首页 > 最新文献

Engineering, Construction and Architectural Management最新文献

英文 中文
Exploring the both-and success paradox in mega construction projects: multi-dimensional assessments of paradoxical leadership, project agility and megaproject success 探索特大型建筑项目中的 "两全其美 "悖论:对悖论型领导力、项目敏捷性和特大型项目成功的多维评估
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-03-14 DOI: 10.1108/ecam-12-2022-1165
Umer Zaman, Laura Florez-Perez, Saba Abbasi, Muhammad Shahid Nawaz

Purpose

Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more important can hardly be judged. To manage contradicting dynamics, today’s managers can adopt the paradoxical leadership approach. We build a theoretical model to investigate the influence of paradoxical leadership on multi-dimensional project agility (proactivity, adaptability, and resilience), and multi-dimensional project success (management, investment, and ownership success).

Design/methodology/approach

Drawing on survey-based data from the China–Pakistan Economic Corridor (CPEC) megaproject (N = 209), we performed covariance-based structural equation modeling to test the conceptual model.

Findings

The findings show that (1) paradoxical leadership has a significant positive impact on megaproject success, (2) paradoxical leadership has a significant positive influence on project agility, (3) project agility has a significant positive effect on megaproject success, and (4) project agility has a significant effect that mediates the link between paradoxical leadership and megaproject success. This research provides a theoretical and practical comprehension of paradoxical leadership with a new perspective on megaprojects.

Originality/value

This study provides an extension of the existing studies on paradoxical leadership and identifies the role of contradicting dynamics and their impact on multiple facets of megaproject success. It not only clarifies the relationship between paradoxical leadership and megaproject success, but also identifies the mediating role of project agility that can play an effective role in mobilizing success in megaprojects.

目的组织中充满了矛盾和领导困境。管理者经常面临这样的挑战:在两个相互矛盾的选项中做出选择,很难判断哪一个更重要。当今的管理者可以采用矛盾领导法来管理矛盾动态。我们建立了一个理论模型,以研究矛盾型领导对多维度项目敏捷性(主动性、适应性和应变能力)和多维度项目成功(管理、投资和所有权成功)的影响。设计/方法/途径我们利用中巴经济走廊(CPEC)大型项目的调查数据(N = 209),建立了基于协方差的结构方程模型,以检验概念模型。研究结果研究结果表明:(1)矛盾型领导对特大项目的成功具有显著的正向影响;(2)矛盾型领导对项目敏捷性具有显著的正向影响;(3)项目敏捷性对特大项目的成功具有显著的正向影响;(4)项目敏捷性对矛盾型领导与特大项目成功之间的联系具有显著的中介作用。本研究从理论和实践两方面对矛盾型领导力进行了解读,为超大型项目提供了新的视角。它不仅阐明了矛盾型领导力与超大型项目成功之间的关系,还确定了项目敏捷性的中介作用,而项目敏捷性可在调动超大型项目成功方面发挥有效作用。
{"title":"Exploring the both-and success paradox in mega construction projects: multi-dimensional assessments of paradoxical leadership, project agility and megaproject success","authors":"Umer Zaman, Laura Florez-Perez, Saba Abbasi, Muhammad Shahid Nawaz","doi":"10.1108/ecam-12-2022-1165","DOIUrl":"https://doi.org/10.1108/ecam-12-2022-1165","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Organizations are full of contradictions and leadership dilemmas. Managers often face challenges such as selecting between two contradicting options such that which one is more important can hardly be judged. To manage contradicting dynamics, today’s managers can adopt the paradoxical leadership approach. We build a theoretical model to investigate the influence of paradoxical leadership on multi-dimensional project agility (proactivity, adaptability, and resilience), and multi-dimensional project success (management, investment, and ownership success).</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Drawing on survey-based data from the China–Pakistan Economic Corridor (CPEC) megaproject (<em>N</em> = 209), we performed covariance-based structural equation modeling to test the conceptual model.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The findings show that (1) paradoxical leadership has a significant positive impact on megaproject success, (2) paradoxical leadership has a significant positive influence on project agility, (3) project agility has a significant positive effect on megaproject success, and (4) project agility has a significant effect that mediates the link between paradoxical leadership and megaproject success. This research provides a theoretical and practical comprehension of paradoxical leadership with a new perspective on megaprojects.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study provides an extension of the existing studies on paradoxical leadership and identifies the role of contradicting dynamics and their impact on multiple facets of megaproject success. It not only clarifies the relationship between paradoxical leadership and megaproject success, but also identifies the mediating role of project agility that can play an effective role in mobilizing success in megaprojects.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"8 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140124837","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The effect of augmented reality applied to learning process with different learning styles in structural engineering education 在结构工程教育中不同学习方式的学习过程中应用增强现实技术的效果
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-03-14 DOI: 10.1108/ecam-06-2023-0596
Pengkun Liu, Zhewen Yang, Jing Huang, Ting-Kwei Wang

Purpose

The purpose of this study is to scrutinize the influence of individual learning styles on the effectiveness of augmented reality (AR)-based learning in structural engineering. There has been a lack of research examining the correlation between learning efficiency and learning style, particularly in the context of quantitatively assessing the efficacy of AR in structural engineering education.

Design/methodology/approach

Using Kolb’s experiential learning theory (ELT), a model that emphasizes learning through experience, students from the construction management department are assigned four learning styles (converging, assimilating, diverging and accommodating). Performance data were gathered, appraised, and compared through the three dimensions from the Knowledge, Attitude and Practices (KAP) survey model across four categories of Kolb’s learning styles in both text-graph (TG)-based and AR-based learning settings.

