Stakeholder management challenges and strategies for sustainability issues in megaprojects: case studies from Australia 大型项目中可持续发展问题的利益相关者管理挑战和策略:来自澳大利亚的案例研究
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-08-25 DOI: 10.1108/bepam-11-2022-0183
S. Senaratne, Abhishek Kc, Siryana Rai
PurposeMegaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from stakeholders on sustainability related issues, from environmental to socio-economic perspective, managing megaprojects has become quite challenging. Hence, there should be proactive approaches in active engagement of stakeholders from the start of the projects to overcome such issues. Currently, there is a knowledge gap on stakeholder management strategies specific to megaprojects on managing sustainability issues.Design/methodology/approachThis research has adopted review of secondary data from case studies to identify stakeholder management challenges and strategies in megaprojects around Sydney area. The documents related to three different projects were reviewed and data were collected through qualitative content analysis and coding with use of NVivo software for within case analysis and was followed by thematic approach for cross case analysis.FindingsEvery case study project's sustainability-related stakeholder issues are more similar than different to others. Differences are mostly in terms of intensity of impact of any issue in a particular project, and/or intensity of impact at certain phase of any project. Moreover, significant sectors and strategies have been identified for key focus to manage environment and socioeconomic issues. Whatever be the strategies, in case of megaprojects, they need to be mostly proactive.Originality/valueThis research has extended the knowledge on stakeholder management, in relation to managing sustainability-related issues of megaprojects during their design, construction and operation phases. This research offers useful strategies for project teams of megaprojects to develop a proactive stakeholder management plan, addressing unavoidable sustainability challenges.
大型项目在财务上规模庞大,范围复杂,需要来自不同机构和社区的利益相关者的参与。随着利益相关者对可持续发展相关问题的关注日益增加,从环境到社会经济的角度来看,管理大型项目已经变得相当具有挑战性。因此,从项目开始就应该采取积极主动的方法,让利益相关者积极参与,以克服这些问题。目前,在管理可持续性问题的大型项目的特定利益相关者管理策略方面存在知识差距。设计/方法/方法本研究采用了案例研究中的二手数据,以确定悉尼地区大型项目中利益相关者管理的挑战和策略。通过使用NVivo软件进行定性内容分析和编码,收集与三个不同项目相关的文件,进行案例分析,然后采用主题方法进行跨案例分析。发现每个案例研究项目的可持续发展相关利益相关者问题的相似之处大于不同之处。差异主要在于某一特定项目中任何问题的影响强度,及/或任何项目某一阶段的影响强度。此外,还确定了管理环境和社会经济问题的重点部门和战略。无论采取何种策略,在大型项目中,他们都需要积极主动。原创性/价值本研究扩展了利益相关者管理的知识,涉及在大型项目的设计、建设和运营阶段管理与可持续性相关的问题。这项研究为大型项目的项目团队提供了有用的策略,以制定积极的利益相关者管理计划,解决不可避免的可持续性挑战。
{"title":"Stakeholder management challenges and strategies for sustainability issues in megaprojects: case studies from Australia","authors":"S. Senaratne, Abhishek Kc, Siryana Rai","doi":"10.1108/bepam-11-2022-0183","DOIUrl":"https://doi.org/10.1108/bepam-11-2022-0183","url":null,"abstract":"PurposeMegaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from stakeholders on sustainability related issues, from environmental to socio-economic perspective, managing megaprojects has become quite challenging. Hence, there should be proactive approaches in active engagement of stakeholders from the start of the projects to overcome such issues. Currently, there is a knowledge gap on stakeholder management strategies specific to megaprojects on managing sustainability issues.Design/methodology/approachThis research has adopted review of secondary data from case studies to identify stakeholder management challenges and strategies in megaprojects around Sydney area. The documents related to three different projects were reviewed and data were collected through qualitative content analysis and coding with use of NVivo software for within case analysis and was followed by thematic approach for cross case analysis.FindingsEvery case study project's sustainability-related stakeholder issues are more similar than different to others. Differences are mostly in terms of intensity of impact of any issue in a particular project, and/or intensity of impact at certain phase of any project. Moreover, significant sectors and strategies have been identified for key focus to manage environment and socioeconomic issues. Whatever be the strategies, in case of megaprojects, they need to be mostly proactive.Originality/valueThis research has extended the knowledge on stakeholder management, in relation to managing sustainability-related issues of megaprojects during their design, construction and operation phases. This research offers useful strategies for project teams of megaprojects to develop a proactive stakeholder management plan, addressing unavoidable sustainability challenges.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48174085","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Paths leading contractual disputes to litigation 导致合同纠纷走向诉讼的途径
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-08-14 DOI: 10.1108/bepam-02-2023-0042
Murali Jagannathan, V. K. Delhi
PurposeJudiciary plays a pivotal role in the overall development of a nation's economy and its involvement assures process transparency and impartiality. However, litigation is often expensive, uncertain and prone to delays. Notwithstanding such inherent challenges associated with litigation, it is observed that parties in construction disputes do resort to litigation. This study attempts to understand the potential paths triggering litigation of contractual disputes in construction. While extant researchers have identified focus areas or factors influencing litigation, the underlying paths connecting these focus areas, leading parties to litigation, is explored in this study.Design/methodology/approachConsidering the framework of Rachlinski's “framing theory of litigation” and the mixed-methods approach (qualitative and quantitative approaches), this study proposes and validates a model that identifies the paths to litigation of contractual disputes in construction.FindingsThe results of in-depth interviews, followed by validation through structural equation modelling (SEM), reveal four critical paths, namely positional focus (PF) – contract and dispute characteristics (CDC) – decision to litigate (DTL), milieu influence (MI) – CDC – DTL, MI-PF-DTL and CDC-DTL.Practical implicationsThe identified paths highlight the areas policymakers can consider while developing policy interventions to mitigate litigation.Originality/valueResearchers have identified factors causing litigation in construction. However, attempts to examine the existence of multi-factor “paths” on the decision to litigate (DTL) have hitherto received a muted response, so this study focuses on identifying the project-level path(s) leading to the litigation of contractual disputes in construction.
