Pub Date : 2023-07-20DOI: 10.1108/ijbpa-03-2023-0033
Andrew Ebekozien, C. Aigbavboa, M. S. Samsurijan, Ahmad Salman, Godspower C. Amadi
PurposeThe organised self-help approach successfully enhances urban low-income earners' (LIE) homeownership in some developing countries. The technique can enhance urban resilience for sustainable LIE homeownership. There is a paucity of studies concerning sustainable homeownership for Nigeria's urban LIE through a self-help approach. The study investigated the housing needs of the urban LIE via organised self-help mechanisms and how the same can enhance urban resilience for sustainable homeownership in the Ancient City of Benin, Nigeria.Design/methodology/approachGiven the unexplored nature of the issue, 20 face-to-face interviews were conducted with experts and analysed through a thematic approach.FindingsFindings identified eleven main barriers faced by the urban LIE. This includes the absence of government housing policy, funding frameworks, urban land scarcity, high property development costs, naira devaluation, high-interest rates, inflation, bribery and corruption, lax mortgage sub-sector, high cost of infrastructure, and government bureaucracy.Originality/valueThis study will contribute to pioneering the role of organised self-help mechanisms in urban resilience for sustainable LIE homeownership in developing cities via a qualitative approach. Also, findings would significantly contribute to developing countries' sustainable housing and urban resilience literature.
{"title":"Urban resilience for sustainable homeownership: the role of self-help in the ancient city of Benin, Nigeria","authors":"Andrew Ebekozien, C. Aigbavboa, M. S. Samsurijan, Ahmad Salman, Godspower C. Amadi","doi":"10.1108/ijbpa-03-2023-0033","DOIUrl":"https://doi.org/10.1108/ijbpa-03-2023-0033","url":null,"abstract":"PurposeThe organised self-help approach successfully enhances urban low-income earners' (LIE) homeownership in some developing countries. The technique can enhance urban resilience for sustainable LIE homeownership. There is a paucity of studies concerning sustainable homeownership for Nigeria's urban LIE through a self-help approach. The study investigated the housing needs of the urban LIE via organised self-help mechanisms and how the same can enhance urban resilience for sustainable homeownership in the Ancient City of Benin, Nigeria.Design/methodology/approachGiven the unexplored nature of the issue, 20 face-to-face interviews were conducted with experts and analysed through a thematic approach.FindingsFindings identified eleven main barriers faced by the urban LIE. This includes the absence of government housing policy, funding frameworks, urban land scarcity, high property development costs, naira devaluation, high-interest rates, inflation, bribery and corruption, lax mortgage sub-sector, high cost of infrastructure, and government bureaucracy.Originality/valueThis study will contribute to pioneering the role of organised self-help mechanisms in urban resilience for sustainable LIE homeownership in developing cities via a qualitative approach. Also, findings would significantly contribute to developing countries' sustainable housing and urban resilience literature.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43580593","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-17DOI: 10.1108/ijbpa-11-2022-0184
Nadira Islam Nila, J. Akter, M. M. Hossain
PurposeChange orders are a typical occurrence in building projects. Change orders indirectly affect labor productivity, resulting in a significant delay in the completion of a building project. Change orders cause labor productivity losses that are difficult to describe, establish and account for contractors and subcontractors. This study aimed to look at the influence of change orders on labor productivity and develop methods to mitigate their adverse effects.Design/methodology/approachTo assess the change orders' impact on productivity levels a system dynamic model was developed and devise ways were developed to counteract these negative impacts in this research. The impact of change orders on labor productivity and project time was then controlled using techniques established. Finally, a case study of KUET's hall extension was chosen, and the model and principles developed were implemented.FindingsThis study established that if the project delivery date is set and change orders are occurring often, labor productivity will be impacted. With adequate monitoring and supplemental management techniques, it can be reduced by prolonging the project.Originality/valueThe developed policies aid to mitigate the effect of change orders on labor productivity.
