Measuring the impact of lean implementation on BIM and project success: case of construction firms 衡量精益实施对 BIM 和项目成功的影响:建筑公司案例
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-01 DOI: 10.1108/ecam-02-2024-0204
Furkan Polat, Sevilay Demirkesen

Purpose

The main purpose of this study is to reveal the degree of association between lean, building information modeling (BIM) and construction project success. The study further intends to provide strategies for high and low associations of the factors.

Design/methodology/approach

Lean construction and BIM are two important applications that have recently gained popularity in terms of enhancing project success. Considering this impact, this study investigates the synergy between lean construction and BIM and determines to what extent these two contribute to the success of the projects. As a first step, lean, BIM and project success were examined based on an in-depth literature review. In the second stage, a structural equation model (SEM) was established to reflect the relationship among these three through hypotheses. Then, a questionnaire was designed and administered to the construction professionals experienced in both lean and BIM implementation. The SEM was tested using Analysis of Moment Structures (AMOS), an SPSS tool.

Findings

The results indicated that lean implementation has a significant and positive impact on BIM implementation and project success. On the other hand, BIM implementation had a lower significant impact on project success than lean implementation construct.

Research limitations/implications

The results of this study can be used by both policymakers and industry practitioners in terms of developing strategies for effectively using both lean and BIM. The researchers can further develop other implementation models to investigate whether these concepts are more effective in increasing project success when used integratively.

Originality/value

This study considers both the impact of lean and BIM on project success through input from construction practitioners working on large projects. This way, the study fosters the use of lean, BIM or lean–BIM together in construction projects to enhance project success.

目的本研究的主要目的是揭示精益建造、建筑信息模型(BIM)和建筑项目成功之间的关联程度。设计/方法/途径精益建造和 BIM 是最近在提高项目成功率方面得到普及的两个重要应用。考虑到这一影响,本研究调查了精益建造和 BIM 之间的协同作用,并确定了这两者在多大程度上有助于项目的成功。首先,基于深入的文献综述,对精益、BIM 和项目成功进行了研究。第二阶段,建立结构方程模型(SEM),通过假设反映三者之间的关系。然后,设计并向在精益和 BIM 实施方面经验丰富的建筑专业人士发放了调查问卷。结果表明,精益实施对 BIM 实施和项目成功有显著的积极影响。另一方面,BIM 实施对项目成功的显著影响低于精益实施的影响。研究局限/意义本研究的结果可供政策制定者和行业从业者在制定有效使用精益和 BIM 的策略时使用。研究人员可以进一步开发其他实施模型,研究这些概念在综合使用时是否能更有效地提高项目成功率。原创性/价值本研究通过大型项目建筑从业人员的意见,考虑精益和 BIM 对项目成功的影响。通过这种方式,本研究促进了精益、BIM 或精益-BIM 在建筑项目中的结合使用,以提高项目的成功率。
{"title":"Measuring the impact of lean implementation on BIM and project success: case of construction firms","authors":"Furkan Polat, Sevilay Demirkesen","doi":"10.1108/ecam-02-2024-0204","DOIUrl":"https://doi.org/10.1108/ecam-02-2024-0204","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The main purpose of this study is to reveal the degree of association between lean, building information modeling (BIM) and construction project success. The study further intends to provide strategies for high and low associations of the factors.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Lean construction and BIM are two important applications that have recently gained popularity in terms of enhancing project success. Considering this impact, this study investigates the synergy between lean construction and BIM and determines to what extent these two contribute to the success of the projects. As a first step, lean, BIM and project success were examined based on an in-depth literature review. In the second stage, a structural equation model (SEM) was established to reflect the relationship among these three through hypotheses. Then, a questionnaire was designed and administered to the construction professionals experienced in both lean and BIM implementation. The SEM was tested using Analysis of Moment Structures (AMOS), an SPSS tool.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results indicated that lean implementation has a significant and positive impact on BIM implementation and project success. On the other hand, BIM implementation had a lower significant impact on project success than lean implementation construct.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>The results of this study can be used by both policymakers and industry practitioners in terms of developing strategies for effectively using both lean and BIM. The researchers can further develop other implementation models to investigate whether these concepts are more effective in increasing project success when used integratively.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study considers both the impact of lean and BIM on project success through input from construction practitioners working on large projects. This way, the study fosters the use of lean, BIM or lean–BIM together in construction projects to enhance project success.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"27 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141513597","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Determinants for megaproject knowledge innovation management: a Bayesian network analysis 巨型项目知识创新管理的决定因素:贝叶斯网络分析
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-06-28 DOI: 10.1108/ecam-03-2023-0244
Lin-lin Xie, Yifei Luo, Lei Hou, Jianqiang Yu

Purpose

Megaproject knowledge innovation (MKI) is perceived as a critical strategy for engineering value co-creation and industrial chain upgrading. Ascertaining the impact mechanism of MKI is a crucial initial step towards improving management practices. Within the framework of complex systems in megaprojects, factors exhibit intricate interdependencies. However, the current domain of knowledge has either overlooked or oversimplified this relationship and therefore cannot propose pragmatic and efficacious strategies for enhancing MKI. To close this gap, this study develops a Bayesian network (BN) model aiming to investigate the interdependencies among MKI-related factors and their impact on MKI.

Design/methodology/approach

First, this study implements literature review, expert interview and field investigation to identify the influencing factor nodes for the network model development. Second, a Bayesian network was constructed by integrating the expert knowledge with Dempster-Shafer theory. Next, a MKI measurement model was established using 253 training samples. Finally, the factor significance and optimal MKI improvement strategies are identified from the sensitivity analysis and probabilistic reasoning within the BNs.

Findings

The results indicate that (1) the BN model exhibits significant reliability and holds promotion and application value in formulating MKI management strategies; (2) knowledge sharing, shared vision and leadership are the key influencing factors of MKI; and (3) simultaneously improving institutional pressure, leadership and knowledge sharing is the most optimal strategy to enhance MKI.

Originality/value

This study innovatively introduced the BN method into the domain of MKI management, providing an appropriate approach for modelling complex relationships among factors and investigate nonlinear influences. The developed model raises megaproject stakeholders’ awareness about factors influencing MKI and presents quantified strategies that increase the likelihood of maximising MKI levels. Its ease of generalisability positions it as a promising decision support tool, facilitating the implementation of sustainable MKI practices.

