AUDIT KESELAMATAN JALAN TOL TANGERANG - MERAK
Pub Date : 2021-05-04 DOI: 10.24912/JMSTKIK.V5I1.9057
Ni Luh Shinta Putu Eka Setyarini, Michael Gani Virgantara
Tangerang-Merak Toll Road is a toll road connecting Tangerang and Merak Port, which includes Cikupa Toll Road, East Balaraja, West Balaraja, Ciakande, Ciujung, East Serang, West Serang, East Cilegon, West Cilegon, and Merak. With the more congested, will make the risk of car accidents also increased. In an effort to improve of road safety, especially toll roads, a Road Safety Audit (AKJ) is needed. Aspects examined and observed include geometric, traffic management, pavements, street furnitures and complementary buildings. As a result, it is concluded that in geometric aspect, in general has been designed in accordance with the provisions, but nevertheless there are parts that still require improvement. This research will discussed the existing condition of Tangerang-Merak Toll Road based on direct observation. The aspects reviewed are geometric, pavement, street furnitures and road complementary buildings such as Signs, Markings and Median roads. In the end, accident-prone areas will be obtained on tangerang-merak toll road with a comparison analysis of direct observation data, and traffic accident data. Keywords: Toll Road; Street funitures; Accident Prone Areas; Road Safety AuditAbstrakJalan Tol Tangerang-Merak adalah jalan tol yang menghubungkan Kota Tangerang dan Pelabuhan Merak yang mencakup Tol Cikupa, Balaraja Timur, Balaraja Barat, Ciakande, Ciujung, Serang Timur, Serang Barat, Cilegon Timur, Cilegon Barat, dan Merak. Dengan semakin padatnya ruas jalan tol tersebut akan membuat angka risiko kecelakaan mobil juga semakin meningkat. Dalam upaya meningkatkan keselamatan para pengguna jalan, khususnya jalan tol, maka perlu dilaksanakan Audit Keselamatan Jalan (AKJ). Aspek yang diperiksa dan diamati meliputi aspek geometrik jalan, manajemen lalu lintas, perkerasan, bangunan pelengkap jalan dan perlengkapan jalan. Sebagai hasilnya, diperoleh kesimpulan bahwa dari segi geometrik, secara umum jalan sudah dirancang sesuai dengan ketentuan, namun demikian ada bagian-bagian yang masih memerlukan penyempurnaan. Penelitian ini akan membahas kondisi eksisting jalan Tol Tangerang-Merak berdasarkan pengamatan langsung. Aspek yang ditinjau adalah aspek geometrik, perkerasan, dan bangunan pelengkap jalan seperti Rambu, Marka dan Median jalan. Pada akhirnya, akan didapatkan daerah rawan kecelakaan pada ruas tol Tangerang-Merak dengan analisis perbandingan dari data pengamatan langsung, dan data kecelakaan lalu lintas.
丹格朗-美叻收费公路是一条连接丹格朗和美叻港的收费公路,包括Cikupa收费公路、东巴拉拉加、西巴拉拉加、Ciakande、Ciujung、东雪朗、西雪朗、东西里贡、西西里贡和美叻。随着交通的日益拥挤,将使发生车祸的风险也随之增加。为了改善道路安全,特别是收费公路,需要进行道路安全审计。检查和观察的方面包括几何、交通管理、人行道、街道设施和配套建筑。由此得出结论,在几何方面,总体上已符合设计规定,但仍有部分需要改进。本研究将在直接观察的基础上,探讨坦格朗-美叻收费公路的现状。检讨的方面是几何,路面,街道设施和道路配套建筑,如标志,标线和中间道路。最后,通过对直接观测数据和交通事故数据的对比分析,得出tangerang-merak收费公路上的事故易发区域。关键词:收费公路;街道家具;易发生意外地区;【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】【道路安全稽查】邓干人说:“邓干人说:‘我爱你,我爱你,我爱你。’”Dalam upaya meningkatkan keselamatan para pengguna jalan, khususnya jalan tol, maka perlu dilaksanakan Audit keselamatan jalan (AKJ)。阿斯佩克杨diperiksa dan diamati meliputi阿斯帕克几何语,管理lalu lintas, perkerasan, bangunan pelengkap jalan dan perlengkapan jalan。Sebagai hasilnya, diperoleh kespulan bahwa dari segi geometrik, secara umum jalan sudah dirancang sesuai dengan ketentuan, namun demikian ada baggian -bagian yang masih memerkan penyempurnaan。Penelitian ini akan成员有一个kondisi,即存在的jalan Tol Tangerang-Merak berdasarkan pengamatan langsung。Aspek yang ditinjau adalah Aspek geometrik, perkerasan, dan bangunan pelengkap jalan seperti Rambu, Marka dan Median jalan。我想说的是,我想说的是,我想说的是,我想说的是,我想说的是,我想说的是,我想说的是,我想说的是,我想说的是,我想说的是,我想说的是。
{"title":"AUDIT KESELAMATAN JALAN TOL TANGERANG - MERAK","authors":"Ni Luh Shinta Putu Eka Setyarini, Michael Gani Virgantara","doi":"10.24912/JMSTKIK.V5I1.9057","DOIUrl":"https://doi.org/10.24912/JMSTKIK.V5I1.9057","url":null,"abstract":"Tangerang-Merak Toll Road is a toll road connecting Tangerang and Merak Port, which includes Cikupa Toll Road, East Balaraja, West Balaraja, Ciakande, Ciujung, East Serang, West Serang, East Cilegon, West Cilegon, and Merak. With the more congested, will make the risk of car accidents also increased. In an effort to improve of road safety, especially toll roads, a Road Safety Audit (AKJ) is needed. Aspects examined and observed include geometric, traffic management, pavements, street furnitures and complementary buildings. As a result, it is concluded that in geometric aspect, in general has been designed in accordance with the provisions, but nevertheless there are parts that still require improvement. This research will discussed the existing condition of Tangerang-Merak Toll Road based on direct observation. The aspects reviewed are geometric, pavement, street furnitures and road complementary buildings such as Signs, Markings and Median roads. In the end, accident-prone areas will be obtained on tangerang-merak toll road with a comparison analysis of direct observation data, and traffic accident data. Keywords: Toll Road; Street funitures; Accident Prone Areas; Road Safety AuditAbstrakJalan Tol Tangerang-Merak adalah jalan tol yang menghubungkan Kota Tangerang dan Pelabuhan Merak yang mencakup Tol Cikupa, Balaraja Timur, Balaraja Barat, Ciakande, Ciujung, Serang Timur, Serang Barat, Cilegon Timur, Cilegon Barat, dan Merak. Dengan semakin padatnya ruas jalan tol tersebut akan membuat angka risiko kecelakaan mobil juga semakin meningkat. Dalam upaya meningkatkan keselamatan para pengguna jalan, khususnya jalan tol, maka perlu dilaksanakan Audit Keselamatan Jalan (AKJ). Aspek yang diperiksa dan diamati meliputi aspek geometrik jalan, manajemen lalu lintas, perkerasan, bangunan pelengkap jalan dan perlengkapan jalan. Sebagai hasilnya, diperoleh kesimpulan bahwa dari segi geometrik, secara umum jalan sudah dirancang sesuai dengan ketentuan, namun demikian ada bagian-bagian yang masih memerlukan penyempurnaan. Penelitian ini akan membahas kondisi eksisting jalan Tol Tangerang-Merak berdasarkan pengamatan langsung. Aspek yang ditinjau adalah aspek geometrik, perkerasan, dan bangunan pelengkap jalan seperti Rambu, Marka dan Median jalan. Pada akhirnya, akan didapatkan daerah rawan kecelakaan pada ruas tol Tangerang-Merak dengan analisis perbandingan dari data pengamatan langsung, dan data kecelakaan lalu lintas.","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"79 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-05-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121250954","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
BUSINESS INTELLIGENCE FRAMEWORK FOR PERFORMANCE MEASUREMENT IN HIGHER EDUCATION STUDY PROGRAMS 高等教育学习项目绩效评估的商业智能框架
Pub Date : 2020-10-29 DOI: 10.24912/jmstkik.v4i2.8877
D. Trisnawarman, M. Imam
Business Intelligence (BI) is an online application and realtime, needed by large and modern organizations to increase competitive advantage in the global competitive environment. Higher Education (HE) is a current organization that houses excellent resources, with the number of students reaching up to tens of thousands, thus requiring an application that can be used as a tool to achieve the organization's business goals. This study aims to build a BI model and framework aimed at developing decision-making applications for measuring the business performance of HE. The method used in this research is the BI development method which is derived from the software engineering development method and adapted to the Study Program Accreditation Instrument (IAPS) 4.0. The case study used is the Information Systems Study Program at Tarumanagara University. The BI development methods are: Business Case Assessment, Enterprise Infrastructure Evaluation, Project Planning, Project Requirements, Data Analysis, Prototyping, Meta Data Analysis, Database Design, ETL Design, Meta Data Design, ETL Development, Application Development, Data Mining, Meta Data Repository Development, Implementation, Release Evaluation. The results of this study are a development stage model and framework that can be used to build BI applications for study program performance measurement.ABSTRAK Business Intelligence (BI) adalah aplikasi daringdan terkini, dibutuhkan oleh organisasi besar dan modern untuk meningkatkan keunggulan kompetitif dalam persaingan global. Perguruan tinggi adalah organisasi saat ini yang memiliki sumber daya yang sangat baik, dengan jumlah mahasiswa mencapai puluhan ribu, sehingga membutuhkan aplikasi yang dapat digunakan sebagai alat untuk mencapai tujuan bisnis organisasi. Penelitian ini bertujuan untuk membangun model dan framework BI yang bertujuan untuk mengembangkan aplikasi pengambilan keputusan untuk mengukur kinerja bisnis PT. Metode yang digunakan dalam penelitian ini adalah metode pengembangan BI yang bersumber dari metode pengembangan rekayasa perangkat lunak dan disesuaikan dengan Instrumen Akreditasi Program Studi (IAPS) 4.0. Studi kasus yang digunakan adalah Program Studi Sistem Informasi Universitas Tarumanagara. Metode pengembangan BI adalah: Business Case Assessment, Enterprise Infrastructure Evaluation, Project Planning, Project Requirements, Data Analysis, Prototyping, Metadata Analysis, Database Design, ETL Design, Metadata Design, ETL Development, Application Development, Data Mining, Metadata Pengembangan Repositori, Implementasi, Evaluasi Rilis. Hasil dari penelitian ini berupa model tahapan pengembangan dan kerangka kerja yang dapat digunakan untuk membangun aplikasi BI untuk pengukuran kinerja program studi. Kata Kunci: Kerangka kerja Business Intelligence; Pengukuran Performa; Perguruan Tinggi 
