首页 > 最新文献

Journal of Entrepreneurship & Project Management最新文献

英文 中文
Health Project Implementation Processes and Performance Efficiency in Rwanda: A Case Study of the HIV Case Based Surveillance Program in Mayange Health Centre, Bugesera District 卢旺达的卫生项目实施过程和绩效效率:布格塞拉区马恩杰保健中心基于艾滋病毒病例的监测方案的案例研究
Pub Date : 2023-06-23 DOI: 10.53819/81018102t3089
{"title":"Health Project Implementation Processes and Performance Efficiency in Rwanda: A Case Study of the HIV Case Based Surveillance Program in Mayange Health Centre, Bugesera District","authors":"","doi":"10.53819/81018102t3089","DOIUrl":"https://doi.org/10.53819/81018102t3089","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"41 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117183830","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Beneficiaries Empowerment and Sustainability of Non-Governmental Organization Projects in Rwanda: A Case of Send a Cow Rwanda Jyambere Project 卢旺达非政府组织项目的受益人赋权和可持续性:以送一头牛卢旺达Jyambere项目为例
Pub Date : 2023-06-23 DOI: 10.53819/81018102t3090
Kanyesigye Rhoda Kadunguri, D. G. Njenga
This research analyzed how beneficiary empowerment affects the sustainability of NGO projects in Rwanda. The key characteristics that significantly help communities to empower themselves and promote sustainable development were discussed in detail and finally validated. More specifically, the study evaluated the impact of capacity building, material resources and partnerships on the sustainability of the Send a Cow Jyambere project in Rwanda. The study used descriptive research design with both quantitative and qualitative methods. The population of this study consisted of 5 technical project staff, 120 peer farmers and para-veterinaries and 1520 direct project beneficiaries. Thus, the total population was1645 individuals. Stratified random sampling was used to select 322 respondents as sample size. The survey used questionnaires and interviews to collect data. Descriptive and inferential analyses such as frequencies, percentages, correlations and regressions were used to present the quantitative data in tabular and graphical form using SPSS version 23. This study targeted to be of utmost importance to the researcher, future researchers, Mount Kenya University, the Jyambere project and the Rwandan society at large. The Pearson correlation analysis between capacity building (r=0.772, p=0.000), material resource (r=0.613, p=0.000) and partnership (r=0.631, p=0.000) against project sustainability showed that capacity building was found to have a positive and statistically significant correlation. The analysis of regression coefficients showed that capacity building (β1=0.511, p=0.000) material resource (β2=0.374 p=0.000) and partnership (β1=0.201, p=0.000) all have positive and statistically significant effect on project sustainability since the p-values are less than 5%. This study has empirically demonstrated that beneficiaries’ empowerment plays a significant role in ensuring that projects are sustainable. Therefore, the researcher recommends that project managers should embrace best practices that enhance beneficiaries’ empowerment such as incorporating capacity building, provide necessary material resources that equip beneficiaries ready to work by themselves as well as partnership with other parties. The government and the regulatory bodies should be keen to promote such projects which are community-based.