{"title":"Change order effects on labor productivity and mitigation the effects by developing policies using system dynamic modeling: a case study in a construction project","authors":"Nadira Islam Nila, J. Akter, M. M. Hossain","doi":"10.1108/ijbpa-11-2022-0184","DOIUrl":"https://doi.org/10.1108/ijbpa-11-2022-0184","url":null,"abstract":"PurposeChange orders are a typical occurrence in building projects. Change orders indirectly affect labor productivity, resulting in a significant delay in the completion of a building project. Change orders cause labor productivity losses that are difficult to describe, establish and account for contractors and subcontractors. This study aimed to look at the influence of change orders on labor productivity and develop methods to mitigate their adverse effects.Design/methodology/approachTo assess the change orders' impact on productivity levels a system dynamic model was developed and devise ways were developed to counteract these negative impacts in this research. The impact of change orders on labor productivity and project time was then controlled using techniques established. Finally, a case study of KUET's hall extension was chosen, and the model and principles developed were implemented.FindingsThis study established that if the project delivery date is set and change orders are occurring often, labor productivity will be impacted. With adequate monitoring and supplemental management techniques, it can be reduced by prolonging the project.Originality/valueThe developed policies aid to mitigate the effect of change orders on labor productivity.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"46778819","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-17DOI: 10.1108/ijbpa-10-2022-0168
Zahra Jalali, A. Shamseldin, Sandeeka Mannakkara
PurposeClimate change reports from New Zealand claim that climate change will impact some cities such as Auckland from a heating-dominated to a cooling-dominated climate. The benefits and risks of climate change on buildings' thermal performance are still unknown. This paper examines the impacts of climate change on the energy performance of residential buildings in New Zealand and provides insight into changes in trends in energy consumption by quantifying the impacts of climate change.Design/methodology/approachThe present paper used a downscaling method to generate weather data for three locations in New Zealand: Auckland, Wellington and Christchurch. The weather data sets were applied to the energy simulation of a residential case study as a reference building using a validated building energy analysis tool (EnergyPlus).FindingsThe result indicated that in Wellington and Christchurch, heating would be the major thermal load of residential buildings, while in Auckland, the main thermal load will change from heating to cooling in future years. The revised R-values for the building code will affect the pattern of dominant heating and cooling demands in buildings in Auckland in the future, while in Wellington and Christchurch, the heating load will be higher than the cooling load.Originality/valueThe findings of this study gave a broader insight into the risks and opportunities of climate change for the thermal performance of buildings. The results established the significance of considering climate change in energy performance analysis to inform the appropriate building codes for the design of residential buildings to avoid future costly changes to buildings.
{"title":"Evaluation of climate change effects on residential building cooling and heating demands in New Zealand: implications for energy efficiency standards and building codes","authors":"Zahra Jalali, A. Shamseldin, Sandeeka Mannakkara","doi":"10.1108/ijbpa-10-2022-0168","DOIUrl":"https://doi.org/10.1108/ijbpa-10-2022-0168","url":null,"abstract":"PurposeClimate change reports from New Zealand claim that climate change will impact some cities such as Auckland from a heating-dominated to a cooling-dominated climate. The benefits and risks of climate change on buildings' thermal performance are still unknown. This paper examines the impacts of climate change on the energy performance of residential buildings in New Zealand and provides insight into changes in trends in energy consumption by quantifying the impacts of climate change.Design/methodology/approachThe present paper used a downscaling method to generate weather data for three locations in New Zealand: Auckland, Wellington and Christchurch. The weather data sets were applied to the energy simulation of a residential case study as a reference building using a validated building energy analysis tool (EnergyPlus).FindingsThe result indicated that in Wellington and Christchurch, heating would be the major thermal load of residential buildings, while in Auckland, the main thermal load will change from heating to cooling in future years. The revised R-values for the building code will affect the pattern of dominant heating and cooling demands in buildings in Auckland in the future, while in Wellington and Christchurch, the heating load will be higher than the cooling load.Originality/valueThe findings of this study gave a broader insight into the risks and opportunities of climate change for the thermal performance of buildings. The results established the significance of considering climate change in energy performance analysis to inform the appropriate building codes for the design of residential buildings to avoid future costly changes to buildings.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49268665","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-12DOI: 10.1108/ijbpa-11-2022-0173
Frank Victor Mushi, H. Nguluma, J. Kihila
PurposeGreen buildings have proven to be essential contributors to the sustainability of buildings in the construction industry. However, in developing economies, the rate of green building adoption is slow. Moreover, the factors linked to a relatively slow adoption rarely feature in the literature. This study seeks to bridge the gap by first exploring factors influencing the adoption of green buildings. Second, analysing strategies and preferences determining the adoption of green building principles and lastly, exploring case-based opportunities for their adoption in Tanzania.Design/methodology/approachSemi-structured interviews were conducted to collect qualitative data from twelve key informants. The qualitative data were analysed using content analysis.FindingsThe findings indicate that the most influential factors in green building adoption are related to key organizational decisions. Moreover, social and environmental factors are more related to green building adoption than economic factors. In addition, energy and water efficiency are the most commonly adopted sustainability features, while certified materials, recycling and reusing are rarely implemented.Practical implicationsSince green building adoption is still in its infancy, this study informs policymakers, professional bodies, developers, and researchers of the empirically supported factors for green building adoption. The conclusions can be amplified within the sustainability movement.Originality/valueThis study provides an in-depth understanding of the precursors of green building adoption, which is increasingly becoming a paradigm shift in the construction sector. The study is the first to present an in-depth analysis of the real-life factors influencing the adoption of green buildings in Tanzania.
