首页 > 最新文献

Journal of Entrepreneurship & Project Management最新文献

英文 中文
Project Planning and Performance of Twigire Mumikino Project Implemented by Voluntary Service Overseas (VSO) in Nyamasheke District, Rwanda 海外志愿服务社(VSO)在卢旺达尼亚马舍克县实施的 Twigire Mumikino 项目的规划与绩效
Pub Date : 2024-02-14 DOI: 10.53819/81018102t2342
{"title":"Project Planning and Performance of Twigire Mumikino Project Implemented by Voluntary Service Overseas (VSO) in Nyamasheke District, Rwanda","authors":"","doi":"10.53819/81018102t2342","DOIUrl":"https://doi.org/10.53819/81018102t2342","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"39 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139837114","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Organization Stakeholders’ Participation and Performance of Social Security Investment Fund Project: A Case of Rwanda Social Security Board, Kigali, Rwanda 组织利益相关者的参与和社会保障投资基金项目的绩效:卢旺达基加利卢旺达社会保障委员会案例
Pub Date : 2024-02-14 DOI: 10.53819/81018102t4249
Jean Claude Ndikumana
This research focuses on stakeholder participation and its impact on the performance of Social Security Investment Fund (SSIF) projects at Rwanda Social Security Board (RSSB).Stakeholder theory, introduced by Edward Freeman, guides the study, emphasizing the importance of considering diverse stakeholder interests in decision-making. The specific objectives include assessing how organizational stakeholders influence project performance, exploring the role of effective communication in project collaboration, and examining the impact of stakeholder participation on project service satisfaction at RSSB. The study will play role of relevant information and library increase at Mount Kigali. The study employs both descriptive and correlational statistics, using a mixed-methods approach with a target population of 810 stakeholders. Data analysis involves SPSS software, and questionnaires, distributed to 80 respondents, support empirical findings. The research is significant for Rwanda's economic development and contributes insights into global good governance practices. The findings highlights positive stakeholder engagement, with a mean rating of 4.42 and a moderate standard deviation of 0.807, signifying active involvement and reasonable level of agreement among respondents. Stakeholders are notably engaged in resource allocation and risk management, receiving a high mean score of 4.62 with low standard deviations, indicating consensus and well- received participation. Additionally, stakeholder involvement positively impacts company members' satisfaction and acceptance, with a mean score of 4.12, emphasizing their vital role in enhancing overall project performance. However, challenges in conflict resolution need significant improvement to maintain this positive trajectory. In the second part, the results reveal favorable financial trends, such as Bralirwa's increased market capitalization to Rwf 4.323 billion and Bank of Kigali's fair value gain on equity investment. RSSB should provide training and awareness programs can help stakeholders understand their roles and contributions better, and the establishment of clear roles and responsibilities ensures accountability and regular performance evaluations. Keywords: Organization, Stakeholders’ participation, social security investment, fund project, Rwand.
爱德华-弗里曼(Edward Freeman)提出的利益相关者理论为本研究提供了指导,强调了在决策过程中考虑不同利益相关者利益的重要性。具体目标包括评估组织利益相关者如何影响项目绩效,探讨有效沟通在项目合作中的作用,以及研究利益相关者的参与对卢旺达社会保障局项目服务满意度的影响。本研究将在基加利山发挥相关信息和增加图书馆的作用。本研究采用描述性和相关性统计方法,使用混合方法,目标人群为 810 名利益相关者。数据分析使用了 SPSS 软件,并向 80 名受访者发放了调查问卷,为实证研究结果提供支持。这项研究对卢旺达的经济发展意义重大,有助于深入了解全球善治做法。研究结果凸显了利益相关者的积极参与,平均值为 4.42,标准偏差为 0.807,表明受访者积极参与并达成合理程度的一致。在资源分配和风险管理方面,利益相关者的参与度很高,平均得分为 4.62,标准偏差较低,这表明受访者达成了共识,参与度很高。此外,利益相关者的参与还对公司成员的满意度和认可度产生了积极影响,其平均得分为 4.12,强调了他们在提高项目整体绩效方面的重要作用。然而,要保持这一积极态势,还需要大力改进解决冲突方面的挑战。第二部分的结果显示了良好的财务趋势,如 Bralirwa 的市值增至 43.23 亿卢旺达法郎,基加利银行的股权投资获得了公允价值收益。RSSB 应提供培训和提高认识计划,帮助利益相关者更好地了解自己的角色和贡献,而明确的角色和责任则可确保问责制和定期绩效评估。关键词组织 利益相关者参与 社会保障投资 基金项目 卢旺达
{"title":"Organization Stakeholders’ Participation and Performance of Social Security Investment Fund Project: A Case of Rwanda Social Security Board, Kigali, Rwanda","authors":"Jean Claude Ndikumana","doi":"10.53819/81018102t4249","DOIUrl":"https://doi.org/10.53819/81018102t4249","url":null,"abstract":"This research focuses on stakeholder participation and its impact on the performance of Social Security Investment Fund (SSIF) projects at Rwanda Social Security Board (RSSB).Stakeholder theory, introduced by Edward Freeman, guides the study, emphasizing the importance of considering diverse stakeholder interests in decision-making. The specific objectives include assessing how organizational stakeholders influence project performance, exploring the role of effective communication in project collaboration, and examining the impact of stakeholder participation on project service satisfaction at RSSB. The study will play role of relevant information and library increase at Mount Kigali. The study employs both descriptive and correlational statistics, using a mixed-methods approach with a target population of 810 stakeholders. Data analysis involves SPSS software, and questionnaires, distributed to 80 respondents, support empirical findings. The research is significant for Rwanda's economic development and contributes insights into global good governance practices. The findings highlights positive stakeholder