商业智能(BI)是一种在线和实时的应用程序,大型现代组织需要它来增加在全球竞争环境中的竞争优势。高等教育(HE)是一个拥有优秀资源的当前组织,学生数量达到数万,因此需要一个可以用作实现组织业务目标的工具的应用程序。本研究旨在建立一个商业智能模型和框架,以开发决策应用程序来衡量高等教育企业的业务绩效。本研究使用的方法是BI开发方法,该方法来源于软件工程开发方法,并适应于学习计划认证工具(IAPS) 4.0。使用的案例研究是塔鲁马纳加拉大学的信息系统研究项目。BI开发方法有:业务案例评估、企业基础设施评估、项目规划、项目需求、数据分析、原型设计、元数据分析、数据库设计、ETL设计、元数据设计、ETL开发、应用开发、数据挖掘、元数据存储库开发、实施、发布评估。本研究的结果是一个开发阶段模型和框架,可用于构建用于研究项目绩效测量的BI应用程序。【摘要】商业智能(BI)数据分析应用于商业数据分析、商业数据分析、商业数据分析、商业数据分析、商业数据分析、商业数据分析、商业数据分析、商业数据分析、商业数据分析、商业数据分析、商业数据分析、商业数据分析和商业数据分析。perguran tinggi adalah organisasi saat ini yang memiliki sumnumber daya yang sangat baik, dengan jumlah mahasiswa menchapai puluhan ribu, sehinga menbutuhkan apilkasi yang dapat digunakan sebagai alat untuk menchapai tujuan bisnisorganisasi。Penelitian ini bertujuan untuk membangun模型和框架BI yang bertujuan untuk mengenbangkan应用plikasi pengambilan keputusan untuk mengukur kinerja bisnis PT. Metode yang digunakan dalam peneltian ini adalah memede pengembangan rekayasa perangkat lunak dandissuaikan dengan仪器研究程序研究(IAPS) 4.0。塔鲁马纳加拉大学信息系统研究项目。商业案例评估、企业基础设施评估、项目规划、项目需求、数据分析、原型设计、元数据分析、数据库设计、ETL设计、元数据设计、ETL开发、应用程序开发、数据挖掘、元数据存储、实现、评估等。Hasil dari penelitian ini berupa模型tahapan pengembangan dan kerangka kerja yang dapat digunakan untuk成员ungun应用BI untuk企鹅kinerja程序研究。Kata Kunci: Kerangka kerja商业智能;Pengukuran性能;Perguruan丁宜受困
{"title":"BUSINESS INTELLIGENCE FRAMEWORK FOR PERFORMANCE MEASUREMENT IN HIGHER EDUCATION STUDY PROGRAMS","authors":"D. Trisnawarman, M. Imam","doi":"10.24912/jmstkik.v4i2.8877","DOIUrl":"https://doi.org/10.24912/jmstkik.v4i2.8877","url":null,"abstract":"Business Intelligence (BI) is an online application and realtime, needed by large and modern organizations to increase competitive advantage in the global competitive environment. Higher Education (HE) is a current organization that houses excellent resources, with the number of students reaching up to tens of thousands, thus requiring an application that can be used as a tool to achieve the organization's business goals. This study aims to build a BI model and framework aimed at developing decision-making applications for measuring the business performance of HE. The method used in this research is the BI development method which is derived from the software engineering development method and adapted to the Study Program Accreditation Instrument (IAPS) 4.0. The case study used is the Information Systems Study Program at Tarumanagara University. The BI development methods are: Business Case Assessment, Enterprise Infrastructure Evaluation, Project Planning, Project Requirements, Data Analysis, Prototyping, Meta Data Analysis, Database Design, ETL Design, Meta Data Design, ETL Development, Application Development, Data Mining, Meta Data Repository Development, Implementation, Release Evaluation. The results of this study are a development stage model and framework that can be used to build BI applications for study program performance measurement.ABSTRAK Business Intelligence (BI) adalah aplikasi daringdan terkini, dibutuhkan oleh organisasi besar dan modern untuk meningkatkan keunggulan kompetitif dalam persaingan global. Perguruan tinggi adalah organisasi saat ini yang memiliki sumber daya yang sangat baik, dengan jumlah mahasiswa mencapai puluhan ribu, sehingga membutuhkan aplikasi yang dapat digunakan sebagai alat untuk mencapai tujuan bisnis organisasi. Penelitian ini bertujuan untuk membangun model dan framework BI yang bertujuan untuk mengembangkan aplikasi pengambilan keputusan untuk mengukur kinerja bisnis PT. Metode yang digunakan dalam penelitian ini adalah metode pengembangan BI yang bersumber dari metode pengembangan rekayasa perangkat lunak dan disesuaikan dengan Instrumen Akreditasi Program Studi (IAPS) 4.0. Studi kasus yang digunakan adalah Program Studi Sistem Informasi Universitas Tarumanagara. Metode pengembangan BI adalah: Business Case Assessment, Enterprise Infrastructure Evaluation, Project Planning, Project Requirements, Data Analysis, Prototyping, Metadata Analysis, Database Design, ETL Design, Metadata Design, ETL Development, Application Development, Data Mining, Metadata Pengembangan Repositori, Implementasi, Evaluasi Rilis. Hasil dari penelitian ini berupa model tahapan pengembangan dan kerangka kerja yang dapat digunakan untuk membangun aplikasi BI untuk pengukuran kinerja program studi. Kata Kunci: Kerangka kerja Business Intelligence; Pengukuran Performa; Perguruan Tinggi ","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"188 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116149560","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
UJI KESAHIHAN INTERNA DAN KEHANDALAN KUESIONER CABIN FEVER PHENOMENON (CFP) VERSI INDONESIA
Pub Date : 2020-10-29 DOI: 10.24912/jmstkik.v4i2.8456
Yohanes Firmansyah, Ernawati Su, Ivan Buntara, Hendsun Hendsun, Fiolita Indranita Sutjipto, Pinka Nurashri Setiyati
Outbreaks and isolation due to at home due to COVID-19 outbreaks may have many psychological consequences on human life. Psychological consequences that are not detected early can cause problems in the future that can disrupt the lives of families and sufferers, therefore the need for screening tests that are accurate and reliable in detecting the appearance of psychiatric symptoms during isolation.The survey research was carried out virtually via Google Form This method was chosen because of the condition of Large Scale Social Restrictions due to the Covid-19 Pandemic, which made it impossible to conduct face-to-face interviews. The sample of this research is all of the productive age community with exclusion criteria in the form of incomplete data or unwilling to join the research. This research is a preliminary study of a series of validity and reliability test processes. Internal validity test analysis using the Pearson Product Moment method with the interpretation of the questions is said to be valid if the correlation rho (r) ≥ 0.3. Analysis of reliability testing using the Cronbach α test method with reliable interpretation if the minimum value of Cronbach α is 0.6. 281 respondents who met the inclusion criteria. The results of testing with Pearson Product Moment or Pearson Correlation obtained the value of rho (r) in all questions is above 0.3. The reliability test results using the Cronbach α test are 0.935 with the Cronbach's Alpha if Item Deleted value on each grain below the Cronbach α value. Cabin Fever Phenomenon (CFP) Indonesian Version is proven to have good validity and excellent reliability to detect the appearance of psychiatric symptoms during isolation. Further validity testing is needed such as an external validity test Keywords: Cabin Fever Phenomenon; COVID-19; psychiatry; validity and reliability ABSTRAKWabah dan isolasi akibat dirumah akibat dari wabah COVID-19 mungkin memiliki banyak konsekuensi pada kehidupan manusia dari segi psikologis. Konsekuensi psikologi yang tidak terdeteksi dini dapat menyebabkan permasalahan dikemudian hari yang dapat mengganggu kehidupan keluarga dan penderitanya, Oleh karena itu perlu adanya alat uji penapisan yang akurat serta handal dalam mendeteksi munculnya gejala psikiatri selama masa isolasi. Penelitian survei yang dilaksanakan di secara virtual melalui google form. Metode ini dipilih karena kondisi Pembatasan Sosial Skala Besar (PSBB) akibat Pandemik Covid-19 yang tidak memungkinkan untuk melakukan wawancara secara tatap muka. Sampel penelitian ini adalah seluruh masyarakat usia produktif dengan kriteria eksklusi berupa data yang tidak lengkap atau tidak bersedia mengikuti penelitian. Penelitian ini merupakan penelitian pendahuluan dari serangkaian proses uji kesahihan dan kehandalan. Analisa uji kesahihan internal menggunakan metode Pearson Product Moment dengan interpretasi bulir pertanyaan dikatakan sahih jika korelasi rho (r) ≥ 0,3. Analisa uji kehandalan menggunakan metode penguj
2019冠状病毒病疫情暴发和居家隔离可能对人类生活产生许多心理影响。未及早发现的心理后果可能在未来造成问题,可能扰乱家庭和患者的生活,因此需要在隔离期间进行准确可靠的筛查试验,以发现精神症状的出现。调查研究是通过Google Form进行的虚拟调查,选择这种方法是因为Covid-19大流行导致大规模社会限制的情况,无法进行面对面的访谈。本研究的样本是所有的生产年龄群体,排除标准以数据不完整或不愿意参加研究的形式。本研究是对一系列效度和信度测试过程的初步研究。如果相关系数rho (r)≥0.3,使用皮尔逊积矩法进行的内部效度检验分析被认为是有效的。当Cronbach α的最小值为0.6时,采用可靠解释的Cronbach α检验方法进行信度检验分析。281名符合纳入标准的受访者。Pearson积矩或Pearson相关检验的结果显示,所有问题的rho (r)值都在0.3以上。采用Cronbach α检验的信度检验结果为0.935,各粒的项目删除值均低于Cronbach α值。幽居热现象(CFP)印尼版被证明具有良好的效度和卓越的信度来检测隔离期间精神症状的出现。需要进一步的效度检验,如外部效度检验;关键词:客舱热现象;COVID-19;精神病学;摘要:新冠肺炎是一种新型冠状病毒,是一种新型冠状病毒,是一种新型冠状病毒,是一种新型冠状病毒。【翻译】Konsekuensi psikologi yang tidak terdetekksi dini dapat menyebabkan permasalahan dikemudian hari yang dapat mengganggu kehidupan keluarga danpenderitanya, Oleh karena i perluu adanya alji penapisan yang akurat seram mendeteksi munculnya gejala psikiatri selama masaisolasi。Penelitian survei yang dilaksanakan di secara虚拟melalui google表单。我的意思是,我的祖国,我的祖国,我的祖国,我的祖国,我的祖国,我的祖国,我的祖国,我的祖国。样品peneltitian ini adalah seluruh masyarakat usia产品登高,标准eksklui berup数据yang tidak lengkap atau tidak bersedia mengikuti peneltian。Penelitian ini merupakan Penelitian pendahuluan dari serangkaian proses uji kesahihan dan kehandalan。(3)分析,卡萨哈汉内部蒙古纳坎方法,皮尔逊积矩,邓根解释,布利尔,卡古纳坎,卡古纳坎,萨希卡,卡古纳坎,rho (r)≥0,3。企鹅的最小Cronbach α sebesar[0,6]。281例杨氏记忆标准。Pearson积矩(Pearson Product Moment); Pearson相关系数(Pearson Correlation); (r); (r);(1) Cronbach α; (2) Cronbach α; (3) Cronbach α; (3) Cronbach α;幽居病现象(CFP)是印度尼西亚terbukti memiliki kesahihan yang baik serta kehandalan yang sangat baik untuk mendeteksi munculnya gejala psikiatri selama masa isolasi。Perlu dilakukan uji kesahihan lanjutan seperti uji kesahihan eksternal。