目的 大项目知识创新(MKI)被视为工程价值共创和产业链升级的关键战略。确定 MKI 的影响机制是改进管理实践的关键第一步。在超大型项目的复杂系统框架内,各种因素呈现出错综复杂的相互依存关系。然而,目前的知识领域要么忽视了这种关系,要么将其过于简单化,因此无法提出务实有效的战略来加强 MKI。为了弥补这一不足,本研究建立了一个贝叶斯网络(BN)模型,旨在研究 MKI 相关因素之间的相互依存关系及其对 MKI 的影响。其次,将专家知识与 Dempster-Shafer 理论相结合,构建了贝叶斯网络。接着,利用 253 个训练样本建立了 MKI 测量模型。研究结果表明:(1)贝叶斯网络模型具有显著的可靠性,在制定 MKI 管理策略方面具有推广应用价值;(2)知识共享、共同愿景和领导力是 MKI 的关键影响因素;(3)同时改善制度压力、领导力和知识共享是提升 MKI 的最优策略。原创性/价值 本研究创新性地将 BN 方法引入 MKI 管理领域,为模拟各因素之间的复杂关系和研究非线性影响因素提供了一种合适的方法。所开发的模型提高了巨型项目利益相关者对影响 MKI 的因素的认识,并提出了量化策略,以增加最大化 MKI 水平的可能性。该模型易于推广,是一种有前途的决策支持工具,有助于实施可持续的 MKI 实践。
{"title":"Determinants for megaproject knowledge innovation management: a Bayesian network analysis","authors":"Lin-lin Xie, Yifei Luo, Lei Hou, Jianqiang Yu","doi":"10.1108/ecam-03-2023-0244","DOIUrl":"https://doi.org/10.1108/ecam-03-2023-0244","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Megaproject knowledge innovation (MKI) is perceived as a critical strategy for engineering value co-creation and industrial chain upgrading. Ascertaining the impact mechanism of MKI is a crucial initial step towards improving management practices. Within the framework of complex systems in megaprojects, factors exhibit intricate interdependencies. However, the current domain of knowledge has either overlooked or oversimplified this relationship and therefore cannot propose pragmatic and efficacious strategies for enhancing MKI. To close this gap, this study develops a Bayesian network (BN) model aiming to investigate the interdependencies among MKI-related factors and their impact on MKI.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>First, this study implements literature review, expert interview and field investigation to identify the influencing factor nodes for the network model development. Second, a Bayesian network was constructed by integrating the expert knowledge with Dempster-Shafer theory. Next, a MKI measurement model was established using 253 training samples. Finally, the factor significance and optimal MKI improvement strategies are identified from the sensitivity analysis and probabilistic reasoning within the BNs.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results indicate that (1) the BN model exhibits significant reliability and holds promotion and application value in formulating MKI management strategies; (2) knowledge sharing, shared vision and leadership are the key influencing factors of MKI; and (3) simultaneously improving institutional pressure, leadership and knowledge sharing is the most optimal strategy to enhance MKI.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study innovatively introduced the BN method into the domain of MKI management, providing an appropriate approach for modelling complex relationships among factors and investigate nonlinear influences. The developed model raises megaproject stakeholders’ awareness about factors influencing MKI and presents quantified strategies that increase the likelihood of maximising MKI levels. Its ease of generalisability positions it as a promising decision support tool, facilitating the implementation of sustainable MKI practices.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"91 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502952","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A generative design-based optimization model for multi-objective construction site layout planning 基于生成设计的多目标建筑工地布局规划优化模型
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-06-26 DOI: 10.1108/ecam-11-2023-1193
Hossam Wefki, Mona Salah, Emad Elbeltagi, Asser Elsheikh, Rana Khallaf

Purpose

Given the growing interest in modern construction techniques and the emergence of innovative technologies, construction site layout planning research has progressively been investigating approaches to adopt innovative concepts and incorporate renewed approaches to improve widespread efficiency. This research develops a decision-making tool that optimizes construction site layout plans. The developed model targets two main objectives: minimizing material transportation costs and maximizing safety by optimally placing facilities on construction sites.

Design/methodology/approach

A novel approach is devised based on the integration of Building Information Modeling and Generative Design (BIM-GD). This engine is used to optimize the multi-objective site layout problems to identify layout alternatives in the early project stages. Parametric modeling uses Dynamo to construct the model and explore constraints initially. Finally, the GD environment is utilized to create different design alternatives, and then the decision-making procedure selects the most appropriate design alternative. Additionally, a case study is applied to validate the effectiveness of the developed model.

Findings

The results indicate the effectiveness of the proposed GD tool and its potential for more complex applications. The GD engine examined optimal layout plans, balancing different objectives and adhering to appointed geometric constraints. A case study was conducted to assess the model's effectiveness and showcase its suitability. Construction Site Layout Planning (CSLP) is an essential step in design that can influence considerable aspects, such as material transportation expenses and different safety standards on the site. Employing visual programming for parametric modeling within Dynamo-Revit creates an expedient and user-friendly platform for planning engineers who may require more programming expertise to create and program algorithmic models visually. Utilizing GD in CSLP has proven to be a powerful tool with consequential prospects for improving applications and executing more models.

Practical implications

The findings from this framework are intended to help construction practitioners select the most appropriate site layout during early project stages while incorporating different safety criteria inside construction sites to alleviate actual safety risks.

Originality/value

A new approach is proposed that utilizes an integrated BIM-GD engine to optimize multi-objective site layout problems. This approach targets two main objectives: minimizing material transportation costs and maximizing safety by optimally placing facilities in construction sites.

