首页 > 最新文献

Engineering, Construction and Architectural Management最新文献

英文 中文
Navigating compliance complexity: insights from the MOA framework in international construction 驾驭合规的复杂性:MOA 框架对国际建筑业的启示
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-15 DOI: 10.1108/ecam-02-2024-0163
Li Feng, Junying Liu, Zhixiu Wang, Yanyan Hong
<h3>Purpose</h3><p>The regulatory landscape surrounding international construction projects presents significant challenges, and contractors are still struggling to pay a painful price for their performance in the project. While existing research has identified various causes of contractor compliance, the intricate interplay of these factors and their impact on compliance remain largely elusive. The motivation-opportunity-ability (MOA) framework may hold the key to determining what factors can foster induced contractor compliance in international projects.</p><!--/ Abstract__block --><h3>Design/methodology/approach</h3><p>This study collected 124 valid data samples from practitioners involved in large-scale international contracting projects through expert interviews and questionnaire surveys. Fuzzy-set qualitative comparative analysis (fsQCA) was employed to analyze the diverse combinations of contractor compliance factors.</p><!--/ Abstract__block --><h3>Findings</h3><p>The study identifies seven key factors that contribute to compliance behavior among international construction contractors: economic motivation, social motivation, normative motivation, legal completeness, deterrent sanctions, organizational learning and compliance management ability. The interplay of these factors promotes compliance in the following ways: When international construction contractors are influenced by both social and normative motivations, they exhibit a higher level of compliance. In situations where regulatory systems are relatively weak, the ability to manage compliance becomes the primary driver of compliance behavior for businesses. A comprehensive legal framework creates a conducive environment for contractors to improve their compliance through organizational learning.</p><!--/ Abstract__block --><h3>Research limitations/implications</h3><p>The findings offer guidance for international construction contractors in enhancing compliance by considering factors such as motivations, legal frameworks, organizational learning and compliance management. This can lead to improved risk management and performance in international projects.</p><!--/ Abstract__block --><h3>Social implications</h3><p>This research enhances fair and ethical practices in international construction by identifying compliance drivers, fostering positive social impact, mitigating negative consequences and empowering local communities. It informs legal and regulatory reform, encourages improved business practices and contributes to knowledge advancement in the field. Overall, the findings have the potential to positively impact the social fabric of international construction projects.</p><!--/ Abstract__block --><h3>Originality/value</h3><p>This study has made an important contribution to the field of compliance theory by integrating theories from multiple disciplinary domains and constructing a new theoretical framework from the perspectives of motivation, opportunity and capabilit
目的围绕国际建筑项目的监管环境带来了巨大挑战,承包商仍在努力为其在项目中的表现付出惨痛代价。虽然现有的研究已经发现了承包商合规的各种原因,但这些因素之间错综复杂的相互作用及其对合规的影响在很大程度上仍然难以捉摸。本研究通过专家访谈和问卷调查,从参与大型国际承包项目的从业人员中收集了 124 份有效数据样本。研究发现了促进国际建筑承包商合规行为的七个关键因素:经济动机、社会动机、规范动机、法律完备性、威慑性制裁、组织学习和合规管理能力。这些因素的相互作用通过以下方式促进合规:当国际建筑承包商同时受到社会和规范动机的影响时,他们会表现出更高的合规水平。在监管体系相对薄弱的情况下,合规管理能力成为企业合规行为的主要驱动力。全面的法律框架为承包商通过组织学习提高合规性创造了有利环境。研究局限/意义研究结果为国际建筑承包商通过考虑动机、法律框架、组织学习和合规管理等因素提高合规性提供了指导。社会影响这项研究通过确定合规驱动因素、促进积极的社会影响、减轻负面影响和增强当地社区的能力,加强了国际建筑业的公平和道德实践。它为法律和监管改革提供了信息,鼓励改进商业实践,并促进了该领域的知识进步。总体而言,研究结果有可能对国际建筑项目的社会结构产生积极影响。原创性/价值本研究通过整合多个学科领域的理论,从动机、机会和能力的角度构建了一个新的理论框架,为合规理论领域做出了重要贡献。通过阐明这些因素如何相互作用并影响国际建筑承包商的合规行为,本研究有助于理解承包商合规行为的复杂动态,并为建筑行业的合规治理提供理论参考。
{"title":"Navigating compliance complexity: insights from the MOA framework in international construction","authors":"Li Feng, Junying Liu, Zhixiu Wang, Yanyan Hong","doi":"10.1108/ecam-02-2024-0163","DOIUrl":"https://doi.org/10.1108/ecam-02-2024-0163","url":null,"abstract":"&lt;h3&gt;Purpose&lt;/h3&gt;\u0000&lt;p&gt;The regulatory landscape surrounding international construction projects presents significant challenges, and contractors are still struggling to pay a painful price for their performance in the project. While existing research has identified various causes of contractor compliance, the intricate interplay of these factors and their impact on compliance remain largely elusive. The motivation-opportunity-ability (MOA) framework may hold the key to determining what factors can foster induced contractor compliance in international projects.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Design/methodology/approach&lt;/h3&gt;\u0000&lt;p&gt;This study collected 124 valid data samples from practitioners involved in large-scale international contracting projects through expert interviews and questionnaire surveys. Fuzzy-set qualitative comparative analysis (fsQCA) was employed to analyze the diverse combinations of contractor compliance factors.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Findings&lt;/h3&gt;\u0000&lt;p&gt;The study identifies seven key factors that contribute to compliance behavior among international construction contractors: economic motivation, social motivation, normative motivation, legal completeness, deterrent sanctions, organizational learning and compliance management ability. The interplay of these factors promotes compliance in the following ways: When international construction contractors are influenced by both social and normative motivations, they exhibit a higher level of compliance. In situations where regulatory systems are relatively weak, the ability to manage compliance becomes the primary driver of compliance behavior for businesses. A comprehensive legal framework creates a conducive environment for contractors to improve their compliance through organizational learning.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Research limitations/implications&lt;/h3&gt;\u0000&lt;p&gt;The findings offer guidance for international construction contractors in enhancing compliance by considering factors such as motivations, legal frameworks, organizational learning and compliance management. This can lead to improved risk management and performance in international projects.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Social implications&lt;/h3&gt;\u0000&lt;p&gt;This research enhances fair and ethical practices in international construction by identifying compliance drivers, fostering positive social impact, mitigating negative consequences and empowering local communities. It informs legal and regulatory reform, encourages improved business practices and contributes to knowledge advancement in the field. Overall, the findings have the potential to positively impact the social fabric of international construction projects.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Originality/value&lt;/h3&gt;\u0000&lt;p&gt;This study has made an important contribution to the field of compliance theory by integrating theories from multiple disciplinary domains and constructing a new theoretical framework from the perspectives of motivation, opportunity and capabilit","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"32 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141610426","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Investigation of factors affecting the readiness for the adoption of sustainable building materials 调查影响采用可持续建筑材料意愿的因素
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-12 DOI: 10.1108/ecam-12-2023-1268
Minh Van Nguyen, Khanh Duy Ha

Purpose

Adopting sustainable building materials (SBMs) is one way to reduce the negative environmental impacts of the built environment. However, the adoption of SBMs is not as high as expected. This study aims to investigate which factors affect the adoption of SBMs.

