矿类型的开放式采矿系统。公司的生产目标是70万吨/月,而BWE 205的生产目标是32.5万吨/月,尚未达到生产目标。所使用的机械设备为斗轮挖掘机1台、皮带车1台、钢轨车1台、斗车1台。该装置位于库存A OPB 1中,用作装载工具。由于旧设备的老化,生产目标没有达到预期,因此生产率下降。在本研究中将寻找解决方案,使生产实现,有必要努力提高工作效率,尽量减少发生的障碍。工具的操作会影响生产量,即用正确的挖掘方法会增加生产量,如果连续使用会增加生产量是非常显著的。影响装货生产的因素有:灌装因素、斗转次数和时间、拖拽时间和工作效率。从观察结果来看,一个桶旋转的结果为11.91秒,总溢出71-78次。工作效率为47%。实际产量为166785吨/月,改进后的生产成果达到377153吨/月。综合考虑人、机、法、料、环境等因素,力求提高工作效率,减少时间限制。Abstrak。Kegiatan penelitian dilakukan PT Bukit Asam Tbk。Adalah salah satu perusahaan yang bergerak di bidang industri pertambangan batubara。Kegiatan penambangan di perusahaan ini menggunakan systems Tambang Terbuka dengan type Area Mining。Perusahaan ini memiliki目标产品为sebesar 70万吨/bulan, sedangkan 32.5万吨/bulan khususuntuk BWE 205目标产品为terseberum tercapa。Alat mekanis yang digunakan adalah铲斗式轮式挖掘机,铲斗式皮带车,铲斗式钢轨车,铲斗式吊车。单位ini berada di储存A OPB - 1,但digunakan sebagai警报。目标产品为生产能力、生产能力、生产能力、生产能力、生产能力等。Pada penelitian ini akan mencari bagaimana solusi agar produksinya tercapai, maka perlu dilakukan upaya perbaikan efisiensi kerja dengan memperkecil hambatan-hambatan yang terjadi。pengperasian dari alat akan mempengaruhi jumlah producksi, dengan memede penggalian yang tepat akan menambah jumlah producksi, walaupun tidak besar, namun jika kontinu akan menambah jumlah producksi yang sangat signfikan。Adapun factor - factor for yang dapat mempengaruhi producksi pemuatan adalah: factor pengisian, waktu dan jumlah putaran bucket, waktu hambatan dan efisiensi kerja。Dari hasil pengamatan, diperoleh hasil satu kali rotasi bucket didapat 11,91 detik dengan total tumpahan sebanyak 71-78 kali。邓安·埃菲西·克贾·西贝萨尔47%。产量实际达哈什尔坎成员合计产量达166.785吨/bulan,产量达哈什尔坎成员合计产量达377.153吨/bulan。Usaha yang dilakukan untuk menaikkan efisiensi kerja dan mengurangi waktu hambatan dicari menggunakan beberapa factor, solusinya didapatkan dengan cara,是指人、机器、方法、材料、环境等因素。
{"title":"Kajian Kinerja Pemuatan Batubara dengan Bucket Wheel Excavator (BWE-205) PT Bukit Asam Tbk, di Kecamatan Tanjung Enim, Kabupaten Muara Enim, Sumatera Selatan","authors":"Tessar Ilham Topani, Zaenal, Noor Fauzi","doi":"10.29313/bcsme.v3i2.7924","DOIUrl":"https://doi.org/10.29313/bcsme.v3i2.7924","url":null,"abstract":"Abstract. Research activities were carried out at PT Bukit Asam Tbk. Is one of the companies engaged in the coal mining industry. Mining activities in this company use an Open Mining System with the type of Area Mining. The company has a production target of 700,000 tons / month, while 325,000 tons / month specifically for BWE 205 and the production target has not been achieved. The mechanical equipment used is one unit Bucket Wheel Excavator, one unit Belt Wagon, one unit Cable Rail Car, one unit Hooper Car. This unit is located in stockpile A OPB 1 and is used as a loading tool. The production target is not achieved predicted due to the age of the old equipment, so there is a decrease in productivity. In this study will look for solutions so that production is achieved, it is necessary to make efforts to improve work efficiency by minimizing the obstacles that occur. The operation of the tool will affect the amount of production, namely with the right excavation method will increase the amount of production, if continuous will increase the amount of production is very significant. The factors that can affect loading production are: filling factor, time and number of bucket revolutions, drag time and work efficiency. From the observations, the results obtained for one bucket rotation were 11.91 seconds with a total spill of 71-78 times. With a work efficiency of 47%. The actual production produced of 166,785 tons / month, after the improvement of production results reached 377,153 tons / month. Efforts made to increase work efficiency and reduce time constraints are sought using several factors, the solution is obtained by paying attention to the factors of