司法机构在一国经济的全面发展中起着关键作用,它的参与确保了程序的透明度和公正性。然而,诉讼往往是昂贵的,不确定的,容易拖延。尽管存在与诉讼相关的这些固有挑战,但据观察,建筑纠纷各方确实诉诸诉讼。本研究试图了解建筑工程合同纠纷引发诉讼的潜在途径。虽然现有的研究人员已经确定了影响诉讼的焦点领域或因素,但本研究探索了连接这些焦点领域的潜在路径,即导致诉讼的各方。设计/方法/方法考虑到Rachlinski的“诉讼框架理论”框架和混合方法方法(定性和定量方法),本研究提出并验证了一个模型,该模型确定了建筑合同纠纷的诉讼路径。深入访谈的结果,随后通过结构方程模型(SEM)验证,揭示了四条关键路径,即位置焦点(PF) -合同和争议特征(CDC) -诉讼决定(DTL),环境影响(MI) - CDC-DTL, MI-PF-DTL和CDC-DTL。所确定的路径突出了政策制定者在制定政策干预措施以减轻诉讼时可以考虑的领域。独创性/价值研究人员已经确定了导致建筑诉讼的因素。然而,迄今为止,试图检查诉讼决定(DTL)上存在的多因素“路径”的尝试得到了沉默的回应,因此本研究的重点是确定导致施工合同纠纷诉讼的项目层面路径。
{"title":"Paths leading contractual disputes to litigation","authors":"Murali Jagannathan, V. K. Delhi","doi":"10.1108/bepam-02-2023-0042","DOIUrl":"https://doi.org/10.1108/bepam-02-2023-0042","url":null,"abstract":"PurposeJudiciary plays a pivotal role in the overall development of a nation's economy and its involvement assures process transparency and impartiality. However, litigation is often expensive, uncertain and prone to delays. Notwithstanding such inherent challenges associated with litigation, it is observed that parties in construction disputes do resort to litigation. This study attempts to understand the potential paths triggering litigation of contractual disputes in construction. While extant researchers have identified focus areas or factors influencing litigation, the underlying paths connecting these focus areas, leading parties to litigation, is explored in this study.Design/methodology/approachConsidering the framework of Rachlinski's “framing theory of litigation” and the mixed-methods approach (qualitative and quantitative approaches), this study proposes and validates a model that identifies the paths to litigation of contractual disputes in construction.FindingsThe results of in-depth interviews, followed by validation through structural equation modelling (SEM), reveal four critical paths, namely positional focus (PF) – contract and dispute characteristics (CDC) – decision to litigate (DTL), milieu influence (MI) – CDC – DTL, MI-PF-DTL and CDC-DTL.Practical implicationsThe identified paths highlight the areas policymakers can consider while developing policy interventions to mitigate litigation.Originality/valueResearchers have identified factors causing litigation in construction. However, attempts to examine the existence of multi-factor “paths” on the decision to litigate (DTL) have hitherto received a muted response, so this study focuses on identifying the project-level path(s) leading to the litigation of contractual disputes in construction.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-08-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47628689","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Roles of clients in buildability improvement in Nigeria: an exploratory factor analysis 客户在尼日利亚可建性改善中的作用:探索性因素分析
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-08-03 DOI: 10.1108/bepam-01-2023-0007
I. Osuizugbo, O. Aina, A. Onokwai
PurposeConstruction industry is a vital sector for national and economic development of any country. Past studies reveal that the Nigerian construction industry is suffering from buildability problems. Buildability improvement is the duty of every key stakeholder, including designers, builders and clients. This study sets out to determine the principal roles of clients in buildability improvement in Nigerian construction projects.Design/methodology/approachA questionnaire survey was adopted to evaluate construction industry professionals’ views on the roles of clients in buildability improvement in Nigeria. Eighty-one questionnaires were sufficiently filled and returned, representing a return percentage of 76% which formed the basis of this study. Data elicited were analysed using descriptive and inferential statistics.FindingsThe results from factors analysis show that the roles of clients in buildability improvement can be categorised into two constructs: commitment to buildability assessment and other related practices, and adequate planning of project objectives.Originality/valueThis study contributed to more effective buildability studies by highlighting the roles of clients in buildability improvement in the construction industry. An understanding of these roles is very significant for minimising buildability problems as well as for improving and embedding buildability as a practice in the construction industry.