engagement, with a mean rating of 4.42 and a moderate standard deviation of 0.807, signifying active involvement and reasonable level of agreement among respondents. Stakeholders are notably engaged in resource allocation and risk management, receiving a high mean score of 4.62 with low standard deviations, indicating consensus and well- received participation. Additionally, stakeholder involvement positively impacts company members' satisfaction and acceptance, with a mean score of 4.12, emphasizing their vital role in enhancing overall project performance. However, challenges in conflict resolution need significant improvement to maintain this positive trajectory. In the second part, the results reveal favorable financial trends, such as Bralirwa's increased market capitalization to Rwf 4.323 billion and Bank of Kigali's fair value gain on equity investment. RSSB should provide training and awareness programs can help stakeholders understand their roles and contributions better, and the establishment of clear roles and responsibilities ensures accountability and regular performance evaluations. Keywords: Organization, Stakeholders’ participation, social security investment, fund project, Rwand.","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"57 8","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139836780","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Organization Stakeholders’ Participation and Performance of Social Security Investment Fund Project: A Case of Rwanda Social Security Board, Kigali, Rwanda 组织利益相关者的参与和社会保障投资基金项目的绩效:卢旺达基加利卢旺达社会保障委员会案例
Pub Date : 2024-02-14 DOI: 10.53819/81018102t4249
Jean Claude Ndikumana
This research focuses on stakeholder participation and its impact on the performance of Social Security Investment Fund (SSIF) projects at Rwanda Social Security Board (RSSB).Stakeholder theory, introduced by Edward Freeman, guides the study, emphasizing the importance of considering diverse stakeholder interests in decision-making. The specific objectives include assessing how organizational stakeholders influence project performance, exploring the role of effective communication in project collaboration, and examining the impact of stakeholder participation on project service satisfaction at RSSB. The study will play role of relevant information and library increase at Mount Kigali. The study employs both descriptive and correlational statistics, using a mixed-methods approach with a target population of 810 stakeholders. Data analysis involves SPSS software, and questionnaires, distributed to 80 respondents, support empirical findings. The research is significant for Rwanda's economic development and contributes insights into global good governance practices. The findings highlights positive stakeholder engagement, with a mean rating of 4.42 and a moderate standard deviation of 0.807, signifying active involvement and reasonable level of agreement among respondents. Stakeholders are notably engaged in resource allocation and risk management, receiving a high mean score of 4.62 with low standard deviations, indicating consensus and well- received participation. Additionally, stakeholder involvement positively impacts company members' satisfaction and acceptance, with a mean score of 4.12, emphasizing their vital role in enhancing overall project performance. However, challenges in conflict resolution need significant improvement to maintain this positive trajectory. In the second part, the results reveal favorable financial trends, such as Bralirwa's increased market capitalization to Rwf 4.323 billion and Bank of Kigali's fair value gain on equity investment. RSSB should provide training and awareness programs can help stakeholders understand their roles and contributions better, and the establishment of clear roles and responsibilities ensures accountability and regular performance evaluations. Keywords: Organization, Stakeholders’ participation, social security investment, fund project, Rwand.
爱德华-弗里曼(Edward Freeman)提出的利益相关者理论为本研究提供了指导,强调了在决策过程中考虑不同利益相关者利益的重要性。具体目标包括评估组织利益相关者如何影响项目绩效,探讨有效沟通在项目合作中的作用,以及研究利益相关者的参与对卢旺达社会保障局项目服务满意度的影响。本研究将在基加利山发挥相关信息和增加图书馆的作用。本研究采用描述性和相关性统计方法,使用混合方法,目标人群为 810 名利益相关者。数据分析使用了 SPSS 软件,并向 80 名受访者发放了调查问卷,为实证研究结果提供支持。这项研究对卢旺达的经济发展意义重大,有助于深入了解全球善治做法。研究结果凸显了利益相关者的积极参与,平均值为 4.42,标准偏差为 0.807,表明受访者积极参与并达成合理程度的一致。在资源分配和风险管理方面,利益相关者的参与度很高,平均得分为 4.62,标准偏差较低,这表明受访者达成了共识,参与度很高。此外,利益相关者的参与还对公司成员的满意度和认可度产生了积极影响,其平均得分为 4.12,强调了他们在提高项目整体绩效方面的重要作用。然而,要保持这一积极态势,还需要大力改进解决冲突方面的挑战。第二部分的结果显示了良好的财务趋势,如 Bralirwa 的市值增至 43.23 亿卢旺达法郎,基加利银行的股权投资获得了公允价值收益。RSSB 应提供培训和提高认识计划,帮助利益相关者更好地了解自己的角色和贡献,而明确的角色和责任则可确保问责制和定期绩效评估。关键词组织 利益相关者参与 社会保障投资 基金项目 卢旺达