Design/methodology/approach

A literature review and discussions with professional practitioners formed an initial list of variables affecting readiness to adopt SBMs. A questionnaire survey was designed, and data from industrial practitioners were collected using the snowball sampling method. The data collected from 218 respondents were analyzed using the PLS-SEM technique.

Findings

The findings show that SBM adoption is critically influenced by readiness at different levels (market, organization, and employee). Specifically, market readiness enhances organization preparedness (beta = 0.628), and organization readiness positively affects employee readiness (beta = 0.510). Market, organization, and employee readiness positively impact the adoption of SBMs (beta = 0.386, 0.364, and 0.158, respectively). Moreover, the relationship between market and employee readiness is fully mediated by organization readiness (indirect effect = 0.320; p = 0.000). Organization readiness positively mediates the relationship between market readiness and SBM adoption (indirect effect = 0.050; p = 0.001). The relationship between organization readiness and SBM adoption is fully mediated by employee readiness (indirect effect = 0.229; p = 0.000). Additionally, employee readiness positively mediates the relationship between market readiness and SBM adoption through organization readiness (indirect effect = 0.080; p = 0.000).

Originality/value

While past studies have predominantly focused on human perception, this study recognizes the importance of contextual factors like market conditions, Organization readiness, and employee readiness in shaping the adoption of SBMs. Thus, it fills a notable void in the literature and highlights the need for a broader theoretical framework that incorporates both individual perceptions and external contextual influences.