本研究分析了受益人赋权如何影响卢旺达非政府组织项目的可持续性。详细讨论并最终验证了显著帮助社区增强自身能力和促进可持续发展的关键特征。更具体地说,该研究评估了能力建设、物质资源和伙伴关系对卢旺达送牛Jyambere项目可持续性的影响。本研究采用定性与定量相结合的描述性研究设计。研究对象包括5名项目技术人员、120名同级农民和准兽医以及1520名项目直接受益者。因此,种群总数为1645个个体。采用分层随机抽样的方法,选取322名受访者作为样本量。该调查采用问卷调查和访谈的方式收集数据。描述性和推理分析,如频率,百分比,相关性和回归使用SPSS版本23以表格和图形形式呈现定量数据。这项研究的目标是对研究人员、未来的研究人员、肯尼亚山大学、Jyambere项目和整个卢旺达社会至关重要。能力建设(r=0.772, p=0.000)、物质资源(r=0.613, p=0.000)和伙伴关系(r=0.631, p=0.000)与项目可持续性之间的Pearson相关分析表明,能力建设与项目可持续性之间存在显著正相关。回归系数分析表明,能力建设(β1=0.511, p=0.000)、物质资源(β2=0.374, p=0.000)和伙伴关系(β1=0.201, p=0.000)对项目可持续性均有显著的正向影响,且p值均小于5%。本研究实证证明,受益人赋权在确保项目可持续性方面发挥着重要作用。因此,该研究人员建议,项目经理应该采用增强受益人赋权的最佳实践,例如纳入能力建设,提供必要的物质资源,使受益人准备好自己工作以及与其他各方合作。政府和监管机构应该积极推动这类以社区为基础的项目。
{"title":"Beneficiaries Empowerment and Sustainability of Non-Governmental Organization Projects in Rwanda: A Case of Send a Cow Rwanda Jyambere Project","authors":"Kanyesigye Rhoda Kadunguri, D. G. Njenga","doi":"10.53819/81018102t3090","DOIUrl":"https://doi.org/10.53819/81018102t3090","url":null,"abstract":"This research analyzed how beneficiary empowerment affects the sustainability of NGO projects in Rwanda. The key characteristics that significantly help communities to empower themselves and promote sustainable development were discussed in detail and finally validated. More specifically, the study evaluated the impact of capacity building, material resources and partnerships on the sustainability of the Send a Cow Jyambere project in Rwanda. The study used descriptive research design with both quantitative and qualitative methods. The population of this study consisted of 5 technical project staff, 120 peer farmers and para-veterinaries and 1520 direct project beneficiaries. Thus, the total population was1645 individuals. Stratified random sampling was used to select 322 respondents as sample size. The survey used questionnaires and interviews to collect data. Descriptive and inferential analyses such as frequencies, percentages, correlations and regressions were used to present the quantitative data in tabular and graphical form using SPSS version 23. This study targeted to be of utmost importance to the researcher, future researchers, Mount Kenya University, the Jyambere project and the Rwandan society at large. The Pearson correlation analysis between capacity building (r=0.772, p=0.000), material resource (r=0.613, p=0.000) and partnership (r=0.631, p=0.000) against project sustainability showed that capacity building was found to have a positive and statistically significant correlation. The analysis of regression coefficients showed that capacity building (β1=0.511, p=0.000) material resource (β2=0.374 p=0.000) and partnership (β1=0.201, p=0.000) all have positive and statistically significant effect on project sustainability since the p-values are less than 5%. This study has empirically demonstrated that beneficiaries’ empowerment plays a significant role in ensuring that projects are sustainable. Therefore, the researcher recommends that project managers should embrace best practices that enhance beneficiaries’ empowerment such as incorporating capacity building, provide necessary material resources that equip beneficiaries ready to work by themselves as well as partnership with other parties. The government and the regulatory bodies should be keen to promote such projects which are community-based.","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115446053","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Project Risk Management Practices and Performance of Construction Projects: A Case of Horizon Construction in Kigali, Rwanda 项目风险管理实践与建设项目绩效:以卢旺达基加利地平线建设为例
Pub Date : 2023-06-16 DOI: 10.53819/81018102t2153
Janvier Hakizimana
The general objective was to examine the effect of project risk management on performance of construction of rehabilitation house construction in Kigali, Rwanda. The specific objectives were; to determine effect of project risk assessment, project risk base decision and project contingency decision on performance of commercial rehabilitation in Kigali. Working on that topic would provide a better way to large-scale construction projects. Other scholars who would be interested to work in the same field. The study used relevant theories such as risk management and risk assessment theories. This research used a descriptive study variables, indicators and