目的建筑业是任何国家国民经济发展的重要部门。过去的研究表明,尼日利亚建筑业正遭受可建造性问题的困扰。可构建性改进是每个关键利益相关者的责任,包括设计师、建设者和客户。本研究旨在确定客户在尼日利亚建筑项目可建造性改善中的主要作用。设计/方法/方法采用问卷调查来评估建筑行业专业人士对客户在尼日利亚可建造性改善中的作用的看法。81份问卷得到了充分的填写和返还,返还率为76%,构成了本研究的基础。所得数据采用描述性统计和推理统计进行分析。结果因素分析的结果表明,客户在可建性改善中的作用可以分为两个构式:对可建性评估和其他相关实践的承诺,以及对项目目标的充分规划。独创性/价值这项研究强调了客户在改善建造业可建造性方面的作用,有助于进行更有效的可建造性研究。对这些角色的理解对于最大限度地减少可建造性问题以及改善和嵌入可建造性作为建筑行业的实践非常重要。
{"title":"Roles of clients in buildability improvement in Nigeria: an exploratory factor analysis","authors":"I. Osuizugbo, O. Aina, A. Onokwai","doi":"10.1108/bepam-01-2023-0007","DOIUrl":"https://doi.org/10.1108/bepam-01-2023-0007","url":null,"abstract":"PurposeConstruction industry is a vital sector for national and economic development of any country. Past studies reveal that the Nigerian construction industry is suffering from buildability problems. Buildability improvement is the duty of every key stakeholder, including designers, builders and clients. This study sets out to determine the principal roles of clients in buildability improvement in Nigerian construction projects.Design/methodology/approachA questionnaire survey was adopted to evaluate construction industry professionals’ views on the roles of clients in buildability improvement in Nigeria. Eighty-one questionnaires were sufficiently filled and returned, representing a return percentage of 76% which formed the basis of this study. Data elicited were analysed using descriptive and inferential statistics.FindingsThe results from factors analysis show that the roles of clients in buildability improvement can be categorised into two constructs: commitment to buildability assessment and other related practices, and adequate planning of project objectives.Originality/valueThis study contributed to more effective buildability studies by highlighting the roles of clients in buildability improvement in the construction industry. An understanding of these roles is very significant for minimising buildability problems as well as for improving and embedding buildability as a practice in the construction industry.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47797881","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A critical appraisal of traditional methods of construction progress monitoring 对传统施工进度监控方法的批判性评价
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-07-04 DOI: 10.1108/bepam-02-2023-0040
Muhammad Sami Ur Rehman, M. Shafiq, F. Ullah, Khaled Galal Ahmed
PurposeThe purpose of this study is to investigate the current construction progress monitoring (CPM) process in relation to the contractual obligations, how project management teams carry out this activity in the field and why teams continue to adopt the current method. The study aims to provide a comprehensive understanding of the current monitoring process and its effectiveness, identify any shortcomings and propose recommendations for improvements that can lead to better project outcomes.Design/methodology/approachThe study conducted semi-structured interviews with 28 construction management practitioners to explore their views on contractual requirements, traditional progress monitoring practices and advanced monitoring methods. Thematic analysis was used to identify existing processes, practices and incentives for advanced monitoring.FindingsStandard construction contracts mandate current progress monitoring practices, which often rely on manual, document-centric and labor-intensive methods, leading to slow and erroneous progress reporting and project delays. Key barriers to adopting advanced tools include rigid contractual clauses, lack of incentives and the absence of reliable automated tools. A holistic automated approach that covers the entire CPM process, from planning to claim management, is needed as a viable alternative to traditional practices.Research limitations/implicationsThe study's findings can inform researchers, stakeholders and decision-makers about the existing monitoring practices and contribute to enhancing project management practices.Originality/valueThe study identified contractually mandated progress monitoring processes, traditional methods of collecting, transferring, analyzing and dispensing progress-related information and potential incentives and points of departure towards technologically advanced methods.