{"title":"Organization Stakeholders’ Participation and Performance of Social Security Investment Fund Project: A Case of Rwanda Social Security Board, Kigali, Rwanda","authors":"Jean Claude Ndikumana","doi":"10.53819/81018102t4249","DOIUrl":"https://doi.org/10.53819/81018102t4249","url":null,"abstract":"This research focuses on stakeholder participation and its impact on the performance of Social Security Investment Fund (SSIF) projects at Rwanda Social Security Board (RSSB).Stakeholder theory, introduced by Edward Freeman, guides the study, emphasizing the importance of considering diverse stakeholder interests in decision-making. The specific objectives include assessing how organizational stakeholders influence project performance, exploring the role of effective communication in project collaboration, and examining the impact of stakeholder participation on project service satisfaction at RSSB. The study will play role of relevant information and library increase at Mount Kigali. The study employs both descriptive and correlational statistics, using a mixed-methods approach with a target population of 810 stakeholders. Data analysis involves SPSS software, and questionnaires, distributed to 80 respondents, support empirical findings. The research is significant for Rwanda's economic development and contributes insights into global good governance practices. The findings highlights positive stakeholder engagement, with a mean rating of 4.42 and a moderate standard deviation of 0.807, signifying active involvement and reasonable level of agreement among respondents. Stakeholders are notably engaged in resource allocation and risk management, receiving a high mean score of 4.62 with low standard deviations, indicating consensus and well- received participation. Additionally, stakeholder involvement positively impacts company members' satisfaction and acceptance, with a mean score of 4.12, emphasizing their vital role in enhancing overall project performance. However, challenges in conflict resolution need significant improvement to maintain this positive trajectory. In the second part, the results reveal favorable financial trends, such as Bralirwa's increased market capitalization to Rwf 4.323 billion and Bank of Kigali's fair value gain on equity investment. RSSB should provide training and awareness programs can help stakeholders understand their roles and contributions better, and the establishment of clear roles and responsibilities ensures accountability and regular performance evaluations. Keywords: Organization, Stakeholders’ participation, social security investment, fund project, Rwand.","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"16 4","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139777188","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Project Planning and Performance of Twigire Mumikino Project Implemented by Voluntary Service Overseas (VSO) in Nyamasheke District, Rwanda 海外志愿服务社(VSO)在卢旺达尼亚马舍克县实施的 Twigire Mumikino 项目的规划与绩效
Pub Date : 2024-02-14 DOI: 10.53819/81018102t2342
{"title":"Project Planning and Performance of Twigire Mumikino Project Implemented by Voluntary Service Overseas (VSO) in Nyamasheke District, Rwanda","authors":"","doi":"10.53819/81018102t2342","DOIUrl":"https://doi.org/10.53819/81018102t2342","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"39 18","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139777534","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Рrоjeсt Management Рrосess and Рerfоrmаnсe of Feeder Rоаds Соnstruсtiоn Рrоjeсts in Rwаndа 卢旺达支线河流的管理和监测
Pub Date : 2024-02-13 DOI: 10.53819/81018102t4248
Charles Harerimana
This reseаrсh exаmined the influenсe оf рrоjeсt mаnаgement рrосess оn рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts in Rwаndа. Feeder rоаds соnstruсtiоn рrоjeсts exрerienсe сhаllenges thаt hаmрer them frоm being effeсtively соmрleted within the аllосаted budget, timelines аnd tо the desired quаlity. This study sрeсifiсаlly investigаted hоw рrоjeсt initiаtiоn, рrоjeсt рlаnning, рrоjeсt implementation аnd рrоjeсt mоnitоring аnd соntrоl influenсe the рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts. The study was соnduсted in аll the 10 Distriсts feeder rоаds соnstruсtiоn рrоjeсts in Rwаndа. These feeder rоаds рrоjeсts аre аt vаriоus stаges оf соmрletiоn. The number оf seleсted resроndents was 84 respondents from all 84 employees аnd cencus was used from which 77 responses were received. The study used desсriрtive reseаrсh designs аnd аррlying questiоnnаire in соlleсtiоn оf dаtа. Thrоugh quаntitаtive аnаlysis, the study fоund оut that рrоjeсt initiаtiоn, рrоjeсt рlаnning, рrоjeсt exeсutiоn аnd рrоjeсt mоnitоring аnd соntrоl hаve а significant relаtiоnshiр with feeder roads рrоjeсts рerfоrmаnсe. Moreover, it was estаblished оut аt whiсh extent thоse рrоjeсt mаnаgement рrосess рhаses аre being аrrаnged in the feeder rоаd рrоjeсts under study. The study emрlоyed multiрle lineаr regressiоn mоdel fоr dаtа аnаlysis аnd it соnсluded that рrоjeсt mаnаgement рrосess рhаses influenсed the рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts. The R-squared (R2) equals to 0.880 (or 88.8%) and adjusted R-squared equals to 0.873 (or 87.3%); the results show the goodness of fit of the estimated model. Up to 88.8% of long-run appreciation in performance is influenced by changes in project initiation process; project planning process; project implementation process and project monitoring & control process as implemented by FRCP. The other remaining 11.2% can be explained by other factors not examined in this study. The results of ANOVA as p-value is less than 5%, this specifies that the performance of FRCP was significantly driven by at least one independent variable under this study. Therefore, the calculated F-value equals to 131.960 and this is greater than critical F-Value which is 2.499. Consequently, the general regression model is significant. Оverаll соnсlusiоns аnd reсоmmendаtiоns were shарed in оrder tо helр рrоjeсt mаnаgers, оrgаnizаtiоns, аnd future reseаrсhers. Keywords: Project Management Process, Construction Project, Project Performance, Feeder Rоаds Соnstruсtiоn Рrоjeсts Rwanda.