{"title":"UJI KESAHIHAN INTERNA DAN KEHANDALAN KUESIONER CABIN FEVER PHENOMENON (CFP) VERSI INDONESIA","authors":"Yohanes Firmansyah, Ernawati Su, Ivan Buntara, Hendsun Hendsun, Fiolita Indranita Sutjipto, Pinka Nurashri Setiyati","doi":"10.24912/jmstkik.v4i2.8456","DOIUrl":"https://doi.org/10.24912/jmstkik.v4i2.8456","url":null,"abstract":"Outbreaks and isolation due to at home due to COVID-19 outbreaks may have many psychological consequences on human life. Psychological consequences that are not detected early can cause problems in the future that can disrupt the lives of families and sufferers, therefore the need for screening tests that are accurate and reliable in detecting the appearance of psychiatric symptoms during isolation.The survey research was carried out virtually via Google Form This method was chosen because of the condition of Large Scale Social Restrictions due to the Covid-19 Pandemic, which made it impossible to conduct face-to-face interviews. The sample of this research is all of the productive age community with exclusion criteria in the form of incomplete data or unwilling to join the research. This research is a preliminary study of a series of validity and reliability test processes. Internal validity test analysis using the Pearson Product Moment method with the interpretation of the questions is said to be valid if the correlation rho (r) ≥ 0.3. Analysis of reliability testing using the Cronbach α test method with reliable interpretation if the minimum value of Cronbach α is 0.6. 281 respondents who met the inclusion criteria. The results of testing with Pearson Product Moment or Pearson Correlation obtained the value of rho (r) in all questions is above 0.3. The reliability test results using the Cronbach α test are 0.935 with the Cronbach's Alpha if Item Deleted value on each grain below the Cronbach α value. Cabin Fever Phenomenon (CFP) Indonesian Version is proven to have good validity and excellent reliability to detect the appearance of psychiatric symptoms during isolation. Further validity testing is needed such as an external validity test Keywords: Cabin Fever Phenomenon; COVID-19; psychiatry; validity and reliability ABSTRAKWabah dan isolasi akibat dirumah akibat dari wabah COVID-19 mungkin memiliki banyak konsekuensi pada kehidupan manusia dari segi psikologis. Konsekuensi psikologi yang tidak terdeteksi dini dapat menyebabkan permasalahan dikemudian hari yang dapat mengganggu kehidupan keluarga dan penderitanya, Oleh karena itu perlu adanya alat uji penapisan yang akurat serta handal dalam mendeteksi munculnya gejala psikiatri selama masa isolasi. Penelitian survei yang dilaksanakan di secara virtual melalui google form. Metode ini dipilih karena kondisi Pembatasan Sosial Skala Besar (PSBB) akibat Pandemik Covid-19 yang tidak memungkinkan untuk melakukan wawancara secara tatap muka. Sampel penelitian ini adalah seluruh masyarakat usia produktif dengan kriteria eksklusi berupa data yang tidak lengkap atau tidak bersedia mengikuti penelitian. Penelitian ini merupakan penelitian pendahuluan dari serangkaian proses uji kesahihan dan kehandalan. Analisa uji kesahihan internal menggunakan metode Pearson Product Moment dengan interpretasi bulir pertanyaan dikatakan sahih jika korelasi rho (r) ≥ 0,3. Analisa uji kehandalan menggunakan metode penguj","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"58 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115387985","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Penataan Desa Bawomataluo Sebagai Desa Wisata Budaya Dengan Pendekatan Konservasi 将巴沃马塔罗村作为一个以保护方式进行的文化旅游村庄
Pub Date : 2020-06-02 DOI: 10.24912/jmstkik.v4i1.6006
Juntrisnawati Loi
Bawomataluo Village is a tourist village located in Fanayama sub-district, South Nias Regency, North Sumatra Province. The existence of this Bawomataluwo Village as an heir and preservation that actively run the local wisdom very potential in maintaining cultural identity and become a tourist attraction visited by many tourists. Bawomataluwo Village has many traditional houses and megaliths. There are many traditional house buildings and megalith stones that function as markers of the village experiencing damage caused by various factors. One of them traditional house have lost  its authenticity and lead to modern buildings using materials of concrete materials and roof of the house in the form of zinc. This condition makes the traditional building can no longer fulfill its function under reasonable conditions and the inactivity of the community and local government in maintaining existing cultural heritage and village life systems based on cultural values to be forgotten. One of the efforts in preserving Bawomataluo Village is by development  village with conservation approach. This conservation objective is to revive and maintain the cultural activities of local communities, both physical and non-physical, such as repairing traditional buildings, and adding to the completeness of village supporting facilities as a village tourism. The determination of conservation measures against each traditional building and megalith stone is seen based on the existing condition, its integrity and its authenticity, as well as changes occurring both physically and in the function of traditional house building. This study result are conservation action to traditional buildings, megaliths and masterplan that can be developed into a culture tourism area. This masterplan is divided into three zones like core zone (conservation), buffer zone and development zone for social economy development and community culture. ABSTRAK Desa Bawomataluo merupakan desa wisata yang berada di Kecamatan Fanayama, Kabupaten Nias Selatan, Provinsi Sumatera Utara. Keberadaan Desa Bawomataluo sebagai pewaris dan pelestari yang aktif menjalankan kearifan-kearifan lokal sangat berpotensi dalam mempertahankan identitas budaya serta menjadi objek wisata yang banyak dikunjungi oleh para wisatawan. Terdapat banyak bangunan rumah tradisional dan batu megalit yang berfungsi sebagai penanda desa mengalami kerusakan disebabkan oleh berbagai faktor. Salah satunya yaitu mulai banyaknya bangunan rumah tradisional yang kehilangan keasliannya dan mengarah kepada bangunan modern dengan menggunakan bahan-bahan material beton dan atap rumah berupa seng. Kondisi ini menyebabkan bangunan tradisional tidak lagi dapat memenuhi fungsinya dalam kondisi yang wajar. Serta kurang aktifnya keterlibatan masyarakat dan pemerintah lokal dalam memelihara serta mempertahankan warisan budaya dan sistem kehidupan desa yang berlandaskan nilai-nilai budaya dan adat istiadat yang mulai terlupakan. Salah satu upaya pelestari
Bawomataluo村是一个位于北苏门答腊省南尼亚斯县法纳亚山街道的旅游村。这个Bawomataluwo村的存在作为一个继承者和保存者,积极地运行着当地的智慧,在维护文化认同和成为许多游客参观的旅游景点方面非常有潜力。Bawomataluwo村有许多传统房屋和巨石。这里有许多传统的房屋建筑和巨石,作为村庄遭受各种因素破坏的标志。其中一个传统的房子失去了它的真实性,导致现代建筑使用混凝土材料和锌形式的屋顶的材料。这种状况使得传统建筑在合理的条件下无法发挥其功能,社区和地方政府在维护现有文化遗产和基于文化价值的乡村生活系统方面的不作为被遗忘。保护巴沃马塔洛村的努力之一是采用发展村与保护方法。这一保护目标是恢复和维护当地社区的物质和非物质文化活动,如修复传统建筑,并增加村庄配套设施的完整性,作为乡村旅游。对每座传统建筑和巨石的保护措施的确定是基于其现有状况、完整性和真实性,以及传统住宅建筑在物理和功能上发生的变化。研究结果是对传统建筑、巨石和总体规划的保护行动,可发展为文化旅游区。总体规划分为核心区(保护)、缓冲区和社会经济发展和社区文化发展区三个区域。摘要/ abstract摘要:苏门答腊省西拉坦省喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县喀拉拉邦县。Keberadaan Desa Bawomataluo sebagai pewaris dan pelestari yang aktif menjalankan kearifan本地sangat berpotensi dalam成员pertahankan identitas budaya serta menjadi objjek wisata yang banyak dikunjungi oleh para wisatawan。Terdapat banyak bangunan rumah传统的dan batu megalit yang berfunsi sebagai penanda desa mengalami kerusakan disebabkan oleh berbagai因素。Salah satunya yitu mulai banyaknya bangunan rumah传统的yang kehilangan keasliannya dan mengarah kepada bangunan现代的dunan menggunakan bahan-bahan材料,dan atap rumah berupa seng。Kondisi ini menyebabkan bangunan传统的节日庆典。这句话的意思是:“地方自治”,意思是“地方自治”,意思是“地方自治”,意思是“地方自治”。Salah satu upaya pelestarian Desa Bawomataluo adalah dengan melakukan penataan konservasi, dilakukan untuk menghidupkan kembali, dpertahankan aktivitas budaya masyarakat setemat baik fisik maupun non- fisk, serta menambah kelengkapan fasilitas penunjang Desa sebagai Desa wisata。Penentuan tindakan konservasi terhadap setap bangunan rumah传统的丹batu megalit dilihat berdasarkan pada kondisi eksisiting, keutuhan dan keasliaannya, serta perubahan yang terjadi baik secara fisik maupun funsi。Hasil studi ini berupa Hasil bentuk -bentuk tindakan konservasi terhadap bangunan adat dan batu megalit, serta berupa总体规划yang dapat dikembangkan menjadi kawasan wisata budaya。总体规划kawasan wisata terbagi dalam tiga区,yitu zone inti (konservasi), zone penyangga区,zone pengembangan untuk pengembangan社会经济dan budaya masyarakat。