measurement. A correlation study design was used to establish the association between variables and regression effect size for each specific objectives. The study targeted 180 staffs of Horizon Construction. A sample of 125 respondents determined using Yamane formula participated in the study process. The sample size was chosen using simple random and purposive sampling techniques. The study collected data using questionnaire and interview guide. The researcher study data using a computer based software known statistical product and service solutions to 26.0 to generate descriptive and inferential statistics. Qualitative data was analyzed using content analysis through themes and subthemes. Findings show
总目标是审查项目风险管理对卢旺达基加利重建房屋建造工作业绩的影响。具体目标是;确定项目风险评估、项目风险基础决策和项目应急决策对基加利商业重建绩效的影响。研究这一专题将为大型建筑项目提供更好的途径。其他有兴趣在同一领域工作的学者。本研究运用了风险管理、风险评估等相关理论。本研究采用描述性研究变量、指标和测量方法。采用相关研究设计来建立每个特定目标的变量和回归效应大小之间的关联。这项研究的对象是地平线建筑公司的180名员工。使用Yamane公式确定的125名受访者样本参与了研究过程。样本量的选择采用简单的随机和有目的的抽样技术。本研究采用问卷调查法和访谈法收集数据。研究人员利用基于计算机的已知统计软件对产品和服务的26.0解决方案进行数据研究,生成描述性和推断性统计。定性数据通过主题和副主题进行内容分析。研究结果显示
{"title":"Project Risk Management Practices and Performance of Construction Projects: A Case of Horizon Construction in Kigali, Rwanda","authors":"Janvier Hakizimana","doi":"10.53819/81018102t2153","DOIUrl":"https://doi.org/10.53819/81018102t2153","url":null,"abstract":"The general objective was to examine the effect of project risk management on performance of construction of rehabilitation house construction in Kigali, Rwanda. The specific objectives were; to determine effect of project risk assessment, project risk base decision and project contingency decision on performance of commercial rehabilitation in Kigali. Working on that topic would provide a better way to large-scale construction projects. Other scholars who would be interested to work in the same field. The study used relevant theories such as risk management and risk assessment theories. This research used a descriptive study variables, indicators and measurement. A correlation study design was used to establish the association between variables and regression effect size for each specific objectives. The study targeted 180 staffs of Horizon Construction. A sample of 125 respondents determined using Yamane formula participated in the study process. The sample size was chosen using simple random and purposive sampling techniques. The study collected data using questionnaire and interview guide. The researcher study data using a computer based software known statistical product and service solutions to 26.0 to generate descriptive and inferential statistics. Qualitative data was analyzed using content analysis through themes and subthemes. Findings show","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129060475","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Procurement Practices and Public Projects Implementation in Rwanda: A Case of African Evangelist Enterprise 卢旺达的采购实践与公共项目实施:以非洲福音企业为例
Pub Date : 2023-06-16 DOI: 10.53819/81018102t2150
J. Mukashema
This study examined the role of procurement practices on public projects implementation in Rwanda using a case of African Evangelist Enterprise. The specific objectives were to determine the effect of procurement planning, professionalism
本研究以非洲福音企业为例,审查了采购做法对卢旺达公共项目实施的作用。具体目标是确定采购规划的效果、专业性
{"title":"Procurement Practices and Public Projects Implementation in Rwanda: A Case of African Evangelist Enterprise","authors":"J. Mukashema","doi":"10.53819/81018102t2150","DOIUrl":"https://doi.org/10.53819/81018102t2150","url":null,"abstract":"This study examined the role of procurement practices on public projects implementation in Rwanda using a case of African Evangelist Enterprise. The specific objectives were to determine the effect of procurement planning, professionalism","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"20 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116728358","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Operational Outsourcing Practices and Organizational Performance of Telecommunication Companies in Rwanda: A Case of Airtel Rwanda Plc 运营外包实践与卢旺达电信公司的组织绩效:以卢旺达Airtel公司为例
Pub Date : 2023-06-16 DOI: 10.53819/81018102t2151
Crepin Kirori
Practices and Organizational Performance
实践与组织绩效