目的 采用可持续建筑材料(SBM)是减少建筑环境对环境负面影响的一种方法。然而,可持续建筑材料的采用率并没有预期的那么高。本研究旨在调查哪些因素会影响可持续建筑材料的采用。通过文献综述以及与专业从业人员的讨论,初步列出了影响可持续建筑材料采用意愿的变量。我们设计了一份问卷调查,并采用滚雪球抽样法从行业从业人员中收集数据。调查结果表明,SBM 的采用受到不同层面(市场、组织和员工)准备程度的重要影响。具体来说,市场准备度会增强组织准备度(贝塔=0.628),组织准备度会积极影响员工准备度(贝塔=0.510)。市场、组织和员工的准备程度对采用 SBM 有积极影响(贝塔值分别为 0.386、0.364 和 0.158)。此外,市场和员工准备度之间的关系完全由组织准备度中介(间接效应 = 0.320; p = 0.000)。组织准备度对市场准备度和采用 SBM 之间的关系起着积极的中介作用(间接效应 = 0.050;p = 0.001)。组织准备度与采用 SBM 之间的关系完全由员工准备度中介(间接效应 = 0.229;p = 0.000)。此外,员工准备度通过组织准备度(间接效应 = 0.080; p = 0.000)对市场准备度和采用 SBM 之间的关系起到了积极的中介作用。原创性/价值虽然过去的研究主要关注人的感知,但本研究认识到了市场条件、组织准备度和员工准备度等环境因素在影响采用 SBM 方面的重要性。因此,本研究填补了文献中的一个显著空白,并强调需要一个更广泛的理论框架,将个人感知和外部环境影响因素结合起来。
{"title":"Investigation of factors affecting the readiness for the adoption of sustainable building materials","authors":"Minh Van Nguyen, Khanh Duy Ha","doi":"10.1108/ecam-12-2023-1268","DOIUrl":"https://doi.org/10.1108/ecam-12-2023-1268","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Adopting sustainable building materials (SBMs) is one way to reduce the negative environmental impacts of the built environment. However, the adoption of SBMs is not as high as expected. This study aims to investigate which factors affect the adoption of SBMs.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A literature review and discussions with professional practitioners formed an initial list of variables affecting readiness to adopt SBMs. A questionnaire survey was designed, and data from industrial practitioners were collected using the snowball sampling method. The data collected from 218 respondents were analyzed using the PLS-SEM technique.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The findings show that SBM adoption is critically influenced by readiness at different levels (market, organization, and employee). Specifically, market readiness enhances organization preparedness (beta = 0.628), and organization readiness positively affects employee readiness (beta = 0.510). Market, organization, and employee readiness positively impact the adoption of SBMs (beta = 0.386, 0.364, and 0.158, respectively). Moreover, the relationship between market and employee readiness is fully mediated by organization readiness (indirect effect = 0.320; <em>p</em> = 0.000). Organization readiness positively mediates the relationship between market readiness and SBM adoption (indirect effect = 0.050; <em>p</em> = 0.001). The relationship between organization readiness and SBM adoption is fully mediated by employee readiness (indirect effect = 0.229; <em>p</em> = 0.000). Additionally, employee readiness positively mediates the relationship between market readiness and SBM adoption through organization readiness (indirect effect = 0.080; <em>p</em> = 0.000).</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>While past studies have predominantly focused on human perception, this study recognizes the importance of contextual factors like market conditions, Organization readiness, and employee readiness in shaping the adoption of SBMs. Thus, it fills a notable void in the literature and highlights the need for a broader theoretical framework that incorporates both individual perceptions and external contextual influences.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"4 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141586714","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A life cycle assessment – based case study analysis of the sustainability of “vernacular” versus contemporary construction techniques 以生命周期评估为基础,对 "乡土 "与现代建筑技术的可持续性进行案例研究分析
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-11 DOI: 10.1108/ecam-12-2023-1255
Ann Francis, Vandana Padmanabhan, Albert Thomas
<h3>Purpose</h3><p>Contemporary construction techniques provide benefits of speed and cost savings on a large scale, and is viable in urban regions with exorbitant housing demand. In rural areas, where scale and access to technology are unavailable, locally prevalent vernacular architecture and methods are more suitable. Although vernacular construction techniques have historically proven more sustainable and climate-sensitive, the lack of skilled labour and lack of versatility in material selection limits its application on large-scale projects. This study explores the choice of building design and technology, from the context of embodied energy, carbon and other life cycle impacts for housing construction.</p><!--/ Abstract__block --><h3>Design/methodology/approach</h3><p>Life cycle assessment (LCA) that evaluates impacts due to the products/processes is used to analyse different construction techniques. Further a detailed estimation of embodied carbon and embodied energy is done for both “vernacular” and “contemporary” choices of construction methodology for a case study project.</p><!--/ Abstract__block --><h3>Findings</h3><p>The building constructed using vernacular techniques has lower embodied carbon and energy by over 30% compared to the other clusters designed using contemporary confined masonry techniques. However, with a few external interventions the contemporary methods can be implemented with improved sustainability.</p><!--/ Abstract__block --><h3>Research limitations/implications</h3><p>The limitation of the study is that it presents a case study-based exploration into comparing construction techniques to provide a practical understanding of making sustainable design choices and, hence, is limited to two construction methods. However, the same method could be extended to compare other construction techniques. Furthermore, it does not present a whole building LCA since the operating phase impacts are assumed to be fairly constant for such housing type, irrespective of the chosen method. Similarly, the demolition phase or the potential of reuse of the waste generated, water consumption and cultural and social heritage are not investigated in comparing the alternatives. Nevertheless, future studies could perform extensive exploratory and modelling studies on the operation phase and demolition phase to understand these impacts further.</p><!--/ Abstract__block --><h3>Practical implications</h3><p>In mass housing projects that belong to the so-called “affordable housing” or low-income housing category, sustainability concerns are not yet at the forefront of the decision-making process. Therefore, this study emphasizes the importance of incorporating sustainability into building design and construction and making sustainability accessible to even low-income communities. Adequate planning, social awareness initiatives and imparting skills and knowledge of sustainability to these communities are of utmost importance. The choice o
目的当代建筑技术具有速度快、成本低、规模大等优点,在住房需求量巨大的城市地区是可行的。而在农村地区,由于缺乏规模和技术,当地流行的乡土建筑和方法更为适用。尽管乡土建筑技术历来被证明更具可持续性和气候敏感性,但由于缺乏熟练劳动力和材料选择的多样性,其在大型项目中的应用受到限制。本研究从房屋建筑的内含能源、碳和其他生命周期影响的角度,探讨了建筑设计和技术的选择。此外,还对一个案例研究项目中 "乡土 "和 "现代 "建筑方法的内含碳和内含能进行了详细估算。研究结果采用乡土技术建造的建筑与采用现代密闭砌体技术设计的其他建筑群相比,内含碳和内含能降低了 30% 以上。研究的局限性/意义这项研究的局限性在于,它以案例研究为基础,探讨了建筑技术的比较,以提供对可持续设计选择的实际理解,因此仅限于两种建筑方法。不过,同样的方法也可以扩展到其他建筑技术的比较。此外,该研究并没有提出整栋建筑的生命周期评估,因为无论选择哪种方法,运营阶段对此类房屋类型的影响都被假定为相当稳定。同样,在比较替代方案时,也没有对拆除阶段或所产生废物的再利用潜力、耗水量以及文化和社会遗产进行调查。然而,未来的研究可以对运营阶段和拆除阶段进行广泛的探索和建模研究,以进一步了解这些影响。 实际意义在属于所谓 "经济适用房 "或低收入住房类别的大众住房项目中,可持续性问题尚未成为决策过程中的首要考虑因素。因此,本研究强调了将可持续性纳入建筑设计和施工的重要性,并使低收入社区也能获得可持续性。充分的规划、社会意识倡议以及向这些社区传授可持续发展的技能和知识至关重要。社会影响这项研究的主要影响是,与传统的 RCC 框架结构建筑以及密闭砖石结构等现代建筑方法相比,乡土技术在可持续性方面要优越得多。然而,这些技术的实施也带来了巨大的挑战,如缺乏熟练的劳动力、维护成本增加以及缺乏对细微改动的灵活性。因此,尽管这是一种可持续发展的选择,但其接受和实施都存在实际困难。因此,本研究的主要目的是加强人们对乡土建筑和技术的信念,以建设可持续发展和具有抗灾能力的社区,同时强调现代社会在实施这些技术时所面临的挑战。然而,本研究强调了在选择城市和半城市地区住房建造方法时考虑可持续性方面的重要性。本研究还指出,在为低收入社区选择住房技术时,不应忽视乡土建筑技术。
{"title":"A life cycle assessment – based case study analysis of the sustainability of “vernacular” versus contemporary construction techniques","authors":"Ann Francis, Vandana Padmanabhan, Albert Thomas","doi":"10.1108/ecam-12-2023-1255","DOIUrl":"https://doi.org/10.1108/ecam-12-2023-1255","url":null,"abstract":"&lt;h3&gt;Purpose&lt;/h3&gt;\u0000&lt;p&gt;Contemporary construction techniques provide benefits of speed and cost savings on a large scale, and is viable in urban regions with exorbitant housing demand. In rural areas, where scale and access to technology are unavailable, locally prevalent vernacular architecture and methods are more suitable. Although vernacular construction techniques have historically proven more sustainable and climate-sensitive, the lack of skilled labour and lack of versatility in material selection limits its application on large-scale projects. This study explores the choice of building design and technology, from the context of embodied energy, carbon and other life cycle impacts for housing construction.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Design/methodology/approach&lt;/h3&gt;\u0000&lt;p&gt;Life cycle assessment (LCA) that evaluates impacts due to the products/processes is used to analyse different construction techniques. Further a detailed estimation of embodied carbon and embodied energy is done for both “vernacular” and “contemporary” choices of construction methodology for a case study project.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Findings&lt;/h3&gt;\u0000&lt;p&gt;The building constructed using vernacular techniques has lower embodied carbon and energy by over 30% compared to the other clusters designed using contemporary confined masonry techniques. However, with a few external interventions the contemporary methods can be implemented with improved sustainability.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Research limitations/implications&lt;/h3&gt;\u0000&lt;p&gt;The limitation of the study is that it presents a case study-based exploration into comparing construction techniques to provide a practical understanding of making sustainable design choices and, hence, is limited to two construction methods. However, the same method could be extended to compare other construction techniques. Furthermore, it does not present a whole building LCA since the operating phase impacts are assumed to be fairly constant for such housing type, irrespective of the chosen method. Similarly, the demolition phase or the potential of reuse of the waste generated, water consumption and cultural and social heritage are not investigated in comparing the alternatives. Nevertheless, future studies could perform extensive exploratory and modelling studies on the operation phase and demolition phase to understand these impacts further.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Practical implications&lt;/h3&gt;\u0000&lt;p&gt;In mass housing projects that belong to the so-called “affordable housing” or low-income housing category, sustainability concerns are not yet at the forefront of the decision-making process. Therefore, this study emphasizes the importance of incorporating sustainability into building design and construction and making sustainability accessible to even low-income communities. Adequate planning, social awareness initiatives and imparting skills and knowledge of sustainability to these communities are of utmost importance. The choice o","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"382 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141586715","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: mediating role of project control 马来西亚建筑业建筑信息模型(BIM)的实施与建筑项目的成功:项目控制的中介作用
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-10 DOI: 10.1108/ecam-08-2023-0794
Ahsan Waqar, Idris Bin Othman, Muhammad Shoaib Mansoor

Purpose

The primary objective of this study is to analyze the correlation between the application of building information modeling (BIM), the construction project success (CPS) and project control. Additionally, this research aims to explore the potential mediating effect of project control on the link between BIM and construction project success in the Malaysian construction industry.