目的鉴于人们对现代建筑技术的兴趣与日俱增以及创新技术的不断涌现,建筑工地布局规划研究一直在逐步探索采用创新概念和更新方法的方法,以提高普遍效率。本研究开发了一种优化施工现场布局规划的决策工具。设计/方法/途径基于建筑信息模型和生成设计(BIM-GD)的整合,设计了一种新颖的方法。该引擎用于优化多目标场地布局问题,以便在项目早期阶段确定布局备选方案。参数建模使用 Dynamo 来构建模型并初步探索约束条件。最后,利用 GD 环境创建不同的设计备选方案,然后通过决策程序选择最合适的设计备选方案。此外,还应用案例研究来验证所开发模型的有效性。GD 引擎检查了最佳布局方案,平衡了不同的目标,并遵守了指定的几何约束条件。为了评估模型的有效性并展示其适用性,我们进行了一项案例研究。建筑工地布局规划(CSLP)是设计中的一个重要步骤,会影响到很多方面,如材料运输费用和工地上不同的安全标准。在 Dynamo-Revit 中采用可视化编程进行参数化建模,为规划工程师创建了一个便捷、用户友好的平台。事实证明,在 CSLP 中使用 GD 是一种强大的工具,具有改进应用和执行更多模型的广阔前景。原创性/价值提出了一种新方法,利用集成的 BIM-GD 引擎来优化多目标场地布局问题。该方法针对两个主要目标:通过优化建筑工地的设施布置,最大限度地降低材料运输成本和最大限度地提高安全性。
{"title":"A generative design-based optimization model for multi-objective construction site layout planning","authors":"Hossam Wefki, Mona Salah, Emad Elbeltagi, Asser Elsheikh, Rana Khallaf","doi":"10.1108/ecam-11-2023-1193","DOIUrl":"https://doi.org/10.1108/ecam-11-2023-1193","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Given the growing interest in modern construction techniques and the emergence of innovative technologies, construction site layout planning research has progressively been investigating approaches to adopt innovative concepts and incorporate renewed approaches to improve widespread efficiency. This research develops a decision-making tool that optimizes construction site layout plans. The developed model targets two main objectives: minimizing material transportation costs and maximizing safety by optimally placing facilities on construction sites.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A novel approach is devised based on the integration of Building Information Modeling and Generative Design (BIM-GD). This engine is used to optimize the multi-objective site layout problems to identify layout alternatives in the early project stages. Parametric modeling uses Dynamo to construct the model and explore constraints initially. Finally, the GD environment is utilized to create different design alternatives, and then the decision-making procedure selects the most appropriate design alternative. Additionally, a case study is applied to validate the effectiveness of the developed model.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results indicate the effectiveness of the proposed GD tool and its potential for more complex applications. The GD engine examined optimal layout plans, balancing different objectives and adhering to appointed geometric constraints. A case study was conducted to assess the model's effectiveness and showcase its suitability. Construction Site Layout Planning (CSLP) is an essential step in design that can influence considerable aspects, such as material transportation expenses and different safety standards on the site. Employing visual programming for parametric modeling within Dynamo-Revit creates an expedient and user-friendly platform for planning engineers who may require more programming expertise to create and program algorithmic models visually. Utilizing GD in CSLP has proven to be a powerful tool with consequential prospects for improving applications and executing more models.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>The findings from this framework are intended to help construction practitioners select the most appropriate site layout during early project stages while incorporating different safety criteria inside construction sites to alleviate actual safety risks.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>A new approach is proposed that utilizes an integrated BIM-GD engine to optimize multi-objective site layout problems. This approach targets two main objectives: minimizing material transportation costs and maximizing safety by optimally placing facilities in construction sites.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"13 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141513598","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods 通过项目交付方法对交通项目进行施工后评估,监督学习成本风险
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-06-25 DOI: 10.1108/ecam-01-2024-0136
Junseo Bae

Purpose

The main objectives of this study are to (1) develop and test a cost contingency learning model that can generalize initially estimated contingency amounts by analyzing back the multiple project changes experienced and (2) uncover the hidden link of the learning networks using a curve-fitting technique for the post-construction evaluation of cost contingency amounts to cover cost risk for future projects.

Design/methodology/approach

Based on a total of 1,434 datapoints collected from DBB and DB transportation projects, a post-construction cost contingency learning model was developed using feedforward neural networks (FNNs). The developed model generalizes cost contingencies under two different project delivery methods (i.e. DBB and DB). The learning outputs of generalized contingency amounts were curve-fitted with the post-construction schedule and cost information, specifically aiming at uncovering the hidden link of the FNNs. Two different bridge projects completed under DBB and DB were employed as illustrative examples to demonstrate how the proposed modeling framework could be implemented.

Findings

With zero or negative values of change growth experienced, it was concluded that cost contingencies were overallocated at the contract stage. On the other hand, with positive values of change growth experienced, it was evaluated that set cost contingencies were insufficient from the post-construction standpoint. Taken together, this study proposed a tangible post-construction evaluation technique that can produce not only the plausible ranges of cost contingencies but also the exact amounts of contingency under DBB and DB contracts.

Originality/value

As the first of its kind, the proposed modeling framework provides agency engineers and decision-makers with tangible assessments of cost contingency coupled with experienced risks at the post-construction stage. Use of the proposed model will help them evaluate the allocation of appropriate contingency amounts. If an agency allocates a cost contingency benchmarked from similar projects on aspects of the base estimate and experienced risks, a set contingency can be defended more reliably. The main findings of this study contribute to post-construction cost contingency verification, enabling agency engineers and decision-makers to systematically evaluate set cost contingencies during the post-construction assessment stage and achieving further any enhanced level of confidence for future cost contingency plans.