man, machine, method, material, and environment. \u0000Abstrak. Kegiatan penelitian dilakukan di PT Bukit Asam Tbk. Adalah salah satu perusahaan yang bergerak di bidang industri pertambangan batubara. Kegiatan penambangan di perusahaan ini menggunakan Sistem Tambang Terbuka dengan tipe Area Mining. Perusahaan ini memiliki target produksi sebesar 700.000 ton/bulan, sedangkan 325.000 ton/bulan khusus untuk di BWE 205 dan target produksi tersebut belum tercapai. Alat mekanis yang digunakan adalah satu unit Bucket Wheel Excavator, Satu unit Belt Wagon, satu unit Cable Rail Car, satu unit Hooper Car. Unit ini berada di stockpile A OPB 1 dan digunakan sebagai alat muat. Target produksi tidak tercapai diprediksi karena umur alat yang sudah tua, sehingga ada penurunan produktivitas. Pada penelitian ini akan mencari bagaimana solusi agar produksinya tercapai, maka perlu dilakukan upaya perbaikan efisiensi kerja dengan memperkecil hambatan-hambatan yang terjadi. Pengoperasian dari alat akan mempengaruhi jumlah produksi, dengan metode penggalian yang tepat akan menambah jumlah produksi, walaupun tidak besar, namun jika kontinu akan menambah jumlah produksi yang sangat signifikan. Adapun faktor-faktor yang dapat mempengaruhi produksi pemuatan adalah : faktor pengisian, waktu dan jumlah putaran bucket, waktu ","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"423 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123145431","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-02-02DOI: 10.29313/bcsme.v3i1.7141
Syifa Kharenina, Elfida Moralista, Zaenal
Abstract. Conveyor is a means of transportation used in the mining industry to transport minerals to make it more efficient. The conveyor structure is made of carbon steel which has the potential to experience oxidation reactions due to contact with the surrounding environment. The oxidation reaction that occurs causes the conveyor to corrode, thus causing a reduction in Remaining Service Life. Therefore, it is necessary to control and supervise corrosion on the conveyor structure so that Remaining Service Life can reach its design life. The purpose of this research is to determine the type of corrosion that occurs, the methods used for corrosion control, the corrosion rate, and the remaining service life. The research methodology used is measuring the thickness of the conveyor structure. The actual thickness measurement was carried out on a 92 meter conveyor structure with 25 test points divided into 3 segments. Measurements were made using an Ultrasonic Thickness Gauge TT 130. The environmental conditions in the study area in 2017-2021 with an average rainfall of 233,65 mm/year, an average air temperature of 26,96oC, and an average air relative humidity 84,54%. The type of corrosion that occurs is uniform corrosion. The corrosion control method used on the conveyor structure is a coating method with 3 layers system namely, primary coating using Seaguard 5000, intermediate coating using Sherglass FF, and top coating using Aliphatic Arcylic Modified Polyurethane. The corrosion rate of the coveyor structure is between 0.1767 – 0.3283 mm/year in the good category based on the relative corrosion resistance of steel. The service life of the conveyor structure is 6 years and based on calculations, the Remaining Service Life is 8,50 – 10,96 years. Thus it is estimated that 40% or 10 test points are not expected to reach the design life of 15 years. Abstrak. Conveyor merupakan alat transportasi yang digunakan pada industri pertambangan untuk mengangkut mineral agar lebih efisien. Struktur konveyor terbuat dari baja karbon yang berpotensi mengalami reaksi oksidasi akibat kontak dengan lingkungan sekitar. Reaksi oksidasi yang terjadi menyebabkan conveyor mengalami korosi sehingga menyebabkan Remaining Service Life berkurang. Oleh karena itu, diperlukan