{"title":"Penataan Desa Bawomataluo Sebagai Desa Wisata Budaya Dengan Pendekatan Konservasi","authors":"Juntrisnawati Loi","doi":"10.24912/jmstkik.v4i1.6006","DOIUrl":"https://doi.org/10.24912/jmstkik.v4i1.6006","url":null,"abstract":"Bawomataluo Village is a tourist village located in Fanayama sub-district, South Nias Regency, North Sumatra Province. The existence of this Bawomataluwo Village as an heir and preservation that actively run the local wisdom very potential in maintaining cultural identity and become a tourist attraction visited by many tourists. Bawomataluwo Village has many traditional houses and megaliths. There are many traditional house buildings and megalith stones that function as markers of the village experiencing damage caused by various factors. One of them traditional house have lost  its authenticity and lead to modern buildings using materials of concrete materials and roof of the house in the form of zinc. This condition makes the traditional building can no longer fulfill its function under reasonable conditions and the inactivity of the community and local government in maintaining existing cultural heritage and village life systems based on cultural values to be forgotten. One of the efforts in preserving Bawomataluo Village is by development  village with conservation approach. This conservation objective is to revive and maintain the cultural activities of local communities, both physical and non-physical, such as repairing traditional buildings, and adding to the completeness of village supporting facilities as a village tourism. The determination of conservation measures against each traditional building and megalith stone is seen based on the existing condition, its integrity and its authenticity, as well as changes occurring both physically and in the function of traditional house building. This study result are conservation action to traditional buildings, megaliths and masterplan that can be developed into a culture tourism area. This masterplan is divided into three zones like core zone (conservation), buffer zone and development zone for social economy development and community culture. ABSTRAK Desa Bawomataluo merupakan desa wisata yang berada di Kecamatan Fanayama, Kabupaten Nias Selatan, Provinsi Sumatera Utara. Keberadaan Desa Bawomataluo sebagai pewaris dan pelestari yang aktif menjalankan kearifan-kearifan lokal sangat berpotensi dalam mempertahankan identitas budaya serta menjadi objek wisata yang banyak dikunjungi oleh para wisatawan. Terdapat banyak bangunan rumah tradisional dan batu megalit yang berfungsi sebagai penanda desa mengalami kerusakan disebabkan oleh berbagai faktor. Salah satunya yaitu mulai banyaknya bangunan rumah tradisional yang kehilangan keasliannya dan mengarah kepada bangunan modern dengan menggunakan bahan-bahan material beton dan atap rumah berupa seng. Kondisi ini menyebabkan bangunan tradisional tidak lagi dapat memenuhi fungsinya dalam kondisi yang wajar. Serta kurang aktifnya keterlibatan masyarakat dan pemerintah lokal dalam memelihara serta mempertahankan warisan budaya dan sistem kehidupan desa yang berlandaskan nilai-nilai budaya dan adat istiadat yang mulai terlupakan. Salah satu upaya pelestari","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"585 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123938781","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
INDIKATOR KINERJA JALAN LONG SEGMENT DI BANTEN DENGAN ANALISIS ANALYTICAL HIERARCHY PROCESS
Pub Date : 2020-06-01 DOI: 10.24912/jmstkik.v4i1.5877
Novel Ridwan, L. S. Putranto
The length of National roads in Banten Province along 564 kilometers is spread in several regencies and cities in the Banten region. In managing road implementation, adequate resources are needed so that prompt and appropriate action can be taken to reduce complaints from road users / communities. Implementation of road handling carried out by service providers with a conventional contract system must be done through a procurement process that goes through procedures based on applicable laws and regulations, namely based on Circular Letter of the Director General of Highways No.9 / SE / DB 2015 Implementation of road handling carried out by service providers use the Long Segment System. In the implementation of road handling carried out by service providers with a long segment contract system, service providers must meet the level of road service conditions, so that service providers are able to meet road quality standards. Because road management in Banten Province currently uses the Long Segment System, it is necessary to analyze all aspects of handling the system. This study analyzes these aspects with the AHP (Analytical Hierarchy Process approach based on interviews and questionnaires. Based on the results of the analysis found in long segment work on the highway, the most important aspect to consider is the Drainage Aspect, and the drainage work needs to pay attention to the smooth work all types of channels made in drainage work. sepanjang 564 kilometer tersebar di beberapa kabupaten dan kota di wilayah Banten. Dalam mengelola implementasi jalan, diperlukan sumber daya yang memadai sehingga tindakan yang cepat dan tepat dapat diambil untuk mengurangi keluhan dari pengguna jalan/masyarakat. Implementasi penanganan jalan yang dilakukan oleh penyedia layanan dengan sistem kontrak konvensional harus dilakukan melalui proses pengadaan yang melewati prosedur berdasarkan hukum dan peraturan yang berlaku, yaitu berdasarkan Surat Edaran Direktur Jenderal Bina Marga No.9/SE/DB Tahun 2015 Implementasi penanganan jalan yang dilakukan oleh penyedia layanan menggunakan Sistem Segmen Panjang. Dalam pelaksanaan penanganan jalan yang dilakukan oleh penyedia jasa dengan sistem kontrak segmen panjang, penyedia jasa harus memenuhi tingkat kondisi layanan jalan, ini agar penyedia jasa mampu memenuhi standar kualitas jalan. Karena manajemen jalan di Provinsi Banten saat ini menggunakan Sistem Segmen Panjang, maka perlu analisis segala aspek dalam penanganan sistem tersebut. Penelitian ini menganalisis aspek-aspek ini dengan pendekatan AHP (Analytical Hierarchy Process yang didasarkan dari wawancara dan kuesioner. Berdasarkan hasil analisis ditemukan dalam pekerjaan long segment pada jalan raya, aspek terpenting yang harus diperhatikan adalah Aspek Drainase, dan pada pekerjaan drainase perlu memperhatikan lancaranya pekerjaan semua jenis saluran yang dibuat dalam pekerjaan drainase.
万丹省的国道全长564公里,分布在万丹地区的几个县和城市。在管理道路实施方面,需要足够的资源,以便采取迅速和适当的行动,减少道路使用者/社区的投诉。服务供应商以传统合约制度进行的道路装卸,必须透过采购程序进行,该程序须根据适用的法律及规例,即以公路署署长第9 / SE / DB 2015号通函为依据。服务供应商进行的道路装卸,须采用长段制。在实施由服务商开展的道路搬运实行长段承包制时,服务商必须符合道路服务条件的等级,使服务商能够达到道路质量标准。由于万丹省目前的道路管理采用的是长段系统,因此有必要对该系统处理的各个方面进行分析。本研究以访谈和问卷为基础,运用层次分析法(AHP)对这些方面进行分析。根据分析结果发现,在高速公路上的长段工程中,最需要考虑的方面是排水方面,而排水工作需要注意的是排水工作中制作的各类渠道的畅通工作。sepanjang 564公里tersebar di beberapa kabupaten dan kota di wilayah Banten。Dalam mengelola implementasjalan, diperlukan sumnumber daya yang memadai sehinga tindakan yang cepat danpatat diambil untuk mengurangi keluhan dari pengguna jalan/masyarakat。执行penanganan jalan yang dilakukan oleh penyedia layanan dengan系统kontrak konvensional harus dilakukan melalui propropengadaan yang melewati检察官berdasarkan hukum dan peraturan yang berlaku, yitu berdasarkan Surat Edaran总监jendera Marga No.9/SE/DB Tahun 2015执行penanganan jalan yang dilakukan oleh penyedia layanan menggunakan系统Segmen Panjang。Dalam pelaksanaan penanganan jalan yang dilakukan oleh penyedia jasa dengan system kontrak segmen panjang, penyedia jasa harus memenuhi tingkat kondisi layanan jalan, ini agar penyedia jasa mampu memenuhi standard kualitas jalan。行政管理:省、省、省、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区、自治区。层次分析法(AHP)。分析层次分析法(AHP)Berdasarkan hasil analysis ditemukan dalam pekerjaan long segment pada jalan raya, ask terpenting yang harus diperhatikan adalah aspekjaan Drainase, dan pada pekerjaan Drainase, perperhatikan lancaranya pekerjaan semua jenis saluran yang dibuat dalam pekerjaan Drainase。
{"title":"INDIKATOR KINERJA JALAN LONG SEGMENT DI BANTEN DENGAN ANALISIS ANALYTICAL HIERARCHY PROCESS","authors":"Novel Ridwan, L. S. Putranto","doi":"10.24912/jmstkik.v4i1.5877","DOIUrl":"https://doi.org/10.24912/jmstkik.v4i1.5877","url":null,"abstract":"The length of National roads in Banten Province along 564 kilometers is spread in several regencies and cities in the Banten region. In managing road implementation, adequate resources are needed so that prompt and appropriate action can be taken to reduce complaints from road users / communities. Implementation of road handling carried out by service providers with a conventional contract system must be done through a procurement process that goes through procedures based on applicable laws and regulations, namely based on Circular Letter of the Director General of Highways No.9 / SE / DB 2015 Implementation of road handling carried out by service providers use the Long Segment System. In the implementation of road handling carried out by service providers with a long segment contract system, service providers must meet the level of road service conditions, so that service providers are able to meet road quality standards. Because road management in Banten Province currently uses the Long Segment System, it is necessary to analyze all aspects of handling the system. This study analyzes these aspects with the AHP (Analytical Hierarchy Process approach based on interviews and questionnaires. Based on the results of the analysis found in long segment work on the highway, the most important aspect to consider is the Drainage Aspect, and the drainage work needs to pay attention to the smooth work all types of channels made in drainage work. sepanjang 564 kilometer tersebar di beberapa kabupaten dan kota di wilayah Banten. Dalam mengelola implementasi jalan, diperlukan sumber daya yang memadai sehingga tindakan yang cepat dan tepat dapat diambil untuk mengurangi keluhan dari pengguna jalan/masyarakat. Implementasi penanganan jalan yang dilakukan oleh penyedia layanan dengan sistem kontrak konvensional harus dilakukan melalui proses pengadaan yang melewati prosedur berdasarkan hukum dan peraturan yang berlaku, yaitu berdasarkan Surat Edaran Direktur Jenderal Bina Marga No.9/SE/DB Tahun 2015 Implementasi penanganan jalan yang dilakukan oleh penyedia layanan menggunakan Sistem Segmen Panjang. Dalam pelaksanaan penanganan jalan yang dilakukan oleh penyedia jasa dengan sistem kontrak segmen panjang, penyedia jasa harus memenuhi tingkat kondisi layanan jalan, ini agar penyedia jasa mampu memenuhi standar kualitas jalan. Karena manajemen jalan di Provinsi Banten saat ini menggunakan Sistem Segmen Panjang, maka perlu analisis segala aspek dalam penanganan sistem tersebut. Penelitian ini menganalisis aspek-aspek ini dengan pendekatan AHP (Analytical Hierarchy Process yang didasarkan dari wawancara dan kuesioner. Berdasarkan hasil analisis ditemukan dalam pekerjaan long segment pada jalan raya, aspek terpenting yang harus diperhatikan adalah Aspek Drainase, dan pada pekerjaan drainase perlu memperhatikan lancaranya pekerjaan semua jenis saluran yang dibuat dalam pekerjaan drainase.","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"140 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116794491","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
