{"title":"Briefing: Design for manufacture and off-site construction at Woolston Wastewater Treatment Works (UK)","authors":"Martin Tresidder, P. White","doi":"10.1680/jmapl.17.00031","DOIUrl":"https://doi.org/10.1680/jmapl.17.00031","url":null,"abstract":"","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"46 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73791102","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Procurement strategies that enable early contractor involvement (ECI) in design may enhance off-site manufacturing (OSM) by overcoming previously identified barriers to its uptake. Involving constructors during the design stage can reduce the risk of design buildability issues, and standardising traditionally bespoke ECI processes may help overcome cultural resistance to unfamiliar OSM technology. Following literature review and using case studies, document analysis and legal doctrine, a two-stage ECI conceptual process model for New Zealand is proposed. This was tested and refined following feedback at a conference. The model comprises a first-stage pre-construction contract and a second-stage standard-form construction contract. Key process variables are considered with solutions to provide collaboration and transparency while maintaining competitive fixed pricing across the supply chain. Legal doctrine analysis is used to distinguish between design buildability obligations and design codes compliance. The model contributes towards the development of a standard form for pre-construction contracts.
{"title":"Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand","authors":"D. Finnie, Naseem Ameer Ali, K. Park","doi":"10.1680/jmapl.17.00029","DOIUrl":"https://doi.org/10.1680/jmapl.17.00029","url":null,"abstract":"Procurement strategies that enable early contractor involvement (ECI) in design may enhance off-site manufacturing (OSM) by overcoming previously identified barriers to its uptake. Involving constructors during the design stage can reduce the risk of design buildability issues, and standardising traditionally bespoke ECI processes may help overcome cultural resistance to unfamiliar OSM technology. Following literature review and using case studies, document analysis and legal doctrine, a two-stage ECI conceptual process model for New Zealand is proposed. This was tested and refined following feedback at a conference. The model comprises a first-stage pre-construction contract and a second-stage standard-form construction contract. Key process variables are considered with solutions to provide collaboration and transparency while maintaining competitive fixed pricing across the supply chain. Legal doctrine analysis is used to distinguish between design buildability obligations and design codes compliance. The model contributes towards the development of a standard form for pre-construction contracts.","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"126 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-07-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"74679994","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
A general confusion exists as to the correct interpretation of payment clauses structured in a manner similar to those in the NEC3 Professional Services Contract (PSC). This has led to a number of ...
{"title":"Briefing: Payment provisions of NEC3 Professional Services Contract","authors":"DavisTerrence","doi":"10.1680/JMAPL.18.00023","DOIUrl":"https://doi.org/10.1680/JMAPL.18.00023","url":null,"abstract":"A general confusion exists as to the correct interpretation of payment clauses structured in a manner similar to those in the NEC3 Professional Services Contract (PSC). This has led to a number of ...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"37 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77578699","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Information management during the construction phase of a built asset involves multiple stakeholders using multiple software applications to generate and store data. This is problematic as data com...
在构建资产的构建阶段,信息管理涉及使用多个软件应用程序生成和存储数据的多个涉众。这是有问题的数据…
{"title":"An ontology-based data integration framework for construction information management","authors":"Abiodun Gideon Akinyemi, M. Sun, A. Gray","doi":"10.1680/JMAPL.17.00052","DOIUrl":"https://doi.org/10.1680/JMAPL.17.00052","url":null,"abstract":"Information management during the construction phase of a built asset involves multiple stakeholders using multiple software applications to generate and store data. This is problematic as data com...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"125 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76150769","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Mediation provides a more cost-effective, faster and generally more beneficial form of dispute resolution than litigation for certain types of disputes. It is for these reasons that mediation may be considered a potentially useful form of dispute resolution in the field of planning and environmental disputes in the UK. Mediation for such disputes promises to facilitate participation in planning disputes on a much broader level, thereby promoting inclusiveness, and allowing for a broader and thus more accurate range of interests to be taken into account. The flexible nature of mediation also enables the process to be tailored according to the particular features of the individual case. It is within this context that the potential benefits of mediation for environmental and planning disputes should be approached and considered within this briefing article, in order to determine whether such benefits are applicable to this type of dispute.
{"title":"Briefing: The potential of mediating planning and environmental disputes in England and Wales","authors":"A. Agapiou","doi":"10.1680/JMAPL.18.00006","DOIUrl":"https://doi.org/10.1680/JMAPL.18.00006","url":null,"abstract":"Mediation provides a more cost-effective, faster and generally more beneficial form of dispute resolution than litigation for certain types of disputes. It is for these reasons that mediation may be considered a potentially useful form of dispute resolution in the field of planning and environmental disputes in the UK. Mediation for such disputes promises to facilitate participation in planning disputes on a much broader level, thereby promoting inclusiveness, and allowing for a broader and thus more accurate range of interests to be taken into account. The flexible nature of mediation also enables the process to be tailored according to the particular features of the individual case. It is within this context that the potential benefits of mediation for environmental and planning disputes should be approached and considered within this briefing article, in order to determine whether such benefits are applicable to this type of dispute.","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"15 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-04-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83624416","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Tariq Umar, C. Egbu, Sam Wamuzir, Mohamed Shaik Honnurvali
Poor occupational safety and health (OS&H) results in an economic burden of 4% of the total world gross domestic product (GDP). Effective OS&H regulations and their implementation are one of the main factors in achieving an improved safety performance. This article discusses the current OS&H regulations applicable in all industries including construction in Oman. Construction is one of the main industries in Oman, which contributes about 9% towards its GDP. This article attempts to offer some basic understanding of the OS&H regulations applicable to both employees and employers in Oman. The current regulations comprise four chapters and 43 articles, which address some of the key areas, including the specifications of worker uniform and personal protection equipment, medical care, precautions against hazards, special precautionary measures, OS&H management system and enforcement by ministry inspectors. The minimum number of employees for an employer to have a qualified OS&H supervisor is 50. Different agreements between Oman and the International Labour Organization indicate that Oman is committed to implementing the National Programme for Work, which aims to build Oman’s labour market and to provide decent work.
{"title":"Briefing: Occupational safety and health regulations in Oman","authors":"Tariq Umar, C. Egbu, Sam Wamuzir, Mohamed Shaik Honnurvali","doi":"10.1680/jmapl.18.00007","DOIUrl":"https://doi.org/10.1680/jmapl.18.00007","url":null,"abstract":"Poor occupational safety and health (OS&H) results in an economic burden of 4% of the total world gross domestic \u0000product (GDP). Effective OS&H regulations and their implementation are one of the main factors in achieving an \u0000improved safety performance. This article discusses the current OS&H regulations applicable in all industries \u0000including construction in Oman. Construction is one of the main industries in Oman, which contributes about 9% \u0000towards its GDP. This article attempts to offer some basic understanding of the OS&H regulations applicable to both \u0000employees and employers in Oman. The current regulations comprise four chapters and 43 articles, which address \u0000some of the key areas, including the specifications of worker uniform and personal protection equipment, medical \u0000care, precautions against hazards, special precautionary measures, OS&H management system and enforcement by \u0000ministry inspectors. The minimum number of employees for an employer to have a qualified OS&H supervisor is 50. \u0000Different agreements between Oman and the International Labour Organization indicate that Oman is committed \u0000to implementing the National Programme for Work, which aims to build Oman’s labour market and to provide \u0000decent work.","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"29 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76616277","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}