pengendalian dan pengawasan korosi pada struktur konveyor agar Remaining Service Life dapat mencapai umur rencana. Tujuan dari penelitian ini adalah untuk mengetahui jenis korosi yang terjadi, metode yang digunakan untuk pengendalian korosi, laju korosi, dan sisa umur pakai. Metodologi penelitian yang digunakan adalah mengukur ketebalan struktur conveyor. Pengukuran ketebalan sebenarnya dilakukan pada struktur konveyor sepanjang 92 meter dengan 25 titik uji yang dibagi menjadi 3 segmen. Pengukuran dilakukan dengan menggunakan Ultrasonic Thickness Gauge TT 130. Kondisi lingkungan di wilayah studi tahun 2017-2021 dengan curah hujan rata-rata 233,65 mm/tahun, suhu udara rata-rata 26,96oC, dan kelembaban relat
摘要。输送机是采矿业中用于运输矿物以提高其效率的一种运输工具。输送机结构由碳钢制成,由于与周围环境接触,有可能发生氧化反应。所发生的氧化反应导致输送机腐蚀,从而导致剩余使用寿命的减少。因此,有必要对输送机结构的腐蚀进行控制和监督,使其剩余使用寿命达到设计寿命。本研究的目的是确定发生腐蚀的类型、腐蚀控制方法、腐蚀速率和剩余使用寿命。采用的研究方法是测量输送机结构的厚度。实际厚度测量是在一个92米的输送机结构上进行的,25个测试点分为3段。使用超声波测厚仪TT 130进行测量。研究区2017-2021年的环境条件为平均降雨量233,65 mm/年,平均气温26.96 oc,平均空气相对湿度84,54%。所发生的腐蚀类型为均匀腐蚀。在输送机结构上采用的腐蚀控制方法是一种3层体系的涂覆方法,即初级涂覆采用Seaguard 5000,中间涂覆采用Sherglass FF,顶层涂覆采用脂族芳烃改性聚氨酯。根据钢材的相对耐腐蚀性,输送机结构的腐蚀速率在0.1767 - 0.3283 mm/年之间,属于良好类别。输送机结构使用寿命为6年,经计算,剩余使用寿命为8,50 - 10,96年。因此,估计有40%或10个测试点预计无法达到15年的设计寿命。Abstrak。输送机merupakan alat transportasi yang digunakan padada industri pertambangan untuk mengangkut mineral agar lebih efisien。Struktur konveyor terbuat达里语巴哈karbon杨berpotensi mengalami reaksi oksidasi akibat kontak dengan lingkungan sekitar。Reaksi oksidasi yang terjadi menyebabkan输送机mengalami korosi sehingga menyebabkan剩余使用寿命berkurang。Oleh karena图,diperlukan pengendalian danpengawasan korosi pada结构输送机,琼脂剩余使用寿命(pada)Tujuan dari penelitian ini adalah untuk mengetahui jenis korosi yang terjadi, metode yang digunakan untuk pengendalian korosi, laju korosi, dan sisa umur pakai。方法:penelitian yang digunakan adalah mengukur ketebalan结构输送机。企鹅ketebalan sebenarnya dilakukan pada struktur konveyor sepanjang 92米登岸25 titik uji yang dibagi menjadi 3段。企鹅dilakukan登干menggunakan超声波测厚仪tt130。Kondisi lingkungan di wilayah studi tahun 2017-2021 dengan curah hujan rata-rata 233,65 mm/tahun, suhu udara rata-rata 26,96 oc, dan kelembaban相对udara rata-rata 84,54%。Jenis korosi yang terjadi adalah korosi seragam。3 .青金石yaitu、青金石底漆menggunakan Seaguard 5000、青金石menengah menggunakan Sherglass FF、青金石atas menggunakan脂肪族芳烃改性聚氨酯。Laju korosi构造输送机antara 0,1767 - 0,3283 mm/tahun dalam kategori baik berdasarkan ketahanan korosi相对baja。Masa layan结构输送机adalah 6 tahun dan berdasarkan perhitungan, Sisa Masa Pakai adalah 8,50 - 10,96 tahun。登干德米基安(demikian diperkirakan)占40%,占10%,占10%。
{"title":"Remaining Service Life Discharge Conveyor F pada Tambang Batubara PT GHI di Kabupaten Kotabaru, Provinsi Kalimantan Selatan","authors":"Syifa Kharenina, Elfida Moralista, Zaenal","doi":"10.29313/bcsme.v3i1.7141","DOIUrl":"https://doi.org/10.29313/bcsme.v3i1.7141","url":null,"abstract":"Abstract. Conveyor is a means of transportation used in the mining industry to transport minerals to make it more efficient. The conveyor structure is made of carbon steel which has the potential to experience oxidation reactions due to contact with the surrounding environment. The oxidation reaction that occurs causes the conveyor to corrode, thus causing a reduction in Remaining Service Life. Therefore, it is necessary to control and supervise corrosion on the conveyor structure so that Remaining Service Life can reach its design life. The purpose of this research is to determine the type of corrosion that occurs, the methods used for corrosion control, the corrosion rate, and the remaining service life. The research methodology used is measuring the thickness of the conveyor structure. The actual thickness measurement was carried out on a 92 meter conveyor structure with 25 test points divided into 3 segments. Measurements were made using an