PERILAKU DINAMIK PELAT PERKERASAN KAKU AKIBAT BEBAN BERGERAK DENGAN KECEPATAN TIDAK KONSTAN 由于负重以非恒定速度移动而导致的刚性弹性板行为
Pub Date : 2020-06-01 DOI: 10.24912/jmstkik.v4i1.2287
Ridwan Halim, S. Alisjahbana
Structural hard structures are often found in industrial buildings, especially in road structures. Most of the vehicles that pass on this road are heavy vehicles such as trucks with heavy loads. So, the engineer must design precisely so that this structure can meet the requirements of strength and deflection. The dynamic analysis of rigid pavement in this thesis is modeled as a concrete slab with boundary conditions all the edges of the slab have a semi rigid footing and on top of the soil media with a Pasternak foundation model that has elastic vertical spring support and a continuous sliding layer underneath. Transverse load that crosses the surface of the plate in the form of a dynamic load that has a initial speed and fixed acceleration. The load is modeled as a single axis centered load equivalent to variations in vehicle types such as: Colt Diesel Double (CDD) Los Bak, Colt Diesel Double (CDD) Long Box, and Colt Diesel Double (CDD) Body. In this study, various types of parameters will be analyzed, including the coefficient of the vehicle, the value of the damping ratio (damping ratio), and various supporting soil conditions, namely soft soil, medium soil and hard soil. Solving the plate dynamics problem with semi-rigid conditions using the Modified Bolotin Method (MBM) with the help of two transcendental equations. This dynamic load function solving uses the special properties of the Dirac-delta function. Analysis is carried out when the load is on the plate (0 ≤ t ≤ t0) with the final result obtained is the spectrum response or critical speed of the vehicle and the forces in the form of moments and shear forces. ABSTRAK Struktur perkerasaan kaku banyak dijumpai pada bangunan industrial khususnya pada struktur jalan. Sebagian besar kendaraan yang melintas pada jalan ini adalah kendaraan berat seperti truk dengan beban berat. Jadi, insinyur harus mendesain dengan tepat sehingga struktur ini dapat memenuhi syarat kekuatan maupun lendutan. Analisis dinamik perkerasan kaku dalam tesis ini dimodelkan sebagai pelat beton dengan kondisi batas semua tepi pelat memiliki tumpuan semi rigid dan di atas media tanah dengan model pondasi Pasternak yang memiliki dukungan pegas vertikal elastis dan lapisan geser menerus di bawahnya. Beban transversal yang melintasi permukaan pelat berupa beban dinamik yang memiliki kecepatan awal serta percepatan tetap. Beban dimodelkan sebagai beban terpusat sumbu tunggal ekuivalen dengan variasi jenis kendaraan seperti: Colt Diesel Double (CDD) Los Bak, Colt Diesel Double (CDD) Long Box, dan Colt Diesel Double (CDD) Bak. Dalam penelitian ini juga akan dilakukan analisis berbagai jenis parameter antara lain nilai koefisien kendaraan, nilai ratio redaman (damping ratio), dan berbagai kondisi tanah pendukung yaitu tanah lunak, tanah sedang, dan tanah keras. Penyelesaian masalah dinamika pelat dengan kondisi semi rigid menggunakan Modified Bolotin Method (MBM) dengan bantuan dua persamaan transendental. Pemecahan fungsi beba
结构硬结构常见于工业建筑,特别是道路结构。这条路上通过的车辆大多是重型车辆,比如载重卡车。因此,工程师必须进行精确的设计,使这种结构能够满足强度和挠度的要求。本文将刚性路面的动力分析建模为具有边界条件的混凝土板,板的所有边缘都具有半刚性基础,并且在土介质的顶部采用帕斯捷尔纳克基础模型,该模型具有弹性垂直弹簧支撑,下面有连续滑动层。以动载荷的形式横过板表面的横向载荷,该动载荷具有初始速度和固定加速度。该负荷被建模为单轴中心负荷,相当于各种车型的变化,如:柯尔特双柴油(CDD)洛斯巴克、柯尔特双柴油(CDD)长箱和柯尔特双柴油(CDD)车身。在本研究中,将分析各种类型的参数,包括车辆系数,阻尼比(阻尼比)的值,以及各种支撑土壤条件,即软土,中土和硬土。利用修正Bolotin法,结合两个超越方程求解半刚性条件下的平板动力学问题。这种动态载荷函数的求解利用了狄拉克函数的特殊性质。在荷载作用于板上(0≤t≤t0)时进行分析,最终得到的结果是车辆的谱响应或临界速度以及弯矩和剪力形式的力。[摘要]工业工人的劳动生产率和劳动生产率。我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说。贾迪,在你的家乡,我的家乡,我的家乡,我的家乡,我的家乡,我的家乡,我的家乡。分析紫金石的垂直弹性,分析紫金石的垂直弹性,分析紫金石的垂直弹性。Beban横向yang melintasi permukaan pelat berupa Beban dinamik yang memiliki keepatan awal sertta percepatan tetap。Beban dimodelkan sebagai Beban terpusat sumbu tunggal ekuivalen dengan variasi jenis kendaraan seperti: Colt Diesel Double (CDD) Los Bak, Colt Diesel Double (CDD) Long Box, dan Colt Diesel Double (CDD) Bak。Dalam penelitian ini juga akan dilakukan分析berbagai jenis参数antara lain nilai koefisien kendaraan, nilai ratio redaman(阻尼比),dan berbagai kondisi tanah pendukung yitu tanah lunak, tanah sedang, dan tanah keras。改进的Bolotin法(MBM)是一种超定性的登干半刚性孟古纳干方法。佩佩喀罕真菌,贝班,迪纳米克,孟古那坎,班团,西特,西特,胡斯,真菌,狄拉克三角洲。分析dilakukan ketika beban berada di数据pelat(0≤t≤t0) dengan hasil akhir yang didapat adalah响应频谱atau kekepetan kritis kendaraan serta gaya-gaya dalam berupa momen dan gaya geser。
{"title":"PERILAKU DINAMIK PELAT PERKERASAN KAKU AKIBAT BEBAN BERGERAK DENGAN KECEPATAN TIDAK KONSTAN","authors":"Ridwan Halim, S. Alisjahbana","doi":"10.24912/jmstkik.v4i1.2287","DOIUrl":"https://doi.org/10.24912/jmstkik.v4i1.2287","url":null,"abstract":"Structural hard structures are often found in industrial buildings, especially in road structures. Most of the vehicles that pass on this road are heavy vehicles such as trucks with heavy loads. So, the engineer must design precisely so that this structure can meet the requirements of strength and deflection. The dynamic analysis of rigid pavement in this thesis is modeled as a concrete slab with boundary conditions all the edges of the slab have a semi rigid footing and on top of the soil media with a Pasternak foundation model that has elastic vertical spring support and a continuous sliding layer underneath. Transverse load that crosses the surface of the plate in the form of a dynamic load that has a initial speed and fixed acceleration. The load is modeled as a single axis centered load equivalent to variations in vehicle types such as: Colt Diesel Double (CDD) Los Bak, Colt Diesel Double (CDD) Long Box, and Colt Diesel Double (CDD) Body. In this study, various types of parameters will be analyzed, including the coefficient of the vehicle, the value of the damping ratio (damping ratio), and various supporting soil conditions, namely soft soil, medium soil and hard soil. Solving the plate dynamics problem with semi-rigid conditions using the Modified Bolotin Method (MBM) with the help of two transcendental equations. This dynamic load function solving uses the special properties of the Dirac-delta function. Analysis is carried out when the load is on the plate (0 ≤ t ≤ t0) with the final result obtained is the spectrum response or critical speed of the vehicle and the forces in the form of moments and shear forces. ABSTRAK Struktur perkerasaan kaku banyak dijumpai pada bangunan industrial khususnya pada struktur jalan. Sebagian besar kendaraan yang melintas pada jalan ini adalah kendaraan berat seperti truk dengan beban berat. Jadi, insinyur harus mendesain dengan tepat sehingga struktur ini dapat memenuhi syarat kekuatan maupun lendutan. Analisis dinamik perkerasan kaku dalam tesis ini dimodelkan sebagai pelat beton dengan kondisi batas semua tepi pelat memiliki tumpuan semi rigid dan di atas media tanah dengan model pondasi Pasternak yang memiliki dukungan pegas vertikal elastis dan lapisan geser menerus di bawahnya. Beban transversal yang melintasi permukaan pelat berupa beban dinamik yang memiliki kecepatan awal serta percepatan tetap. Beban dimodelkan sebagai beban terpusat sumbu tunggal ekuivalen dengan variasi jenis kendaraan seperti: Colt Diesel Double (CDD) Los Bak, Colt Diesel Double (CDD) Long Box, dan Colt Diesel Double (CDD) Bak. Dalam penelitian ini juga akan dilakukan analisis berbagai jenis parameter antara lain nilai koefisien kendaraan, nilai ratio redaman (damping ratio), dan berbagai kondisi tanah pendukung yaitu tanah lunak, tanah sedang, dan tanah keras. Penyelesaian masalah dinamika pelat dengan kondisi semi rigid menggunakan Modified Bolotin Method (MBM) dengan bantuan dua persamaan transendental. Pemecahan fungsi beba","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129880058","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS RISIKO DAN PENCEGAHANNYA PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG BERTINGKAT TINGGI DARI SISI KONTRAKTOR 对承包商一侧高层建筑项目的风险分析和预防
Pub Date : 2020-05-31 DOI: 10.24912/jmstkik.v4i1.6719
Bernardus Calvin, Johny Johan