Design/methodology/approach

The present study employs a quantitative research methodology and adheres to a positivist research philosophy in order to examine the influence of BIM implementation on the CPS and project control within the Malaysian construction sector. The data were collected by structured questionnaire survey from 200 respondents using a purposive sampling strategy, and the results were analyzed by using partial least square (PLS)-structural equation modeling (SEM). The study's findings are all the more noteworthy since, despite the small sample size, 218 persons genuinely participated thanks to the purposive sampling approach.

Findings

The findings of this study indicate that there are notable and positive associations between various variables related to the implementation of BIM. These variables include accurate quantities and estimations, risk management, facility management integration, optimized resource allocation and real-time monitoring. Furthermore, these relationships are observed to have a significant impact on both CPS and project control. The study revealed that project control serves as a mediator in the relationship between the deployment of BIM and the CPS in the Malaysian construction sector, with the exception of its influence on risk management.

Originality/value

The originality of this research consists in examining the mediating function of project control in the relationship between BIM implementation and CPS. This study contributes to the existing knowledge by enhancing our understanding of the processes via which BIM positively influences project outcomes.

目的本研究的主要目的是分析建筑信息模型(BIM)的应用、建筑项目成功(CPS)和项目控制之间的相关性。本研究采用定量研究方法,秉承实证主义研究理念,旨在研究 BIM 的实施对马来西亚建筑行业 CPS 和项目控制的影响。采用目的性抽样策略,通过对 200 名受访者进行结构化问卷调查来收集数据,并使用偏最小二乘法(PLS)-结构方程模型(SEM)对结果进行分析。尽管样本量较小,但由于采用了有目的的抽样方法,218 人真正参与了调查,因此研究结果更值得注意。研究结果本研究结果表明,与实施 BIM 相关的各种变量之间存在显著的正相关关系。这些变量包括准确的数量和估算、风险管理、设施管理整合、优化资源分配和实时监控。此外,还观察到这些关系对 CPS 和项目控制都有重大影响。研究表明,在马来西亚建筑行业,项目控制是 BIM 部署与 CPS 之间关系的中介,但其对风险管理的影响除外。本研究通过加强我们对 BIM 积极影响项目成果的过程的理解,为现有知识做出了贡献。
{"title":"Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: mediating role of project control","authors":"Ahsan Waqar, Idris Bin Othman, Muhammad Shoaib Mansoor","doi":"10.1108/ecam-08-2023-0794","DOIUrl":"https://doi.org/10.1108/ecam-08-2023-0794","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The primary objective of this study is to analyze the correlation between the application of building information modeling (BIM), the construction project success (CPS) and project control. Additionally, this research aims to explore the potential mediating effect of project control on the link between BIM and construction project success in the Malaysian construction industry.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The present study employs a quantitative research methodology and adheres to a positivist research philosophy in order to examine the influence of BIM implementation on the CPS and project control within the Malaysian construction sector. The data were collected by structured questionnaire survey from 200 respondents using a purposive sampling strategy, and the results were analyzed by using partial least square (PLS)-structural equation modeling (SEM). The study's findings are all the more noteworthy since, despite the small sample size, 218 persons genuinely participated thanks to the purposive sampling approach.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The findings of this study indicate that there are notable and positive associations between various variables related to the implementation of BIM. These variables include accurate quantities and estimations, risk management, facility management integration, optimized resource allocation and real-time monitoring. Furthermore, these relationships are observed to have a significant impact on both CPS and project control. The study revealed that project control serves as a mediator in the relationship between the deployment of BIM and the CPS in the Malaysian construction sector, with the exception of its influence on risk management.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The originality of this research consists in examining the mediating function of project control in the relationship between BIM implementation and CPS. This study contributes to the existing knowledge by enhancing our understanding of the processes via which BIM positively influences project outcomes.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"16 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141570241","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Enhancing decision-making in Australian concrete construction: a decision support model using an Entropy-TOPSIS approach 加强澳大利亚混凝土建筑的决策:使用 Entropy-TOPSIS 方法的决策支持模型
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-09 DOI: 10.1108/ecam-01-2024-0062
Marjan Pouraghajan, Sara Omrani, Robin Drogemuller

Purpose

This study addresses the global landscape of offsite construction, highlighting its variable adoption patterns and the challenge posed by the prevalent use of suboptimal decision-making methods. In response, the decision-making model seeks to equip decision-makers with tools for well-informed decisions on concrete construction systems, tailored to the unique characteristics of each project, in contrast to the persisting reliance on expert knowledge, checklists or similar tools.

Design/methodology/approach

The study extracts decision-making criteria through literature reviews, pilot studies and surveys amongst Australian construction professionals. A comprehensive comparison of four concrete systems against each identified criterion is conducted, followed by the application of an integrated decision model (Entropy-TOPSIS) to rank the systems, considering all criteria simultaneously. Real-world case studies validate the practical applicability of the model.

Findings

An analysis of 15 criteria demonstrated the multifaceted nature of selecting concrete construction systems, emphasising evolving industry priorities like time efficiency, environmental considerations and logistical constraints. The enduring appeal of in-situ concrete in complex projects underscores the significance of traditional methods. The integration of the Entropy-TOPSIS model proved to be a robust decision-making tool, enabling professionals to simultaneously consider all criteria and make well-informed, customised decisions.

Originality/value

The study’s originality lies in its comprehensive approach, considering diverse criteria and presenting a flexible decision-making model suitable for the dynamic demands of the construction industry.

目的 本研究探讨了全球非现场施工的情况,强调了其不同的采用模式以及普遍使用次优决策方法所带来的挑战。作为回应,该决策模型旨在为决策者提供有关混凝土施工系统的明智决策工具,根据每个项目的独特性量身定制,与持续依赖专家知识、核对表或类似工具形成鲜明对比。 设计/方法/途径 该研究通过文献综述、试点研究和对澳大利亚建筑专业人士的调查,提取决策标准。根据每个确定的标准对四种混凝土系统进行综合比较,然后应用综合决策模型(熵-TOPSIS)对系统进行排序,同时考虑所有标准。对 15 项标准的分析表明了选择混凝土施工系统的多面性,强调了不断变化的行业优先事项,如时间效率、环境因素和物流限制。现浇混凝土在复杂项目中的持久吸引力强调了传统方法的重要性。事实证明,Entropy-TOPSIS 模型的集成是一种强大的决策工具,它使专业人员能够同时考虑所有标准,并在充分知情的情况下做出量身定制的决策。 原创性/价值这项研究的原创性在于它采用了全面的方法,考虑了各种标准,并提出了一个灵活的决策模型,适合建筑行业的动态需求。
{"title":"Enhancing decision-making in Australian concrete construction: a decision support model using an Entropy-TOPSIS approach","authors":"Marjan Pouraghajan, Sara Omrani, Robin Drogemuller","doi":"10.1108/ecam-01-2024-0062","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0062","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study addresses the global landscape of offsite construction, highlighting its variable adoption patterns and the challenge posed by the prevalent use of suboptimal decision-making methods. In response, the decision-making model seeks to equip decision-makers with tools for well-informed decisions on concrete construction systems, tailored to the unique characteristics of each project, in contrast to the persisting reliance on expert knowledge, checklists or similar tools.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The study extracts decision-making criteria through literature reviews, pilot studies and surveys amongst Australian construction professionals. A comprehensive comparison of four concrete systems against each identified criterion is conducted, followed by the application of an integrated decision model (Entropy-TOPSIS) to rank the systems, considering all criteria simultaneously. Real-world case studies validate the practical applicability of the model.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>An analysis of 15 criteria demonstrated the multifaceted nature of selecting concrete construction systems, emphasising evolving industry priorities like time efficiency, environmental considerations and logistical constraints. The enduring appeal of in-situ concrete in complex projects underscores the significance of traditional methods. The integration of the Entropy-TOPSIS model proved to be a robust decision-making tool, enabling professionals to simultaneously consider all criteria and make well-informed, customised decisions.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The study’s originality lies in its comprehensive approach, considering diverse criteria and presenting a flexible decision-making model suitable for the dynamic demands of the construction industry.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"28 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141570293","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The construction-related project management evolution and its future research directions 与建筑相关的项目管理演变及其未来研究方向
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-09 DOI: 10.1108/ecam-05-2023-0426
Jeffrey S. Russell, Islam El-adaway, Ramy Khalef, Fareed Salih, Gasser Ali