目的本研究的主要目标是:(1) 开发和测试一个成本应急学习模型,该模型可以通过分析经历的多个项目变更来概括最初估算的应急金额;(2) 使用曲线拟合技术挖掘学习网络的隐藏环节,用于施工后评估成本应急金额,以应对未来项目的成本风险。设计/方法/途径基于从 DBB 和 DB 交通项目中收集的 1,434 个数据点,使用前馈神经网络(FNN)开发了一个施工后成本应急学习模型。所开发的模型对两种不同项目交付方法(即 DBB 和 DB)下的成本或有事项进行了归纳。通用应急金额的学习输出与施工后的进度和成本信息进行了曲线拟合,目的是揭示前馈神经网络的隐藏环节。两个不同的桥梁项目分别以 DBB 和 DB 模式完成,作为示例演示了如何实施所建议的建模框架。另一方面,如果变化增长值为正数,则从施工后的角度来看,所设定的成本应急款不足。综上所述,本研究提出了一种切实可行的施工后评估技术,该技术不仅可以得出成本意外开支的合理范围,还可以得出 DBB 和 DB 合同下意外开支的准确金额。使用建议的模型将有助于他们评估分配适当的意外开支金额。如果一个机构根据类似项目的基本估算和经验风险来分配成本应急款,就能更可靠地维护设定的应急款。本研究的主要结论有助于施工后成本应急验证,使机构工程师和决策者能够在施工后评估阶段系统地评估设定的成本应急,并进一步提高未来成本应急计划的可信度。
{"title":"Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods","authors":"Junseo Bae","doi":"10.1108/ecam-01-2024-0136","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0136","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The main objectives of this study are to (1) develop and test a cost contingency learning model that can generalize initially estimated contingency amounts by analyzing back the multiple project changes experienced and (2) uncover the hidden link of the learning networks using a curve-fitting technique for the post-construction evaluation of cost contingency amounts to cover cost risk for future projects.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Based on a total of 1,434 datapoints collected from DBB and DB transportation projects, a post-construction cost contingency learning model was developed using feedforward neural networks (FNNs). The developed model generalizes cost contingencies under two different project delivery methods (i.e. DBB and DB). The learning outputs of generalized contingency amounts were curve-fitted with the post-construction schedule and cost information, specifically aiming at uncovering the hidden link of the FNNs. Two different bridge projects completed under DBB and DB were employed as illustrative examples to demonstrate how the proposed modeling framework could be implemented.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>With zero or negative values of change growth experienced, it was concluded that cost contingencies were overallocated at the contract stage. On the other hand, with positive values of change growth experienced, it was evaluated that set cost contingencies were insufficient from the post-construction standpoint. Taken together, this study proposed a tangible post-construction evaluation technique that can produce not only the plausible ranges of cost contingencies but also the exact amounts of contingency under DBB and DB contracts.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>As the first of its kind, the proposed modeling framework provides agency engineers and decision-makers with tangible assessments of cost contingency coupled with experienced risks at the post-construction stage. Use of the proposed model will help them evaluate the allocation of appropriate contingency amounts. If an agency allocates a cost contingency benchmarked from similar projects on aspects of the base estimate and experienced risks, a set contingency can be defended more reliably. The main findings of this study contribute to post-construction cost contingency verification, enabling agency engineers and decision-makers to systematically evaluate set cost contingencies during the post-construction assessment stage and achieving further any enhanced level of confidence for future cost contingency plans.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"9 2 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502953","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Duration and resource constraint prediction models for construction projects using regression machine learning method 使用回归机器学习方法的建筑项目工期和资源限制预测模型
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-06-25 DOI: 10.1108/ecam-06-2023-0582
Gopinath Selvam, Mohan Kamalanandhini, Muthuvel Velpandian, Sheema Shah
<h3>Purpose</h3><p>The construction projects are highly subjected to uncertainties, which result in overruns in time and cost. Realistic estimates of workforce and duration are imperative for construction projects to attain their intended objectives. The aim of this study is to provide accurate labor and duration estimates for the construction projects, considering actual uncertainties.</p><!--/ Abstract__block --><h3>Design/methodology/approach</h3><p>The dataset was formulated from the information collected from 186 construction projects through direct interviews, group discussions and questionnaire methods. The actual uncertainties and exposure conditions of construction activities were recorded. The data were verified with the standard guideline to remove the outliers. The prediction model was developed using support vector regression (SVR), a machine learning (ML) method. The performance was evaluated using the widely adopted regression metrics. Further, the cross validation was made with the visualization of residuals and predicted errors, ridge regression with transformed target distribution and a Gaussian Naive Bayes (NB) regressor.</p><!--/ Abstract__block --><h3>Findings</h3><p>The prediction models predicted the duration and labor requirements with the consideration of actual uncertainties. The residual plot indicated the appropriate use of SVR to develop the prediction model. The duration (DC) and resource constraint (RC) prediction models obtained 80 and 82% accuracy, respectively. Besides, the developed model obtained better accuracy for the training and test scores than the Gaussian NB regressor. Further, the range of the explained variance score and R<sup>2</sup> was from 0.95 to 0.97, indicating better efficiency compared with other prediction models.</p><!--/ Abstract__block --><h3>Research limitations/implications</h3><p>The researchers will utilize the research findings to estimate the duration and labor requirements under uncertain conditions and further improve the construction project management practices.</p><!--/ Abstract__block --><h3>Practical implications</h3><p>The research findings will enable industry practitioners to accurately estimate the duration and labor requirements, considering historical uncertain conditions. A precise estimation of resources will ensure the attainment of the intended project outcomes.</p><!--/ Abstract__block --><h3>Social implications</h3><p>Delays in construction projects will be reduced by implementing the research findings, which significantly ensures the effective utilization of resources and attainment of other economic benefits. The policymakers will develop a guideline to develop a database to collect the uncertainties of the construction projects and relatively estimate the resource requirements.</p><!--/ Abstract__block --><h3>Originality/value</h3><p>This is the first study to consider the actual uncertainties of construction projects to develop RC and DC prediction
目的 建筑项目极易受到不确定因素的影响,导致时间和成本超支。要使建筑项目达到预期目标,就必须对劳动力和工期进行切合实际的估算。本研究旨在考虑实际的不确定性因素,为建筑项目提供准确的劳动力和工期估算。记录了建筑活动的实际不确定性和暴露条件。数据根据标准准则进行了验证,以去除异常值。预测模型是利用机器学习(ML)方法中的支持向量回归(SVR)建立的。使用广泛采用的回归指标对其性能进行了评估。此外,还利用残差和预测误差的可视化、目标分布转化后的脊回归以及高斯直觉贝叶斯(NB)回归器进行了交叉验证。残差图表明,使用 SVR 建立预测模型是恰当的。工期(DC)和资源限制(RC)预测模型的准确率分别为 80% 和 82%。此外,与高斯 NB 回归器相比,所开发的模型在训练和测试得分方面获得了更好的准确性。研究限制/意义研究人员将利用研究成果估算不确定条件下的工期和劳动力需求,并进一步改进建筑项目管理实践。社会影响通过实施研究成果,建筑项目的延误将会减少,这将极大地确保资源的有效利用和其他经济效益的实现。政策制定者将制定指导方针,开发数据库以收集建设项目的不确定性,并相对估算资源需求。原创性/价值这是首个考虑建设项目的实际不确定性以开发 RC 和 DC 预测模型的研究。所开发的预测模型能以最少的计算时间准确估算工期和劳动力需求。行业从业人员将能够利用所开发的模型准确估算工期和劳动力需求。
{"title":"Duration and resource constraint prediction models for construction projects using regression machine learning method","authors":"Gopinath Selvam, Mohan Kamalanandhini, Muthuvel Velpandian, Sheema Shah","doi":"10.1108/ecam-06-2023-0582","DOIUrl":"https://doi.org/10.1108/ecam-06-2023-0582","url":null,"abstract":"&lt;h3&gt;Purpose&lt;/h3&gt;\u0000&lt;p&gt;The construction projects are highly subjected to uncertainties, which result in overruns in time and cost. Realistic estimates of workforce and duration are imperative for construction projects to attain their intended objectives. The aim of this study is to provide accurate labor and duration estimates for the construction projects, considering actual uncertainties.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Design/methodology/approach&lt;/h3&gt;\u0000&lt;p&gt;The dataset was formulated from the information collected from 186 construction projects through direct interviews, group discussions and questionnaire methods. The actual uncertainties and exposure conditions of construction activities were recorded. The data were verified with the standard guideline to remove the outliers. The prediction model was developed using support vector regression (SVR), a machine learning (ML) method. The performance was evaluated using the widely adopted regression metrics. Further, the cross validation was made with the visualization of residuals and predicted errors, ridge regression with transformed target distribution and a Gaussian Naive Bayes (NB) regressor.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Findings&lt;/h3&gt;\u0000&lt;p&gt;The prediction models predicted the duration and labor requirements with the consideration of actual uncertainties. The residual plot indicated the appropriate use of SVR to develop the prediction model. The duration (DC) and resource constraint (RC) prediction models obtained 80 and 82% accuracy, respectively. Besides, the developed model obtained better accuracy for the training and test scores than the Gaussian NB regressor. Further, the range of the explained variance score and R&lt;sup&gt;2&lt;/sup&gt; was from 0.95 to 0.97, indicating better efficiency compared with other prediction models.