Findings

The findings indicate that AR-based materials positively impact structural engineering education by enhancing overall learning performance more than TG-based materials. It is also found that the learning style has a profound influence on learning effectiveness, with AR technology markedly improving the information retrieval processes, particularly for converging and assimilating learners, then diverging learners, with a less significant impact on accommodating learners.

Originality/value

These results corroborate prior research analyzing learners' outcomes with hypermedia and informational learning systems. It was found that learners with an “abstract” approach (convergers and assimilators) outperform those with a “concrete” approach (divergers and accommodators). This research emphasizes the importance of considering learning styles before integrating technologies into civil engineering education, thereby assisting software developers and educational institutions in creating more effective teaching materials tailored to specific learning styles.

目的本研究旨在探讨个人学习风格对基于增强现实技术(AR)的结构工程学习效果的影响。设计/方法/途径利用科尔布的体验式学习理论(ELT)--一种强调通过体验学习的模式--为建筑管理系的学生分配了四种学习风格(聚合型、同化型、发散型和包容型)。在基于文本图表(TG)和基于 AR 的学习环境中,通过知识、态度和实践(KAP)调查模型的三个维度收集、评估和比较了科尔布学习风格的四个类别的表现数据。研究还发现,学习风格对学习效果有着深远的影响,AR 技术明显改善了信息检索过程,尤其是对趋同型和同化型学习者,然后是发散型学习者,而对适应型学习者的影响则不太明显。研究发现,采用 "抽象 "方法的学习者(趋同者和同化者)优于采用 "具体 "方法的学习者(发散者和包容者)。这项研究强调了在将技术融入土木工程教育之前考虑学习风格的重要性,从而帮助软件开发商和教育机构针对特定的学习风格编写更有效的教材。
{"title":"The effect of augmented reality applied to learning process with different learning styles in structural engineering education","authors":"Pengkun Liu, Zhewen Yang, Jing Huang, Ting-Kwei Wang","doi":"10.1108/ecam-06-2023-0596","DOIUrl":"https://doi.org/10.1108/ecam-06-2023-0596","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The purpose of this study is to scrutinize the influence of individual learning styles on the effectiveness of augmented reality (AR)-based learning in structural engineering. There has been a lack of research examining the correlation between learning efficiency and learning style, particularly in the context of quantitatively assessing the efficacy of AR in structural engineering education.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Using Kolb’s experiential learning theory (ELT), a model that emphasizes learning through experience, students from the construction management department are assigned four learning styles (converging, assimilating, diverging and accommodating). Performance data were gathered, appraised, and compared through the three dimensions from the Knowledge, Attitude and Practices (KAP) survey model across four categories of Kolb’s learning styles in both text-graph (TG)-based and AR-based learning settings.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The findings indicate that AR-based materials positively impact structural engineering education by enhancing overall learning performance more than TG-based materials. It is also found that the learning style has a profound influence on learning effectiveness, with AR technology markedly improving the information retrieval processes, particularly for converging and assimilating learners, then diverging learners, with a less significant impact on accommodating learners.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>These results corroborate prior research analyzing learners' outcomes with hypermedia and informational learning systems. It was found that learners with an “abstract” approach (convergers and assimilators) outperform those with a “concrete” approach (divergers and accommodators). This research emphasizes the importance of considering learning styles before integrating technologies into civil engineering education, thereby assisting software developers and educational institutions in creating more effective teaching materials tailored to specific learning styles.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"20 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140124860","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Beyond the operating room: built environment design knowledge supportive of resilient surgical services 手术室之外:支持弹性外科服务的建筑环境设计知识
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-03-12 DOI: 10.1108/ecam-10-2023-1063
Natália Ransolin, Tarcisio Abreu Saurin, Robyn Clay-Williams, Carlos Torres Formoso, Frances Rapport, John Cartmill

Purpose

Surgical services are settings where resilient performance (RP) is necessary to cope with a wide range of variabilities. Although RP can benefit from a supportive built environment (BE), prior studies have focused on the operating room, giving scant attention to support areas. This study takes a broader perspective, aiming at developing BE design knowledge supportive of RP at the surgical service as a whole.

Design/methodology/approach

Seven BE design prescriptions developed in a previous work in the context of internal logistics of hospitals, and thus addressing interactions between workspaces, were used as a point of departure. The prescriptions were used as a data analysis framework in a case study of the surgical service of a medium-sized private hospital. The scope of the study included surgical and support areas, in addition to workflows involving patients and family members, staff, equipment, sterile instruments and materials, supplies, and waste. Data collection included document analysis, observations, interviews, and meetings with hospital staff.

Findings

Results identified 60 examples of using the prescriptions, 77% of which were related to areas other than the operating rooms. The developed design knowledge is framed as a set of prescriptions, examples, and their association to workflows and areas, indicating where it should be applied.

Originality/value

The design knowledge is new in surgical services and offers guidance to both BE and logistics designers.