Ultrasonic Thickness Gauge TT 130. The environmental conditions in the study area in 2017-2021 with an average rainfall of 233,65 mm/year, an average air temperature of 26,96oC, and an average air relative humidity 84,54%. The type of corrosion that occurs is uniform corrosion. The corrosion control method used on the conveyor structure is a coating method with 3 layers system namely, primary coating using Seaguard 5000, intermediate coating using Sherglass FF, and top coating using Aliphatic Arcylic Modified Polyurethane. The corrosion rate of the coveyor structure is between 0.1767 – 0.3283 mm/year in the good category based on the relative corrosion resistance of steel. The service life of the conveyor structure is 6 years and based on calculations, the Remaining Service Life is 8,50 – 10,96 years. Thus it is estimated that 40% or 10 test points are not expected to reach the design life of 15 years. \u0000Abstrak. Conveyor merupakan alat transportasi yang digunakan pada industri pertambangan untuk mengangkut mineral agar lebih efisien. Struktur konveyor terbuat dari baja karbon yang berpotensi mengalami reaksi oksidasi akibat kontak dengan lingkungan sekitar. Reaksi oksidasi yang terjadi menyebabkan conveyor mengalami korosi sehingga menyebabkan Remaining Service Life berkurang. Oleh karena itu, diperlukan pengendalian dan pengawasan korosi pada struktur konveyor agar Remaining Service Life dapat mencapai umur rencana. Tujuan dari penelitian ini adalah untuk mengetahui jenis korosi yang terjadi, metode yang digunakan untuk pengendalian korosi, laju korosi, dan sisa umur pakai. Metodologi penelitian yang digunakan adalah mengukur ketebalan struktur conveyor. Pengukuran ketebalan sebenarnya dilakukan pada struktur konveyor sepanjang 92 meter dengan 25 titik uji yang dibagi menjadi 3 segmen. Pengukuran dilakukan dengan menggunakan Ultrasonic Thickness Gauge TT 130. Kondisi lingkungan di wilayah studi tahun 2017-2021 dengan curah hujan rata-rata 233,65 mm/tahun, suhu udara rata-rata 26,96oC, dan kelembaban relat","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129060265","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-01-29DOI: 10.29313/bcsme.v3i1.6923
Ilham Adi Prassetia, N. F. Isniarno, Sriyanti
Abstract. In mining industry reclamation activities are very important, because ex-mining land can change the landscape of an area and change land use. Reclamation is an activity that aims to repair or arrange land used for mining activities so that it can function and be useful according to its designation.The purpose of this study is to know the technical plan for land management that will be carried out from reclamation activities, to know the technical revegetation plans to be carried out by reclamation activities, to know the technical plans for care and maintenance to be carried out by reclamation activities and to know the total costsThe planned land reclamation technical scheme scheme will be carried out from 2025-2028 with the area of reclamation in accordance with the area of the mining area being cleared. The total area to be reclaimed is 8.4 Ha. Land structuring activities will begin in 2025 to 2028 including leveling the land surface and spreading topsoil. Meanwhile, the tools used were the Hitachi ZX 210 Excavator, the Hino Super Ranger FF Dump Truck, and the ZKJT 656G Bulldozer. The revegetation technical plan begins in 2025 with a total area of 2.62 Ha, in 2026 with a total area of 2.42 Ha, in 2027 with a total of 2.065 Ha and 2028 with an area of 1.245 The plants used in revegetation activities are the main plants in the form of Sea sengon trees, insert plants in the form of palawijaya plantsMaintenance and maintenance technical plans are carried out in 2025 to 2028 after revegetation activities are carried out. The maintenance and care technical plan includes the activities of fertilizing, replanting, watering and administering medicines for plants or commonly known as plant insecticides. The total cost of this reclamation plan is Rp. Rp. 1,570,236,570.