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Research limitations/implications&lt;/h3&gt;\u0000&lt;p&gt;The researchers will utilize the research findings to estimate the duration and labor requirements under uncertain conditions and further improve the construction project management practices.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Practical implications&lt;/h3&gt;\u0000&lt;p&gt;The research findings will enable industry practitioners to accurately estimate the duration and labor requirements, considering historical uncertain conditions. A precise estimation of resources will ensure the attainment of the intended project outcomes.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Social implications&lt;/h3&gt;\u0000&lt;p&gt;Delays in construction projects will be reduced by implementing the research findings, which significantly ensures the effective utilization of resources and attainment of other economic benefits. The policymakers will develop a guideline to develop a database to collect the uncertainties of the construction projects and relatively estimate the resource requirements.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Originality/value&lt;/h3&gt;\u0000&lt;p&gt;This is the first study to consider the actual uncertainties of construction projects to develop RC and DC prediction","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"45 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502954","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Research on technical suitability analysis and scheme selection of prefabricated buildings in China 中国预制装配式建筑技术适用性分析与方案选择研究
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-06-20 DOI: 10.1108/ecam-01-2024-0049
Layin Wang, Rongfang Huang, Xiaoyu Li
<h3>Purpose</h3><p>China is a large country with different regions due to regional differences and project characteristics, and the selection of prefabricated building technology according to local conditions is the key to its sustainable development in China. The purpose of this paper is to develop the suitability evaluation system of prefabricated building technology from the perspective of the suitability concept and to analyze the selection path of prefabricated building technology and to provide a reference for selecting and developing prefabricated building technology schemes that meet regional endowments.</p><!--/ Abstract__block --><h3>Design/methodology/approach</h3><p>Based on relevant literature, technical specifications, and standards, this paper constructs an index system for analyzing the technical suitability of prefabricated buildings. It includes 23 indicators, 7 dimensions, and 3 aspects through the semantic clustering method. Following this, the comprehensive weight of each index is determined using the order relation method (G1) and the continuous ordered weighted averaging (COWA). The selection of technical schemes is comprehensively evaluated using Visekriterjumska Optimizacija Ikompromisno Resenje (VIKOR) and Fuzzy Comprehensive Evaluation Method.</p><!--/ Abstract__block --><h3>Findings</h3><p> (1) The technical suitability of prefabricated buildings is influenced by 7 core factors, such as adaptability of resources and environment, project planning and design level, and economic benefit; (2) When selecting the appropriate technology for prefabricated buildings, economic suitability should be considered first, followed by regional suitability, and then technical characteristic; (3) The prefabricated building technology suitability evaluation model constructed in this paper has high feasibility in the technical suitability selection of the example project.</p><!--/ Abstract__block --><h3>Research limitations/implications</h3><p>The comprehensive evaluation model of prefabricated building technology suitability constructed in this paper provides technical selection support for the promotion and development of prefabricated buildings in different regions. In addition, the model can also be widely used in areas related to prefabricated building consulting and decision-making, and provides theoretical support for subsequent research.</p><!--/ Abstract__block --><h3>Practical implications</h3><p>This study provides a new decision support tool for prefabricated building technology suitability selection, which helps decision makers to make more rational technology choices.</p><!--/ Abstract__block --><h3>Social implications</h3><p>This study has a positive impact on the advancement of prefabricated building technology, the improvement of construction industry standards, and the promotion of sustainable development.</p><!--/ Abstract__block --><h3>Originality/value</h3><p>The contribution of this study is twofold: (1)
目的 我国幅员辽阔,各地区因地域差异和工程特点不同,因地制宜地选择预制装配式建筑技术是我国预制装配式建筑可持续发展的关键。本文旨在从适宜性理念的角度出发,建立预制装配式建筑技术适宜性评价体系,分析预制装配式建筑技术的选择路径,为选择和制定符合地区禀赋的预制装配式建筑技术方案提供参考。设计/方法/途径本文以相关文献、技术规范、标准为基础,构建了预制装配式建筑技术适宜性分析指标体系。通过语义聚类法,该指标体系包括 23 个指标、7 个维度和 3 个方面。然后,利用顺序关系法(G1)和连续有序加权平均法(COWA)确定各指标的综合权重。采用 Visekriterjumska Optimizacija Ikompromisno Resenje(VIKOR)和模糊综合评价法对技术方案的选择进行综合评价。研究结果(1)预制装配式建筑技术适用性受资源环境适应性、项目规划设计水平、经济效益等 7 个核心因素的影响;(2)在选择预制装配式建筑适用技术时,应首先考虑经济适用性,其次考虑区域适用性,再次考虑技术特点;(3)本文构建的预制装配式建筑技术适用性评价模型在实例项目的技术适用性选择中具有较高的可行性。研究局限性/意义本文构建的预制装配式建筑技术适宜性综合评价模型,为预制装配式建筑在不同地区的推广和发展提供了技术选择支持。实践意义本研究为预制装配式建筑技术适宜性选择提供了一种新的决策支持工具,有助于决策者做出更加合理的技术选择。社会意义本研究对预制装配式建筑技术的进步、建筑行业水平的提高、可持续发展的促进都具有积极的意义。原创性/价值本研究有两方面的贡献:(1)在理论上,本文为各省区政府培育示范城市、规划产业基地等提供了技术评价指标和指南;(2)在实践中,本文为各地区装配式建筑技术应用提供了项目层面的适宜技术体系解决方案。
{"title":"Research on technical suitability analysis and scheme selection of prefabricated buildings in China","authors":"Layin Wang, Rongfang Huang, Xiaoyu Li","doi":"10.1108/ecam-01-2024-0049","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0049","url":null,"abstract":"&lt;h3&gt;Purpose&lt;/h3&gt;\u0000&lt;p&gt;China is a large country with different regions due to regional differences and project characteristics, and the selection of prefabricated building technology according to local conditions is the key to its sustainable development in China. The purpose of this paper is to develop the suitability evaluation system of prefabricated building technology from the perspective of the suitability concept and to analyze the selection path of prefabricated building technology and to provide a reference for selecting and developing prefabricated building technology schemes that meet regional endowments.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Design/methodology/approach&lt;/h3&gt;\u0000&lt;p&gt;Based on relevant literature, technical specifications, and standards, this paper constructs an index system for analyzing the technical suitability of prefabricated buildings. It includes 23 indicators, 7 dimensions, and 3 aspects through the semantic clustering method. Following this, the comprehensive weight of each index is determined using the order relation method (G1) and the continuous ordered weighted averaging (COWA). The selection of technical schemes is comprehensively evaluated using Visekriterjumska Optimizacija Ikompromisno Resenje (VIKOR) and Fuzzy Comprehensive Evaluation Method.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Findings&lt;/h3&gt;\u0000&lt;p&gt; (1) The technical suitability of prefabricated buildings is influenced by 7 core factors, such as adaptability of resources and environment, project planning and design level, and economic benefit; (2) When selecting the appropriate technology for prefabricated buildings, economic suitability should be considered first, followed by regional suitability, and then technical characteristic; (3) The prefabricated building technology suitability evaluation model constructed in this paper has high feasibility in the technical suitability selection of the example project.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Research limitations/implications&lt;/h3&gt;\u0000&lt;p&gt;The comprehensive evaluation model of prefabricated building technology suitability constructed in this paper provides technical selection support for the promotion and development of prefabricated buildings in different regions. In addition, the model can also be widely used in areas related to prefabricated building consulting and decision-making, and provides theoretical support for subsequent research.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Practical implications&lt;/h3&gt;\u0000&lt;p&gt;This study provides a new decision support tool for prefabricated building technology suitability selection, which helps decision makers to make more rational technology choices.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Social implications&lt;/h3&gt;\u0000&lt;p&gt;This study has a positive impact on the advancement of prefabricated building technology, the improvement of construction industry standards, and the promotion of sustainable development.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Originality/value&lt;/h3&gt;\u0000&lt;p&gt;The contribution of this study is twofold: (1) ","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"30 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141513599","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Enhancing precision and efficiency in English bond brick masonry: novel unified templates approach 提高英式粘结砖砌体的精度和效率:新型统一模板法
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-06-19 DOI: 10.1108/ecam-01-2024-0044
Vikas Mehta, Mohindra Singh Thakur