{"title":"Operational Outsourcing Practices and Organizational Performance of Telecommunication Companies in Rwanda: A Case of Airtel Rwanda Plc","authors":"Crepin Kirori","doi":"10.53819/81018102t2151","DOIUrl":"https://doi.org/10.53819/81018102t2151","url":null,"abstract":"Practices and Organizational Performance","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131332018","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Influence of Project Resources Management and Performance of Sustainable Agricultural Intensification and Food Security Project (SAIP) Rwanda 卢旺达可持续农业集约化和粮食安全项目(SAIP)项目资源管理与绩效的影响
Pub Date : 2023-06-15 DOI: 10.53819/81018102t5191
{"title":"Influence of Project Resources Management and Performance of Sustainable Agricultural Intensification and Food Security Project (SAIP) Rwanda","authors":"","doi":"10.53819/81018102t5191","DOIUrl":"https://doi.org/10.53819/81018102t5191","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"49 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115136582","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Factors Affecting Cost and Execution Period of Trail Bridge Construction Project in Nyamagabe District, Rwanda 影响卢旺达尼亚马加贝地区人行天桥建设项目成本及工期的因素
Pub Date : 2023-06-15 DOI: 10.53819/81018102t5192
{"title":"Factors Affecting Cost and Execution Period of Trail Bridge Construction Project in Nyamagabe District, Rwanda","authors":"","doi":"10.53819/81018102t5192","DOIUrl":"https://doi.org/10.53819/81018102t5192","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131383864","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Entrepreneurship Education and Entrepreneurial Intention: Case Study of Business Students in Tianjin, China 创业教育与创业意向:以天津市商科学生为例
Pub Date : 2023-06-15 DOI: 10.53819/81018102t5190
{"title":"Entrepreneurship Education and Entrepreneurial Intention: Case Study of Business Students in Tianjin, China","authors":"","doi":"10.53819/81018102t5190","DOIUrl":"https://doi.org/10.53819/81018102t5190","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"222 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128616790","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Outsourcing Practices and Organizational Performance in Rwanda: A Case of Ampersand Rwanda Ltd 卢旺达外包实践与组织绩效:以安培卢旺达有限公司为例
Pub Date : 2023-06-15 DOI: 10.53819/81018102t2149
Emma Stella Tuyisenge
{"title":"Outsourcing Practices and Organizational Performance in Rwanda: A Case of Ampersand Rwanda Ltd","authors":"Emma Stella Tuyisenge","doi":"10.53819/81018102t2149","DOIUrl":"https://doi.org/10.53819/81018102t2149","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129105367","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Determinants of Project Management Effectiveness and Performance on Public Projects in Rwanda: A Case of Three Stones International Rwanda 卢旺达公共项目项目管理有效性和绩效的决定因素:以三块石头国际卢旺达为例
Pub Date : 2023-06-13 DOI: 10.53819/81018102t4156
Dusabirane Pierre
The purpose of this research is to examine is to investigate the determinants of project management effectiveness and performance on public projects in Rwanda a case of Three Stones International Rwanda. More specifically, the study is motivated by the following particular objectives: To determine the effects of project finance on performance of Three Stones International Rwanda's projects, To explore the effects of beneficiary involvement on the performance of Three Stones International Rwanda, the effects of monitoring and evaluation on the performance of Three Stones International Rwanda and to assess the influence of Project leadership on project performance of Three Stones International Rwanda. This research will help the Rwandan government, to better comprehend the significance of efficient project management on the success of public projects in Rwanda, in particular planners and decision-makers involved in capacity building. Because it inspires them to conduct research on related subjects, this study will be beneficial to other researchers. The researcher employed a descriptive research design, with a sample size of 213 and a target population of 459, in order to achieve on research objectives, the primary data was obtained using questionnaires and an examination of the supporting documentation was utilized to gather the secondary data. The acquired data was analyzed using regression, correlation, and mean calculations in SPSS version 21. Tables