首页 > 最新文献

Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan最新文献

英文 中文
PENERAPAN ASPEK HEALING ENVIRONMENT PADA DESAIN RUMAH SAKIT DARURAT BENCANA 紧急灾害医院设计的环境治疗方面的应用
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.22771
Theresia Budi Jayanti, Irene Syona Darmady
The COVID-19 pandemic is also known as worldwide epidemic disease, the public is already familiar with it. The pandemic label on a disease triggers the government to prepare plans and possibly take emergency procedures to protect society. Due to insufficient emergency procedures, so it has an impact on the capacity of hospitals, which has filled its capacity and resulted in a lack of inpatient facilities. Not only pandemic, when a natural disaster occurs, it also causes infrastructure damage in the area that experiences it, so that other alternative places are needed, such as an emergency hospital and additional inpatient rooms. Besides, patients who are affected by the disaster experience trauma and stress because of the events that occurred, which can hinder the patient's recovery. Based on this, attention to patient psychology through a healing environment aspect approach is needed, considering that patients spend more time in the inpatient rooms. This study discusses the application of healing environment to emergency mobile hospital design so that it can help accelerate patient healing. This research uses qualitative methods with case studies and variabels related to psychological and architectural aspects. The result of this research is an emergency mobile hospital design that can accelerate the patient's healing process. The design results focus on inpatient rooms with an approach of form, material, structure, color, layout and the application of healing environment aspects in the inpatient rooms.Keywords: emergency mobile hospital, healing environment, hospital facilitiesAbstrakPandemi COVID-19 disebut juga sebagai wabah penyakit mendunia yang sudah tidak asing lagi didengar oleh masyarakat. Label pandemi pada suatu penyakit memicu pemerintah untuk mengaktifkan rencana kesiapsiagaan dan mungkin mengambil prosedur darurat untuk melindungi masyarakat. Dikarenakan prosedur keadaan darurat tidak cukup, sehingga berdampak pada kapasitas rumah sakit yang sudah memenuhi kapasitasnya dan mengakibatkan kurangnya fasilitas ruang rawat inap. Tidak hanya pandemi, pada saat terjadi bencana alam juga menyebabkan kerusakan infrastruktur di daerah yang mengalaminya, sehingga diperlukan tempat alternatif lainnya seperti rumah sakit darurat dan ruang rawat inap tambahan. Selain itu pasien yang terkena musibah mengalami trauma dan stress karena peristiwa yang terjadi, sehingga dapat menghambat kesembuhan pasien. Berdasarkan hal tersebut, perhatian terhadap psikologi pasien melalui pendekatan aspek healing environment sangat diperlukan. Mengingat pasien lebih banyak menghabiskan waktunya didalam ruang rawat inap. Tulisan ini membahas penerapan healing environment terhadap desain rumah sakit darurat bencana sehingga dapat membantu mempercepat penyembuhan pasien. Studi menggunakan metode kualitatif dengan variabel penelitian terkait aspek psikologi dan aspek arsitektur. Hasil penelitian berupa arahan aspek desain rumah sakit darurat bencana yang dapat mempe
COVID-19大流行也被称为全球流行病,公众已经熟悉它。一种疾病的大流行标签促使政府准备计划,并可能采取紧急程序来保护社会。由于急诊程序不足,因此对医院的能力产生了影响,医院的能力已经饱和,导致住院设施不足。当自然灾害发生时,不仅会造成大流行,还会对受灾地区的基础设施造成破坏,因此需要其他替代场所,例如急诊医院和额外的住院病房。此外,受灾难影响的患者由于所发生的事件而经历创伤和压力,这可能会阻碍患者的康复。基于此,考虑到患者在住院病房的时间更长,需要通过治疗环境方面的方法来关注患者心理。本研究探讨疗愈环境在急诊流动医院设计中的应用,以促进病人的疗愈。本研究采用定性方法,结合案例研究和与心理和建筑方面相关的变量。本研究的结果是一个紧急流动医院的设计,可以加快病人的愈合过程。设计结果以住院病房为重点,从形式、材料、结构、色彩、布局等方面进行探讨,并结合治疗环境在住院病房中的应用。【关键词】应急流动医院,康复环境,医院设施【摘要】COVID-19大流行疫情,juga sebagai wabah penyakit mendunii, yang sudah tidak, assi didengar oleh masyarakat。标签上的大流行性疾病是由蒙古人、蒙古人、蒙古人、蒙古检察官、蒙古人、蒙古人、蒙古人组成的。孟加拉国检察官keadaan darurat dalakakup说,“我认为这是一个非常好的例子,我认为这是一个非常好的例子。”在印度,流行病、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度、印度。Selain itu pasien yang terkena musibah mengalami创伤和压力karena peristiwa yang terjadi, sehinga dapat menghambat kesembuhan pasien。Berdasarkan hal tersebut, perdasarkan, perdasarkan, perdasarkan, perdasarkan, perdasarkan, perdasarkan, perperlukan, perdasarkan, perperlukan。梦ingat pasien lebih banyak梦habiskan waktunya didalam ruang rawat inap。土里桑尼成员有一个完美的治疗环境,这是一种令人满意的治疗环境。研究蒙古纳坎方法在语音心理学和语音艺术方面的质量特征和变量。Hasil penelitian berupa arahan说:“我想说的是,我想说的是,我想说的是,我想说的是,我想说的是,我想说的是,我想说的是,我想说的是。”阿拉善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善善。