The increasing number of population is increasing every year in the capital city of Jakarta, but is not proportional to the limitations of existing land at this time. Therefore, vertical construction or high rise building is one of the right solutions to overcome these problems. This study aims to identify the dominant risks involved in implementing high-rise building construction projects, obtain problem solving and provide recommendations or appropriate control over these risk variables. The research method was carried out by obtaining literature data from various journals and previous research, validating variables together with experts, distributing questionnaires to the respondents, then the data was processed with the help of the AHP (Analytical Hierarchy Process) method to determine the priority interests of the performance attributes and gives the weight of the rating of the parameter scale used. There are 9 risk categories in this study including safety, health & environment, critical material & supply management, contractor quality, subcontractor & vendor, engineering, project management, financial, human resources and external, which consists of 64 risk variables. The results of the data analysis found 21 variables included in the high risk category. Of the 21 variables, the most dominant risk variable is the design change variable from the owner. Preventive action or appropriate control of this risk variable can be done by the contractor by notifying the owner that the work of the change affects the cost and time of the project, then the process must follow the rules of the contract used, the purpose of the process is that the owner gives SI (site instruction) to the contractor for design changes until it is approved as a VO (variation order) by the owner. ABSTRAKPertambahan jumlah penduduk setiap tahun semakin meningkat di daerah ibukota Jakarta tetapi tidak sebanding dengan keterbatasan lahan yang ada pada saat ini. Oleh karena itu, pembangunan secara vertikal atau gedung bertingkat merupakan salah satu solusi yang tepat untuk mengatasi permasalahan tersebut. Penelitian ini bertujuan untuk mengidentifikasi risiko-risiko dominan yang terdapat dalam pelaksanaan proyek pembangunan gedung bertingkat tinggi, mendapatkan pemecahan masalah dan memberikan rekomendasi atau kontrol yang tepat terhadap variabel risiko tersebut. Metode penelitian dilakukan dengan mendapatkan data-data literatur dari berbagai jurnal dan penelitian terdahulu, melakukan validasi variabel bersama dengan para pakar, menyebarkan kuesioner kepada para responden, selanjutnya data diolah dengan bantuan metode AHP (Analytical Hierarchy Process) untuk menentukan kepentingan prioritas dari atribut kinerja dan memberikan bobot penilaian terhadap skala parameter yang digunakan. Terdapat 9 kategori risiko dalam penelitian ini antara lain safety, health & environment, critical material & supply management, contractor quality, subcontractor & vendor, engineering, project manage
首都雅加达的人口数量每年都在增加,但与目前现有土地的限制不成比例。因此,垂直建筑或高层建筑是克服这些问题的正确解决方案之一。本研究旨在找出高层建筑建设项目实施中所涉及的主要风险,获得问题的解决方案,并对这些风险变量提供建议或适当的控制。研究方法是通过从各种期刊和前人研究中获取文献数据,与专家一起验证变量,向受访者发放问卷,然后利用层次分析法对数据进行处理,确定绩效属性的优先利益,并给出所使用参数量表的评级权重。本研究共有9个风险类别,包括安全、健康与环境、关键材料与供应管理、承包商质量、分包商与供应商、工程、项目管理、财务、人力资源和外部,共64个风险变量。数据分析的结果发现21个变量属于高风险类别。在21个变量中,最主要的风险变量是来自业主的设计变更变量。承包商可以通过通知业主变更的工作影响项目的成本和时间来采取预防措施或适当控制这一风险变量,然后该过程必须遵循所使用的合同规则,该过程的目的是业主向承包商提供SI(现场指示)进行设计变更,直到业主批准其为VO(变更命令)。【摘要】雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:雅加达:Oleh karena itu, pembangunan secara,垂直攻击,攻击,攻击,攻击,攻击,攻击,攻击,攻击,攻击,攻击,攻击,攻击,攻击,攻击。Penelitian ini bertujuan untuk mengidentifikasi risiko-risiko dominan yang terdapat dalam pelaksanaan proyek pembangunan gedung bertingkat tinggi, mendapatkan pemecahan masalah memberikan rekomendasi atau control yang teppan terhadap变量risiktersebut。数据文献dari berbagai journal dan penelitian terdahulu, melakukan validasi variabel bersama dengan para pakar, menebarkan kuesoner kepada para respondden, selanjutnya data diolah dengan bantuan method AHP(层次分析法)untuk menentukan kepenting和prioriitas dari atribut kinerja memberikan bobot penelian terhadap skala parameter yang digunakan。安全、健康与环境、关键材料与供应管理、承包商质量、分包商与供应商、工程、项目管理、财务、人力资源、外部管理等64个变量。Hasil - dari分析数据didapatkan 21变量yang temasuk kedalam kategori visiko tinggi。达里21个变量tersebut,变量visiko yang paling doman adalah变量perubahan desain Dari所有者。Tindakan pencegahan atau control yang tepaet terhadap variabel visiko ini dapat dilakukan oleh kontraktor dengan memberikan通知kasi kepada所有者bahwa pekerjaan atas perubahan tersebut berpengaruh pada nilai biaya dan waktu proyek, kemudian prosesnya harus mengikuti kaidah-kaidah kontrak yang digunakan, maksud prosesnya adalah dari所有者memberikan SI(现场指令)kepada kontraktor atas perubahan desain sampai disetujui sebagai VO(变异指令)oleh所有者。
{"title":"ANALISIS RISIKO DAN PENCEGAHANNYA PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG BERTINGKAT TINGGI DARI SISI KONTRAKTOR","authors":"Bernardus Calvin, Johny Johan","doi":"10.24912/jmstkik.v4i1.6719","DOIUrl":"https://doi.org/10.24912/jmstkik.v4i1.6719","url":null,"abstract":"The increasing number of population is increasing every year in the capital city of Jakarta, but is not proportional to the limitations of existing land at this time. Therefore, vertical construction or high rise building is one of the right solutions to overcome these problems. This study aims to identify the dominant risks involved in implementing high-rise building construction projects, obtain problem solving and provide recommendations or appropriate control over these risk variables. The research method was carried out by obtaining literature data from various journals and previous research, validating variables together with experts, distributing questionnaires to the respondents, then the data was processed with the help of the AHP (Analytical Hierarchy Process) method to determine the priority interests of the performance attributes and gives the weight of the rating of the parameter scale used. There are 9 risk categories in this study including safety, health & environment, critical material & supply management, contractor quality, subcontractor & vendor, engineering, project management, financial, human resources and external, which consists of 64 risk variables. The results of the data analysis found 21 variables included in the high risk category. Of the 21 variables, the most dominant risk variable is the design change variable from the owner. Preventive action or appropriate control of this risk variable can be done by the contractor by notifying the owner that the work of the change affects the cost and time of the project, then the process must follow the rules of the contract used, the purpose of the process is that the owner gives SI (site instruction) to the contractor for design changes until it is approved as a VO (variation order) by the owner. ABSTRAKPertambahan jumlah penduduk setiap tahun semakin meningkat di daerah ibukota Jakarta tetapi tidak sebanding dengan keterbatasan lahan yang ada pada saat ini. Oleh karena itu, pembangunan secara vertikal atau gedung bertingkat merupakan salah satu solusi yang tepat untuk mengatasi permasalahan tersebut. Penelitian ini bertujuan untuk mengidentifikasi risiko-risiko dominan yang terdapat dalam pelaksanaan proyek pembangunan gedung bertingkat tinggi, mendapatkan pemecahan masalah dan memberikan rekomendasi atau kontrol yang tepat terhadap variabel risiko tersebut. Metode penelitian dilakukan dengan mendapatkan data-data literatur dari berbagai jurnal dan penelitian terdahulu, melakukan validasi variabel bersama dengan para pakar, menyebarkan kuesioner kepada para responden, selanjutnya data diolah dengan bantuan metode AHP (Analytical Hierarchy Process) untuk menentukan kepentingan prioritas dari atribut kinerja dan memberikan bobot penilaian terhadap skala parameter yang digunakan. Terdapat 9 kategori risiko dalam penelitian ini antara lain safety, health & environment, critical material & supply management, contractor quality, subcontractor & vendor, engineering, project manage","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"18 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125542949","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
HUBUNGAN ANTARA LESI PRAKANKER SERVIKS DENGAN SOSIODEMOGRAFI PEREMPUAN DI KECAMATAN LEGOK KABUPATEN TANGERANG TAHUN 2018
Pub Date : 2020-05-11 DOI: 10.24912/jmstkik.v4i1.3010
Destiyana Cika Claritha, Chandra Dewi, Shintia Christina
Cervical and breast cancer are the highest prevalence cancer in Indonesia in 2013 which caused death to Indonesian women, cervical cancer by 0.8‰ and breast cancer by 0.5‰. Precancerous lesions of the cervix also known as cervical intraepithelial lesions (Cervical Intraepithelial Neoplastic) are the beginning of changes to cervical carcinoma. In general, precancerous lesions of the cervix originate from the squamous columnar junction in the uterine cervix, which undergoes the process of metaplasia. This study aims to determine whether there is a relationship between precancerous cervical lesions and sociodemography of women in Kecamatan Legok Kabupaten Tangerang in 2018. This study uses an analytical study with cross sectionaI approach. The population is all women in Kecamatan Legok Kabupaten Tangerang who had sexual relations. Total sample are 47 people. Keywords: cervical cancer, cervical precancerous lesions, parity ABSTRAKPenyakit kanker serviks dan payudara merupakan penyakit kanker dengan prevalensi tertinggi di Indonesia pada tahun 2013 yang menyebabkan kematian pada perempuan Indonesia, yaitu kanker serviks sebesar 0,8‰ dan kanker payudara sebesar 0,5‰. Lesi prakanker pada serviks dikenal juga dengan sebutan lesi intraepitelial serviks (Cervical Intraephitelial Neoplasia) merupakan awal dari perubahan menuju karsinoma serviks. Pada umumnya lesi prakanker serviks ini berawal dari daerah squamocolumnar junction pada serviks uteri yang mengalami proses metaplasia. Penelitian ini bertujuan untuk mengetahui adakah hubungan antara lesi prakanker serviks dengn sosiodemografi perempuan di Kecamatan Legok Kabupaten Tangerang tahun 2018. Penelitian ini merupakan studi analitik dengan pendekatan cross sectionaI. Populasi penelitian adalah semua perempuan di Kecamatan Legok Kabupaten Tangerang yang sudah berhubungan seksual. Total sampel 47 orang.