- Abstrak. Dalam industri pertambangan kegiatan reklamasi adalah hal yang sangat penting, karena lahan bekas penambangan dapat mengubah bentang alam suatu wilayah dan merubah tataguna lahan. Reklamasi merupakan kegiatan yang bertujuan untuk memperbaiki atau menata lahan bekas kegiatan penambangan agar dapat berfungsi dan berguna sesuai peruntukannya. Tujuan dari penelitian ini yaitu mengetahui rencana teknis penataan lahan yang akan dilakukan dari kegiatan reklamasi, mengetahui rencana teknis revegetasi yang akan dilakukan kegiatan reklamasi, mengetahui rencana teknis perawatan dan pemeliharaan yang akan dilakukan kegiatan reklamasi serta mengetahui total biaya Rencana skema teknis penataan lahan yang akan direklamasi dilakukan dari tahun 2025-2028 dengan luas area reklamasi sesuai dengan luas area penambangan yang dibuka. Luas total yang akan direklamasi 8,4 Ha. Kegiatan penataan lahan dimulai pada tahun 2025 hingga tahun 2028 meliputi kegiatan perataan permukaan lahan dan penebaran tanah pucuk. Sedangkan alat yang digunakan adalah Excavator Hitachi ZX 210 , Dump Truck Hino Super Ranger FF, dan Bulldozer ZKJT 656G. Rencana teknis revegetasi dimulai pada tahun 2025 deng
摘要。在采矿业中,复垦活动是非常重要的,因为采矿用地可以改变一个地区的景观和土地利用。复垦是一项旨在修复或安排用于采矿活动的土地的活动,使其能够按照其指定功能和有用。本研究的目的是了解复垦活动将实施的土地管理技术计划,了解复垦活动将实施的技术植被计划,了解复垦活动要实施的养护技术方案,了解总费用。规划的土地复垦技术方案方案,从2025年至2028年实施,复垦面积与已清理矿区面积一致。填海总面积为8.4公顷。土地结构活动将于2025年至2028年开始,包括平整土地表面和铺展表土。同时,使用的工具是日立ZX 210挖掘机,日野超级游侠FF自卸卡车和ZKJT 656G推土机。再种植技术计划开始于2025年,总面积2.62公顷,2026年,总面积2.42公顷,2027年共有2028面积2.065公顷和1.245中使用的植物再生长活动的形式是主要的植物海sengon树木,插入植物的形式palawijaya plantsMaintenance和维护技术计划是在2025年到2028年后再种植活动。维护和护理技术计划包括施肥、补种、浇水和施用植物药物或通常称为植物杀虫剂的活动。该填海计划的总费用为Rp。Rp》1570236570。——Abstrak。Dalam industries pertambangan kegiatan reklamasi adalah hal yang sangat penting, karena lahan bekas penambangan dapat mengubah bentang alatu wilayah dan merubuah tataguna lahan。这句话的意思是:“我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说。”Tujuan dari penelitian ini yitu mengetahui rencana teknis penatan lahan yang akan dilakukan kegiatan reklamasi, mengetahui rencana teknis rekkukan reklamasi, mengetahui rencana teknis rekakukan perawatan, mengetahui rencana teknis perawatan, pemeliharaan yang akan dilakukan kegiatan reklamasi serta mengetahui total biaya rencana skema teknis penatan lahany akan direklamasi dilakukan dari tahun 2025-2028 dengan luas area reklamasi sesuai dengan luas area penambangan yang dibuka。陆总阳干直干8、4公顷。Kegiatan penataan lahan dimulai pada tahun 2025 hinga tahun 2028 meliputi Kegiatan perataan permukaan lahan dan penebaran tanah pucuk。挖掘机日立zx210,自卸卡车日野超级游侠FF,推土机ZKJT 656G。Rencana teknis regegei - didiai pa - tahun2025登干总面积2,62公顷,tahun2026登干总面积2,42公顷,tahun2027登干总面积2,065公顷。dan 2028 selu45 Tanaman yang digunakan pada kegiatan vegetasi yitu Tanaman pokok berupa Pohon sengon Laut, Tanaman sisipan berupa Tanaman palawijaya Rencana teknis pemeliharaan danperawatan dilakukan pada tahun 2025 hinga tahun 2028 setelah dilakukannya kegiatan vegetasi。Rencana teknis pemeliharaan dan perawatan meliputi kegiatan pemupukan, penyulaman, penyiraman serta pemberian obat-obatan untuk tanaman atau biasa disebut dengan insektisida tanaman。适应总biaya rencana reklamasi ini adalah Rp。Rp 1.570.236.570. -