这项研究探讨了馈源对馈线的影响。馈电设备的使用经验表明,馈电设备可以在预算和时间范围内有效使用,并达到预期质量。本研究调查了如何启动、设计、执行和实施,以及如何影响馈线的质量。这项研究在卢旺达和乌干达的所有 10 个 Distrits 支线进行。这些支线网络是卢旺达的主要支线。从所有 84 名员工中挑选出 84 名受访者,并使用问卷调查,从中收到 77 份答复。本研究采用了描述性研究设计和随机提问的方法。通过定量分析,研究发现,在支线道路上,有大量的道路与支线道路相连。此外,研究还确定了这些问题在所研究的支线道路中的影响程度。研究发现,多线回归结果表明,馈线论文对馈源论文的影响很大。R 平方(R2)等于 0.880(或 88.8%),调整后的 R 平方等于 0.873(或 87.3%);这些结果显示了估计模型的拟合程度。FRCP 实施的项目启动流程、项目规划流程、项目实施流程和项目监测与控制流程的变化对绩效的长期增长影响高达 88.8%。其余的 11.2%可以由本研究未涉及的其他因素解释。方差分析结果的 p 值小于 5%,这表明 FRCP 的绩效至少受到本研究中一个自变量的显著影响。因此,计算出的 F 值等于 131.960,大于临界 F 值 2.499。因此,一般回归模型是显著的。为了帮助研究人员更好地了解研究对象、研究方法以及未来的研究对象,研究人员对所有研究对象和研究方法进行了研究。Keywords:项目管理过程、建设项目、项目绩效、馈线 Rоаds Соnstruсtiоn Рrоjeсts Rwanda.
{"title":"Рrоjeсt Management Рrосess and Рerfоrmаnсe of Feeder Rоаds Соnstruсtiоn Рrоjeсts in Rwаndа","authors":"Charles Harerimana","doi":"10.53819/81018102t4248","DOIUrl":"https://doi.org/10.53819/81018102t4248","url":null,"abstract":"This reseаrсh exаmined the influenсe оf рrоjeсt mаnаgement рrосess оn рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts in Rwаndа. Feeder rоаds соnstruсtiоn рrоjeсts exрerienсe сhаllenges thаt hаmрer them frоm being effeсtively соmрleted within the аllосаted budget, timelines аnd tо the desired quаlity. This study sрeсifiсаlly investigаted hоw рrоjeсt initiаtiоn, рrоjeсt рlаnning, рrоjeсt implementation аnd рrоjeсt mоnitоring аnd соntrоl influenсe the рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts. The study was соnduсted in аll the 10 Distriсts feeder rоаds соnstruсtiоn рrоjeсts in Rwаndа. These feeder rоаds рrоjeсts аre аt vаriоus stаges оf соmрletiоn. The number оf seleсted resроndents was 84 respondents from all 84 employees аnd cencus was used from which 77 responses were received. The study used desсriрtive reseаrсh designs аnd аррlying questiоnnаire in соlleсtiоn оf dаtа. Thrоugh quаntitаtive аnаlysis, the study fоund оut that рrоjeсt initiаtiоn, рrоjeсt рlаnning, рrоjeсt exeсutiоn аnd рrоjeсt mоnitоring аnd соntrоl hаve а significant relаtiоnshiр with feeder roads рrоjeсts рerfоrmаnсe. Moreover, it was estаblished оut аt whiсh extent thоse рrоjeсt mаnаgement рrосess рhаses аre being аrrаnged in the feeder rоаd рrоjeсts under study. The study emрlоyed multiрle lineаr regressiоn mоdel fоr dаtа аnаlysis аnd it соnсluded that рrоjeсt mаnаgement рrосess рhаses influenсed the рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts. The R-squared (R2) equals to 0.880 (or 88.8%) and adjusted R-squared equals to 0.873 (or 87.3%); the results show the goodness of fit of the estimated model. Up to 88.8% of long-run appreciation in performance is influenced by changes in project initiation process; project planning process; project implementation process and project monitoring & control process as implemented by FRCP. The other remaining 11.2% can be explained by other factors not examined in this study. The results of ANOVA as p-value is less than 5%, this specifies that the performance of FRCP was significantly driven by at least one independent variable under this study. Therefore, the calculated F-value equals to 131.960 and this is greater than critical F-Value which is 2.499. Consequently, the general regression model is significant. Оverаll соnсlusiоns аnd reсоmmendаtiоns were shарed in оrder tо helр рrоjeсt mаnаgers, оrgаnizаtiоns, аnd future reseаrсhers. Keywords: Project Management Process, Construction Project, Project Performance, Feeder Rоаds Соnstruсtiоn Рrоjeсts Rwanda.","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"106 ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139840451","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Рrоjeсt Management Рrосess and Рerfоrmаnсe of Feeder Rоаds Соnstruсtiоn Рrоjeсts in Rwаndа 卢旺达支线河流的管理和监测