{"title":"Factors influencing adoption of green buildings in Tanzania: a qualitative case study","authors":"Frank Victor Mushi, H. Nguluma, J. Kihila","doi":"10.1108/ijbpa-11-2022-0173","DOIUrl":"https://doi.org/10.1108/ijbpa-11-2022-0173","url":null,"abstract":"PurposeGreen buildings have proven to be essential contributors to the sustainability of buildings in the construction industry. However, in developing economies, the rate of green building adoption is slow. Moreover, the factors linked to a relatively slow adoption rarely feature in the literature. This study seeks to bridge the gap by first exploring factors influencing the adoption of green buildings. Second, analysing strategies and preferences determining the adoption of green building principles and lastly, exploring case-based opportunities for their adoption in Tanzania.Design/methodology/approachSemi-structured interviews were conducted to collect qualitative data from twelve key informants. The qualitative data were analysed using content analysis.FindingsThe findings indicate that the most influential factors in green building adoption are related to key organizational decisions. Moreover, social and environmental factors are more related to green building adoption than economic factors. In addition, energy and water efficiency are the most commonly adopted sustainability features, while certified materials, recycling and reusing are rarely implemented.Practical implicationsSince green building adoption is still in its infancy, this study informs policymakers, professional bodies, developers, and researchers of the empirically supported factors for green building adoption. The conclusions can be amplified within the sustainability movement.Originality/valueThis study provides an in-depth understanding of the precursors of green building adoption, which is increasingly becoming a paradigm shift in the construction sector. The study is the first to present an in-depth analysis of the real-life factors influencing the adoption of green buildings in Tanzania.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45261692","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-11DOI: 10.1108/ijbpa-10-2022-0167
T. Gledhill, W. Swan, R. Fitton
PurposeThis paper aims to focus on the assessment of a domestic property's energy performance status by a domestic energy assessor (DEA), to ascertain the possible underlying reasons for variability in the results of Energy Performance Certificates (EPCs). By variability, the authors mean discrepancies in assessment between different DEAs on similar properties. This is important because the uses for the EPC have been extended beyond their original function as an asset rating system, to include themes encompassing building policy decisions, building performance and the distribution of incentives and grants. Consequently, inaccuracies in EPC reporting will have a greater impact than may have been the case at the outset.Design/methodology/approachA case study approach involving the conducting of semi-structured interviews with 20 practicing DEAs was carried out, with transcribed recordings of the interview material subjected to thematic analysis. This formed part of a wider mixed methods study.FindingsThe results identify a wide range of underlying reasons for variability driven by issues in both practice and process, including conflicts of interests, the EPC auditing process, the default inputting of missing data by RdSAP where information may not be available/discoverable by the DEA, the quality and perception of EPCs and DEA training and experience.Research limitations/implicationsThe sample size of 20 is by definition limiting, and it is possible that different results would have been obtained from a different sample. Although thematic saturation from the analysis of the responses on the key question of whether EPCs are considered variable does mitigate this. The respondents were all in possession of five years or more experience and of carrying out EPCs for different purposes. Less experienced DEAs may inevitably have responded to questions differently. The thematic analysis gives the researcher control over the presentation of the results, and it is noted that this creates a potential for bias. The researcher is immersed in the world of construction and property, with regular contact with DEAs and EPCs, which may influence the perspective of the results.Practical implicationsThe research identifies risks to the accuracy of EPCs. To this end, and with the specific research findings in mind, this research may be of interest to construction professionals with respect to EPC practice and procurement, to the Accrediting Bodies who audit EPCs, to the creators of RdSAP with respect to automated EPC inputs, to academics either at face value or for use in further research and to policy makers who may wish to consider RdSAP data in future with qualifiers or margins of error, or may even look to review the EPC as the instrument of choice for some applications.Originality/valueThere is much literature analysing the shortcomings and nuances of RdSAP results, and the software model that generates the EPC, but only very limited literature extending the discu