2013年,宫颈癌和乳腺癌是印度尼西亚发病率最高的癌症,导致印度尼西亚妇女死亡,宫颈癌为0.8‰,乳腺癌为0.5‰。宫颈癌前病变也称为宫颈上皮内病变(宫颈上皮内肿瘤)是宫颈癌变化的开始。一般情况下,宫颈癌前病变起源于宫颈的鳞状柱状连接处,并经历化生过程。本研究旨在确定2018年Kecamatan Legok Kabupaten Tangerang地区女性宫颈癌前病变与社会人口统计学之间是否存在关系。本研究采用横断面分析研究方法。Kecamatan Legok Kabupaten Tangerang的人口都是发生性关系的女性。总共有47人。关键词:宫颈癌、宫颈癌前病变,平价ABSTRAKPenyakit kanker serviks丹payudara merupakan penyakit kanker dengan prevalensi tertinggi di印尼篇tahun 2013杨menyebabkan kematian篇perempuan印度尼西亚,yaitu kanker serviks sebesar 0 8‰丹kanker payudara sebesar 0 5‰。宫颈上皮内瘤(宫颈上皮内瘤);宫颈上皮内瘤(宫颈上皮内瘤)Pada umumnya lesi prakanker serviks ini berawal dari daerah鳞状柱状连接处Pada serviks子宫阳门髓发生化生。Penelitian ini bertujuan untuk mengetahui adakah hubungan antara lesi prakanker服务,社会人口统计学perperan di Kecamatan Legok Kabupaten Tangerang tahun 2018。Penelitian ini merupakan的研究分析了denan pendakan的横切面。我的意思是说,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是。总样本47个橙色。
{"title":"HUBUNGAN ANTARA LESI PRAKANKER SERVIKS DENGAN SOSIODEMOGRAFI PEREMPUAN DI KECAMATAN LEGOK KABUPATEN TANGERANG TAHUN 2018","authors":"Destiyana Cika Claritha, Chandra Dewi, Shintia Christina","doi":"10.24912/jmstkik.v4i1.3010","DOIUrl":"https://doi.org/10.24912/jmstkik.v4i1.3010","url":null,"abstract":"Cervical and breast cancer are the highest prevalence cancer in Indonesia in 2013 which caused death to Indonesian women, cervical cancer by 0.8‰ and breast cancer by 0.5‰. Precancerous lesions of the cervix also known as cervical intraepithelial lesions (Cervical Intraepithelial Neoplastic) are the beginning of changes to cervical carcinoma. In general, precancerous lesions of the cervix originate from the squamous columnar junction in the uterine cervix, which undergoes the process of metaplasia. This study aims to determine whether there is a relationship between precancerous cervical lesions and sociodemography of women in Kecamatan Legok Kabupaten Tangerang in 2018. This study uses an analytical study with cross sectionaI approach. The population is all women in Kecamatan Legok Kabupaten Tangerang who had sexual relations. Total sample are 47 people. Keywords: cervical cancer, cervical precancerous lesions, parity ABSTRAKPenyakit kanker serviks dan payudara merupakan penyakit kanker dengan prevalensi tertinggi di Indonesia pada tahun 2013 yang menyebabkan kematian pada perempuan Indonesia, yaitu kanker serviks sebesar 0,8‰ dan kanker payudara sebesar 0,5‰. Lesi prakanker pada serviks dikenal juga dengan sebutan lesi intraepitelial serviks (Cervical Intraephitelial Neoplasia) merupakan awal dari perubahan menuju karsinoma serviks. Pada umumnya lesi prakanker serviks ini berawal dari daerah squamocolumnar junction pada serviks uteri yang mengalami proses metaplasia. Penelitian ini bertujuan untuk mengetahui adakah hubungan antara lesi prakanker serviks dengn sosiodemografi perempuan di Kecamatan Legok Kabupaten Tangerang tahun 2018. Penelitian ini merupakan studi analitik dengan pendekatan cross sectionaI. Populasi penelitian adalah semua perempuan di Kecamatan Legok Kabupaten Tangerang yang sudah berhubungan seksual. Total sampel 47 orang.","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"136 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123594354","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PENERAPAN VALUE ENGINEERING PADA KONSTRUKSI DINDING PENAHAN TANAH DENGAN MENGGUNAKAN SITE MIX SEBAGAI PENGGANTI BENTONITE (STUDI KASUS PROYEK APARTEMEN DI SERPONG) 用混合网站代替苯铁矿(SERPONG的公寓项目案例研究),为土墩建设提供可行的工程原理
Pub Date : 2020-01-15 DOI: 10.24912/jmstkik.v3i2.5625
Sharwanda Asfarina, C. A. Makarim
In an effort to obtain efficient, stable, and optimal design results with good quality, one of the analytical methods used to evaluate construction project planning is value engineering. The purpose of value engineering is cost savings, performance optimization, and time efficiency, while still considering the function, quality, and aesthetics of the project. Value engineering analysis begins by selecting one activity that has a higher cost than other activities, then analysis to determine the alternative classification of works or materials with basic and secondary functions in accordance with the requirements in order to obtain better costs. In this value analysis aims to obtain the amount of cost savings that can be done in construction after the Value Engineering is done and find more advantages between Bentonite and Site Mix materials. Site Mix was chosen to replace bentonite in retaining wall works. The savings obtained were 10.4% for bored pile work and 36.4% for casting work. Based on the results of the prices that have been obtained, it can be concluded that the use of site mix can provide far greater savings compared to using bentonite. Both the analysis of the unit price of the above work, found both for the overall bored pile foundation work and casting work only with K250 quality concrete, giving the result that the use of site mix will be more efficient. In addition to using literature studies and observations, the next method is questionnaire survey by spreading questions to be filled in by respondents who are then included in the SPSS program and then tested for validity, reliability testing, and RII from the results of the questionnaire obtained results that support that the site mix can used as a substitute for bentonite in retaining wall works. ABSTRAKDalam upaya memperoleh hasil desain yang efisien, stabil, dan optimal dengan mutu yang baik, salah satu metode analisis yang digunakan untuk mengevaluasi perencanaan proyek konstruksi adalah rekayasa nilai. Tujuan dari rekayasa nilai adalah penghematan biaya, optimalisasi kinerja, dan efisiensi waktu, tetapi tetap mempertimbangkan fungsi, kualitas, dan estetika proyek. Analisis rekayasa nilai dimulai dengan memilih salah satu kegiatan yang memiliki biaya lebih tinggi daripada aktivitas lainnya, kemudian analisis untuk menentukan klasifikasi alternative karya atau bahan dengan fungsi dasar dan sekunder sesuai dengan persyaratan dalam untuk mendapatkan biaya yang lebih baik. Pada analisis nilai ini bertujuan untuk memperoleh besarnya penghematan biaya yang dapat dilakukan pada pembangunan konstruksi setelah dilakukan Value Engineering dan menemukan keunggulan lebih di antara bahan Bentonite dan Site Mix. Site Mix dipilih untuk menggantikan bentonite dalam pekerjaan dinding penahan tanah. Penghematan yang didapatkan sebesar 10,4% untuk pekerjaan bored pile dan 36,4% untuk pekerjaan pengecoran. Berdasarkan hasil harga yang telah didapatkan, maka bisa diambil kesimpulan bahwa penggunaa
为了获得高效、稳定、优质的设计结果,价值工程是评价建设项目规划的一种分析方法。价值工程的目的是节约成本、优化性能和提高时间效率,同时还要考虑项目的功能、质量和美观性。价值工程分析首先选择成本高于其他活动的一项活动,然后根据需求分析确定具有基本和次要功能的工程或材料的替代分类,以获得更好的成本。在本价值分析中,旨在获得价值工程完成后在施工中可以节省的成本,并发现膨润土与Site Mix材料之间的更多优势。在挡土墙工程中,选用土混合料代替膨润土。钻孔桩工程节省10.4%,浇筑工程节省36.4%。根据已获得的价格结果,可以得出结论,与使用膨润土相比,使用现场混合料可以提供更大的节省。通过对上述工程的单价分析,发现无论是整体钻孔灌注桩基础工程还是浇铸工程都只使用K250优质混凝土,给出的结果是使用现场配合比会更高效。除了文献研究和观察外,接下来的方法是问卷调查,通过散布问题让被调查者填写,然后将被调查者纳入SPSS程序,然后进行效度测试,信度测试和RII从问卷的结果中得到支持场地混合物可以替代膨润土用于挡土墙工程的结果。摘要/ abstract摘要:杨树树模型的设计,稳定、最优的杨树树模型,对杨树树模型进行了分析,对杨树树模型进行了评价,并对杨树树模型进行了分析。Tujuan dari rekayasa nilai adalah penghematan biaya, optimalisasi kinerja, dan efisiensi waktu, tetapi tetap mempertimbangkan funsi, kualitas, dan estetika proyek。分析rekayasa nilai dimulai dengan memorilih salah satu kegiatan yang memoriliki bitivitas lainnya, kemudian分析untuk menentukan klasifikasi alternative karya bahan dengan真菌dasar dan sekunder sesuai dengan persyatan dalam untuk mendapatkan biaya yang lebih baik。土分析nilai ini bertujuan untuk memperoleh besarya penghematan biaya yang dapat dilakukan pembangunan konstruksi setelah dilakukan价值工程dan menemukan keungulan lebih di antara bahan膨润土dan Site Mix。场地混合物dipilih untuk menggantikan膨润土dalam pekerjaan dinding penahan tanah。彭海曼杨didapatkan sebesar 10,4% untuk pekerjaan钻孔桩36,4% untuk pekerjaan penecoran。Berdasarkan hasil harga yang telah didapatkan, maka bisa diambil kespuldan bahwa penggunaan site mix bisa memberikan penghematan yang jauh lebih besar dibandingkan dengan menggunakan膨润土。Baik dari analytics harga satuan pekerjaan di ata, ditemukan Baik untuk pekerjaan pondasi钻孔桩secara keseluruhan maupun pekerjaan pengecoran saja dengan beton mutu K250, memberikan hasil bahwa penggunaan site mix akan lebih hemat。Selain menggunakan study pustakakan dan observasi, mede selanjutnya adalah survey kuisioner dengan menyebarkan pertanyan - pertanyan untuk diisoleh para响应yang kemudian dimasukkan kedalam程序SPSS lalu dilakukan uji有效性,uji可靠性,dan RII dari hasil kusier tersebut didapatkan hasil yang mendukung bahwa站点混合dapat digunakan sebagi pengganti bentonite dalam pekerjaan dinding penahan tanah。