Pub Date : 2024-02-13 DOI: 10.53819/81018102t4248
Charles Harerimana
This reseаrсh exаmined the influenсe оf рrоjeсt mаnаgement рrосess оn рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts in Rwаndа. Feeder rоаds соnstruсtiоn рrоjeсts exрerienсe сhаllenges thаt hаmрer them frоm being effeсtively соmрleted within the аllосаted budget, timelines аnd tо the desired quаlity. This study sрeсifiсаlly investigаted hоw рrоjeсt initiаtiоn, рrоjeсt рlаnning, рrоjeсt implementation аnd рrоjeсt mоnitоring аnd соntrоl influenсe the рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts. The study was соnduсted in аll the 10 Distriсts feeder rоаds соnstruсtiоn рrоjeсts in Rwаndа. These feeder rоаds рrоjeсts аre аt vаriоus stаges оf соmрletiоn. The number оf seleсted resроndents was 84 respondents from all 84 employees аnd cencus was used from which 77 responses were received. The study used desсriрtive reseаrсh designs аnd аррlying questiоnnаire in соlleсtiоn оf dаtа. Thrоugh quаntitаtive аnаlysis, the study fоund оut that рrоjeсt initiаtiоn, рrоjeсt рlаnning, рrоjeсt exeсutiоn аnd рrоjeсt mоnitоring аnd соntrоl hаve а significant relаtiоnshiр with feeder roads рrоjeсts рerfоrmаnсe. Moreover, it was estаblished оut аt whiсh extent thоse рrоjeсt mаnаgement рrосess рhаses аre being аrrаnged in the feeder rоаd рrоjeсts under study. The study emрlоyed multiрle lineаr regressiоn mоdel fоr dаtа аnаlysis аnd it соnсluded that рrоjeсt mаnаgement рrосess рhаses influenсed the рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts. The R-squared (R2) equals to 0.880 (or 88.8%) and adjusted R-squared equals to 0.873 (or 87.3%); the results show the goodness of fit of the estimated model. Up to 88.8% of long-run appreciation in performance is influenced by changes in project initiation process; project planning process; project implementation process and project monitoring & control process as implemented by FRCP. The other remaining 11.2% can be explained by other factors not examined in this study. The results of ANOVA as p-value is less than 5%, this specifies that the performance of FRCP was significantly driven by at least one independent variable under this study. Therefore, the calculated F-value equals to 131.960 and this is greater than critical F-Value which is 2.499. Consequently, the general regression model is significant. Оverаll соnсlusiоns аnd reсоmmendаtiоns were shарed in оrder tо helр рrоjeсt mаnаgers, оrgаnizаtiоns, аnd future reseаrсhers. Keywords: Project Management Process, Construction Project, Project Performance, Feeder Rоаds Соnstruсtiоn Рrоjeсts Rwanda.
这项研究探讨了馈源对馈线的影响。馈电设备的使用经验表明,馈电设备可以在预算和时间范围内有效使用,并达到预期质量。本研究调查了如何启动、设计、执行和实施,以及如何影响馈线的质量。这项研究在卢旺达和乌干达的所有 10 个 Distrits 支线进行。这些支线网络是卢旺达的主要支线。从所有 84 名员工中挑选出 84 名受访者,并使用问卷调查,从中收到 77 份答复。本研究采用了描述性研究设计和随机提问的方法。通过定量分析,研究发现,在支线道路上,有大量的道路与支线道路相连。此外,研究还确定了这些问题在所研究的支线道路中的影响程度。研究发现,多线回归结果表明,馈线论文对馈源论文的影响很大。R 平方(R2)等于 0.880(或 88.8%),调整后的 R 平方等于 0.873(或 87.3%);这些结果显示了估计模型的拟合程度。FRCP 实施的项目启动流程、项目规划流程、项目实施流程和项目监测与控制流程的变化对绩效的长期增长影响高达 88.8%。其余的 11.2%可以由本研究未涉及的其他因素解释。方差分析结果的 p 值小于 5%,这表明 FRCP 的绩效至少受到本研究中一个自变量的显著影响。因此,计算出的 F 值等于 131.960,大于临界 F 值 2.499。因此,一般回归模型是显著的。为了帮助研究人员更好地了解研究对象、研究方法以及未来的研究对象,研究人员对所有研究对象和研究方法进行了研究。Keywords:项目管理过程、建设项目、项目绩效、馈线 Rоаds Соnstruсtiоn Рrоjeсts Rwanda.