{"title":"A practitioner study into the variability of UK domestic energy assessments","authors":"T. Gledhill, W. Swan, R. Fitton","doi":"10.1108/ijbpa-10-2022-0167","DOIUrl":"https://doi.org/10.1108/ijbpa-10-2022-0167","url":null,"abstract":"PurposeThis paper aims to focus on the assessment of a domestic property's energy performance status by a domestic energy assessor (DEA), to ascertain the possible underlying reasons for variability in the results of Energy Performance Certificates (EPCs). By variability, the authors mean discrepancies in assessment between different DEAs on similar properties. This is important because the uses for the EPC have been extended beyond their original function as an asset rating system, to include themes encompassing building policy decisions, building performance and the distribution of incentives and grants. Consequently, inaccuracies in EPC reporting will have a greater impact than may have been the case at the outset.Design/methodology/approachA case study approach involving the conducting of semi-structured interviews with 20 practicing DEAs was carried out, with transcribed recordings of the interview material subjected to thematic analysis. This formed part of a wider mixed methods study.FindingsThe results identify a wide range of underlying reasons for variability driven by issues in both practice and process, including conflicts of interests, the EPC auditing process, the default inputting of missing data by RdSAP where information may not be available/discoverable by the DEA, the quality and perception of EPCs and DEA training and experience.Research limitations/implicationsThe sample size of 20 is by definition limiting, and it is possible that different results would have been obtained from a different sample. Although thematic saturation from the analysis of the responses on the key question of whether EPCs are considered variable does mitigate this. The respondents were all in possession of five years or more experience and of carrying out EPCs for different purposes. Less experienced DEAs may inevitably have responded to questions differently. The thematic analysis gives the researcher control over the presentation of the results, and it is noted that this creates a potential for bias. The researcher is immersed in the world of construction and property, with regular contact with DEAs and EPCs, which may influence the perspective of the results.Practical implicationsThe research identifies risks to the accuracy of EPCs. To this end, and with the specific research findings in mind, this research may be of interest to construction professionals with respect to EPC practice and procurement, to the Accrediting Bodies who audit EPCs, to the creators of RdSAP with respect to automated EPC inputs, to academics either at face value or for use in further research and to policy makers who may wish to consider RdSAP data in future with qualifiers or margins of error, or may even look to review the EPC as the instrument of choice for some applications.Originality/valueThere is much literature analysing the shortcomings and nuances of RdSAP results, and the software model that generates the EPC, but only very limited literature extending the discu","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49634623","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-07DOI: 10.1108/ijbpa-11-2022-0183
Ala'aldin Al-Hassoun, Rabab Allouzi
PurposeConcrete-filled double skin steel tubes (CFDST) columns are taken more attention due to their ability to withstand high structural loads in structures such as high-rise buildings, bridges' piers, offshore and marine structures. This paper is intended to improve the CFDST column's capacity without the need to increase the column's size to maintain its lightweight by filling it with self-compacted concrete (SCC) containing nanoclay (NC).Design/methodology/approachFirst, experimental investigation is conducted to select the optimal NC percentage that improves the mechanical properties. Different mixing method, mixture ingredients, cement content, and NC percentage are considered. Then, slender and short CFDST columns are tested for axial capacity to investigate the effect of adding the optimum NC percentage on column's capacity and failure mode.FindingsThe test results show that adding 3% NC by cement weight using dry mixing method to SCC is the optimum ratio. It is concluded that adding 3% NC by cement weight increased the CFDST column's capacity, especially the specimens with higher slenderness ratio. Moreover, it is concluded that more specimens should be tested under various geometric and reinforcement details.Originality/valueRecently, CFDST tube columns solve many structural and architectural problems that engineers have encountered in traditional systems. Therefore, more studies are required to design high-performance columns capable of carrying complex loads with high efficiency since the traditional design could not achieve the required performance. Since concrete contributes to a large portion in the axial capacity of the CFDST columns, it is proposed to improve the CFDST column's capacity without the need to increase the column's size to maintain its lightweight by filling it with (SCC containing NC. Previous research has affirmed the effectiveness of employing nanoclay in the concrete's workability, durability, microstructures, and mechanical properties.