目的本研究的目的是调查与合同义务相关的当前施工进度监控(CPM)过程,项目管理团队如何在现场开展这项活动,以及团队为什么继续采用当前方法。该研究旨在全面了解当前的监测过程及其有效性,找出任何不足之处,并提出改进建议,以取得更好的项目成果。设计/方法/方法该研究对28名施工管理从业人员进行了半结构化访谈,探讨他们对合同要求、传统进度监控实践和先进监控方法的看法。专题分析用于确定先进监测的现有程序、做法和激励措施。Findings标准施工合同规定了当前的进度监控做法,这些做法通常依赖于手动、以文件为中心和劳动密集型的方法,导致进度报告缓慢和错误,并导致项目延误。采用先进工具的主要障碍包括严格的合同条款、缺乏激励措施以及缺乏可靠的自动化工具。需要一种涵盖从规划到索赔管理的整个CPM流程的整体自动化方法,作为传统做法的可行替代方案。研究局限性/含义研究结果可以向研究人员、利益相关者和决策者介绍现有的监测实践,并有助于加强项目管理实践。独创性/价值该研究确定了合同规定的进度监测流程、收集、转移、分析和分发进度相关信息的传统方法以及向技术先进方法的潜在激励和出发点。
{"title":"A critical appraisal of traditional methods of construction progress monitoring","authors":"Muhammad Sami Ur Rehman, M. Shafiq, F. Ullah, Khaled Galal Ahmed","doi":"10.1108/bepam-02-2023-0040","DOIUrl":"https://doi.org/10.1108/bepam-02-2023-0040","url":null,"abstract":"PurposeThe purpose of this study is to investigate the current construction progress monitoring (CPM) process in relation to the contractual obligations, how project management teams carry out this activity in the field and why teams continue to adopt the current method. The study aims to provide a comprehensive understanding of the current monitoring process and its effectiveness, identify any shortcomings and propose recommendations for improvements that can lead to better project outcomes.Design/methodology/approachThe study conducted semi-structured interviews with 28 construction management practitioners to explore their views on contractual requirements, traditional progress monitoring practices and advanced monitoring methods. Thematic analysis was used to identify existing processes, practices and incentives for advanced monitoring.FindingsStandard construction contracts mandate current progress monitoring practices, which often rely on manual, document-centric and labor-intensive methods, leading to slow and erroneous progress reporting and project delays. Key barriers to adopting advanced tools include rigid contractual clauses, lack of incentives and the absence of reliable automated tools. A holistic automated approach that covers the entire CPM process, from planning to claim management, is needed as a viable alternative to traditional practices.Research limitations/implicationsThe study's findings can inform researchers, stakeholders and decision-makers about the existing monitoring practices and contribute to enhancing project management practices.Originality/valueThe study identified contractually mandated progress monitoring processes, traditional methods of collecting, transferring, analyzing and dispensing progress-related information and potential incentives and points of departure towards technologically advanced methods.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"49492489","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Significant factors affecting the New Zealand transportation infrastructure project cost – quantity surveyors' perception 影响新西兰交通基础设施项目造价的重要因素——量测师的认知
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-06-28 DOI: 10.1108/bepam-07-2022-0105
C. Atapattu, N. Domingo, M. Sutrisna
PurposeCost overrun is one of the critical issues faced in construction projects, as nine out of ten projects will likely go over the budget. In particular, transportation infrastructure (TI) projects, such as roads and bridges, are vastly affected by cost overruns, which can delay the entire project. This research intends to identify the factors affecting the cost overruns in New Zealand (NZ) TI projects.Design/methodology/approachThe research was conducted using a questionnaire survey involving ninety-two participants experienced in infrastructure project estimation in NZ. Quantitative methods were used to analyse the data.FindingsFifty-three factors were identified through literature under ten categories. Based on the survey, ten significant factors were identified with a high grade of importance. The three most critical factors were “frequent design changes,” “poor planning and scheduling” and “inadequate tender documentation.” It was found that the cost overrun is primarily affected by the pre-contract stage causes.Research limitations/implicationsThe data were collected from professionals involved in NZTI projects. Therefore, the implications may be different for other contexts.Practical implicationsThe results will improve the current estimation practice by developing a new statistical model considering all the significant variables for NZTI projects.Originality/valueAlthough much research is done to identify these factors, they are only considered in a few statistical cost models. These new statistical models mainly focused on technical variable factors similar to the current standard estimation process. However, the results of this research, qualitative and quantitative factors, will be used for the future cost model.
目的成本超支是建筑项目面临的关键问题之一,因为十分之九的项目可能会超出预算。特别是,道路和桥梁等交通基础设施项目受到成本超支的严重影响,这可能会推迟整个项目。本研究旨在确定影响新西兰TI项目成本超支的因素。设计/方法/方法本研究采用问卷调查进行,涉及92名在新西兰有基础设施项目评估经验的参与者。使用定量方法分析数据。研究结果通过10个类别的文献,确定了53个因素。根据调查,确定了10个重要程度较高的重要因素。三个最关键的因素是“频繁的设计变更”、“糟糕的规划和进度安排”以及“不充分的招标文件”。研究发现,成本超支主要受合同前阶段原因的影响。研究局限性/含义数据是从参与NZTI项目的专业人士那里收集的。因此,其他情况下的含义可能不同。实际含义该结果将通过开发一个新的统计模型来改进当前的估算实践,该模型考虑了NZTI项目的所有重要变量。原创性/价值尽管已经做了很多研究来确定这些因素,但它们只在少数统计成本模型中被考虑。这些新的统计模型主要关注与当前标准估计过程类似的技术变量因素。然而,本研究的结果,定性和定量因素,将用于未来的成本模型。