{"title":"Рrоjeсt Management Рrосess and Рerfоrmаnсe of Feeder Rоаds Соnstruсtiоn Рrоjeсts in Rwаndа","authors":"Charles Harerimana","doi":"10.53819/81018102t4248","DOIUrl":"https://doi.org/10.53819/81018102t4248","url":null,"abstract":"This reseаrсh exаmined the influenсe оf рrоjeсt mаnаgement рrосess оn рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts in Rwаndа. Feeder rоаds соnstruсtiоn рrоjeсts exрerienсe сhаllenges thаt hаmрer them frоm being effeсtively соmрleted within the аllосаted budget, timelines аnd tо the desired quаlity. This study sрeсifiсаlly investigаted hоw рrоjeсt initiаtiоn, рrоjeсt рlаnning, рrоjeсt implementation аnd рrоjeсt mоnitоring аnd соntrоl influenсe the рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts. The study was соnduсted in аll the 10 Distriсts feeder rоаds соnstruсtiоn рrоjeсts in Rwаndа. These feeder rоаds рrоjeсts аre аt vаriоus stаges оf соmрletiоn. The number оf seleсted resроndents was 84 respondents from all 84 employees аnd cencus was used from which 77 responses were received. The study used desсriрtive reseаrсh designs аnd аррlying questiоnnаire in соlleсtiоn оf dаtа. Thrоugh quаntitаtive аnаlysis, the study fоund оut that рrоjeсt initiаtiоn, рrоjeсt рlаnning, рrоjeсt exeсutiоn аnd рrоjeсt mоnitоring аnd соntrоl hаve а significant relаtiоnshiр with feeder roads рrоjeсts рerfоrmаnсe. Moreover, it was estаblished оut аt whiсh extent thоse рrоjeсt mаnаgement рrосess рhаses аre being аrrаnged in the feeder rоаd рrоjeсts under study. The study emрlоyed multiрle lineаr regressiоn mоdel fоr dаtа аnаlysis аnd it соnсluded that рrоjeсt mаnаgement рrосess рhаses influenсed the рerfоrmаnсe оf feeder rоаds соnstruсtiоn рrоjeсts. The R-squared (R2) equals to 0.880 (or 88.8%) and adjusted R-squared equals to 0.873 (or 87.3%); the results show the goodness of fit of the estimated model. Up to 88.8% of long-run appreciation in performance is influenced by changes in project initiation process; project planning process; project implementation process and project monitoring & control process as implemented by FRCP. The other remaining 11.2% can be explained by other factors not examined in this study. The results of ANOVA as p-value is less than 5%, this specifies that the performance of FRCP was significantly driven by at least one independent variable under this study. Therefore, the calculated F-value equals to 131.960 and this is greater than critical F-Value which is 2.499. Consequently, the general regression model is significant. Оverаll соnсlusiоns аnd reсоmmendаtiоns were shарed in оrder tо helр рrоjeсt mаnаgers, оrgаnizаtiоns, аnd future reseаrсhers. Keywords: Project Management Process, Construction Project, Project Performance, Feeder Rоаds Соnstruсtiоn Рrоjeсts Rwanda.","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"12 6","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139780543","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effect of Women’s Development Projects in Improving the Social Welfare of the Beneficiaries: A Case of Mother and Child Development Center in Gakenke District 妇女发展项目对改善受益人社会福利的影响:加肯克区母婴发展中心案例
Pub Date : 2024-02-13 DOI: 10.53819/81018102t4247
Alice Mukeshimana
The study aimed to analyze the effect of women’s development projects on improving the socio-welfare of beneficiaries in Gakenke district. Specifically, it sought to examine the impact of financial support provided by the Mother and Child Development Project on beneficiaries' social welfare, to assess the effect of women’s advocacy efforts by the Mother and Child Development Project on social welfare, to determine the influence of women’s training and development initiatives provided by the Mother and Child Development Project on social welfare. The sample size, calculated using the Slovin formula, comprised 170 respondents, representing beneficiaries of the Mother and Child Development Project in Gakenke district. Data were collected through documentary analysis and questionnaires. Statistical analyses, including correlation coefficient and R-squared values, were employed to assess the relationships and variations in the outcome variables. The study results found a strong positive correlation (correlation coefficient = 0.901) between financial support provided by the Mother and Child Development Project and beneficiaries' social welfare. The R-squared value of 0.63 indicated that 63% of the variation in social welfare improvement could be attributed to financial support. Additionally, the advocacy efforts of the project showed a strong positive relationship (correlation coefficient = 0.742) with social welfare improvement. The model explained 39.8% of the variation in the improvement of social welfare. In conclusion, the women's development projects, particularly those providing services like healthcare, nutrition, education, and psychosocial support through centers like the Mother and Child Development Project, significantly enhance the socio-welfare of beneficiaries. The study highlights the importance of sustained government support and the need for project sustainability to ensure long-term impact. The study recommends continued government support for women's development projects, emphasizing sustainability and long-term impact. Additionally, it suggests further research to explore additional factors influencing social welfare improvement and to evaluate the long-term effectiveness of such projects. Keywords: Women's development, Socio welfare, Beneficiary, Mother and Child Development Center, Gakenke District, Rwanda