{"title":"Rencana Kegiatan Reklamasi Tambang Andesit PT Gunung Bumi Perkasa, Desa Neglasari, Kecamatan Nyalindung, Kabupaten Sukabumi, Provinsi Jawa Barat","authors":"Ilham Adi Prassetia, N. F. Isniarno, Sriyanti","doi":"10.29313/bcsme.v3i1.6923","DOIUrl":"https://doi.org/10.29313/bcsme.v3i1.6923","url":null,"abstract":"Abstract. In mining industry reclamation activities are very important, because ex-mining land can change the landscape of an area and change land use. Reclamation is an activity that aims to repair or arrange land used for mining activities so that it can function and be useful according to its designation.The purpose of this study is to know the technical plan for land management that will be carried out from reclamation activities, to know the technical revegetation plans to be carried out by reclamation activities, to know the technical plans for care and maintenance to be carried out by reclamation activities and to know the total costsThe planned land reclamation technical scheme scheme will be carried out from 2025-2028 with the area of reclamation in accordance with the area of the mining area being cleared. The total area to be reclaimed is 8.4 Ha. Land structuring activities will begin in 2025 to 2028 including leveling the land surface and spreading topsoil. Meanwhile, the tools used were the Hitachi ZX 210 Excavator, the Hino Super Ranger FF Dump Truck, and the ZKJT 656G Bulldozer. The revegetation technical plan begins in 2025 with a total area of 2.62 Ha, in 2026 with a total area of 2.42 Ha, in 2027 with a total of 2.065 Ha and 2028 with an area of 1.245 The plants used in revegetation activities are the main plants in the form of Sea sengon trees, insert plants in the form of palawijaya plantsMaintenance and maintenance technical plans are carried out in 2025 to 2028 after revegetation activities are carried out. The maintenance and care technical plan includes the activities of fertilizing, replanting, watering and administering medicines for plants or commonly known as plant insecticides. The total cost of this reclamation plan is Rp. Rp. 1,570,236,570.- \u0000Abstrak. Dalam industri pertambangan kegiatan reklamasi adalah hal yang sangat penting, karena lahan bekas penambangan dapat mengubah bentang alam suatu wilayah dan merubah tataguna lahan. Reklamasi merupakan kegiatan yang bertujuan untuk memperbaiki atau menata lahan bekas kegiatan penambangan agar dapat berfungsi dan berguna sesuai peruntukannya. Tujuan dari penelitian ini yaitu mengetahui rencana teknis penataan lahan yang akan dilakukan dari kegiatan reklamasi, mengetahui rencana teknis revegetasi yang akan dilakukan kegiatan reklamasi, mengetahui rencana teknis perawatan dan pemeliharaan yang akan dilakukan kegiatan reklamasi serta mengetahui total biaya Rencana skema teknis penataan lahan yang akan direklamasi dilakukan dari tahun 2025-2028 dengan luas area reklamasi sesuai dengan luas area penambangan yang dibuka. Luas total yang akan direklamasi 8,4 Ha. Kegiatan penataan lahan dimulai pada tahun 2025 hingga tahun 2028 meliputi kegiatan perataan permukaan lahan dan penebaran tanah pucuk. Sedangkan alat yang digunakan adalah Excavator Hitachi ZX 210 , Dump Truck Hino Super Ranger FF, dan Bulldozer ZKJT 656G. Rencana teknis revegetasi dimulai pada tahun 2025 deng","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"22 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132994413","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-01-29DOI: 10.29313/bcsme.v3i1.6843
Rizal Andriansyah, Elfida Moralista, Zaenal
Abstract. Conveyor is a mechanical conveyance used for the coal removal process. The conveyor structure is generally made of carbon steel which is prone to corrosion when reacting with the environment. The corrosion that occurs can lead to a reduction in the thickness of the conveyor structure. Therefore, monitoring and corrosion control are needed, so as to slow down the corrosion rate and reach the design life. The purpose of this research is to determine the type of corrosion that occurs, the corrosion control methods used, Corrosion rate, and Remaining service life.In this study using the research methodology of measuring the thickness reduction of the conveyor