{"title":"Performance of double skin steel tube columns filled with self-compacted concrete containing nanoclay","authors":"Ala'aldin Al-Hassoun, Rabab Allouzi","doi":"10.1108/ijbpa-11-2022-0183","DOIUrl":"https://doi.org/10.1108/ijbpa-11-2022-0183","url":null,"abstract":"PurposeConcrete-filled double skin steel tubes (CFDST) columns are taken more attention due to their ability to withstand high structural loads in structures such as high-rise buildings, bridges' piers, offshore and marine structures. This paper is intended to improve the CFDST column's capacity without the need to increase the column's size to maintain its lightweight by filling it with self-compacted concrete (SCC) containing nanoclay (NC).Design/methodology/approachFirst, experimental investigation is conducted to select the optimal NC percentage that improves the mechanical properties. Different mixing method, mixture ingredients, cement content, and NC percentage are considered. Then, slender and short CFDST columns are tested for axial capacity to investigate the effect of adding the optimum NC percentage on column's capacity and failure mode.FindingsThe test results show that adding 3% NC by cement weight using dry mixing method to SCC is the optimum ratio. It is concluded that adding 3% NC by cement weight increased the CFDST column's capacity, especially the specimens with higher slenderness ratio. Moreover, it is concluded that more specimens should be tested under various geometric and reinforcement details.Originality/valueRecently, CFDST tube columns solve many structural and architectural problems that engineers have encountered in traditional systems. Therefore, more studies are required to design high-performance columns capable of carrying complex loads with high efficiency since the traditional design could not achieve the required performance. Since concrete contributes to a large portion in the axial capacity of the CFDST columns, it is proposed to improve the CFDST column's capacity without the need to increase the column's size to maintain its lightweight by filling it with (SCC containing NC. Previous research has affirmed the effectiveness of employing nanoclay in the concrete's workability, durability, microstructures, and mechanical properties.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-07-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42789164","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-04DOI: 10.1108/ijbpa-08-2022-0136
A. Shaikh, Robert Osei Kyei, M. Hardie, M. Stevens
PurposeThis paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to the existing but limited understanding of teamwork drivers on construction workers’ safety performance. This paper presents scholars and industry-based professionals with critical initiatives that have to be implemented in organisations to get positive results in safety while working in teams with an emphasis on systems drivers of teamwork on safety performance at the organisational level, which will help in providing information on the functioning of the teams and contribute towards improved safety performance of team workers.Design/methodology/approachThis study aims to systematically examine the existing body of knowledge on drivers of teamwork by analysing 53 publications from the years 1997–2021. The Scopus search engine was used to conduct a systematic review and germane publications were collated.FindingsAccording to the findings of the review, since 1997, there has been a burgeoning concern in the research of drivers of teamwork and its impact on workers’ safety performance. After performing a systematic review, 37 drivers of teamwork were identified. The top five drivers are effective communications, team workers’ relations, leadership, shared knowledge and information, and team training. Moreover, it was noted that the United States and Australia have been the international regions of focus for most of the research in the area of drivers of teamwork from the years 1997–2021. The 37 drivers of teamwork are distributed into six major socio-technical components: people drivers; culture drivers; metrics drivers; organisational and management practices and procedures drivers; infrastructure drivers and technology drivers.Practical implicationsThe results reported present research scholars and professional practitioners with an overview of the drivers of teamwork that could be implemented in the construction industry to streamline potential implementations and improve safety performance of construction workers.Originality/valueA list of teamwork drivers has been developed to ratify potential empirical research in the area of construction safety. The results would contribute to the existing but restricted understanding of drivers of teamwork in the construction industry.