本研究旨在分析妇女发展项目对改善加肯克地区受益人社会福利的影响。具体而言,研究试图考察 "母亲与儿童发展项目 "提供的财政支持对受益人社会福利的影响,评估 "母亲与儿童发展项目 "开展的妇女宣传工作对社会福利的影响,确定 "母亲与儿童发展项目 "提供的妇女培训和发展举措对社会福利的影响。使用斯洛文公式计算得出的样本量包括 170 名受访者,他们都是加肯克地区母婴发展项目的受益者。数据通过文献分析和问卷调查收集。统计分析包括相关系数和 R 平方值,用于评估结果变量之间的关系和变化。研究结果发现,母婴发展项目提供的财政支持与受益人的社会福利之间存在很强的正相关性(相关系数=0.901)。0.63 的 R 平方值表明,63% 的社会福利改善差异可归因于财政支持。此外,项目的宣传工作与社会福利的改善也有很强的正相关关系(相关系数 = 0.742)。该模型解释了 39.8%的社会福利改善差异。总之,妇女发展项目,尤其是那些通过母婴发展项目等中心提供医疗保健、营养、教育和社会心理支持等服务的项目,极大地改善了受益人的社会福利。研究强调了政府持续支持的重要性,以及项目可持续性以确保长期影响的必要性。研究建议政府继续支持妇女发展项目,强调可持续性和长期影响。此外,研究还建议开展进一步研究,探索影响社会福利改善的其他因素,并评估此类项目的长期有效性。关键词妇女发展、社会福利、受益人、母婴发展中心、加肯克区、卢旺达
{"title":"Effect of Women’s Development Projects in Improving the Social Welfare of the Beneficiaries: A Case of Mother and Child Development Center in Gakenke District","authors":"Alice Mukeshimana","doi":"10.53819/81018102t4247","DOIUrl":"https://doi.org/10.53819/81018102t4247","url":null,"abstract":"The study aimed to analyze the effect of women’s development projects on improving the socio-welfare of beneficiaries in Gakenke district. Specifically, it sought to examine the impact of financial support provided by the Mother and Child Development Project on beneficiaries' social welfare, to assess the effect of women’s advocacy efforts by the Mother and Child Development Project on social welfare, to determine the influence of women’s training and development initiatives provided by the Mother and Child Development Project on social welfare. The sample size, calculated using the Slovin formula, comprised 170 respondents, representing beneficiaries of the Mother and Child Development Project in Gakenke district. Data were collected through documentary analysis and questionnaires. Statistical analyses, including correlation coefficient and R-squared values, were employed to assess the relationships and variations in the outcome variables. The study results found a strong positive correlation (correlation coefficient = 0.901) between financial support provided by the Mother and Child Development Project and beneficiaries' social welfare. The R-squared value of 0.63 indicated that 63% of the variation in social welfare improvement could be attributed to financial support. Additionally, the advocacy efforts of the project showed a strong positive relationship (correlation coefficient = 0.742) with social welfare improvement. The model explained 39.8% of the variation in the improvement of social welfare. In conclusion, the women's development projects, particularly those providing services like healthcare, nutrition, education, and psychosocial support through centers like the Mother and Child Development Project, significantly enhance the socio-welfare of beneficiaries. The study highlights the importance of sustained government support and the need for project sustainability to ensure long-term impact. The study recommends continued government support for women's development projects, emphasizing sustainability and long-term impact. Additionally, it suggests further research to explore additional factors influencing social welfare improvement and to evaluate the long-term effectiveness of such projects. Keywords: Women's development, Socio welfare, Beneficiary, Mother and Child Development Center, Gakenke District, Rwanda","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"91 18","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139781273","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effect of Women’s Development Projects in Improving the Social Welfare of the Beneficiaries: A Case of Mother and Child Development Center in Gakenke District 妇女发展项目对改善受益人社会福利的影响:加肯克区母婴发展中心案例
Pub Date : 2024-02-13 DOI: 10.53819/81018102t4247
Alice Mukeshimana
The study aimed to analyze the effect of women’s development projects on improving the socio-welfare of beneficiaries in Gakenke district. Specifically, it sought to examine the impact of financial support provided by the Mother and Child Development Project on beneficiaries' social welfare, to assess the effect of women’s advocacy efforts by the Mother and Child Development Project on social welfare, to determine the influence of women’s training and development initiatives provided by the Mother and Child Development Project on social welfare. The sample size, calculated using the Slovin formula, comprised 170 respondents, representing beneficiaries of the Mother and Child Development Project in Gakenke district. Data were collected through documentary analysis and questionnaires. Statistical analyses, including correlation coefficient and R-squared values, were employed to assess the relationships and variations in the outcome variables. The study results found a strong positive correlation (correlation coefficient = 0.901) between financial support provided by the Mother and Child Development Project and beneficiaries' social welfare. The R-squared value of 0.63 indicated that 63% of the variation in social welfare improvement could be attributed to financial support. Additionally, the advocacy efforts of the project showed a strong positive relationship (correlation coefficient = 0.742) with social welfare improvement. The model explained 39.8% of the variation in the improvement of social welfare. In conclusion, the women's development projects, particularly those providing services like healthcare, nutrition, education, and psychosocial support through centers like the Mother and Child Development Project, significantly enhance the socio-welfare of beneficiaries. The study highlights the importance of sustained government support and the need for project sustainability to ensure long-term impact. The study recommends continued government support for women's development projects, emphasizing sustainability and long-term impact. Additionally, it suggests further research to explore additional factors influencing social welfare improvement and to evaluate the long-term effectiveness of such projects. Keywords: Women's development, Socio welfare, Beneficiary, Mother and Child Development Center, Gakenke District, Rwanda