structure. The thickness measurement of the conveyance was carried out using the Ultrasonic Gauge TT130 tool on a 95-meter-long conveyor structure divided into 3 segments with 25 test points. The data obtained include nominal thickness, actual thickness, design life of 15 years and service life of 5 years, used to calculate Thickness Required, Corrosion rate, and Remaining service life. The environmental conditions of the study area in a period of 5 years from 2015 to 2019 had an average rainfall of 197.98 mm / year, an average air temperature of 26.91 °C, and an average humidity of 83.62%. Corrosion that occurs in the conveyor structure is evenly corrosion and the corrosion control method applied is a coating with a three-layer system, namely primer coating using Seaguard 5000, intermediate coating using Sherglass FF, and top coating using Aliphatic arcylic modified polyurethane. The corrosion rate that occurs in the conveyor structure ranges from 0.1880-0.3300 mm / year, so based on the relative corrosive resistance of steel is included in the "good" category. The service life of the conveyor structure is 9.43-11.35 years. Thus, 40% of the 25 test points are predicted to not be able to reach the design life, which is 15 years. Abstrak. Conveyor merupakan alat angkut mekanis yang digunakan untuk proses pemindahan batubara. Struktur conveyor pada umumnya berbahan dasar baja karbon yang rentan mengalami korosi apabila bereaksi dengan lingkungan. Korosi yang terjadi dapat menyebabkan pengurangan ketebalan pada struktur conveyor. Oleh karena itu diperlukan monitoring dan pengendalian korosi, sehingga dapat memperlambat laju korosi serta mencapai umur desain. Tujuan dilakukannya penelitian ini untuk mengetahui jenis korosi yang terjadi, metode pengendalian korosi yang digunakan, Corrosion rate, dan Remaining service life.. Pada penelitian ini menggunakan metodologi penelitian pengukuran pengurangan ketebalan struktur conveyor. Pengukuran ketebalan dilakukan menggunakan alat Ultrasonic Gauge TT130 pada struktur conveyor sepanjang 95 meter yang terbagi ke dalam 3 segmen dengan 25 test point. Data yang diperoleh meliputi tebal nominal, tebal aktual, umur desain 15 tahun dan umur pakai 5 tahun, data tersebut kemudian diolah untuk mengetahui Thickness Required, Corrosion rate, dan Remaining se
抽象的。输送机是一种用于除煤过程的机械运输工具。输送机结构一般由碳钢制成,与环境反应时容易发生腐蚀。所发生的腐蚀会导致输送机结构厚度的减少。因此,需要进行监测和腐蚀控制,以减缓腐蚀速度,达到设计寿命。本研究的目的是确定发生腐蚀的类型,所使用的腐蚀控制方法,腐蚀速率和剩余使用寿命。本研究采用测量输送机结构减厚的研究方法。采用TT130超声测量仪对95米长的输送机结构进行厚度测量,该输送机结构分为3段,共25个测点。获得的数据包括公称厚度、实际厚度、设计寿命15年和使用寿命5年,用于计算所需厚度、腐蚀速率和剩余使用寿命。研究区2015 - 2019年5年的环境条件为平均降雨量197.98 mm /年,平均气温26.91℃,平均湿度83.62%。输送机结构中发生的腐蚀为均匀腐蚀,采用的腐蚀控制方法为三层体系的涂层,即底漆采用Seaguard 5000,中间漆采用Sherglass FF,面漆采用脂肪族芳烃改性聚氨酯。输送机结构中发生的腐蚀速率范围为0.1880-0.3300 mm /年,因此根据钢材的相对耐腐蚀性被列入“良好”类别。输送机结构使用寿命为9.43-11.35年。因此,预计25个测试点中有40%无法达到设计寿命,即15年。Abstrak。传送带merupakan alat angkut mekanis yang digunakan untuk处理pemindahan batubara。构造输送机帕达umumnya berbahan dasar baja karbon yang rentan mengalami korosi abilabila bereaksi dengan lingkungan。Korosi yang terjadi dapat menyebabkan pengurangan ketebalan pada结构输送机。Oleh karena itu diperlukan监测dan pengendalian korosi, sehinga datapat memperlamat laju korosi serta memapai umur设计。Tujuan dilakukannya penelitian ini untuk mengetahui jenis korosi yang terjadi, method pengen大连korosi yang digunakan,腐蚀速率,dan剩余使用寿命。padadpenelitian ini menggunakan方法论penelitian pengukuran pengurangan kettebalan结构输送机。企鹅ketebalan dilakukan menggunakan alat超声波探测仪TT130 padadstruturturtransportsepanjang 95米扬terbagi ke dalam 3段登岸25试验点。数据阳双管管管公称、实际,钢质设计15塔粗,钢质设计5塔粗,数据阳双管管粗,钢质要求厚度,腐蚀速率,钢质剩余使用寿命。Kondisi lingkungan daerah penelitian dalam kurun waktu 5 tahun yang terhitung sejak tahun 2015 sampai tahun 2019 memiliki curah hujan rata-rata sebesar 197,98 mm/tahun,温度udara rata-rata 26,91°C, dan kelembapan udara rata-rata 83,62%。高丽阳特拉加迪帕达结构输送机高丽阳特拉加迪拉达达涂层邓安体系三层雅图底漆邓安蒙古纳坎Seaguard 5000,中间涂层蒙古纳坎Sherglass FF,丹面涂层邓安蒙古纳坎脂肪族芳烃改性聚氨酯。拉州korosi yang terjadi patada结构输送机berkisar 0,1880-0,3300 mm/tahun, sehinga berdasarkan ketahanan korosian相对baja termasuk ke dalam kategori“好”。Umur pakai结构输送机adalah 9,43-11,35 tahun。杨Dengan demikian terdapat 40%达里语25个测试点diprediksi有些dapat mencapai umur desain, yakni 15 tahun。