{"title":"Review of drivers of teamwork for construction health and safety","authors":"A. Shaikh, Robert Osei Kyei, M. Hardie, M. Stevens","doi":"10.1108/ijbpa-08-2022-0136","DOIUrl":"https://doi.org/10.1108/ijbpa-08-2022-0136","url":null,"abstract":"PurposeThis paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to the existing but limited understanding of teamwork drivers on construction workers’ safety performance. This paper presents scholars and industry-based professionals with critical initiatives that have to be implemented in organisations to get positive results in safety while working in teams with an emphasis on systems drivers of teamwork on safety performance at the organisational level, which will help in providing information on the functioning of the teams and contribute towards improved safety performance of team workers.Design/methodology/approachThis study aims to systematically examine the existing body of knowledge on drivers of teamwork by analysing 53 publications from the years 1997–2021. The Scopus search engine was used to conduct a systematic review and germane publications were collated.FindingsAccording to the findings of the review, since 1997, there has been a burgeoning concern in the research of drivers of teamwork and its impact on workers’ safety performance. After performing a systematic review, 37 drivers of teamwork were identified. The top five drivers are effective communications, team workers’ relations, leadership, shared knowledge and information, and team training. Moreover, it was noted that the United States and Australia have been the international regions of focus for most of the research in the area of drivers of teamwork from the years 1997–2021. The 37 drivers of teamwork are distributed into six major socio-technical components: people drivers; culture drivers; metrics drivers; organisational and management practices and procedures drivers; infrastructure drivers and technology drivers.Practical implicationsThe results reported present research scholars and professional practitioners with an overview of the drivers of teamwork that could be implemented in the construction industry to streamline potential implementations and improve safety performance of construction workers.Originality/valueA list of teamwork drivers has been developed to ratify potential empirical research in the area of construction safety. The results would contribute to the existing but restricted understanding of drivers of teamwork in the construction industry.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49670298","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-07-03DOI: 10.1108/ijbpa-06-2023-185
I. Flores-Colen, J. de Brito
{"title":"Guest editorial: “Building pathology: the past, new approaches and opportunities”","authors":"I. Flores-Colen, J. de Brito","doi":"10.1108/ijbpa-06-2023-185","DOIUrl":"https://doi.org/10.1108/ijbpa-06-2023-185","url":null,"abstract":"","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43544517","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-06-28DOI: 10.1108/ijbpa-11-2022-0176
Ahmed M. Ibrahim, M. Hassanain, Mohamed H. Salaheldin
PurposeThis research compares consultants' and contractors' professional practices and perspectives on the use of specifications in the engineering of built environment projects.Design/methodology/approachThe study initiates with a review of literature, toward realizing (1) the need for inclusion of specifications, throughout the projects' stages (design, tender, construction and handing over), as well as the (2) causes and effects of defective specifications in design and execution of engineered projects. Additionally (3) the study investigates the challenges and causes of specification variations to projects' design and execution. The systematic methodology adopted in this research utilizes frequency indicators, to rank and correlate the perspectives of 60 professionals, who are experienced in consulting and contracting of mega public and private projects.FindingsThe research considers the uncertainties and differences that could be present in engineering developments and use of design specifications for projects' execution and handing over. The two groups of experts' (consultants and contractors) perspectives are usually observed as conflicting, in practice. Practices comparison of their experiences with engineering projects' specifications usability provides unique empirical findings. The analysis and assessment of the experts' knowledge, this research addresses gaps identified in the literature, providing valuable insights.Originality/valueThe study provides in-depth recommendations and discusses possible trends and methods for enhancing specifications' usability in design engineering and execution of built environment projects. The analysis and recommendations present and assess experts' knowledge while bridge gaps identified from the literature.