目的 外科服务是需要弹性表现(RP)来应对各种变化的环境。虽然弹性性能可以从支持性建筑环境(BE)中获益,但之前的研究主要集中在手术室,很少关注支持性区域。本研究从更广阔的视角出发,旨在开发建筑环境设计知识,从整体上支持外科手术服务中的康复治疗。设计/方法/途径以之前在医院内部后勤工作中开发的七个建筑环境设计方案为出发点,解决工作空间之间的互动问题。在对一家中型私立医院的外科手术服务进行案例研究时,这些设计方案被用作数据分析框架。研究范围包括手术区和辅助区,以及涉及病人和家属、员工、设备、无菌器械和材料、用品和废物的工作流程。数据收集包括文件分析、观察、访谈以及与医院员工的会谈。研究结果研究结果发现了 60 个使用处方的例子,其中 77% 与手术室以外的区域有关。所开发的设计知识以一系列处方、实例及其与工作流程和区域的关联为框架,指明了应在何处应用这些知识。
{"title":"Beyond the operating room: built environment design knowledge supportive of resilient surgical services","authors":"Natália Ransolin, Tarcisio Abreu Saurin, Robyn Clay-Williams, Carlos Torres Formoso, Frances Rapport, John Cartmill","doi":"10.1108/ecam-10-2023-1063","DOIUrl":"https://doi.org/10.1108/ecam-10-2023-1063","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Surgical services are settings where resilient performance (RP) is necessary to cope with a wide range of variabilities. Although RP can benefit from a supportive built environment (BE), prior studies have focused on the operating room, giving scant attention to support areas. This study takes a broader perspective, aiming at developing BE design knowledge supportive of RP at the surgical service as a whole.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Seven BE design prescriptions developed in a previous work in the context of internal logistics of hospitals, and thus addressing interactions between workspaces, were used as a point of departure. The prescriptions were used as a data analysis framework in a case study of the surgical service of a medium-sized private hospital. The scope of the study included surgical and support areas, in addition to workflows involving patients and family members, staff, equipment, sterile instruments and materials, supplies, and waste. Data collection included document analysis, observations, interviews, and meetings with hospital staff.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Results identified 60 examples of using the prescriptions, 77% of which were related to areas other than the operating rooms. The developed design knowledge is framed as a set of prescriptions, examples, and their association to workflows and areas, indicating where it should be applied.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The design knowledge is new in surgical services and offers guidance to both BE and logistics designers.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"92 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140106362","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effective leadership styles to boost employees’ work outcomes during COVID-19 pandemic: perspective of facilities management professionals 在 COVID-19 大流行期间提高员工工作成果的有效领导方式:设施管理专业人员的观点
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-03-11 DOI: 10.1108/ecam-07-2022-0628
Florence Yean Yng Ling, Kelly Kai Li Teh

Purpose

This study investigated what are the effective leadership styles and practices that boost employees’ work outcomes during the COVID-19 pandemic from the perspective of facilities management professionals (FMPs).

Design/methodology/approach

Three predominant leadership styles (transformational, transactional contingent reward and disaster management) were operationalized into 38 leadership practices (X variables) and 8 work outcomes (Y variables). The explanatory sequential research design was adopted. Online questionnaire survey was first conducted on FMPs who managed facilities during the critical periods of COVID-19 pandemic in Singapore. In-depth interviews were then carried out with subject matter experts to elaborate on the quantitative findings.

Findings

During the pandemic, FMPs were significantly stressed at work, but also experienced significant job satisfaction and satisfaction with their leaders/supervisors. Statistical results revealed a range of leadership practices that are significantly correlated with FMPs’ work outcomes. One leadership practice is critical as it affects 4 of the 8 FMPs’ work outcomes - frequently acknowledging employees’ good performance during the pandemic.

Research limitations/implications

The study explored 3 leadership styles. There are other styles like laissez faire and servant leadership that might also affect work outcomes.

Practical implications

Based on the findings, suggestions were provided to organizations that employ FMPs on how to improve their work outcomes during a crisis such as a pandemic.

Originality/value

The novelty is the discovery that in the context of a global disaster such as the COVID-19 pandemic, the most relevant leadership styles to boost employees’ work outcomes are transactional contingent reward and disaster management leadership. The study adds to knowledge by showing that not one leadership style is superior – all 3 styles are complementary, but distinct, forms of leadership that need to work in tandem to boost FMPs’ work outcomes during a crisis such as a pandemic.