{"title":"Monitoring Korosi Discharge Conveyor E pada Tambang Batubara PT GHI di Kabupaten Kotabaru Provinsi Kalimantan Selatan","authors":"Rizal Andriansyah, Elfida Moralista, Zaenal","doi":"10.29313/bcsme.v3i1.6843","DOIUrl":"https://doi.org/10.29313/bcsme.v3i1.6843","url":null,"abstract":"Abstract. Conveyor is a mechanical conveyance used for the coal removal process. The conveyor structure is generally made of carbon steel which is prone to corrosion when reacting with the environment. The corrosion that occurs can lead to a reduction in the thickness of the conveyor structure. Therefore, monitoring and corrosion control are needed, so as to slow down the corrosion rate and reach the design life. The purpose of this research is to determine the type of corrosion that occurs, the corrosion control methods used, Corrosion rate, and Remaining service life.In this study using the research methodology of measuring the thickness reduction of the conveyor structure. The thickness measurement of the conveyance was carried out using the Ultrasonic Gauge TT130 tool on a 95-meter-long conveyor structure divided into 3 segments with 25 test points. The data obtained include nominal thickness, actual thickness, design life of 15 years and service life of 5 years, used to calculate Thickness Required, Corrosion rate, and Remaining service life. The environmental conditions of the study area in a period of 5 years from 2015 to 2019 had an average rainfall of 197.98 mm / year, an average air temperature of 26.91 °C, and an average humidity of 83.62%. Corrosion that occurs in the conveyor structure is evenly corrosion and the corrosion control method applied is a coating with a three-layer system, namely primer coating using Seaguard 5000, intermediate coating using Sherglass FF, and top coating using Aliphatic arcylic modified polyurethane. The corrosion rate that occurs in the conveyor structure ranges from 0.1880-0.3300 mm / year, so based on the relative corrosive resistance of steel is included in the \"good\" category. The service life of the conveyor structure is 9.43-11.35 years. Thus, 40% of the 25 test points are predicted to not be able to reach the design life, which is 15 years. \u0000Abstrak. Conveyor merupakan alat angkut mekanis yang digunakan untuk proses pemindahan batubara. Struktur conveyor pada umumnya berbahan dasar baja karbon yang rentan mengalami korosi apabila bereaksi dengan lingkungan. Korosi yang terjadi dapat menyebabkan pengurangan ketebalan pada struktur conveyor. Oleh karena itu diperlukan monitoring dan pengendalian korosi, sehingga dapat memperlambat laju korosi serta mencapai umur desain. Tujuan dilakukannya penelitian ini untuk mengetahui jenis korosi yang terjadi, metode pengendalian korosi yang digunakan, Corrosion rate, dan Remaining service life.. Pada penelitian ini menggunakan metodologi penelitian pengukuran pengurangan ketebalan struktur conveyor. Pengukuran ketebalan dilakukan menggunakan alat Ultrasonic Gauge TT130 pada struktur conveyor sepanjang 95 meter yang terbagi ke dalam 3 segmen dengan 25 test point. Data yang diperoleh meliputi tebal nominal, tebal aktual, umur desain 15 tahun dan umur pakai 5 tahun, data tersebut kemudian diolah untuk mengetahui Thickness Required, Corrosion rate, dan Remaining se","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"84 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124691203","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}