本研究旨在分析妇女发展项目对改善加肯克地区受益人社会福利的影响。具体而言,研究试图考察 "母亲与儿童发展项目 "提供的财政支持对受益人社会福利的影响,评估 "母亲与儿童发展项目 "开展的妇女宣传工作对社会福利的影响,确定 "母亲与儿童发展项目 "提供的妇女培训和发展举措对社会福利的影响。使用斯洛文公式计算得出的样本量包括 170 名受访者,他们都是加肯克地区母婴发展项目的受益者。数据通过文献分析和问卷调查收集。统计分析包括相关系数和 R 平方值,用于评估结果变量之间的关系和变化。研究结果发现,母婴发展项目提供的财政支持与受益人的社会福利之间存在很强的正相关性(相关系数=0.901)。0.63 的 R 平方值表明,63% 的社会福利改善差异可归因于财政支持。此外,项目的宣传工作与社会福利的改善也有很强的正相关关系(相关系数 = 0.742)。该模型解释了 39.8%的社会福利改善差异。总之,妇女发展项目,尤其是那些通过母婴发展项目等中心提供医疗保健、营养、教育和社会心理支持等服务的项目,极大地改善了受益人的社会福利。研究强调了政府持续支持的重要性,以及项目可持续性以确保长期影响的必要性。研究建议政府继续支持妇女发展项目,强调可持续性和长期影响。此外,研究还建议开展进一步研究,探索影响社会福利改善的其他因素,并评估此类项目的长期有效性。关键词妇女发展、社会福利、受益人、母婴发展中心、加肯克区、卢旺达
{"title":"Effect of Women’s Development Projects in Improving the Social Welfare of the Beneficiaries: A Case of Mother and Child Development Center in Gakenke District","authors":"Alice Mukeshimana","doi":"10.53819/81018102t4247","DOIUrl":"https://doi.org/10.53819/81018102t4247","url":null,"abstract":"The study aimed to analyze the effect of women’s development projects on improving the socio-welfare of beneficiaries in Gakenke district. Specifically, it sought to examine the impact of financial support provided by the Mother and Child Development Project on beneficiaries' social welfare, to assess the effect of women’s advocacy efforts by the Mother and Child Development Project on social welfare, to determine the influence of women’s training and development initiatives provided by the Mother and Child Development Project on social welfare. The sample size, calculated using the Slovin formula, comprised 170 respondents, representing beneficiaries of the Mother and Child Development Project in Gakenke district. Data were collected through documentary analysis and questionnaires. Statistical analyses, including correlation coefficient and R-squared values, were employed to assess the relationships and variations in the outcome variables. The study results found a strong positive correlation (correlation coefficient = 0.901) between financial support provided by the Mother and Child Development Project and beneficiaries' social welfare. The R-squared value of 0.63 indicated that 63% of the variation in social welfare improvement could be attributed to financial support. Additionally, the advocacy efforts of the project showed a strong positive relationship (correlation coefficient = 0.742) with social welfare improvement. The model explained 39.8% of the variation in the improvement of social welfare. In conclusion, the women's development projects, particularly those providing services like healthcare, nutrition, education, and psychosocial support through centers like the Mother and Child Development Project, significantly enhance the socio-welfare of beneficiaries. The study highlights the importance of sustained government support and the need for project sustainability to ensure long-term impact. The study recommends continued government support for women's development projects, emphasizing sustainability and long-term impact. Additionally, it suggests further research to explore additional factors influencing social welfare improvement and to evaluate the long-term effectiveness of such projects. Keywords: Women's development, Socio welfare, Beneficiary, Mother and Child Development Center, Gakenke District, Rwanda","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"63 7","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139841275","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effect of Project Risk Management on Performance of Social Development Projects in Rwanda: A Case of VUP Financial Services Project in Gakenke District 项目风险管理对卢旺达社会发展项目绩效的影响:加肯克区 VUP 金融服务项目案例
Pub Date : 2024-02-12 DOI: 10.53819/81018102t2338
{"title":"Effect of Project Risk Management on Performance of Social Development Projects in Rwanda: A Case of VUP Financial Services Project in Gakenke District","authors":"","doi":"10.53819/81018102t2338","DOIUrl":"https://doi.org/10.53819/81018102t2338","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"76 34","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139844062","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effect of Project Risk Management on Performance of Social Development Projects in Rwanda: A Case of VUP Financial Services Project in Gakenke District 项目风险管理对卢旺达社会发展项目绩效的影响:加肯克区 VUP 金融服务项目案例
Pub Date : 2024-02-12 DOI: 10.53819/81018102t2338
{"title":"Effect of Project Risk Management on Performance of Social Development Projects in Rwanda: A Case of VUP Financial Services Project in Gakenke District","authors":"","doi":"10.53819/81018102t2338","DOIUrl":"https://doi.org/10.53819/81018102t2338","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"51 10","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139783992","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Journal of Entrepreneurship & Project Management
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1