{"title":"Significant factors affecting the New Zealand transportation infrastructure project cost – quantity surveyors' perception","authors":"C. Atapattu, N. Domingo, M. Sutrisna","doi":"10.1108/bepam-07-2022-0105","DOIUrl":"https://doi.org/10.1108/bepam-07-2022-0105","url":null,"abstract":"PurposeCost overrun is one of the critical issues faced in construction projects, as nine out of ten projects will likely go over the budget. In particular, transportation infrastructure (TI) projects, such as roads and bridges, are vastly affected by cost overruns, which can delay the entire project. This research intends to identify the factors affecting the cost overruns in New Zealand (NZ) TI projects.Design/methodology/approachThe research was conducted using a questionnaire survey involving ninety-two participants experienced in infrastructure project estimation in NZ. Quantitative methods were used to analyse the data.FindingsFifty-three factors were identified through literature under ten categories. Based on the survey, ten significant factors were identified with a high grade of importance. The three most critical factors were “frequent design changes,” “poor planning and scheduling” and “inadequate tender documentation.” It was found that the cost overrun is primarily affected by the pre-contract stage causes.Research limitations/implicationsThe data were collected from professionals involved in NZTI projects. Therefore, the implications may be different for other contexts.Practical implicationsThe results will improve the current estimation practice by developing a new statistical model considering all the significant variables for NZTI projects.Originality/valueAlthough much research is done to identify these factors, they are only considered in a few statistical cost models. These new statistical models mainly focused on technical variable factors similar to the current standard estimation process. However, the results of this research, qualitative and quantitative factors, will be used for the future cost model.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45714015","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Assessment of building retrofit scenarios using embodied energy and life cycle impact assessment 利用隐含能源和生命周期影响评估对建筑改造方案进行评估
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-06-27 DOI: 10.1108/bepam-07-2022-0103
Olubukola O. Tokede, Mani Kumar Boggavarapu, S. Wamuziri
PurposeCrucial transition of the Indian residential building sector into a low-emission economy require an in-depth understanding of the potentials for retrofitting the existing building stock. There are, however, limited studies that have recognised the interdependencies and trade-offs in the embodied energy and life cycle impact assessment of retrofit interventions. This research appraises the life cycle assessment and embodied energy output of a residential building in India to assess the environmental implications of selected retrofit scenarios.Design/methodology/approachThis study utilises a single case study building project in South India to assess the effectiveness and impact of three retrofit scenarios based on life cycle assessment (LCA) and embodied energy (EE) estimates. The LCA was conducted using SimaPro version 9.3 and with background data from Ecoinvent database version 3.81. The EE estimates were calculated using material coefficients from relevant databases in the published literature. Monte Carlo Simulation is then used to allow for uncertainties in the estimates for the scenarios.FindingsThe three key findings that materialized from the study are as follows: (1) the retrofitting of Indian residential buildings could achieve up to 20% reduction in the life cycle energy emissions, (2) the modification of the building envelope and upgrading of the building service systems could suffice in providing optimum operational energy savings, if the electricity from the grid is sourced from renewable plants, and (3) the production of LEDs and other building services systems has the highest environmental impacts across a suite of LCA indicators.Originality/valueThe retrofitting of residential buildings in India will lead to better and improved opportunities to meet the commitments in the Paris Climate Change Agreement and will lead to enhanced savings for building owners.
目的印度住宅建筑行业向低排放经济的关键转型需要深入了解改造现有建筑存量的潜力。然而,在改造干预措施的具体能源和生命周期影响评估中,认识到相互依存性和权衡的研究有限。本研究评估了印度一栋住宅楼的生命周期评估和具体能源输出,以评估所选改造方案的环境影响。设计/方法/方法本研究利用南印度的一个单一案例研究建筑项目,根据生命周期评估(LCA)和具体能源(EE)估计,评估三种改造方案的有效性和影响。LCA使用SimaPro 9.3版和Ecoinvent数据库3.81版的背景数据进行。使用已发表文献中相关数据库的材料系数计算EE估计值。然后使用蒙特卡罗模拟来考虑场景估计中的不确定性。研究结果该研究的三个关键发现如下:(1)印度住宅楼的改造可以实现高达20%的生命周期能源排放减少;(2)建筑围护结构的改造和建筑服务系统的升级足以提供最佳的运营节能,如果电网的电力来源于可再生植物,以及(3)LED和其他建筑服务系统的生产在一系列LCA指标中对环境的影响最大。独创性/价值印度住宅楼的改造将为履行《巴黎气候变化协定》中的承诺带来更好的机会,并将为建筑业主带来更多的节约。
{"title":"Assessment of building retrofit scenarios using embodied energy and life cycle impact assessment","authors":"Olubukola O. Tokede, Mani Kumar Boggavarapu, S. Wamuziri","doi":"10.1108/bepam-07-2022-0103","DOIUrl":"https://doi.org/10.1108/bepam-07-2022-0103","url":null,"abstract":"PurposeCrucial transition of the Indian residential building sector into a low-emission economy require an in-depth understanding of the potentials for retrofitting the existing building stock. There are, however, limited studies that have recognised the interdependencies and trade-offs in the embodied energy and life cycle impact assessment of retrofit interventions. This research appraises the life cycle assessment and embodied energy output of a residential building in India to assess the environmental implications of selected retrofit scenarios.Design/methodology/approachThis study utilises a single case study building project in South India to assess the effectiveness and impact of three retrofit scenarios based on life cycle assessment (LCA) and embodied energy (EE) estimates. The LCA was conducted using SimaPro version 9.3 and with background data from Ecoinvent database version 3.81. The EE estimates were calculated using material coefficients from relevant databases in the published literature. Monte Carlo Simulation is then used to allow for uncertainties in the estimates for the scenarios.FindingsThe three key findings that materialized from the study are as follows: (1) the retrofitting of Indian residential buildings could achieve up to 20% reduction in the life cycle energy emissions, (2) the modification of the building envelope and upgrading of the building service systems could suffice in providing optimum operational energy savings, if the electricity from the grid is sourced from renewable plants, and (3) the production of LEDs and other building services systems has the highest environmental impacts across a suite of LCA indicators.Originality/valueThe retrofitting of residential buildings in India will lead to better and improved opportunities to meet the commitments in the Paris Climate Change Agreement and will lead to enhanced savings for building owners.