was utilized to illustrate the findings, and a pilot study was conducted to evaluate the validity and dependability of the instruments used to gather the data. After collecting and analyzing data the following responses were obtained. The Pearson coefficient correlation showed that there is strongly positive correlation of 852 (r=0.852) between beneficiary involvement and public project performance. The study concluded that project managers emphasize on the availability of project finance, beneficiary’ involvement, monitoring and evaluation and project leadership to boost public project performance. The study recommended that the project managers should focus highly on the effective utilization of allocated resources to avoid any misuse of financial resources. Keywords: Project Management, project management effectiveness, Performance of public project
本研究的目的是研究是调查项目管理的有效性和绩效的决定因素在卢旺达的公共项目,三块石头国际卢旺达的一个案例。更具体地说,这项研究的动机是下列具体目标:确定项目融资对三石国际卢旺达项目绩效的影响,探讨受益人参与对三石国际卢旺达项目绩效的影响,监测和评估对三石国际卢旺达项目绩效的影响,评估项目领导对三石国际卢旺达项目绩效的影响。这项研究将有助于卢旺达政府更好地理解有效的项目管理对卢旺达公共项目成功的重要性,特别是参与能力建设的规划者和决策者。因为它激励他们进行相关课题的研究,这项研究将对其他研究人员有益。研究人员采用描述性研究设计,样本量为213,目标人群为459,为了实现研究目标,主要数据是通过问卷调查获得的,并通过对支持文件的审查来收集次要数据。采集的数据在SPSS version 21中使用回归、相关和均值计算进行分析。使用表格来说明调查结果,并进行了一项试点研究,以评估用于收集数据的工具的有效性和可靠性。在收集和分析数据后,得到了以下回应。Pearson相关系数显示,受益人参与与公共项目绩效之间存在强正相关(r=0.852),为852。该研究的结论是,项目经理强调项目融资的可获得性、受益人的参与、监测和评价以及项目领导,以提高公共项目的绩效。该研究建议,项目经理应高度重视有效利用分配的资源,以避免滥用财政资源。关键词:项目管理,项目管理有效性,公共项目绩效
{"title":"Determinants of Project Management Effectiveness and Performance on Public Projects in Rwanda: A Case of Three Stones International Rwanda","authors":"Dusabirane Pierre","doi":"10.53819/81018102t4156","DOIUrl":"https://doi.org/10.53819/81018102t4156","url":null,"abstract":"The purpose of this research is to examine is to investigate the determinants of project management effectiveness and performance on public projects in Rwanda a case of Three Stones International Rwanda. More specifically, the study is motivated by the following particular objectives: To determine the effects of project finance on performance of Three Stones International Rwanda's projects, To explore the effects of beneficiary involvement on the performance of Three Stones International Rwanda, the effects of monitoring and evaluation on the performance of Three Stones International Rwanda and to assess the influence of Project leadership on project performance of Three Stones International Rwanda. This research will help the Rwandan government, to better comprehend the significance of efficient project management on the success of public projects in Rwanda, in particular planners and decision-makers involved in capacity building. Because it inspires them to conduct research on related subjects, this study will be beneficial to other researchers. The researcher employed a descriptive research design, with a sample size of 213 and a target population of 459, in order to achieve on research objectives, the primary data was obtained using questionnaires and an examination of the supporting documentation was utilized to gather the secondary data. The acquired data was analyzed using regression, correlation, and mean calculations in SPSS version 21. Tables was utilized to illustrate the findings, and a pilot study was conducted to evaluate the validity and dependability of the instruments used to gather the data. After collecting and analyzing data the following responses were obtained. The Pearson coefficient correlation showed that there is strongly positive correlation of 852 (r=0.852) between beneficiary involvement and public project performance. The study concluded that project managers emphasize on the availability of project finance, beneficiary’ involvement, monitoring and evaluation and project leadership to boost public project performance. The study recommended that the project managers should focus highly on the effective utilization of allocated resources to avoid any misuse of financial resources. Keywords: Project Management, project management effectiveness, Performance of public project","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"70 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132587064","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Journal of Entrepreneurship & Project Management
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1