目的 本研究从设施管理专业人员(FMPs)的视角出发,探讨了在 COVID-19 大流行期间,哪些有效的领导风格和实践能够促进员工的工作成果。研究采用了解释性顺序研究设计。首先对在新加坡 COVID-19 大流行的关键时期管理设施的家庭医生进行了在线问卷调查。研究结果在大流行期间,财务管理人员的工作压力很大,但同时也体验到了显著的工作满意度和对领导/主管的满意度。统计结果表明,一系列领导方法与家庭医生的工作结果有明显的相关性。其中一种领导方式至关重要,因为它影响了 8 位家庭医生中 4 位的工作成果--经常肯定员工在大流行病期间的良好表现。原创性/价值本研究的新颖之处在于发现了在 COVID-19 大流行等全球性灾难的背景下,与提高员工工作成果最相关的领导风格是交易型或有报酬型领导和灾难管理型领导。这项研究表明,并不是哪一种领导风格更胜一筹--所有三种领导风格都是互补但又截然不同的领导形式,它们需要相互配合,才能在大流行病等危机期间促进财务管理人员的工作成果。
{"title":"Effective leadership styles to boost employees’ work outcomes during COVID-19 pandemic: perspective of facilities management professionals","authors":"Florence Yean Yng Ling, Kelly Kai Li Teh","doi":"10.1108/ecam-07-2022-0628","DOIUrl":"https://doi.org/10.1108/ecam-07-2022-0628","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study investigated what are the effective leadership styles and practices that boost employees’ work outcomes during the COVID-19 pandemic from the perspective of facilities management professionals (FMPs).</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Three predominant leadership styles (transformational, transactional contingent reward and disaster management) were operationalized into 38 leadership practices (X variables) and 8 work outcomes (Y variables). The explanatory sequential research design was adopted. Online questionnaire survey was first conducted on FMPs who managed facilities during the critical periods of COVID-19 pandemic in Singapore. In-depth interviews were then carried out with subject matter experts to elaborate on the quantitative findings.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>During the pandemic, FMPs were significantly stressed at work, but also experienced significant job satisfaction and satisfaction with their leaders/supervisors. Statistical results revealed a range of leadership practices that are significantly correlated with FMPs’ work outcomes. One leadership practice is critical as it affects 4 of the 8 FMPs’ work outcomes - frequently acknowledging employees’ good performance during the pandemic.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>The study explored 3 leadership styles. There are other styles like laissez faire and servant leadership that might also affect work outcomes.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>Based on the findings, suggestions were provided to organizations that employ FMPs on how to improve their work outcomes during a crisis such as a pandemic.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The novelty is the discovery that in the context of a global disaster such as the COVID-19 pandemic, the most relevant leadership styles to boost employees’ work outcomes are transactional contingent reward and disaster management leadership. The study adds to knowledge by showing that not one leadership style is superior – all 3 styles are complementary, but distinct, forms of leadership that need to work in tandem to boost FMPs’ work outcomes during a crisis such as a pandemic.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"12 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140076017","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: scenario of Bangladesh 利益相关者对基础设施项目延误看法的异质性:孟加拉国的情况
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-03-08 DOI: 10.1108/ecam-04-2023-0330
Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman, Md. Istiak Jahan
<h3>Purpose</h3><p>In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.</p><!--/ Abstract__block --><h3>Design/methodology/approach</h3><p>A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.</p><!--/ Abstract__block --><h3>Findings</h3><p>The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.</p><!--/ Abstract__block --><h3>Research limitations/implications</h3><p>The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.</p><!--/ Abstract__block --><h3>Practical implications</h3><p>This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not c
目的 在孟加拉国(BD),基础设施的延误很常见。以前的许多研究都探讨过基础设施延误的原因。然而,本研究通过听取负责规划、设计、筹资、审批和实施的利益相关者的意见,对延误的原因进行了调查。设计/方法/途径 利用 350 个正态分布数据点建立了一个结构方程(SE)模型,以了解利益相关者对英国发展部基础设施项目延误的看法的异质性。研究发现,在三个潜在变量中,"项目本身相关延误 "对基础设施项目延误的影响更大。在 "项目本身相关延误 "潜变量下的观察变量中,"DPP 审批流程 "的意义最大。从异质性分析中,研究发现来自 "工程部"、"规划办公室 "和 "建筑公司/行业 "的利益相关者的反应存在差异。一类重要的利益相关者认为,他们所处的阶段没有被延误,其他阶段需要关注。更多的数据可以提高研究结果的准确性。大多数受访者是土木工程师(74%),代表项目业主。本研究探讨了孟加拉国项目利益相关者的要求,以及他们之间的互动如何导致项目延误。此外,在确定个别利益相关者造成延误的具体因素时,也考虑了其他利益相关者的意见。实际上,利益相关者之间的距离应该缩短。项目经理可以在这方面发挥作用。应采取主动行动,消除利益相关者之间讨论的要求和官僚主义的复杂性,从而快速完成项目。利益相关者不应相互指责,而应主动想办法共同合作,如期完成项目。业主利益相关者应尽快获得规划委员会对开发项目建议书(DPP)和修订开发项目建议书(RDPP)的批准。为避免频繁更改发展项目建议书,业主在选择承包商时也应更加谨慎。承包商利益相关者应使用高效、适当的人力和设备,以免在施工过程中出现意外延误。由于承包商利益相关者在三类利益相关者中扮演着最重要的角色,因此承包商应提高认识,敦促业主尽快批准区域发展计划。
{"title":"Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: scenario of Bangladesh","authors":"Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman, Md. Istiak Jahan","doi":"10.1108/ecam-04-2023-0330","DOIUrl":"https://doi.org/10.1108/ecam-04-2023-0330","url":null,"abstract":"&lt;h3&gt;Purpose&lt;/h3&gt;\u0000&lt;p&gt;In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Design/methodology/approach&lt;/h3&gt;\u0000&lt;p&gt;A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Findings&lt;/h3&gt;\u0000&lt;p&gt;The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Research limitations/implications&lt;/h3&gt;\u0000&lt;p&gt;The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Practical implications&lt;/h3&gt;\u0000&lt;p&gt;This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not c","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"33 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140076040","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Does owners’ leadership matter to relational behavior in mega construction projects? A role orientation perspective 业主的领导力对超大型建筑项目中的关系行为有影响吗?角色定位视角
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-03-06 DOI: 10.1108/ecam-05-2023-0528
Xian Zheng, Xiao Hu, Chunlin Wu, Ju Bai

Purpose

Although researchers have long recognized the importance of participating organizations’ (POs) relational behavior for mega construction projects (MCPs) performance, relational behavior may not be executed by POs without effective leadership from project owners. However, little is known about the mechanisms linking owners’ leadership styles to POs’ relational behavior. This study draws on full range leadership theory and role theory to examine the relationships between owners’ leadership styles (i.e. transformational and transactional) and relational behavior. POs’ role orientations (i.e. normative and economic) are considered as potential mediators.

Design/methodology/approach

Data were collected from 175 managers deeply involved in MCPs. Hierarchical regression model and bootstrapping methods were performed on the data to examine the direct effects of owners’ leadership on POs’ relational behavior and the mediating effects of POs’ role orientations.