Purpose

Project management (PM) involves planning, allocating, directing and controlling project resources within a set of predetermined objectives. The modern definition of PM has evolved and grown into a broader concept. This paper supports the notion that PM evolved into four distinct phases: PM 1.0 is primarily concerned with planning, PM 2.0 with collaboration, PM 3.0 with proactive adaptation and PM 4.0 with using innovative technologies. Research efforts tackled critical aspects of PM, but none of them provided a clear foundation for the full context of PM principles and how they complement one another. This study fills this knowledge gap by investigating the evolution of PM over time.

Design/methodology/approach

The authors collected a dataset of research papers between 1960 and 2022 and performed a bibliometric analysis on the collected dataset to isolate the main trends that define the evolution of PM phases.

Findings

Results show that all PM phases overlap in terms of overarching themes, concepts, principles and contributions. More importantly, PM 5.0 may be around the corner to facilitate effective and efficient handling of time, cost, scope and risks within the ever-growing complexity of project initiatives.

Originality/value

This paper provides a data-driven study for a holistic understanding of the key trends in PM and the associated expectations of future research directions. This will be of interest to stakeholders within the overall PM domain and multidisciplinary work related to the construction industry.

目的项目管理(PM)涉及在一系列预定目标范围内规划、分配、指导和控制项目资源。项目管理的现代定义已经演变并发展成为一个更广泛的概念。本文支持项目管理演变为四个不同阶段的观点:PM 1.0 主要涉及规划,PM 2.0 涉及协作,PM 3.0 涉及主动适应,PM 4.0 涉及使用创新技术。研究工作涉及 PM 的关键方面,但没有一项研究为 PM 原则的全部背景以及它们如何相互补充提供了明确的基础。作者收集了1960年至2022年期间的研究论文数据集,并对所收集的数据集进行了文献计量分析,以分离出界定可持续管理各阶段演变的主要趋势。更重要的是,项目管理 5.0 可能指日可待,以促进在日益复杂的项目计划中有效和高效地处理时间、成本、范围和风险。 原创性/价值 本文提供了一项数据驱动型研究,以全面了解项目管理的主要趋势以及对未来研究方向的相关预期。这对整个项目管理领域的利益相关者以及与建筑行业相关的多学科工作都有意义。
{"title":"The construction-related project management evolution and its future research directions","authors":"Jeffrey S. Russell, Islam El-adaway, Ramy Khalef, Fareed Salih, Gasser Ali","doi":"10.1108/ecam-05-2023-0426","DOIUrl":"https://doi.org/10.1108/ecam-05-2023-0426","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Project management (PM) involves planning, allocating, directing and controlling project resources within a set of predetermined objectives. The modern definition of PM has evolved and grown into a broader concept. This paper supports the notion that PM evolved into four distinct phases: PM 1.0 is primarily concerned with planning, PM 2.0 with collaboration, PM 3.0 with proactive adaptation and PM 4.0 with using innovative technologies. Research efforts tackled critical aspects of PM, but none of them provided a clear foundation for the full context of PM principles and how they complement one another. This study fills this knowledge gap by investigating the evolution of PM over time.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The authors collected a dataset of research papers between 1960 and 2022 and performed a bibliometric analysis on the collected dataset to isolate the main trends that define the evolution of PM phases.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Results show that all PM phases overlap in terms of overarching themes, concepts, principles and contributions. More importantly, PM 5.0 may be around the corner to facilitate effective and efficient handling of time, cost, scope and risks within the ever-growing complexity of project initiatives.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This paper provides a data-driven study for a holistic understanding of the key trends in PM and the associated expectations of future research directions. This will be of interest to stakeholders within the overall PM domain and multidisciplinary work related to the construction industry.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"26 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141570242","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Mentorship as a tool for improving construction artisan's skills to achieve sustainable development Goal 8 via qualitative approach 将辅导作为提高建筑工匠技能的工具,通过定性方法实现可持续发展目标 8
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-08 DOI: 10.1108/ecam-07-2023-0655
Andrew Ebekozien, Clinton Ohis Aigbavboa, Mohamad Shaharudin Samsurijan, John Aliu, Angeline Ngozika Chibuike Nwaole

Purpose

The paucity of artisans in some construction trades and the transitioning of the experience of the few for sustainability calls for concern. Mentorship programmes offer a promising mechanism to support construction artisans through those transitions. Mentorship may enhance artisan decent work and economic growth, like increased income for artisans. This is part of Sustainable Development Goal 8 (Goal 8). Hence, this study aims to investigate issues hindering construction artisan skills growth and suggest measures to improve construction artisan skills through mentorship mechanisms to achieve Goal 8.

Design/methodology/approach

The study adopted a qualitative approach and collected data via oral interviews with knowledgeable participants. The participants were consultant experts in mentorship and Sustainable Development Goals (SDGs) matters, construction organisation management staffers and construction artisans in the Nigerian construction industry. The study covered Lagos and Abuja and achieved saturation at the 30th interviewee. Also, the research utilised a thematic method to analyse the collated data.

Findings

Enhanced knowledge sharing accelerates junior artisans’ learning skills quickly, improving artisans’ performance, ensuring sustainability of the skills learned (knowledge retention), encouraging collaboration, building the next generation of leaders and transitioning of experience to mentees emerged as mentorship’s role in developing construction artisans’ skills. Findings show that mentorship mechanisms to develop construction artisan skills face encumbrances. The perceived 32 encumbrances were re-clustered into mentee, mentor and government-related encumbrances. Also, achieving Goal 8 regarding construction artisans may be threatened if these issues are not checked. Thus, the study recommended measures improving construction artisan skills through mentorship mechanisms to achieve Goal 8.