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45444194","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Guest editorial: Social value of infrastructure projects: design, construction and global practices 客座编辑:基础设施项目的社会价值:设计、施工和全球实践
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-06-21 DOI: 10.1108/bepam-07-2023-204
H. Doloi, P. Raisbeck
{"title":"Guest editorial: Social value of infrastructure projects: design, construction and global practices","authors":"H. Doloi, P. Raisbeck","doi":"10.1108/bepam-07-2023-204","DOIUrl":"https://doi.org/10.1108/bepam-07-2023-204","url":null,"abstract":"","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"43612925","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Good practices in COVID-19 risk reduction adopted by Australian construction enterprises 澳大利亚建筑企业降低新冠肺炎风险的良好做法
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-06-20 DOI: 10.1108/bepam-10-2022-0154
K. Seneviratne, S. Perera, B. Ginigaddara, X. Jin, Liyaning Tang, Robert Osei Kyei
PurposeThis research investigated the impacts of COVID-19 on construction enterprises and good practices adopted by the enterprises in reducing COVID-19 risks. The Sendai Framework (TSF) is widely accepted as a strategic roadmap to reduce disaster risks throughout the life cycle of a disaster. As such, with the aim of enhancing the resilience of Australian construction enterprises, the identified good practices were mapped with TSF priorities to consolidate COVID-19 risk reduction practices that can be adopted by Australian construction enterprises.Design/methodology/approachCase study research approach was used, and three case studies were conducted with small, medium and large construction enterprises. Small, medium and large enterprises were selected based on the Australian Bureau of Statistics classification of the business size. Data were collected through semi-structured interviews conducted with three executive members from the three enterprises. Data were analysed using content analysis.FindingsThe study found that construction enterprises faced demand and supply side impacts. Infrastructure projects, funded by public sector clients and larger enterprises were least affected. Investments and demand for residential and other building projects were reduced by private sector clients, affecting small and medium enterprises. Findings also show that the construction enterprises adopted good practices in identifying, managing, investing on resilience and recovery that align with TSF priorities. All three enterprises agreed on some common good practices on risk identification, risk management and effective recovery. Different views were shared on investments related to disaster resilience.Practical implicationsThis study contributes to mitigate the COVID-19 impacts on construction enterprises and subsequent economic and social impacts.Originality/valueThis research found how Australian construction enterprises survived during COVID-19. The study adopted TSF to construction and COVID-19 context while consolidating COVID-19 risk reduction practices.
目的研究新型冠状病毒肺炎对建筑企业的影响,以及企业在降低新型冠状病毒肺炎风险方面采取的良好做法。仙台框架(TSF)被广泛接受为在灾害的整个生命周期内减少灾害风险的战略路线图。因此,为了增强澳大利亚建筑企业的抵御能力,已将确定的良好做法与可持续发展基金的优先事项相结合,以巩固澳大利亚建筑企业可采用的降低COVID-19风险的做法。设计/方法/方法采用案例研究的方法,对小型、中型和大型建筑企业进行了三个案例研究。小型、中型和大型企业是根据澳大利亚统计局对企业规模的分类来选择的。通过对三家企业的三名高管进行半结构化访谈来收集数据。数据采用内容分析法进行分析。研究发现,建筑企业面临着需求侧和供给侧的影响。由公共部门客户和大型企业资助的基础设施项目受到的影响最小。私营部门客户减少了对住宅和其他建筑项目的投资和需求,影响到中小型企业。调查结果还表明,建筑企业在识别、管理和投资适应力和恢复方面采取了良好的做法,这些做法与TSF的优先事项相一致。所有三家企业就风险识别、风险管理和有效恢复方面的一些共同良好做法达成一致。与会者对与抗灾能力有关的投资意见不一。实践意义本研究有助于缓解新冠肺炎疫情对建筑企业的影响以及后续的经济和社会影响。独创性/价值这项研究发现了澳大利亚建筑企业如何在COVID-19期间生存下来。该研究将TSF用于构建和COVID-19背景,同时巩固COVID-19风险降低实践。
{"title":"Good practices in COVID-19 risk reduction adopted by Australian construction enterprises","authors":"K. Seneviratne, S. Perera, B. Ginigaddara, X. Jin, Liyaning Tang, Robert Osei Kyei","doi":"10.1108/bepam-10-2022-0154","DOIUrl":"https://doi.org/10.1108/bepam-10-2022-0154","url":null,"abstract":"PurposeThis research investigated the impacts of COVID-19 on construction enterprises and good practices adopted by the enterprises in reducing COVID-19 risks. The Sendai Framework (TSF) is widely accepted as a strategic roadmap to reduce disaster risks throughout the life cycle of a disaster. As such, with the aim of enhancing the resilience of Australian construction enterprises, the identified good practices were mapped with TSF priorities to consolidate COVID-19 risk reduction practices that can be adopted by Australian construction enterprises.Design/methodology/approachCase study research approach was used, and three case studies were conducted with small, medium and large construction enterprises. Small, medium and large enterprises were selected based on the Australian Bureau of Statistics classification of the business size. Data were collected through semi-structured interviews conducted with three executive members from the three enterprises. Data were analysed using content analysis.FindingsThe study found that