Purpose

This study aims to enhance the precision and efficiency of English Bond brick masonry by developing three unified templates: Tc, T1, and T2. These templates are designed to address the complexities in the placement of bricks, particularly queen closers and brickbats, in English Bond patterns.

Design/methodology/approach

The research introduces a unique numbering system integrated within each template to facilitate accurate brick placement. Template Tc is designed explicitly for corner masonry, while T1 and T2 are developed for linear masonry along the X and Y directions, respectively. The approach standardizes the bricklaying process, ensuring proper alignment and bricks overlap.

Findings

Applying these templates significantly improves the efficiency and pace of English bond brick masonry. They simplify the construction process, reduce errors, and enhance the overall quality of masonry work. The study demonstrates that using these templates results in consistent and high-quality brickwork, surpassing traditional speed, efficiency, and accuracy methods.

Originality/value

This study contributes a novel, systematic approach to bricklaying in English Bond masonry. The introduction of unified templates aids in skill acquisition for professionals and learners, ensuring flawless execution of masonry projects. This innovative approach holds great value in modern construction practices, promoting standardization and excellence in masonry work.

目的 本研究旨在通过开发三种统一模板来提高英式粘结砖砌体的精度和效率:Tc、T1 和 T2。这些模板旨在解决英式邦德砖砌体图案中砖块(尤其是后收口砖和砖块)摆放的复杂性。模板 Tc 专为转角砌筑而设计,而 T1 和 T2 则分别为沿 X 和 Y 方向的线性砌筑而开发。这些模板的应用大大提高了英式粘结砖砌筑的效率和速度。它们简化了施工过程,减少了错误,并提高了砌筑工作的整体质量。研究表明,使用这些模板可以获得一致的高质量砖砌体,在速度、效率和准确性方面都超过了传统方法。统一模板的引入有助于专业人员和学习者掌握技能,确保完美无瑕地完成砌筑工程。这种创新方法在现代建筑实践中具有重要价值,可促进砌筑工作的标准化和卓越性。
{"title":"Enhancing precision and efficiency in English bond brick masonry: novel unified templates approach","authors":"Vikas Mehta, Mohindra Singh Thakur","doi":"10.1108/ecam-01-2024-0044","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0044","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study aims to enhance the precision and efficiency of English Bond brick masonry by developing three unified templates: Tc, T1, and T2. These templates are designed to address the complexities in the placement of bricks, particularly queen closers and brickbats, in English Bond patterns.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The research introduces a unique numbering system integrated within each template to facilitate accurate brick placement. Template Tc is designed explicitly for corner masonry, while T1 and T2 are developed for linear masonry along the X and Y directions, respectively. The approach standardizes the bricklaying process, ensuring proper alignment and bricks overlap.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Applying these templates significantly improves the efficiency and pace of English bond brick masonry. They simplify the construction process, reduce errors, and enhance the overall quality of masonry work. The study demonstrates that using these templates results in consistent and high-quality brickwork, surpassing traditional speed, efficiency, and accuracy methods.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study contributes a novel, systematic approach to bricklaying in English Bond masonry. The introduction of unified templates aids in skill acquisition for professionals and learners, ensuring flawless execution of masonry projects. This innovative approach holds great value in modern construction practices, promoting standardization and excellence in masonry work.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"139 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502955","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A green project scheduling with material ordering problem considering cost constraints and quality of materials 考虑成本约束和材料质量的绿色项目材料订购调度问题
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-06-18 DOI: 10.1108/ecam-01-2024-0004
Omid Kebriyaii, Ali Heidari, Mohammad Khalilzadeh, Dragan Pamucar