Originality/value

Identifying the major encumbrances facing construction artisan skills improvement through mentorship would be useful to advocate measures to improve construction artisan’s skills to achieve Goal 8.

目的 某些建筑行业的工匠人数稀少,少数工匠为实现可持续发展而进行的经验转型令人担忧。导师计划为支持建筑工匠完成这些过渡提供了一个很有前景的机制。导师制可促进工匠体面工作和经济增长,如增加工匠收入。这是可持续发展目标 8(目标 8)的一部分。因此,本研究旨在调查阻碍建筑工匠技能增长的问题,并提出通过导师机制提高建筑工匠技能的措施,以实现目标 8。 设计/方法/途径 本研究采用定性方法,通过与了解情况的参与者进行口头访谈来收集数据。参与者包括辅导和可持续发展目标(SDGs)方面的顾问专家、建筑组织管理人员以及尼日利亚建筑行业的建筑工匠。研究覆盖了拉各斯和阿布贾,在访谈到第 30 位受访者时达到了饱和。研究结果加强知识共享可加速初级工匠快速学习技能、提高工匠的绩效、确保所学技能的可持续性(知识保留)、鼓励合作、培养下一代领导者以及将经验传授给被指导者,这些都是导师制在培养建筑工匠技能方面的作用。研究结果表明,培养建筑工匠技能的指导机制面临着障碍。所发现的 32 个障碍被重新归类为被指导者、指导者和政府相关障碍。此外,如果这些问题得不到解决,有关建筑工匠的目标 8 的实现可能会受到威胁。因此,本研究建议采取措施,通过导师机制提高建筑工匠的技能,以实现目标 8。 原创性/价值确定通过导师机制提高建筑工匠技能所面临的主要障碍,有助于倡导采取措施提高建筑工匠的技能,以实现目标 8。
{"title":"Mentorship as a tool for improving construction artisan's skills to achieve sustainable development Goal 8 via qualitative approach","authors":"Andrew Ebekozien, Clinton Ohis Aigbavboa, Mohamad Shaharudin Samsurijan, John Aliu, Angeline Ngozika Chibuike Nwaole","doi":"10.1108/ecam-07-2023-0655","DOIUrl":"https://doi.org/10.1108/ecam-07-2023-0655","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The paucity of artisans in some construction trades and the transitioning of the experience of the few for sustainability calls for concern. Mentorship programmes offer a promising mechanism to support construction artisans through those transitions. Mentorship may enhance artisan decent work and economic growth, like increased income for artisans. This is part of Sustainable Development Goal 8 (Goal 8). Hence, this study aims to investigate issues hindering construction artisan skills growth and suggest measures to improve construction artisan skills through mentorship mechanisms to achieve Goal 8.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The study adopted a qualitative approach and collected data via oral interviews with knowledgeable participants. The participants were consultant experts in mentorship and Sustainable Development Goals (SDGs) matters, construction organisation management staffers and construction artisans in the Nigerian construction industry. The study covered Lagos and Abuja and achieved saturation at the 30th interviewee. Also, the research utilised a thematic method to analyse the collated data.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Enhanced knowledge sharing accelerates junior artisans’ learning skills quickly, improving artisans’ performance, ensuring sustainability of the skills learned (knowledge retention), encouraging collaboration, building the next generation of leaders and transitioning of experience to mentees emerged as mentorship’s role in developing construction artisans’ skills. Findings show that mentorship mechanisms to develop construction artisan skills face encumbrances. The perceived 32 encumbrances were re-clustered into mentee, mentor and government-related encumbrances. Also, achieving Goal 8 regarding construction artisans may be threatened if these issues are not checked. Thus, the study recommended measures improving construction artisan skills through mentorship mechanisms to achieve Goal 8.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Identifying the major encumbrances facing construction artisan skills improvement through mentorship would be useful to advocate measures to improve construction artisan’s skills to achieve Goal 8.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"1 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141570240","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Unmanned ground vehicle (UGV) based automated construction progress measurement of road using LSTM 基于无人地面车辆(UGV)的道路施工进度自动测量(使用 LSTM
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-04 DOI: 10.1108/ecam-01-2024-0020
Tirth Patel, Brian H.W. Guo, Jacobus Daniel van der Walt, Yang Zou

Purpose

Current solutions for monitoring the progress of pavement construction (such as collecting, processing and analysing data) are inefficient, labour-intensive, time-consuming, tedious and error-prone. In this study, an automated solution proposes sensors prototype mounted unmanned ground vehicle (UGV) for data collection, an LSTM classifier for road layer detection, the integrated algorithm for as-built progress calculation and web-based as-built reporting.

Design/methodology/approach

The crux of the proposed solution, the road layer detection model, is proposed to develop from the layer change detection model and rule-based reasoning. In the beginning, data were gathered using a UGV with a laser ToF (time-of-flight) distance sensor, accelerometer, gyroscope and GPS sensor in a controlled environment. The long short-term memory (LSTM) algorithm was utilised on acquired data to develop a classifier model for layer change detection, such as layer not changed, layer up and layer down.

Findings

In controlled environment experiments, the classification of road layer changes achieved 94.35% test accuracy with 14.05% loss. Subsequently, the proposed approach, including the layer detection model, as-built measurement algorithm and reporting, was successfully implemented with a real case study to test the robustness of the model and measure the as-built progress.

Research limitations/implications

The implementation of the proposed framework can allow continuous, real-time monitoring of road construction projects, eliminating the need for manual, time-consuming methods. This study will potentially help the construction industry in the real time decision-making process of construction progress monitoring and controlling action.

Originality/value

This first novel approach marks the first utilization of sensors mounted UGV for monitoring road construction progress, filling a crucial research gap in incremental and segment-wise construction monitoring and offering a solution that addresses challenges faced by Unmanned Aerial Vehicles (UAVs) and 3D reconstruction. Utilizing UGVs offers advantages like cost-effectiveness, safety and operational flexibility in no-fly zones.