construction enterprises faced demand and supply side impacts. Infrastructure projects, funded by public sector clients and larger enterprises were least affected. Investments and demand for residential and other building projects were reduced by private sector clients, affecting small and medium enterprises. Findings also show that the construction enterprises adopted good practices in identifying, managing, investing on resilience and recovery that align with TSF priorities. All three enterprises agreed on some common good practices on risk identification, risk management and effective recovery. Different views were shared on investments related to disaster resilience.Practical implicationsThis study contributes to mitigate the COVID-19 impacts on construction enterprises and subsequent economic and social impacts.Originality/valueThis research found how Australian construction enterprises survived during COVID-19. The study adopted TSF to construction and COVID-19 context while consolidating COVID-19 risk reduction practices.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"44978027","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Prospects, drivers of and barriers to artificial intelligence adoption in project management 在项目管理中采用人工智能的前景、驱动因素和障碍
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-06-20 DOI: 10.1108/bepam-12-2022-0195
G. Shang, S. Low, Xin Ying Valen Lim
PurposeThe rise of artificial intelligence (AI) and differing attitudes towards its adoption in the building and environment (B&E) industry has an impact upon whether companies can meet changing demand and remain relevant and competitive. The emergence of Industry 4.0 technologies, coupled with the repercussions of COVID-19, increases the urgency and opportunities offered that companies must react to, as disruptive technologies impact how project management (PM) professionals work and necessitate acquisition of new skills. This paper attempts to identify the drivers of and barriers to, as well as the general perception and receptiveness of local PM professionals towards, AI adoption in PM and thereby propose potential strategies and recommendations to drive AI adoption in PM.Design/methodology/approachThis study employs both quantitative and qualitative approaches to examine the findings gathered. A survey questionnaire was used as the primary method of gathering quantitative data from 60 local PM professionals. Statistical tests were performed to analyse the data. To substantiate and validate the findings, in-depth interviews with several experienced industry professionals were performed.FindingsIt is found that top drivers include support from top management and leadership, organisational readiness and the need for greater work productivity and efficiency. Top barriers were found to be the high cost of AI implementation and maintenance and the lack of top-down support and skilled employees trained in AI. These findings could be attributed to the present state of AI technologies being new and considerably underutilised in the industry. Hence, substantial top-down support with the right availability of resources and readiness, both in terms of cost and skilled employees, is paramount to kick-start AI implementation in PM.Originality/valueLittle research has been done on the use of AI in PM locally. AI's potential to improve the productivity and efficiency of PM processes in the B&E industry cannot be overlooked. An understanding of the drivers of, barriers to and attitudes towards AI adoption can facilitate more intentional and directed oversight of AI's strategic roll-out at both the governmental and corporate levels and thus mitigate potential challenges that may hinder the implementation process in the future.
人工智能(AI)的兴起以及对建筑和环境(B&E)行业采用人工智能的不同态度对公司是否能够满足不断变化的需求并保持相关性和竞争力产生了影响。工业4.0技术的出现,加上2019冠状病毒病的影响,增加了企业必须应对的紧迫性和机会,因为颠覆性技术影响了项目管理(PM)专业人员的工作方式,并需要获得新技能。本文试图确定驱动因素和障碍,以及当地项目管理专业人员对项目管理中人工智能采用的一般看法和接受程度,从而提出潜在的策略和建议,以推动项目管理中人工智能的采用。设计/方法/方法本研究采用定量和定性两种方法来检验所收集的结果。问卷调查是收集60名当地项目管理专业人员定量数据的主要方法。对数据进行统计检验分析。为了证实和验证这些发现,我们对几位经验丰富的行业专业人士进行了深入访谈。调查发现,最重要的驱动因素包括来自高层管理和领导的支持、组织的准备程度以及对更高工作效率和生产力的需求。研究发现,最大的障碍是人工智能实施和维护的高成本,以及缺乏自上而下的支持和受过人工智能培训的熟练员工。这些发现可以归因于人工智能技术的现状是新的,并且在行业中未得到充分利用。因此,在成本和熟练员工方面,大量的自上而下的支持,以及适当的资源可用性和准备,对于启动项目管理中的AI实现至关重要。独创性/价值很少有关于在本地项目管理中使用人工智能的研究。人工智能在提高B&E行业PM流程的生产力和效率方面的潜力不容忽视。了解人工智能采用的驱动因素、障碍和态度,有助于在政府和企业层面对人工智能的战略推广进行更有意和更直接的监督,从而减轻可能阻碍未来实施过程的潜在挑战。
{"title":"Prospects, drivers of and barriers to artificial intelligence adoption in project management","authors":"G. Shang, S. Low, Xin Ying Valen Lim","doi":"10.1108/bepam-12-2022-0195","DOIUrl":"https://doi.org/10.1108/bepam-12-2022-0195","url":null,"abstract":"PurposeThe rise of artificial intelligence (AI) and differing attitudes towards its adoption in the building and environment (B&E) industry has an impact upon whether companies can meet changing demand and remain relevant and competitive. The emergence of Industry 4.0 technologies, coupled with the repercussions of COVID-19, increases the urgency and opportunities offered that companies must react to, as disruptive technologies impact how project management (PM) professionals work and necessitate acquisition of new skills. This paper attempts to identify the drivers of and barriers to, as well as the general perception and receptiveness of local PM professionals towards, AI adoption in PM and thereby propose potential strategies and recommendations to drive AI adoption in PM.Design/methodology/approachThis study employs both quantitative and qualitative approaches to examine the findings gathered. A survey questionnaire was used as the primary method of gathering quantitative data from 60 local PM professionals. Statistical tests were performed to analyse the data. To