{"title":"PENERAPAN ASPEK HEALING ENVIRONMENT PADA DESAIN RUMAH SAKIT DARURAT BENCANA","authors":"Theresia Budi Jayanti, Irene Syona Darmady","doi":"10.24912/jmstkik.v6i2.22771","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.22771","url":null,"abstract":"The COVID-19 pandemic is also known as worldwide epidemic disease, the public is already familiar with it. The pandemic label on a disease triggers the government to prepare plans and possibly take emergency procedures to protect society. Due to insufficient emergency procedures, so it has an impact on the capacity of hospitals, which has filled its capacity and resulted in a lack of inpatient facilities. Not only pandemic, when a natural disaster occurs, it also causes infrastructure damage in the area that experiences it, so that other alternative places are needed, such as an emergency hospital and additional inpatient rooms. Besides, patients who are affected by the disaster experience trauma and stress because of the events that occurred, which can hinder the patient's recovery. Based on this, attention to patient psychology through a healing environment aspect approach is needed, considering that patients spend more time in the inpatient rooms. This study discusses the application of healing environment to emergency mobile hospital design so that it can help accelerate patient healing. This research uses qualitative methods with case studies and variabels related to psychological and architectural aspects. The result of this research is an emergency mobile hospital design that can accelerate the patient's healing process. The design results focus on inpatient rooms with an approach of form, material, structure, color, layout and the application of healing environment aspects in the inpatient rooms.\u0000Keywords: emergency mobile hospital, healing environment, hospital facilities\u0000Abstrak\u0000Pandemi COVID-19 disebut juga sebagai wabah penyakit mendunia yang sudah tidak asing lagi didengar oleh masyarakat. Label pandemi pada suatu penyakit memicu pemerintah untuk mengaktifkan rencana kesiapsiagaan dan mungkin mengambil prosedur darurat untuk melindungi masyarakat. Dikarenakan prosedur keadaan darurat tidak cukup, sehingga berdampak pada kapasitas rumah sakit yang sudah memenuhi kapasitasnya dan mengakibatkan kurangnya fasilitas ruang rawat inap. Tidak hanya pandemi, pada saat terjadi bencana alam juga menyebabkan kerusakan infrastruktur di daerah yang mengalaminya, sehingga diperlukan tempat alternatif lainnya seperti rumah sakit darurat dan ruang rawat inap tambahan. Selain itu pasien yang terkena musibah mengalami trauma dan stress karena peristiwa yang terjadi, sehingga dapat menghambat kesembuhan pasien. Berdasarkan hal tersebut, perhatian terhadap psikologi pasien melalui pendekatan aspek healing environment sangat diperlukan. Mengingat pasien lebih banyak menghabiskan waktunya didalam ruang rawat inap. Tulisan ini membahas penerapan healing environment terhadap desain rumah sakit darurat bencana sehingga dapat membantu mempercepat penyembuhan pasien. Studi menggunakan metode kualitatif dengan variabel penelitian terkait aspek psikologi dan aspek arsitektur. Hasil penelitian berupa arahan aspek desain rumah sakit darurat bencana yang dapat mempe","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"99 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121531759","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