Findings

The results revealed that both owners’ transformational and transactional leadership positively affect POs’ relational behavior, despite the former being higher than the latter, and indirectly influence relational behavior via POs’ normative and economic role orientation, respectively.

Practical implications

This study provides a clear picture of how owners’ leadership can motivate POs’ relational behavior to achieve high-quality inter-organizational relationships in MCPs. The findings can guide owners’ top manager selection by prioritizing those with transformational leadership, which is beneficial to achieving high-level relational behavior of POs. The results also imply that owners should pay greater attention to cultivating POs’ normative role orientation by encouraging teamwork and open communication to enhance their implementation of relational behavior.

Originality/value

Unlike previous research focusing more on intra-organizational leader–follower relationship within one PO, this study is one of the first to empirically confirm owners’ leadership as a critical antecedent of POs’ relational behavior, thus enhancing the theoretical understanding of inter-organizational relationship management in MCPs. Based on role theory, this study considers a novel organizational psychology mechanism, i.e. POs’ role orientations, as the mediator to unravel how owners’ leadership affects POs’ relational behavior, which was rarely invoked in MCP leadership literature.

目的虽然研究人员早已认识到参与组织(POs)的关系行为对超大型建设项目(MCPs)绩效的重要性,但如果没有项目业主的有效领导,参与组织可能无法实施关系行为。然而,人们对业主领导风格与参与组织关系行为之间的关联机制知之甚少。本研究借鉴全方位领导理论和角色理论,研究业主的领导风格(即变革型和交易型)与关系行为之间的关系。设计/方法/途径收集了 175 名深度参与多边协商程序的管理人员的数据。对数据进行了层次回归模型和引导法,以检验所有者领导力对参与企业关系行为的直接影响以及参与企业角色定位的中介效应。研究结果表明,所有者的变革型领导力和交易型领导力都会对参与组织的关系行为产生积极影响,尽管前者高于后者,并分别通过参与组织的规范角色定位和经济角色定位对关系行为产生间接影响。研究结果可以指导企业主选择高层管理者,优先考虑具有变革型领导力的高层管理者,这有利于实现参与组织的高层关系行为。原创性/价值与以往更多关注一个组织内部领导者与追随者关系的研究不同,本研究首次通过实证研究证实了组织所有者的领导力是组织参与人关系行为的关键先决条件之一,从而增强了对多功能社区平台组织间关系管理的理论理解。基于角色理论,本研究考虑了一种新的组织心理学机制,即参与组织的角色定位,将其作为中介来揭示业主领导力如何影响参与组织的关系行为。
{"title":"Does owners’ leadership matter to relational behavior in mega construction projects? A role orientation perspective","authors":"Xian Zheng, Xiao Hu, Chunlin Wu, Ju Bai","doi":"10.1108/ecam-05-2023-0528","DOIUrl":"https://doi.org/10.1108/ecam-05-2023-0528","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Although researchers have long recognized the importance of participating organizations’ (POs) relational behavior for mega construction projects (MCPs) performance, relational behavior may not be executed by POs without effective leadership from project owners. However, little is known about the mechanisms linking owners’ leadership styles to POs’ relational behavior. This study draws on full range leadership theory and role theory to examine the relationships between owners’ leadership styles (i.e. transformational and transactional) and relational behavior. POs’ role orientations (i.e. normative and economic) are considered as potential mediators.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Data were collected from 175 managers deeply involved in MCPs. Hierarchical regression model and bootstrapping methods were performed on the data to examine the direct effects of owners’ leadership on POs’ relational behavior and the mediating effects of POs’ role orientations.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results revealed that both owners’ transformational and transactional leadership positively affect POs’ relational behavior, despite the former being higher than the latter, and indirectly influence relational behavior via POs’ normative and economic role orientation, respectively.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>This study provides a clear picture of how owners’ leadership can motivate POs’ relational behavior to achieve high-quality inter-organizational relationships in MCPs. The findings can guide owners’ top manager selection by prioritizing those with transformational leadership, which is beneficial to achieving high-level relational behavior of POs. The results also imply that owners should pay greater attention to cultivating POs’ normative role orientation by encouraging teamwork and open communication to enhance their implementation of relational behavior.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Unlike previous research focusing more on intra-organizational leader–follower relationship within one PO, this study is one of the first to empirically confirm owners’ leadership as a critical antecedent of POs’ relational behavior, thus enhancing the theoretical understanding of inter-organizational relationship management in MCPs. Based on role theory, this study considers a novel organizational psychology mechanism, i.e. POs’ role orientations, as the mediator to unravel how owners’ leadership affects POs’ relational behavior, which was rarely invoked in MCP leadership literature.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"9 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140033524","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Key performance indicators for hospital planning and construction: a systematic review and meta-analysis 医院规划与建设的关键绩效指标:系统回顾与荟萃分析
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-02-29 DOI: 10.1108/ecam-10-2023-1060
Wenque Liu, Albert P.C. Chan, Man Wai Chan, Amos Darko, Goodenough D. Oppong

Purpose

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and particularity. Employing key performance indicators (KPIs) facilitates the monitoring of HPs to advance their successful delivery. This study aims to comprehensively investigate the KPIs for hospital planning and construction (HPC).

Design/methodology/approach

The KPIs for HPC were identified through a systematic review. Then a comprehensive assessment of these KPIs was performed utilizing a meta-analysis method. In this process, basic statistical analysis, subgroup analysis, sensitive analysis and publication bias analysis were performed.