Purpose

Integrating project scheduling and material ordering problems is vital in realistically estimating project cost and duration. Also, the quality level of materials is important as one of the key project success factors.

Design/methodology/approach

In this paper, a three-objective mathematical model is presented for green project scheduling with materials ordering problems considering rental resources. The first objective is to minimize the total cost of the project site and logistics. The second objective is to minimize the environmental impacts of producing materials and the third objective is to maximize the total quality of materials. Since costs trigger several challenges in projects, cost constraints are considered in this model for the first time and also the cost of delay in supplying of materials by the suppliers has been deducted from the project costs. Subsequently, the model was implemented in a real case and solved by the Lagrangian Relaxation algorithm as an exact method on GAMS software for model validation.

Findings

Based on sensitivity analysis of some parameters, the findings indicate that the cost constraint and lead time have considerable effects on the project duration. Also, integrating project scheduling and material ordering improves the robustness of the project schedule.

Originality/value

The primary contributions of the present research can be stated as follows: considering the cost constraints in the project scheduling with material ordering problem, incorporating the rental resources and taking the quality levels of materials as well as the environmental impacts into account.

目的将项目调度与材料订购问题结合起来,对于实际估算项目成本和工期至关重要。此外,材料的质量水平作为项目成功的关键因素之一也非常重要。设计/方法/途径本文提出了一个考虑到租赁资源的绿色项目调度与材料订购问题的三目标数学模型。第一个目标是最大限度地降低项目场地和物流的总成本。第二个目标是使材料生产对环境的影响最小,第三个目标是使材料的总质量最大化。由于成本会给项目带来诸多挑战,因此该模型首次考虑了成本约束,同时还从项目成本中扣除了供应商延迟供应材料的成本。随后,在实际案例中实施了该模型,并通过拉格朗日松弛算法作为一种精确方法在 GAMS 软件上进行求解,以验证模型的有效性。原创性/价值本研究的主要贡献如下:在项目进度安排与材料订购问题中考虑成本约束,纳入租赁资源,考虑材料质量水平以及环境影响。
{"title":"A green project scheduling with material ordering problem considering cost constraints and quality of materials","authors":"Omid Kebriyaii, Ali Heidari, Mohammad Khalilzadeh, Dragan Pamucar","doi":"10.1108/ecam-01-2024-0004","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0004","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Integrating project scheduling and material ordering problems is vital in realistically estimating project cost and duration. Also, the quality level of materials is important as one of the key project success factors.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>In this paper, a three-objective mathematical model is presented for green project scheduling with materials ordering problems considering rental resources. The first objective is to minimize the total cost of the project site and logistics. The second objective is to minimize the environmental impacts of producing materials and the third objective is to maximize the total quality of materials. Since costs trigger several challenges in projects, cost constraints are considered in this model for the first time and also the cost of delay in supplying of materials by the suppliers has been deducted from the project costs. Subsequently, the model was implemented in a real case and solved by the Lagrangian Relaxation algorithm as an exact method on GAMS software for model validation.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Based on sensitivity analysis of some parameters, the findings indicate that the cost constraint and lead time have considerable effects on the project duration. Also, integrating project scheduling and material ordering improves the robustness of the project schedule.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The primary contributions of the present research can be stated as follows: considering the cost constraints in the project scheduling with material ordering problem, incorporating the rental resources and taking the quality levels of materials as well as the environmental impacts into account.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"21 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502892","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Schedule-cost optimization in high-rise buildings considering uncertainty 考虑不确定性的高层建筑进度成本优化
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-06-18 DOI: 10.1108/ecam-12-2023-1217
Jinting Huang, Ankang Ji, Zhonghua Xiao, Limao Zhang

Purpose

The paper aims to develop a useful tool that can reliably and accurately find the critical paths of high-rise buildings and provide optimal solutions considering the uncertainty based on Monte Carlo simulation (MCS) to enhance project implementation performance by assisting site workers and project managers in high-rise building engineering.

Design/methodology/approach

This research proposes an approach integrating the improved nondominated sorting genetic algorithm II (NSGA-II) considering uncertainty and delay scenarios simulated by MCS with the technique for order preference by similarity to an ideal solution.

Findings

The results demonstrate that the proposed approach is capable of generating optimal solutions, which can improve the construction performance of high-rise buildings and guide the implementation management for shortening building engineering project schedule and cost under the delay conditions.

Research limitations/implications

In this study, only the construction data of the two floors was focused due to the project at the construction stage, and future work can analyze the whole construction stage of the high-rise building to examine the performance of the approach, and the multi-objective optimization (MOO) only considered two factors as objectives, where more objectives, such as schedule, cost and quality, can be expanded in future.

Practical implications

The approach proposed in this research can be successfully applied to the construction process of high-rise buildings, which can be a guidance basis for optimizing the performance of high-rise building construction.

Originality/value

The innovations and advantages derived from the proposed approach underline its capability to handle project construction scheduling optimization (CSO) problems with different performance objectives under uncertainty and delay conditions.