HUBUNGAN INTENSITAS PENGGUNAAN GAWAI DENGAN MOVEMENT BEHAVIOUR PADA REMAJA SELAMA PANDEMI COVID-19 在COVID-19大流行期间,GAWAI的使用与青少年行为行为的强度联系
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.12991
Ilma Tria Nursyifa, Herwanto Herwanto
Movement behaviour is a individual behavioral pattern regarding movements and daily activities that are associated with health risks. Nowadays, the world is facing COVID-19 that attacks the human respiratory system. There are many impacts, one of the impacts is in the education sector. Schools are forced to change the face-to-face method to the digital learning method, resulting in significant increase gadgets intensity. The purpose of this study was to determine the relationship between the intensity of gadget use and movement behaviour during the COVID-19 in high school students using a cross-sectional study design. This study was conducted in Kharisma Bangsa Senior High School, South Tangerang, with 160 student including 52 male and 108 female. The data was collected using a questionnaire through Zoom. The results of data were processed using statistical software with Pearson chi-square test. The result found an intensity of gadget usage with more than 8 hours per day in 19 (36%) male and in 63 (58%) female. Movement behaviour in categories did not meet the guideline was found in 24 (46%) male and in 60 (60%) female. The number of respondents with movement behaviour that does not meet the three guidelines with the intensity of using gadgets for more than 8 hours is 48 (30%) people. According to Pearson Chi-square test, the correlation coefficient (r) -0.049 with p value 0.269. The conclusion is no significant correlation between the intensity of gadget usage and movement behaviour during the COVID-19 pandemic in Kharisma Bangsa Senior High School, South Tangerang. Keywords: Gadget usage intensity; Movement behaviour; Adolescent; COVID-19Abstrakberhubungan dengan risiko kesehatan. Saat ini, dunia sedang menghadapi pandemi COVID-19 yang menyerang sistem pernapasan manusia. Banyak dampak yang terjadi, salah satunya sektor pendidikan. Sekolah mengganti metode tatap muka menjadi metode pembelajaran jarak jauh yang menimbulkan peningkatan signifikan pada penggunaan gawai. Tujuan dalam penelitian ini adalah mengetahui hubungan intensitas penggunaan gawai dengan movement behaviour selama pandemi COVID-19 pada siswa SMA menggunakan studi cross-sectional. Penelitian ini dilakukan di SMA Kharisma Bangsa, Tangerang Selatan sebanyak 160 responden terdiri dari 52 siswa laki-laki dan 108 siswi perempuan. Pengumpulan data dilakukan dengan menggunakan kuesioner melalui media Zoom. Hasil data diolah dengan menggunakan software statistik dengan uji pearson chi-square. Hasil penelitian menunjukan, intensitas penggunaan gawai lebih dari 8 jam per hari pada laki-laki berjumlah 19 (36%) siswa, sedangkan pada perempuan 63 (58%) siswi. Movement behaviour pada kategori yang tidak memenuhi pedoman untuk laki-laki sebanyak 24 (46%) siswa, sedangkan pada perempuan 60 (60%) siswi. Jumlah responden dengan movement behaviour yang tidak memenuhi 3 pedoman dengan intensitas penggunaan gawai lebih dari 8 jam per hari sebanyak 48 (30%) orang. Berdasarkan uji pearson chi-squar