Findings

Results indicate that all 27 KPIs identified from the literature are significant for executing HPs in P&C phases. Also, some unconventional performance indicators are crucial for implementing HPs, such as “Project monitoring effectiveness” and “Industry innovation and synergy,” as their high significance is reflected in this study. Despite the fact that the findings of meta-analysis are more trustworthy than those of individual studies, a high heterogeneity still exists in the findings. It highlights the inherent uncertainty in the construction industry. Hence, this study applied subgroup analysis to explore the underlying factors causing the high level of heterogeneity and used sensitive analysis to assess the robustness of the findings.

Originality/value

There is no consensus among the prior studies on KPIs for HPC specifically and their degree of significance. Additionally, few reviews in this field have focused on the reliability of the results. This study comprehensively assesses the KPIs for HPC and explores the variability and robustness of the results, which provides a multi-dimensional perspective for practitioners and the research community to investigate the performance of HPs during the P&C stages.

目的由于医院项目的复杂性和特殊性,在规划和建设(P&C)阶段,医院项目的成功实施往往会面临各种挑战。采用关键绩效指标(KPI)有助于对医院项目进行监测,从而推动项目的成功实施。本研究旨在全面调查医院规划与建设(HPC)的关键绩效指标。然后利用荟萃分析法对这些关键绩效指标进行综合评估。结果结果表明,从文献中确定的所有 27 个关键绩效指标对于在 P&C 阶段执行 HPs 具有重要意义。此外,一些非常规绩效指标对实施 HPs 也至关重要,如 "项目监控有效性 "和 "行业创新与协同效应",这些指标的高度重要性在本研究中得到了体现。尽管荟萃分析的结果比单个研究的结果更可信,但研究结果仍存在很大的异质性。这凸显了建筑行业固有的不确定性。因此,本研究采用了亚组分析来探讨导致高度异质性的潜在因素,并使用敏感性分析来评估研究结果的稳健性。原创性/价值以往的研究对具体的高性能计算关键绩效指标及其重要程度尚未达成共识。此外,该领域很少有评论关注结果的可靠性。本研究全面评估了高性能计算的关键绩效指标,并探讨了结果的可变性和稳健性,从而为从业人员和研究界提供了一个多维视角,以调查高性能计算在 P&C 阶段的表现。
{"title":"Key performance indicators for hospital planning and construction: a systematic review and meta-analysis","authors":"Wenque Liu, Albert P.C. Chan, Man Wai Chan, Amos Darko, Goodenough D. Oppong","doi":"10.1108/ecam-10-2023-1060","DOIUrl":"https://doi.org/10.1108/ecam-10-2023-1060","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&amp;C) phases due to their complexity and particularity. Employing key performance indicators (KPIs) facilitates the monitoring of HPs to advance their successful delivery. This study aims to comprehensively investigate the KPIs for hospital planning and construction (HPC).</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The KPIs for HPC were identified through a systematic review. Then a comprehensive assessment of these KPIs was performed utilizing a meta-analysis method. In this process, basic statistical analysis, subgroup analysis, sensitive analysis and publication bias analysis were performed.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Results indicate that all 27 KPIs identified from the literature are significant for executing HPs in P&amp;C phases. Also, some unconventional performance indicators are crucial for implementing HPs, such as “Project monitoring effectiveness” and “Industry innovation and synergy,” as their high significance is reflected in this study. Despite the fact that the findings of meta-analysis are more trustworthy than those of individual studies, a high heterogeneity still exists in the findings. It highlights the inherent uncertainty in the construction industry. Hence, this study applied subgroup analysis to explore the underlying factors causing the high level of heterogeneity and used sensitive analysis to assess the robustness of the findings.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>There is no consensus among the prior studies on KPIs for HPC specifically and their degree of significance. Additionally, few reviews in this field have focused on the reliability of the results. This study comprehensively assesses the KPIs for HPC and explores the variability and robustness of the results, which provides a multi-dimensional perspective for practitioners and the research community to investigate the performance of HPs during the P&amp;C stages.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"44 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-02-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140006571","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A configuration analysis on knowledge transfer between projects: from horizontal and vertical perspectives 项目间知识转移的配置分析:从横向和纵向角度看
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-02-27 DOI: 10.1108/ecam-07-2023-0743
Qianwen Zhou, Xiaopeng Deng

Purpose

Despite the knowledge transfer between projects has received increasing attention from scholars, few scholars still conduct comprehensive research on inter-project knowledge transfer from both horizontal and vertical perspectives. Besides, knowledge transfer is affected by multiple antecedent conditions, and these factors should be combined for analysis. Therefore, this paper aims to explore the key factors influencing knowledge transfer between projects using the fuzzy-set qualitative comparative analysis (fsQCA) method from both horizontal and vertical perspectives and how these factors combine to improve the effectiveness of knowledge transfer (EKT) between projects.

Design/methodology/approach

First, nine factors affecting knowledge transfer between projects were identified, which were from the four dimensions of subject, relationship, channel, and context, namely temporary nature (TN), time urgency (TU), transmit willingness (TW), receive willingness (RW), trust (TR), project-project transfer channels (PPC), project-enterprise transfer channels (PEC), organizational atmosphere (OA), and motivation system (MS). Then, the source of the samples was determined and the data from the respondents was collected for analysis. Following the operation steps of the fsQCA method, variable calibration, single condition necessity analysis, and configuration analysis were carried out. After that, the configurations of influencing factors were obtained and the robustness test was conducted.

Findings

The results of the fsQCA method show that there are five configurations that can obtain better EKT between projects. Configuration 3 (∼TN * ∼TU * TW * RW * TR * ∼PPC * PEC * MS) has the highest consistency, indicating that it has the highest degree of the explanatory variable subset. Configuration 1 (∼TN * ∼TU * TW * RW * PEC * OA * MS) has the highest coverage, meaning that this configuration can explain most cases. Also, the five configurations were divided into three types: vertical transfer, horizontal-vertical transfer, and channel-free transfer category.