substantiate and validate the findings, in-depth interviews with several experienced industry professionals were performed.FindingsIt is found that top drivers include support from top management and leadership, organisational readiness and the need for greater work productivity and efficiency. Top barriers were found to be the high cost of AI implementation and maintenance and the lack of top-down support and skilled employees trained in AI. These findings could be attributed to the present state of AI technologies being new and considerably underutilised in the industry. Hence, substantial top-down support with the right availability of resources and readiness, both in terms of cost and skilled employees, is paramount to kick-start AI implementation in PM.Originality/valueLittle research has been done on the use of AI in PM locally. AI's potential to improve the productivity and efficiency of PM processes in the B&E industry cannot be overlooked. An understanding of the drivers of, barriers to and attitudes towards AI adoption can facilitate more intentional and directed oversight of AI's strategic roll-out at both the governmental and corporate levels and thus mitigate potential challenges that may hinder the implementation process in the future.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45571263","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Impact of transparency law on the post-award development phase of Toll and Annuity PPPs 透明度法对收费和年金PPP授予后发展阶段的影响
IF 2.2 Q3 ENGINEERING, CIVIL Pub Date : 2023-06-19 DOI: 10.1108/bepam-11-2022-0168
M. I. Nayyer, Mukkai R. Aravindan, T. R. Annamalai
PurposeInvolvement of lenders for PPP highway projects in India starts after the bid award. The post-award development phase of Toll and Annuity PPPs differ significantly in terms of potential risk assumed by lenders. This study aims to assess the impact of the transparency law on the post-award development phase of Toll and Annuity PPPs.Design/methodology/approachA unique dataset of 469 PPP highway projects implemented in India was used to conduct this empirical study. An OLS regression model was developed to assess the impact of the transparency law on the post-award development phase.FindingsEnacting the transparency law increased the duration of the post-award development phase of Toll projects; however, its impact on Annuity projects was not significant. Moreover, Toll and Annuity projects with a longer post-award development phase had a shorter construction phase. The post-award development phase of the Toll projects was relatively more sensitive to technical, economic and location-specific variables than Annuity projects. Length of road stretch, duration of the concession period and individual income of end-users significantly impacted the duration of this phase of Toll projects.Practical implicationsTransparency law can improve risk mitigation of Toll projects during the post-award development phase.Originality/valueThe impact of transparency law on PPP projects has never been assessed. This study assesses its impact on the two forms of PPPs. It also highlights the determinants of this phase and how they differ for the two forms of PPPs.
目的:在中标后,贷款机构开始参与印度PPP公路项目。收费型和年金型ppp的奖励后发展阶段在贷款方承担的潜在风险方面存在显著差异。本研究旨在评估透明度法对收费与年金公私合作伙伴关系奖励后发展阶段的影响。设计/方法/方法采用了印度实施的469个PPP公路项目的独特数据集来进行这项实证研究。开发了OLS回归模型来评估透明度法对奖励后开发阶段的影响。通过透明度法增加了收费项目中标后开发阶段的持续时间;然而,其对年金项目的影响并不显著。此外,收费和年金项目奖励后开发阶段较长,建设阶段较短。与年金项目相比,收费项目的奖励后发展阶段相对更容易受到技术、经济和具体地点变量的影响。道路延伸的长度、特许期的持续时间和最终用户的个人收入对这一阶段收费项目的持续时间有重大影响。实践意义透明度法可以在奖励后开发阶段改善收费项目的风险缓解。透明度法对PPP项目的影响从未被评估过。本研究评估了其对两种形式的公私伙伴关系的影响。它还强调了这一阶段的决定因素以及两种形式的ppp的不同之处。
{"title":"Impact of transparency law on the post-award development phase of Toll and Annuity PPPs","authors":"M. I. Nayyer, Mukkai R. Aravindan, T. R. Annamalai","doi":"10.1108/bepam-11-2022-0168","DOIUrl":"https://doi.org/10.1108/bepam-11-2022-0168","url":null,"abstract":"PurposeInvolvement of lenders for PPP highway projects in India starts after the bid award. The post-award development phase of Toll and Annuity PPPs differ significantly in terms of potential risk assumed by lenders. This study aims to assess the impact of the transparency law on the post-award development phase of Toll and Annuity PPPs.Design/methodology/approachA unique dataset of 469 PPP highway projects implemented in India was used to conduct this empirical study. An OLS regression model was developed to assess the impact of the transparency law on the post-award development phase.FindingsEnacting the transparency law increased the duration of the post-award development phase of Toll projects; however, its impact on Annuity projects was not significant. Moreover, Toll and Annuity projects with a longer post-award development phase had a shorter construction phase. The post-award development phase of the Toll projects was relatively more sensitive to technical, economic and location-specific variables than Annuity projects. Length of road stretch, duration of the concession period and individual income of end-users significantly impacted the duration of this phase of Toll projects.Practical implicationsTransparency law can improve risk mitigation of Toll projects during the post-award development phase.Originality/valueThe impact of transparency law on PPP projects has never been assessed. This study assesses its impact on the two forms of PPPs. It also highlights the determinants of this phase and how they differ for the two forms of PPPs.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":2.2,"publicationDate":"2023-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42647270","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Built Environment Project and Asset Management
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1