运动行为是指与健康风险相关的运动和日常活动的个人行为模式。当前,全球正面临着新型冠状病毒病(COVID-19)的威胁。有很多影响,其中一个影响是在教育领域。学校被迫将面对面的学习方式转变为数字学习方式,导致电子设备的强度显著增加。本研究的目的是采用横断面研究设计,确定高中生COVID-19期间电子设备使用强度与运动行为之间的关系。本研究在南坦格朗的Kharisma Bangsa高中进行,共有160名学生,其中男52名,女108名。数据是通过Zoom进行问卷调查收集的。数据结果采用统计学软件进行Pearson卡方检验。结果发现,19名(36%)男性和63名(58%)女性每天使用电子设备的时间超过8小时。有24名(46%)男性和60名(60%)女性的运动行为不符合指南。有48人(30%)的运动行为不符合三项准则,使用电子设备的强度超过8小时。经Pearson卡方检验,相关系数(r) -0.049, p值0.269。结论是,在南坦格朗Kharisma Bangsa高中,2019冠状病毒病大流行期间,电子设备使用强度与运动行为之间没有显著相关性。关键词:小工具使用强度;运动行为;青少年;2019冠状病毒病(covid -19)新冠肺炎大流行杨门杨系统pernapasan manusia。祝你好运,祝你好运,祝你好运。我的意思是,我的意思是我的意思是我的意思是我的意思是我的意思是我的意思。图juan dalam penelitian ini adalah mengetahui hubungan intensitas penggunaan gawai dunan运动行为selama 2019冠状病毒大流行巴巴多斯SMA menggunakan研究横截面。Penelitian ini dilakukan di SMA Kharisma Bangsa, Tangerang Selatan sebanyak 160受访者terdiri dari 52 siswa laki- lakki dan108 siswi perempuan。彭普兰数据:彭普兰数据;彭普兰数据;彭普兰数据;哈西尔数据diolah登安梦古纳坎软件统计登安乌吉皮尔逊卡方。Hasil penelitian menunjukan, intensitas penggunaan gawai lebih dari 8 jam per hari pada laki-laki berjumlah 19 (36%) siswa, sedangkan pada perempuan 63 (58%) siswi。运动行为pada kategori yang tidak memenuhi pedoman untuk laki-laki sebanyak 24 (46%) siswa, sedangkan pada perempuan 60 (60%) siswi。Jumlah对dengan运动行为的响应yang tidak memenuhi 3 pedoman dengan intensitas penggunaan gawai lebih dari 8 jam per hari sebanyak 48 (30%) orang。皮尔逊卡方didapatkan koefisien korelasi (r) sebesar -0.049 dengan nilai p sebesar 0.269。大流行新冠肺炎(COVID-19)大流行新冠肺炎(COVID-19)大流行新冠肺炎(COVID-19
{"title":"HUBUNGAN INTENSITAS PENGGUNAAN GAWAI DENGAN MOVEMENT BEHAVIOUR PADA REMAJA SELAMA PANDEMI COVID-19","authors":"Ilma Tria Nursyifa, Herwanto Herwanto","doi":"10.24912/jmstkik.v6i2.12991","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.12991","url":null,"abstract":"Movement behaviour is a individual behavioral pattern regarding movements and daily activities that are associated with health risks. Nowadays, the world is facing COVID-19 that attacks the human respiratory system. There are many impacts, one of the impacts is in the education sector. Schools are forced to change the face-to-face method to the digital learning method, resulting in significant increase gadgets intensity. The purpose of this study was to determine the relationship between the intensity of gadget use and movement behaviour during the COVID-19 in high school students using a cross-sectional study design. This study was conducted in Kharisma Bangsa Senior High School, South Tangerang, with 160 student including 52 male and 108 female. The data was collected using a questionnaire through Zoom. The results of data were processed using statistical software with Pearson chi-square test. The result found an intensity of gadget usage with more than 8 hours per day in 19 (36%) male and in 63 (58%) female. Movement behaviour in categories did not meet the guideline was found in 24 (46%) male and in 60 (60%) female. The number of respondents with movement behaviour that does not meet the three guidelines with the intensity of using gadgets for more than 8 hours is 48 (30%) people. According to Pearson Chi-square test, the correlation coefficient (r) -0.049 with p value 0.269. The conclusion is no significant correlation between the intensity of gadget usage and movement behaviour during the COVID-19 pandemic in Kharisma Bangsa Senior High School, South Tangerang. \u0000Keywords: Gadget usage intensity; Movement behaviour; Adolescent; COVID-19\u0000Abstrak\u0000berhubungan dengan risiko kesehatan. Saat ini, dunia sedang menghadapi pandemi COVID-19 yang menyerang sistem pernapasan manusia. Banyak dampak yang terjadi, salah satunya sektor pendidikan. Sekolah mengganti metode tatap muka menjadi metode pembelajaran jarak jauh yang menimbulkan peningkatan signifikan pada penggunaan gawai. Tujuan dalam penelitian ini adalah mengetahui hubungan intensitas penggunaan gawai dengan movement behaviour selama pandemi COVID-19 pada siswa SMA menggunakan studi cross-sectional. Penelitian ini dilakukan di SMA Kharisma Bangsa, Tangerang Selatan sebanyak 160 responden terdiri dari 52 siswa laki-laki dan 108 siswi perempuan. Pengumpulan data dilakukan dengan menggunakan kuesioner melalui media Zoom. Hasil data diolah dengan menggunakan software statistik dengan uji pearson chi-square. Hasil penelitian menunjukan, intensitas penggunaan gawai lebih dari 8 jam per hari pada laki-laki berjumlah 19 (36%) siswa, sedangkan pada perempuan 63 (58%) siswi. Movement behaviour pada kategori yang tidak memenuhi pedoman untuk laki-laki sebanyak 24 (46%) siswa, sedangkan pada perempuan 60 (60%) siswi. Jumlah responden dengan movement behaviour yang tidak memenuhi 3 pedoman dengan intensitas penggunaan gawai lebih dari 8 jam per hari sebanyak 48 (30%) orang. Berdasarkan uji pearson chi-squar","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"40 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130272895","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