目的目前用于监测路面施工进度的解决方案(如收集、处理和分析数据)效率低下、劳动密集、耗时、繁琐且容易出错。本研究提出了一种自动化解决方案,包括用于数据收集的传感器原型无人地面车辆(UGV)、用于路层检测的 LSTM 分类器、用于竣工进度计算的集成算法以及基于网络的竣工报告。首先,在受控环境中使用带有激光 ToF(飞行时间)距离传感器、加速计、陀螺仪和 GPS 传感器的 UGV 收集数据。结果在受控环境实验中,路层变化分类的测试准确率达到 94.35%,损失率为 14.05%。随后,通过实际案例研究成功实施了所提出的方法,包括层检测模型、竣工测量算法和报告,以测试模型的鲁棒性和测量竣工进度。这项研究将为建筑行业在施工进度监测和控制行动的实时决策过程中提供潜在帮助。独创性/价值这项首创的新方法标志着首次利用安装了传感器的无人机来监测道路施工进度,填补了增量和分段施工监测方面的重要研究空白,并为解决无人机(UAV)和三维重建所面临的挑战提供了解决方案。利用无人驾驶飞行器具有成本效益、安全性和禁飞区操作灵活性等优势。
{"title":"Unmanned ground vehicle (UGV) based automated construction progress measurement of road using LSTM","authors":"Tirth Patel, Brian H.W. Guo, Jacobus Daniel van der Walt, Yang Zou","doi":"10.1108/ecam-01-2024-0020","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0020","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Current solutions for monitoring the progress of pavement construction (such as collecting, processing and analysing data) are inefficient, labour-intensive, time-consuming, tedious and error-prone. In this study, an automated solution proposes sensors prototype mounted unmanned ground vehicle (UGV) for data collection, an LSTM classifier for road layer detection, the integrated algorithm for as-built progress calculation and web-based as-built reporting.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The crux of the proposed solution, the road layer detection model, is proposed to develop from the layer change detection model and rule-based reasoning. In the beginning, data were gathered using a UGV with a laser ToF (time-of-flight) distance sensor, accelerometer, gyroscope and GPS sensor in a controlled environment. The long short-term memory (LSTM) algorithm was utilised on acquired data to develop a classifier model for layer change detection, such as layer not changed, layer up and layer down.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>In controlled environment experiments, the classification of road layer changes achieved 94.35% test accuracy with 14.05% loss. Subsequently, the proposed approach, including the layer detection model, as-built measurement algorithm and reporting, was successfully implemented with a real case study to test the robustness of the model and measure the as-built progress.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>The implementation of the proposed framework can allow continuous, real-time monitoring of road construction projects, eliminating the need for manual, time-consuming methods. This study will potentially help the construction industry in the real time decision-making process of construction progress monitoring and controlling action.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This first novel approach marks the first utilization of sensors mounted UGV for monitoring road construction progress, filling a crucial research gap in incremental and segment-wise construction monitoring and offering a solution that addresses challenges faced by Unmanned Aerial Vehicles (UAVs) and 3D reconstruction. Utilizing UGVs offers advantages like cost-effectiveness, safety and operational flexibility in no-fly zones.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"166 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141513601","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Interactive roles of megaproject governance mechanisms and their effects on governance performance 特大项目治理机制的互动作用及其对治理绩效的影响
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-04 DOI: 10.1108/ecam-10-2023-1081
Lan Luo, Yuyang Liu, Yue Yang, Jianxun Xie, Guangdong Wu
<h3>Purpose</h3><p>This study aims to explore the interaction of “contractual governance – relational governance – governmental governance” mechanisms and proposes hypotheses about the effects of megaproject governance on governance performance from both theoretical and practical perspectives.</p><!--/ Abstract__block --><h3>Design/methodology/approach</h3><p>In this paper, a megaproject governance model is developed to explain the relationship between governance mechanisms and governance performance. The model is based on related literature and explores the interactions between governance mechanisms and how they work to improve governance performance. The structural equation model (SEM) is adopted to explore the influence path on governance performance for megaprojects.</p><!--/ Abstract__block --><h3>Findings</h3><p>The results indicate that: (a) The findings highlight the positive role of project governance mechanisms on governance performance. (b) Contractual governance, relational governance, and governmental governance directly affect governance performance. In addition, contractual governance mediates governance performance through relational governance and governmental governance; governmental governance mediates governance performance through contractual governance and relational governance. (c) Contractual governance, relational governance, and governmental governance play a positive role in governance performance.</p><!--/ Abstract__block --><h3>Research limitations/implications</h3><p>Governmental governance is added to project governance theory and the empirical research method is used to explore the interaction between contractual governance, relational governance, and governmental governance of megaprojects. The SEM is used to systematically explore the paths of megaproject governance mechanisms on governance performance, considering the interactive role of the “contractual governance - relational governance - governmental governance” and the mediating role.</p><!--/ Abstract__block --><h3>Practical implications</h3><p>The study reveals the impact path of multidimensional megaproject governance mechanisms on governance performance. In this paper, the empirical findings can help the project participants by providing a decision-making basis for good governance and references for the governments to promote the construction of a micro-institutional environment for megaprojects.</p><!--/ Abstract__block --><h3>Originality/value</h3><p>The contributions of this study are (1) to add an exploration of governmental governance to the existing project governance theory, and (2) to consider the interactions of the “contractual governance – relational governance – governmental governance” mechanisms, and (3) to explore their effects on governance performance, including direct and mediating effects. This study contributes to a comprehensive understanding of megaproject governance by considering governmental governance and the interact
目的本研究旨在探讨 "契约治理--关系治理--政府治理 "机制的相互作用,并从理论和实践的角度提出巨型项目治理对治理绩效影响的假设。设计/方法/途径本文建立了一个巨型项目治理模型,以解释治理机制与治理绩效之间的关系。该模型以相关文献为基础,探讨了治理机制之间的相互作用以及这些机制如何提高治理绩效。采用结构方程模型(SEM)来探讨巨型项目治理绩效的影响路径:(a) 研究结果凸显了项目治理机制对治理绩效的积极作用。(b) 合同治理、关系治理和政府治理直接影响治理绩效。此外,合同治理通过关系治理和政府治理对治理绩效产生中介作用;政府治理通过合同治理和关系治理对治理绩效产生中介作用。(c) 合同治理、关系治理和政府治理对治理绩效起积极作用。研究局限/意义在项目治理理论中加入政府治理,采用实证研究方法探讨特大项目合同治理、关系治理和政府治理之间的互动关系。研究揭示了多维巨型项目治理机制对治理绩效的影响路径。本文的实证研究结果可以为项目参与方提供良好治理的决策依据,为政府推进超大项目微观制度环境建设提供参考。原创性/价值本研究的贡献在于:(1)在现有项目治理理论的基础上,增加了对政府治理的探讨;(2)考虑了 "契约治理-关系治理-政府治理 "机制的相互作用;(3)探讨了它们对治理绩效的影响,包括直接影响和中介影响。本研究通过考虑政府治理以及三种治理机制的相互作用,有助于全面理解特大项目治理。了解特大项目治理对治理绩效的影响有助于项目利益相关者,并为良好治理提供决策指导。
{"title":"Interactive roles of megaproject governance mechanisms and their effects on governance performance","authors":"Lan Luo, Yuyang Liu, Yue Yang, Jianxun Xie, Guangdong Wu","doi":"10.1108/ecam-10-2023-1081","DOIUrl":"https://doi.org/10.1108/ecam-10-2023-1081","url":null,"abstract":"&lt;h3&gt;Purpose&lt;/h3&gt;\u0000&lt;p&gt;This study aims to explore the interaction of “contractual governance – relational governance – governmental governance” mechanisms and proposes hypotheses about the effects of megaproject governance on governance performance from both theoretical and practical perspectives.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Design/methodology/approach&lt;/h3&gt;\u0000&lt;p&gt;In this paper, a megaproject governance model is developed to explain the relationship between governance mechanisms and governance performance. The model is based on related literature and explores the interactions between governance mechanisms and how they work to improve governance performance. The structural equation model (SEM) is adopted to explore the influence path on governance performance for megaprojects.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Findings&lt;/h3&gt;\u0000&lt;p&gt;The results indicate that: (a) The findings highlight the positive role of project governance mechanisms on governance performance. (b) Contractual governance, relational governance, and governmental governance directly affect governance performance. In addition, contractual governance mediates governance performance through relational governance and governmental governance; governmental governance mediates governance performance through contractual governance and relational governance. (c) Contractual governance, relational governance, and governmental governance play a positive role in governance performance.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Research limitations/implications&lt;/h3&gt;\u0000&lt;p&gt;Governmental governance is added to project governance theory and the empirical research method is used to explore the interaction between contractual governance, relational governance, and governmental governance of megaprojects. The SEM is used to systematically explore the paths of megaproject governance mechanisms on governance performance, considering the interactive role of the “contractual governance - relational governance - governmental governance” and the mediating role.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Practical implications&lt;/h3&gt;\u0000&lt;p&gt;The study reveals the impact path of multidimensional megaproject governance mechanisms on governance performance. In this paper, the empirical findings can help the project participants by providing a decision-making basis for good governance and references for the governments to promote the construction of a micro-institutional environment for megaprojects.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Originality/value&lt;/h3&gt;\u0000&lt;p&gt;The contributions of this study are (1) to add an exploration of governmental governance to the existing project governance theory, and (2) to consider the interactions of the “contractual governance – relational governance – governmental governance” mechanisms, and (3) to explore their effects on governance performance, including direct and mediating effects. This study contributes to a comprehensive understanding of megaproject governance by considering governmental governance and the interact","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"13 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141550295","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Dynamic incentive mechanisms in mega project-risk management considering the participation of the insurance company 考虑保险公司参与的超大型项目风险管理的动态激励机制
IF 4.1 2区 工程技术 Q1 ENGINEERING, CIVIL Pub Date : 2024-07-01 DOI: 10.1108/ecam-04-2024-0473
Qianqian Shi, Longyu Yao, Changwei Bi, Jianbo Zhu