目的 本文旨在基于蒙特卡罗模拟(Monte Carlo simulation,MCS)开发一种有用的工具,能够可靠、准确地找到高层建筑的关键路径,并在考虑不确定性的基础上提供最优解决方案,以帮助高层建筑工程中的现场工人和项目经理提高项目实施绩效。研究结果研究结果表明,所提出的方法能够生成最优解,从而提高高层建筑的施工性能,并指导实施管理部门在延迟条件下缩短建筑工程项目的进度和成本。研究局限性/启示本研究由于项目处于施工阶段,只关注了两层楼的施工数据,今后的工作可以对高层建筑的整个施工阶段进行分析,以检验该方法的性能,而且多目标优化(MOO)只考虑了两个因素作为目标,今后可以扩展更多目标,如进度、成本和质量。实用意义本研究提出的方法可成功应用于高层建筑的施工过程,可作为优化高层建筑施工性能的指导依据。原创性/价值本研究提出的方法所具有的创新性和优势凸显了其在不确定性和延迟条件下处理具有不同性能目标的项目施工进度优化(CSO)问题的能力。
{"title":"Schedule-cost optimization in high-rise buildings considering uncertainty","authors":"Jinting Huang, Ankang Ji, Zhonghua Xiao, Limao Zhang","doi":"10.1108/ecam-12-2023-1217","DOIUrl":"https://doi.org/10.1108/ecam-12-2023-1217","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The paper aims to develop a useful tool that can reliably and accurately find the critical paths of high-rise buildings and provide optimal solutions considering the uncertainty based on Monte Carlo simulation (MCS) to enhance project implementation performance by assisting site workers and project managers in high-rise building engineering.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This research proposes an approach integrating the improved nondominated sorting genetic algorithm II (NSGA-II) considering uncertainty and delay scenarios simulated by MCS with the technique for order preference by similarity to an ideal solution.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results demonstrate that the proposed approach is capable of generating optimal solutions, which can improve the construction performance of high-rise buildings and guide the implementation management for shortening building engineering project schedule and cost under the delay conditions.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>In this study, only the construction data of the two floors was focused due to the project at the construction stage, and future work can analyze the whole construction stage of the high-rise building to examine the performance of the approach, and the multi-objective optimization (MOO) only considered two factors as objectives, where more objectives, such as schedule, cost and quality, can be expanded in future.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>The approach proposed in this research can be successfully applied to the construction process of high-rise buildings, which can be a guidance basis for optimizing the performance of high-rise building construction.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The innovations and advantages derived from the proposed approach underline its capability to handle project construction scheduling optimization (CSO) problems with different performance objectives under uncertainty and delay conditions.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"20 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502956","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Knowledge fusion-driven sustainable decision-making for mega transportation infrastructure projects 超大型交通基础设施项目的知识融合驱动可持续决策
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-06-14 DOI: 10.1108/ecam-08-2023-0817
Long Li, Haiying Luan, Mengqi Yuan, Ruiyan Zheng

Purpose

As the scale of mega transportation infrastructure projects (MTIs) continues to expand, the complexity of engineering construction sharply increases and decision-making sustainability faces severe challenges. Decision-making for mega transportation infrastructure projects unveils the knowledge-intensive characteristic, requiring collaborative decisions by cross-domain decision-makers. However, the exploration of heterogeneous knowledge fusion-driven decision-making problems is limited. This study aims to improve the deficiencies of existing decision-making by constructing a knowledge fusion-driven multi-attribute group decision model under fuzzy context to improve the sustainability of MTIs decision-making.

Design/methodology/approach

This study utilizes intuitionistic fuzzy information to handle uncertain information; calculates decision-makers and indicators weights by hesitation, fuzziness and intuitionistic fuzzy entropy; applies the intuitionistic fuzzy weighted averaging (IFWA) operator to fuse knowledge and uses consensus to measure the level of knowledge fusion. Finally, a calculation example is given to verify the rationality and effectiveness of the model.

Findings

This research finally constructs a two-level decision model driven by knowledge fusion, which alleviates the uncertainty and fuzziness of decision knowledge, promotes knowledge fusion among cross-domain decision-makers and can be effectively applied in practical applications.

Originality/value

This study provides an effective decision-making model for mega transportation infrastructure projects and guides policymakers.

目的 随着超大型交通基础设施项目(MTI)规模的不断扩大,工程建设的复杂性急剧增加,决策的可持续性面临严峻挑战。超大型交通基础设施项目的决策具有知识密集型的特点,需要跨领域的决策者协同决策。然而,对异构知识融合驱动决策问题的探索还很有限。本研究旨在通过构建模糊情境下知识融合驱动的多属性群体决策模型,改善现有决策的不足,以提高 MTIs 决策的可持续性。设计/方法/途径 本研究利用直觉模糊信息处理不确定信息;通过犹豫不决、模糊性和直觉模糊熵计算决策者和指标权重;应用直觉模糊加权平均(IFWA)算子融合知识,并用共识衡量知识融合水平。研究结果本研究最终构建了知识融合驱动的两级决策模型,缓解了决策知识的不确定性和模糊性,促进了跨领域决策者之间的知识融合,并能有效地应用于实际应用中。
{"title":"Knowledge fusion-driven sustainable decision-making for mega transportation infrastructure projects","authors":"Long Li, Haiying Luan, Mengqi Yuan, Ruiyan Zheng","doi":"10.1108/ecam-08-2023-0817","DOIUrl":"https://doi.org/10.1108/ecam-08-2023-0817","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>As the scale of mega transportation infrastructure projects (MTIs) continues to expand, the complexity of engineering construction sharply increases and decision-making sustainability faces severe challenges. Decision-making for mega transportation infrastructure projects unveils the knowledge-intensive characteristic, requiring collaborative decisions by cross-domain decision-makers. However, the exploration of heterogeneous knowledge fusion-driven decision-making problems is limited. This study aims to improve the deficiencies of existing decision-making by constructing a knowledge fusion-driven multi-attribute group decision model under fuzzy context to improve the sustainability of MTIs decision-making.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This study utilizes intuitionistic fuzzy information to handle uncertain information; calculates decision-makers and indicators weights by hesitation, fuzziness and intuitionistic fuzzy entropy; applies the intuitionistic fuzzy weighted averaging (IFWA) operator to fuse knowledge and uses consensus to measure the level of knowledge fusion. Finally, a calculation example is given to verify the rationality and effectiveness of the model.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>This research finally constructs a two-level decision model driven by knowledge fusion, which alleviates the uncertainty and fuzziness of decision knowledge, promotes knowledge fusion among cross-domain decision-makers and can be effectively applied in practical applications.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study provides an effective decision-making model for mega transportation infrastructure projects and guides policymakers.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"7 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141513600","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Engineering, Construction and Architectural Management
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1