EVALUASI KONDISI RUAS JALAN TOMANG RAYA DENGAN AKJ UNTUK MENCAPAI JALAN BERKESELAMATAN 与AKJ一起评估托郎高速公路上的情况
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.18453
Niluh Putu Shinta Eka Setyarini, Falah Isag Taubi
Along with the increase in population, the number of vehicles continues to increase from year to year, while the length of roads cannot catch up significantly, this results in traffic jams. If congestion is not reduced, it will cause stress and physical fatigue, reduce productivity, which will eventually result in traffic accidents. Indonesia has a much higher death rate compared to ASEAN countries. Traffic accidents are influenced by three main factors, namely human factors, vehicles and roads. In an effort to improve road safety and reduce accident fatality rates, direct observations are carried out using the Road Safety Audit (AKJ) form on roads that are already operating on Jalan Tomang Raya, which are targeted to obtain recommendations and follow-up, to improve road safety during the operation phase. and maintenance, as well as preventing the recurrence of traffic accidents.Keywords: Accident; Road Safety; AKJ; Jalan Tomang RayaAbstrakSeiring dengan bertambahnya jumlah penduduk, maka jumlah kendaraanpun terus meningkat dari tahun ke tahun, sedangkan panjang ruas jalan tidak dapat menyusul secara signifikan, hal ini mengakibatkan terjadinya kemacetan lalu lintas. Kemacetan apabila tidak dikurangi akan menyebabkan stres dan lelah fisik, mengurangi produktifitas yang akhirnya mengakibatkan kecelakaan lalu lintas. Indonesia memiliki tingkat kematian yang jauh lebih tinggi dibandingkan dengan negara ASEAN. Kecelakaan lalu lintas dipengaruhi tiga faktor utama yaitu faktor manusia, kendaraan, dan jalan. Dalam upaya meningkatkan keselamatan jalan dan mengurangi angka fatalitas kecelakaan maka dilaksanakan observasi langung dengan mengunakan formulir Audit Keselamatan Jalan (AKJ) pada ruas jalan yang sudah beroperasi di jalan Tomang Raya, yang ditargetkan untuk mendapatkan rekomendasi dan tindak lanjut, untuk meningkatkan keselamatan jalan selama fase operasi dan pemeliharaan, serta mencegah terulangnya kembali kecelakaan lalu lintas.
随着人口的增长,车辆的数量每年都在增加,而道路的长度却跟不上,这就导致了交通堵塞。如果不减少拥堵,就会造成压力和身体疲劳,降低生产力,最终会造成交通事故。印度尼西亚的死亡率比东盟国家高得多。交通事故主要受三个因素影响,即人为因素、车辆因素和道路因素。为了改善道路安全和降低事故死亡率,使用道路安全审计表对Jalan Tomang Raya上已经运营的道路进行了直接观察,目的是获得建议和后续行动,以改善运营阶段的道路安全。并进行维护,以及防止交通事故的再次发生。关键词:交通事故;道路安全;AKJ;【中文译文】【中文译文】【中文译文】【中文译文】【中文译文】【中文译文】【中文译文】【中文译文】【中文译文】【中文译文】【中文译文】【中文译文】【中文译文】Kemacetan apabila tidak dikurangi akan menyebabkan stres dan lelah fisik, mengurangi producktifitas yang akhirnya mengakibatkan kecelakaan lalu lintas。印度尼西亚的纪念活动包括:东盟的纪念活动、东盟的纪念活动。Kecelakaan lalu lintas dipengaruhi tiga factor for utama yaitu factor for manusia, kendaraan, dan jalan。审计审计审计(AKJ)审计审计,审计审计,审计审计,审计审计,审计审计,审计审计,审计审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计,审计。