Purpose

The construction of megaprojects often involves substantial risks. While insurance plays an important role as a traditional risk transfer means, owners and insurance companies may still suffer huge losses during the risk management process. Therefore, considering the strong motivation of insurance companies to participate in the on-site risk management of megaprojects, this study aims to propose a collaborative incentive mechanism involving insurance companies, to optimize the risk management effect and reduce the risk of accidents in megaprojects.

Design/methodology/approach

Based on principal-agent theory, the research develops the static and dynamic incentive models for risk management in megaprojects, involving both the owner and insurance company. The study examines the primary factors influencing incentive efficiency. The results are numerically simulated with a validation case. Finally, the impact of parameter changes on the stakeholders' benefits is analyzed.

Findings

The results indicate that the dynamic incentive model is available to the achievement of a flexible mechanism to ensure the benefits of contractors while protecting the benefits of the owner and insurance company. Adjusting the incentive coefficients for owners and insurance companies within a specified range promotes the growth of benefits for all parties involved. The management cost and economic benefit allocation coefficients have a positive effect on the adjustment range of the incentive coefficient, which helps implement a more flexible dynamic incentive mechanism to motivate contractors to carry out risk management to reduce risk losses.

Originality/value

This study makes up for the absence of important stakeholders in risk management. Different from traditional megaproject risk management, this model uses insurance companies as bridges to break the island effect of risk management among multiple megaprojects. This study contributes to the body of knowledge by designing appropriate dynamic incentive mechanisms in megaproject risk management through insurance company participation, and provides practical implications to both owner and insurance company on incentive contract making, thus achieving better risk governance of megaprojects.

目的 特大项目的建设往往涉及巨大风险。虽然保险作为传统的风险转移手段发挥着重要作用,但在风险管理过程中,业主和保险公司仍可能遭受巨大损失。因此,考虑到保险公司参与特大型项目现场风险管理的强烈动机,本研究旨在提出一种有保险公司参与的协同激励机制,以优化特大型项目的风险管理效果,降低事故风险。设计/方法/途径基于委托代理理论,本研究建立了特大型项目风险管理的静态和动态激励模型,涉及业主和保险公司双方。研究探讨了影响激励效率的主要因素。研究结果通过一个验证案例进行了数值模拟。研究结果表明,动态激励模型可以实现灵活的机制,在确保承包商利益的同时,保护业主和保险公司的利益。在一定范围内调整业主和保险公司的激励系数,可以促进各方利益的增长。管理成本和经济利益分配系数对激励系数的调整范围有正向影响,有助于实施更加灵活的动态激励机制,激励承包商开展风险管理,减少风险损失。与传统的特大型项目风险管理不同,该模型以保险公司为桥梁,打破了多个特大型项目之间风险管理的孤岛效应。本研究通过保险公司的参与,在特大型项目风险管理中设计适当的动态激励机制,为业主和保险公司在激励合同制定方面提供了实践意义,从而更好地实现特大型项目的风险治理。
{"title":"Dynamic incentive mechanisms in mega project-risk management considering the participation of the insurance company","authors":"Qianqian Shi, Longyu Yao, Changwei Bi, Jianbo Zhu","doi":"10.1108/ecam-04-2024-0473","DOIUrl":"https://doi.org/10.1108/ecam-04-2024-0473","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The construction of megaprojects often involves substantial risks. While insurance plays an important role as a traditional risk transfer means, owners and insurance companies may still suffer huge losses during the risk management process. Therefore, considering the strong motivation of insurance companies to participate in the on-site risk management of megaprojects, this study aims to propose a collaborative incentive mechanism involving insurance companies, to optimize the risk management effect and reduce the risk of accidents in megaprojects.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Based on principal-agent theory, the research develops the static and dynamic incentive models for risk management in megaprojects, involving both the owner and insurance company. The study examines the primary factors influencing incentive efficiency. The results are numerically simulated with a validation case. Finally, the impact of parameter changes on the stakeholders' benefits is analyzed.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results indicate that the dynamic incentive model is available to the achievement of a flexible mechanism to ensure the benefits of contractors while protecting the benefits of the owner and insurance company. Adjusting the incentive coefficients for owners and insurance companies within a specified range promotes the growth of benefits for all parties involved. The management cost and economic benefit allocation coefficients have a positive effect on the adjustment range of the incentive coefficient, which helps implement a more flexible dynamic incentive mechanism to motivate contractors to carry out risk management to reduce risk losses.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study makes up for the absence of important stakeholders in risk management. Different from traditional megaproject risk management, this model uses insurance companies as bridges to break the island effect of risk management among multiple megaprojects. This study contributes to the body of knowledge by designing appropriate dynamic incentive mechanisms in megaproject risk management through insurance company participation, and provides practical implications to both owner and insurance company on incentive contract making, thus achieving better risk governance of megaprojects.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"26 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141550296","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Engineering, Construction and Architectural Management
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1