Originality/value

Firstly, this study explores the key factors influencing knowledge transfer between projects from four dimensions, which presents the logical chain of influencing factors more clearly. Then, this study divided the five configurations obtained into three categories according to the transfer direction: vertical, horizontal-vertical, and channel-free transfer, which gives implications to focus on both horizontal knowledge transfer (HKT) and (VKT) when studying knowledge transfer between projects. Lastly, this study helps to realize the exploration of combined improvement strategies for EKT, thereby providing meaningful recommendations for enterprises and project teams to facilitate knowledge transfer between projects.

目的尽管项目间的知识转移越来越受到学者们的关注,但很少有学者从横向和纵向两个角度对项目间的知识转移进行全面研究。此外,知识转移受多种前因条件的影响,应综合这些因素进行分析。因此,本文旨在利用模糊集定性比较分析(fsQCA)方法,从横向和纵向两个角度探讨影响项目间知识转移的关键因素,以及这些因素如何结合起来提高项目间知识转移(EKT)的有效性。设计/方法/途径首先,从主体、关系、渠道和情境四个维度确定了影响项目间知识转移的九个因素,即临时性(TN)、时间紧迫性(TU)、传递意愿(TW)、接收意愿(RW)、信任(TR)、项目-项目转移渠道(PPC)、项目-企业转移渠道(PEC)、组织氛围(OA)和激励系统(MS)。然后,确定样本来源,收集受访者的数据进行分析。按照 fsQCA 方法的操作步骤,进行了变量校准、单一条件必要性分析和配置分析。结果 fsQCA 方法的结果表明,有五种配置可以获得较好的项目间 EKT。配置 3(∼TN * ∼TU * TW * RW * TR * ∼PPC * PEC * MS)的一致性最高,说明其解释变量子集度最高。配置 1(∼TN * ∼TU * TW * RW * PEC * OA * MS)的覆盖率最高,这意味着该配置可以解释大多数情况。原创性/价值首先,本研究从四个维度探讨了影响项目间知识转移的关键因素,更加清晰地呈现了影响因素的逻辑链条。然后,本研究将所得到的五种配置按转移方向分为三类:纵向转移、横向-纵向转移和无渠道转移,这对研究项目间知识转移时同时关注横向知识转移(HKT)和纵向知识转移(VKT)具有启示意义。最后,本研究有助于实现EKT组合改进策略的探索,从而为企业和项目团队促进项目间知识转移提供有意义的建议。
{"title":"A configuration analysis on knowledge transfer between projects: from horizontal and vertical perspectives","authors":"Qianwen Zhou, Xiaopeng Deng","doi":"10.1108/ecam-07-2023-0743","DOIUrl":"https://doi.org/10.1108/ecam-07-2023-0743","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Despite the knowledge transfer between projects has received increasing attention from scholars, few scholars still conduct comprehensive research on inter-project knowledge transfer from both horizontal and vertical perspectives. Besides, knowledge transfer is affected by multiple antecedent conditions, and these factors should be combined for analysis. Therefore, this paper aims to explore the key factors influencing knowledge transfer between projects using the fuzzy-set qualitative comparative analysis (fsQCA) method from both horizontal and vertical perspectives and how these factors combine to improve the effectiveness of knowledge transfer (EKT) between projects.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>First, nine factors affecting knowledge transfer between projects were identified, which were from the four dimensions of subject, relationship, channel, and context, namely temporary nature (TN), time urgency (TU), transmit willingness (TW), receive willingness (RW), trust (TR), project-project transfer channels (PPC), project-enterprise transfer channels (PEC), organizational atmosphere (OA), and motivation system (MS). Then, the source of the samples was determined and the data from the respondents was collected for analysis. Following the operation steps of the fsQCA method, variable calibration, single condition necessity analysis, and configuration analysis were carried out. After that, the configurations of influencing factors were obtained and the robustness test was conducted.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results of the fsQCA method show that there are five configurations that can obtain better EKT between projects. Configuration 3 (∼TN * ∼TU * TW * RW * TR * ∼PPC * PEC * MS) has the highest consistency, indicating that it has the highest degree of the explanatory variable subset. Configuration 1 (∼TN * ∼TU * TW * RW * PEC * OA * MS) has the highest coverage, meaning that this configuration can explain most cases. Also, the five configurations were divided into three types: vertical transfer, horizontal-vertical transfer, and channel-free transfer category.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Firstly, this study explores the key factors influencing knowledge transfer between projects from four dimensions, which presents the logical chain of influencing factors more clearly. Then, this study divided the five configurations obtained into three categories according to the transfer direction: vertical, horizontal-vertical, and channel-free transfer, which gives implications to focus on both horizontal knowledge transfer (HKT) and (VKT) when studying knowledge transfer between projects. Lastly, this study helps to realize the exploration of combined improvement strategies for EKT, thereby providing meaningful recommendations for enterprises and project teams to facilitate knowledge transfer between projects.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"34 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-02-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139978256","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Assessment criteria for inter-organizational collaboration in interconnected infrastructure projects 互联基础设施项目中组织间合作的评估标准
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-02-27 DOI: 10.1108/ecam-11-2022-1109
Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh, Hans L.M. Bakker

Purpose

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.

Design/methodology/approach

A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.

Findings

The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.

Originality/value

The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).