{"title":"Assessment of specifications' usability for engineering projects of the built environment","authors":"Ahmed M. Ibrahim, M. Hassanain, Mohamed H. Salaheldin","doi":"10.1108/ijbpa-11-2022-0176","DOIUrl":"https://doi.org/10.1108/ijbpa-11-2022-0176","url":null,"abstract":"PurposeThis research compares consultants' and contractors' professional practices and perspectives on the use of specifications in the engineering of built environment projects.Design/methodology/approachThe study initiates with a review of literature, toward realizing (1) the need for inclusion of specifications, throughout the projects' stages (design, tender, construction and handing over), as well as the (2) causes and effects of defective specifications in design and execution of engineered projects. Additionally (3) the study investigates the challenges and causes of specification variations to projects' design and execution. The systematic methodology adopted in this research utilizes frequency indicators, to rank and correlate the perspectives of 60 professionals, who are experienced in consulting and contracting of mega public and private projects.FindingsThe research considers the uncertainties and differences that could be present in engineering developments and use of design specifications for projects' execution and handing over. The two groups of experts' (consultants and contractors) perspectives are usually observed as conflicting, in practice. Practices comparison of their experiences with engineering projects' specifications usability provides unique empirical findings. The analysis and assessment of the experts' knowledge, this research addresses gaps identified in the literature, providing valuable insights.Originality/valueThe study provides in-depth recommendations and discusses possible trends and methods for enhancing specifications' usability in design engineering and execution of built environment projects. The analysis and recommendations present and assess experts' knowledge while bridge gaps identified from the literature.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45692748","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pub Date : 2023-06-23DOI: 10.1108/ijbpa-09-2022-0147
D. Oloke, Louis Gyoh, E. Daniel, O. Oladinrin, Nagwan Abdallah
PurposeThis study aims to understand the impact of the Covid-19 pandemic disruptive event on delivery of the built environment degree apprentice programme in higher education in the UK and identify the key strategies to minimise the effect.Design/methodology/approachA qualitative approach was used to collect and analyse data from a sample set of built environment degree apprenticeship stakeholders. Semi-structured interviews were conducted with 17 key stakeholders to collate emerging themes on their perceptions of the impacts of the pandemic and strategies to adopted to minimise it.FindingsThe investigation reveals that the core impacts of Covid-19 on the apprentices training programme are lack of access to the site, furlough, limited access to off the job training, limited interaction with tutors and peers, too much time on the screen, limited pastoral care and lack of contact with a mentor. The census from the research participants is that despite the development and gain with the various virtual platform used during pandemic physical meetings with their mentor remain pivotal to the built environment apprentices learning and training.Practical implicationsThe results provide relevant stakeholders and actors supporting degree apprentices training programmes (training providers and employers, among others) with the information needed to improve the delivery of built environment degree apprenticeship training programmes during a disruptive event Covid-19. The study identifies various strategies to minimise the impact of disruptive events on the apprentices training, including technology, regular meeting with mentors online, and personal and pastoral care.Originality/valueThe study is the first to document the impact of the Covid-19 pandemic on degree apprenticeship programs in the built environment. This study provides an in-depth understanding of how these programs have been affected and offers potential solutions to reduce or mitigate potential damage. The research will inform future policy decisions related to degree apprenticeship programs in the built environment.
{"title":"The impact of disruptive events on built environment degree apprenticeship delivery – a case study of COVID-19","authors":"D. Oloke, Louis Gyoh, E. Daniel, O. Oladinrin, Nagwan Abdallah","doi":"10.1108/ijbpa-09-2022-0147","DOIUrl":"https://doi.org/10.1108/ijbpa-09-2022-0147","url":null,"abstract":"PurposeThis study aims to understand the impact of the Covid-19 pandemic disruptive event on delivery of the built environment degree apprentice programme in higher education in the UK and identify the key strategies to minimise the effect.Design/methodology/approachA qualitative approach was used to collect and analyse data from a sample set of built environment degree apprenticeship stakeholders. Semi-structured interviews were conducted with 17 key stakeholders to collate emerging themes on their perceptions of the impacts of the pandemic and strategies to adopted to minimise it.FindingsThe investigation reveals that the core impacts of Covid-19 on the apprentices training programme are lack of access to the site, furlough, limited access to off the job training, limited interaction with tutors and peers, too much time on the screen, limited pastoral care and lack of contact with a mentor. The census from the research participants is that despite the development and gain with the various virtual platform used during pandemic physical meetings with their mentor remain pivotal to the built environment apprentices learning and training.Practical implicationsThe results provide relevant stakeholders and actors supporting degree apprentices training programmes (training providers and employers, among others) with the information needed to improve the delivery of built environment degree apprenticeship training programmes during a disruptive event Covid-19. The study identifies various strategies to minimise the impact of disruptive events on the apprentices training, including technology, regular meeting with mentors online, and personal and pastoral care.Originality/valueThe study is the first to document the impact of the Covid-19 pandemic on degree apprenticeship programs in the built environment. This study provides an in-depth understanding of how these programs have been affected and offers potential solutions to reduce or mitigate potential damage. The research will inform future policy decisions related to degree apprenticeship programs in the built environment.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":"1 1","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"41486598","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}