{"title":"PENERAPAN VALUE ENGINEERING PADA KONSTRUKSI DINDING PENAHAN TANAH DENGAN MENGGUNAKAN SITE MIX SEBAGAI PENGGANTI BENTONITE (STUDI KASUS PROYEK APARTEMEN DI SERPONG)","authors":"Sharwanda Asfarina, C. A. Makarim","doi":"10.24912/jmstkik.v3i2.5625","DOIUrl":"https://doi.org/10.24912/jmstkik.v3i2.5625","url":null,"abstract":"In an effort to obtain efficient, stable, and optimal design results with good quality, one of the analytical methods used to evaluate construction project planning is value engineering. The purpose of value engineering is cost savings, performance optimization, and time efficiency, while still considering the function, quality, and aesthetics of the project. Value engineering analysis begins by selecting one activity that has a higher cost than other activities, then analysis to determine the alternative classification of works or materials with basic and secondary functions in accordance with the requirements in order to obtain better costs. In this value analysis aims to obtain the amount of cost savings that can be done in construction after the Value Engineering is done and find more advantages between Bentonite and Site Mix materials. Site Mix was chosen to replace bentonite in retaining wall works. The savings obtained were 10.4% for bored pile work and 36.4% for casting work. Based on the results of the prices that have been obtained, it can be concluded that the use of site mix can provide far greater savings compared to using bentonite. Both the analysis of the unit price of the above work, found both for the overall bored pile foundation work and casting work only with K250 quality concrete, giving the result that the use of site mix will be more efficient. In addition to using literature studies and observations, the next method is questionnaire survey by spreading questions to be filled in by respondents who are then included in the SPSS program and then tested for validity, reliability testing, and RII from the results of the questionnaire obtained results that support that the site mix can used as a substitute for bentonite in retaining wall works. ABSTRAKDalam upaya memperoleh hasil desain yang efisien, stabil, dan optimal dengan mutu yang baik, salah satu metode analisis yang digunakan untuk mengevaluasi perencanaan proyek konstruksi adalah rekayasa nilai. Tujuan dari rekayasa nilai adalah penghematan biaya, optimalisasi kinerja, dan efisiensi waktu, tetapi tetap mempertimbangkan fungsi, kualitas, dan estetika proyek. Analisis rekayasa nilai dimulai dengan memilih salah satu kegiatan yang memiliki biaya lebih tinggi daripada aktivitas lainnya, kemudian analisis untuk menentukan klasifikasi alternative karya atau bahan dengan fungsi dasar dan sekunder sesuai dengan persyaratan dalam untuk mendapatkan biaya yang lebih baik. Pada analisis nilai ini bertujuan untuk memperoleh besarnya penghematan biaya yang dapat dilakukan pada pembangunan konstruksi setelah dilakukan Value Engineering dan menemukan keunggulan lebih di antara bahan Bentonite dan Site Mix. Site Mix dipilih untuk menggantikan bentonite dalam pekerjaan dinding penahan tanah. Penghematan yang didapatkan sebesar 10,4% untuk pekerjaan bored pile dan 36,4% untuk pekerjaan pengecoran. Berdasarkan hasil harga yang telah didapatkan, maka bisa diambil kesimpulan bahwa penggunaa","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116792598","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
KAJIAN KEKUATAN BALOK KERATON DENGAN ANALISIS METODE ELEMEN HINGGA 对震颤梁强度的研究与元素方法的分析
Pub Date : 2019-10-02 DOI: 10.24912/jmstkik.v3i1.3357
S. Leman, Fanniwati Itang, Jemy Wijaya
Penelitian numerik sebelumnya mengenai segmen Bata Keraton telah diperoleh kekuatan pikul segmen Bata Keraton adalah lebih kurang 1 ton/m2. Pada penelitian lain uji laboratorium dengan merangkai segmen Bata Keraton menjadi Balok Keraton diperoleh kekuatan pikul untuk bentang 2.0 meter berkisar antara 105-200 Kg dan bentang 3.0 meter berkisar antara 60-170 Kg. Penelitian menggunakan cara uji laboratorium membutuhkan material uji, struktur yang diuji dengan ukuran sebenarnya, sumber daya manusia untuk merakit dari bentuk segmen Bata Keraton tersebut menjadi bentuk Balok Keraton dengan besi tulangan serta membuat adukan spesi untuk merangkai Balok Keraton. Alternatif lain untuk mengetahui kapasitas pikul pada Balok Keraton adalah dengan melakukan analisa numerik menggunakan metode elemen hingga menggunakan perangkat lunak Autodesk Inventor Professional 2017. Pemodelan Balok Keraton untuk analisis numerik dibuat sama dengan kondisi Balok Keraton pada saat diuji di laboratorium dengan bentang 2 meter dan 3 meter. Pola pembebanan pada analisis numerik  dilakukan sama seperti pada uji laboratorium. Tujuan analisis numerik dengan metode elemen hingga ini adalah untuk mengetahui kapasitas pikul Balok Keraton dan membandingkan hasilnya dengan uji laboratorium. Hasil analisis pada penelitian ini diperoleh kapasitas pikul untuk Balok Keraton dengan bentang 2 meter menggunakan tulangan 8 mm dan 10 mm berkisar 80-110 Kg untuk 1 beban di tengah bentang dan untuk 2 beban berkisar 55-80 Kg/ perbeban, sedangkan untuk bentang 3 meter menggunakan tulangan 8 mm dan 10 mm diperoleh untuk 1 beban berkisar 65-85 Kg dan 2 beban berkisar 45-65 Kg/ perbeban. Hasil analisis numerik memberikan hasil kapasitas pikul beban lebih kecil 51-81 % dari pengujian di laboratorium. Previous numerical research on the Keraton Brick segment has obtained the strength of the Keraton Brick segment bearing weight is approximately 1 ton / m2. In another study the laboratory test by stringing the Bata Keraton segment into the Keraton Beam obtained the strength of the pikul for a span of 2.0 meters ranging from 105-200 kg and span of 3.0 meters ranging from 60-170 kg. Research using laboratory testing methods requires test materials, structures that are tested with actual size, human resources to assemble from the shape of the Keraton Bata segment into a Keraton Beam with reinforcing iron and make a specific mixture to assemble the Keraton Beams. Another alternative to determine the bearing capacity of the Keraton Beams is by conducting numerical analysis using the finite element method using Autodesk Inventor Professional 2017. The Keraton Beam Modeling for numerical analysis is made the same as the condition of the Keraton Beams when tested in a laboratory with a span of 2 meters and 3 meters . The pattern of loading in numerical analysis is done the same as in laboratory tests. The purpose of numerical analysis with finite element method is to determine the bearing capacity of the Keraton Be
之前的数字研究人员对角砖段获得了角砖段的力大约是1吨/m2。在另一项实验室测试中,将角砖的段串成角砖的部分通过将角砖的坡度从105-200公斤(45 -200公斤)到3.5英尺(3.0米)不等的带宽和3.0米(200 -170公斤)的带宽获得扭力。使用实验室测试方法进行的研究需要测试材料,一种实际大小的测试结构,一种人力资源,从块状砖块的形状收集到钢筋状的磨床,并制作砂浆来固定桁架。了解圆梁的载波能力的另一种选择是使用元素方法进行数字分析,然后使用自动化专业排序软件2017。在实验室用2米和3米的量规和3米的量规进行测试时,公羊梁的建模与公羊梁的条件是一样的。数字分析的包容模式和实验室测试一样。使用该元素方法进行的数值分析的目的是确定角束的容量,并将测试结果与实验室测试进行比较。这种研究的分析结果是承受能力获得朝臣梁跨度2米用钢化8毫米和10毫米范围80-110公斤到1中间跨度的重担,为2 - perbeban 55-80公斤不等,至于跨度负担3米用大约10毫米钢化8毫米和获得1 65-85公斤不等的重担,2 - perbeban 45-65公斤不等的负担。数字分析结果显示,实验室测试的载重能力为51-81 %。角砖段的新研究证实了角砖体重接近1吨/ m2的强度。在另一项研究实验室的测试中,基岩粒粒进入基岩束束接受了从105到200公斤的2.0米的夹缝和从60到170公斤的3.0米的夹缝。研究人员使用实验室测试材料要求测试的方法,测试材料的结构是真实的大小,人类资源测试从色相构成到基岩束再融合铁,使熔体梁成为一种特殊的混合物。另一种选择是通过使用自动营养学家2017年的方法来确定角的波动性。两米和三米的实验室测试发现了两米的光。数字分析的加载模式和实验室测试时一样。目的是用有限的方法进行核分析results》分析轴承in this study获得capacity for The用reinforcement KeratonBeams with a的跨越2米8毫米和10毫米ranging from 80-110公斤为1《中古英语跨越和加载for 2 loads ranging从55到80公斤为a -加载,而跨越3米用8毫米至10毫米著作百科全书》reinforcement获得for 1加载ranging从65到85公斤和2 loads ranging从45到65公斤-加载。数字分析的结果给出了比实验室测试51-81%的回波。
{"title":"KAJIAN KEKUATAN BALOK KERATON DENGAN ANALISIS METODE ELEMEN HINGGA","authors":"S. Leman, Fanniwati Itang, Jemy Wijaya","doi":"10.24912/jmstkik.v3i1.3357","DOIUrl":"https://doi.org/10.24912/jmstkik.v3i1.3357","url":null,"abstract":"Penelitian numerik sebelumnya mengenai segmen Bata Keraton telah diperoleh kekuatan pikul segmen Bata Keraton adalah lebih kurang 1 ton/m2. Pada penelitian lain uji laboratorium dengan merangkai segmen Bata Keraton menjadi Balok Keraton diperoleh kekuatan pikul untuk bentang 2.0 meter berkisar antara 105-200 Kg dan bentang 3.0 meter berkisar antara 60-170 Kg. Penelitian menggunakan cara uji laboratorium membutuhkan material uji, struktur yang diuji dengan ukuran sebenarnya, sumber daya manusia untuk merakit dari bentuk segmen Bata Keraton tersebut menjadi bentuk Balok Keraton dengan besi tulangan serta membuat adukan spesi untuk merangkai Balok Keraton. Alternatif lain untuk mengetahui kapasitas pikul pada Balok Keraton adalah dengan melakukan analisa numerik menggunakan metode elemen hingga menggunakan perangkat lunak Autodesk Inventor Professional 2017. Pemodelan Balok Keraton untuk analisis numerik dibuat sama dengan kondisi Balok Keraton pada saat diuji di laboratorium dengan bentang 2 meter dan 3 meter. Pola pembebanan pada analisis numerik  dilakukan sama seperti pada uji laboratorium. Tujuan analisis numerik dengan metode elemen hingga ini adalah untuk mengetahui kapasitas pikul Balok Keraton dan membandingkan hasilnya dengan uji laboratorium. Hasil analisis pada penelitian ini diperoleh kapasitas pikul untuk Balok Keraton dengan bentang 2 meter menggunakan tulangan 8 mm dan 10 mm berkisar 80-110 Kg untuk 1 beban di tengah bentang dan untuk 2 beban berkisar 55-80 Kg/ perbeban, sedangkan untuk bentang 3 meter menggunakan tulangan 8 mm dan 10 mm diperoleh untuk 1 beban berkisar 65-85 Kg dan 2 beban berkisar 45-65 Kg/ perbeban. Hasil analisis numerik memberikan hasil kapasitas pikul beban lebih kecil 51-81 % dari pengujian di laboratorium. Previous numerical research on the Keraton Brick segment has obtained the strength of the Keraton Brick segment bearing weight is approximately 1 ton / m2. In another study the laboratory test by stringing the Bata Keraton segment into the Keraton Beam obtained the strength of the pikul for a span of 2.0 meters ranging from 105-200 kg and span of 3.0 meters ranging from 60-170 kg. Research using laboratory testing methods requires test materials, structures that are tested with actual size, human resources to assemble from the shape of the Keraton Bata segment into a Keraton Beam with reinforcing iron and make a specific mixture to assemble the Keraton Beams. Another alternative to determine the bearing capacity of the Keraton Beams is by conducting numerical analysis using the finite element method using Autodesk Inventor Professional 2017. The Keraton Beam Modeling for numerical analysis is made the same as the condition of the Keraton Beams when tested in a laboratory with a span of 2 meters and 3 meters . The pattern of loading in numerical analysis is done the same as in laboratory tests. The purpose of numerical analysis with finite element method is to determine the bearing capacity of the Keraton Be","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"41 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114492669","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1