目的社会依赖于相互连接的基础设施,而随着时间的推移,这些基础设施正变得越来越复杂。多学科知识和技能是发展现代基础设施的必要条件,需要各基础设施业主的密切协作。为有效管理和改善基础设施建设项目中的组织间协作(IOC),应对协作状况进行持续评估。本研究确定了评估标准,为评估互联基础设施项目中 IOC 状态的工具奠定了基础。通过系统的文献研究和对荷兰互联基础设施建设项目从业人员的深入半结构式访谈,确定了评估基础设施建设项目中 IOC 状态的标准,并在此基础上开发了评估工具。研究结果通过文献和从业人员的观点确定的评估标准,设计并开发了协作评估工具。该评估工具包括 12 个标准和 36 个次级标准,分别属于协作能力的三个不同类别:个人协作能力、关系协作能力和组织协作能力。该评估工具提供了根据三个类别(即个人、关系和组织)评估和分析协作状况的机会。
{"title":"Assessment criteria for inter-organizational collaboration in interconnected infrastructure projects","authors":"Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh, Hans L.M. Bakker","doi":"10.1108/ecam-11-2022-1109","DOIUrl":"https://doi.org/10.1108/ecam-11-2022-1109","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"15 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-02-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139978129","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Occupational health risk assessment of PC production-caused pollution based on damage assessment and cyclic mitigation model 基于损害评估和循环缓解模型的 PC 生产所致污染的职业健康风险评估
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-02-27 DOI: 10.1108/ecam-06-2023-0581
Zhiyu Dong, Ruize Qin, Ping Zou, Xin Yao, Peng Cui, Fan Zhang, Yizhou Yang

Purpose

The occupational health risk associated with the production of prefabricated concrete components is often overlooked. This paper will use a damage assessment and cyclic mitigation (DACM) model to provide individualized exposure risk assessment and corresponding mitigation management measures for workers who are being exposed.

Design/methodology/approach

The DACM model is proposed based on the concept of life cycle assessment (LCA). The model uses Monte-Carlo simulation for uncertainty risk assessment, followed by quantitative damage assessment using disability-adjusted life year (DALY). Lastly, sensitivity analysis is used to identify the parameters with the greatest impact on health risks.

Findings

The results show that the dust concentration is centered around the mean, and the fitting results are close to normal distribution, so the mean value can be used to carry out the calculation of risk. However, calculations using the DACM model revealed that there are still some work areas at risk. DALY damage is most severe in concrete production area. Meanwhile, the inhalation rate (IR), exposure duration (ED), exposure frequency (EF) and average exposure time (AT) showed greater impacts based on the sensitivity analysis.

Originality/value

Based on the comparison, the DACM model can determine that the potential occupational health risk of prefabricated concrete component (PC) factory and the risk is less than that of on-site construction. It synthesizes field research and simulation to form the entire assessment process into a case-base system with the depth of the cycle, which allows the model to be continuously adjusted to reduce the occupational health damage caused by production pollution exposure.

目的与预制混凝土构件生产相关的职业健康风险往往被忽视。本文将利用损害评估和周期缓解(DACM)模型,为接触该风险的工人提供个性化的接触风险评估和相应的缓解管理措施。该模型使用蒙特卡洛模拟进行不确定性风险评估,然后使用残疾调整生命年(DALY)进行定量损害评估。结果表明,粉尘浓度以平均值为中心,拟合结果接近正态分布,因此可以使用平均值进行风险计算。然而,使用 DACM 模型进行计算后发现,仍有一些工作区域存在风险。混凝土生产区的 DALY 损害最为严重。根据敏感性分析,吸入率 (IR)、接触持续时间 (ED)、接触频率 (EF) 和平均接触时间 (AT) 显示出更大的影响。它综合了现场研究和模拟,将整个评估过程形成一个具有循环深度的案例基础系统,使模型可以不断调整,以减少生产污染暴露造成的职业健康损害。
{"title":"Occupational health risk assessment of PC production-caused pollution based on damage assessment and cyclic mitigation model","authors":"Zhiyu Dong, Ruize Qin, Ping Zou, Xin Yao, Peng Cui, Fan Zhang, Yizhou Yang","doi":"10.1108/ecam-06-2023-0581","DOIUrl":"https://doi.org/10.1108/ecam-06-2023-0581","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The occupational health risk associated with the production of prefabricated concrete components is often overlooked. This paper will use a damage assessment and cyclic mitigation (DACM) model to provide individualized exposure risk assessment and corresponding mitigation management measures for workers who are being exposed.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The DACM model is proposed based on the concept of life cycle assessment (LCA). The model uses Monte-Carlo simulation for uncertainty risk assessment, followed by quantitative damage assessment using disability-adjusted life year (DALY). Lastly, sensitivity analysis is used to identify the parameters with the greatest impact on health risks.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results show that the dust concentration is centered around the mean, and the fitting results are close to normal distribution, so the mean value can be used to carry out the calculation of risk. However, calculations using the DACM model revealed that there are still some work areas at risk. DALY damage is most severe in concrete production area. Meanwhile, the inhalation rate (IR), exposure duration (ED), exposure frequency (EF) and average exposure time (AT) showed greater impacts based on the sensitivity analysis.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Based on the comparison, the DACM model can determine that the potential occupational health risk of prefabricated concrete component (PC) factory and the risk is less than that of on-site construction. It synthesizes field research and simulation to form the entire assessment process into a case-base system with the depth of the cycle, which allows the model to be continuously adjusted to reduce the occupational health damage caused by production pollution exposure.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"33 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-02-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139951896","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Engineering, Construction and Architectural Management
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1