{"title":"EVALUASI KONDISI RUAS JALAN TOMANG RAYA DENGAN AKJ UNTUK MENCAPAI JALAN BERKESELAMATAN","authors":"Niluh Putu Shinta Eka Setyarini, Falah Isag Taubi","doi":"10.24912/jmstkik.v6i2.18453","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.18453","url":null,"abstract":"Along with the increase in population, the number of vehicles continues to increase from year to year, while the length of roads cannot catch up significantly, this results in traffic jams. If congestion is not reduced, it will cause stress and physical fatigue, reduce productivity, which will eventually result in traffic accidents. Indonesia has a much higher death rate compared to ASEAN countries. Traffic accidents are influenced by three main factors, namely human factors, vehicles and roads. In an effort to improve road safety and reduce accident fatality rates, direct observations are carried out using the Road Safety Audit (AKJ) form on roads that are already operating on Jalan Tomang Raya, which are targeted to obtain recommendations and follow-up, to improve road safety during the operation phase. and maintenance, as well as preventing the recurrence of traffic accidents.\u0000Keywords: Accident; Road Safety; AKJ; Jalan Tomang Raya\u0000Abstrak\u0000Seiring dengan bertambahnya jumlah penduduk, maka jumlah kendaraanpun terus meningkat dari tahun ke tahun, sedangkan panjang ruas jalan tidak dapat menyusul secara signifikan, hal ini mengakibatkan terjadinya kemacetan lalu lintas. Kemacetan apabila tidak dikurangi akan menyebabkan stres dan lelah fisik, mengurangi produktifitas yang akhirnya mengakibatkan kecelakaan lalu lintas. Indonesia memiliki tingkat kematian yang jauh lebih tinggi dibandingkan dengan negara ASEAN. Kecelakaan lalu lintas dipengaruhi tiga faktor utama yaitu faktor manusia, kendaraan, dan jalan. Dalam upaya meningkatkan keselamatan jalan dan mengurangi angka fatalitas kecelakaan maka dilaksanakan observasi langung dengan mengunakan formulir Audit Keselamatan Jalan (AKJ) pada ruas jalan yang sudah beroperasi di jalan Tomang Raya, yang ditargetkan untuk mendapatkan rekomendasi dan tindak lanjut, untuk meningkatkan keselamatan jalan selama fase operasi dan pemeliharaan, serta mencegah terulangnya kembali kecelakaan lalu lintas.","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"51 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126178960","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PERBANDINGAN VALIDITAS PEMERIKSAAN ASAM URAT MENGGUNAKAN TIGA URIC ACID METER DENGAN BAKU EMAS STANDAR LABORATORIUM 尿酸测试的有效性比较使用3厘米标准黄金标准实验室
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.9507
Fia Fia, M. Rumawas, Alfianto Martin
Uric acid is an end-product from Purine metabolism, excreted in kidney. Hyperuricemia is resulted from either over production or decreased excretion of uric acid. Hyperuricemia results in uric acid crystallization or deposition in plasm and extracellular fluid. Deposition of uric acid crystal in synovial fluid cause arthritis, called gouty arthritis. In Indonesia, the prevalence of arthritis (including gouty arthritis) is 11,9%. Monitoring uric acid level is important for hyperurisemic patients, as an increased of acute episodes of gouty arthritis corresponds to the raised of uric acid level. Standard uric acid determination should be done in laboratory, but in daily practice, patient come to primary health center for monitoring, and uric acid meter is used to determine uric acid level. Prior studies reported that uric acid meters could be used in daily practice, yet in Indonesia, there has no published study comparing the  validity of different brands of uric acid meter available in the market. This analytic cross-sectional study aimed to determine the validity of three uric acid meters (UA sure, Autocheck dan Easytouch) as compared to the gold standard Laboratory method. Data of 39 adult men and women who were selected consecutively were analyzed by using the Bland-Altman method, one-sample t-test and ordinary least-square regression.   Result of this study showed that the validity of UA sure and Easytouch  uric acid meters were suitably good, whereas the validity of Autocheck was unrealiable  due to the present of fixed bias dan proportional bias.Keywords: uric acid, hyperuricemia, gouty arthritis, uric acid meterAbstrakAsam urat adalah hasil akhir metabolisme purin yang diekskresikan melalui ginjal. Produksi berlebihan atau penurunan ekskresi, atau keduanya dapat menyebabkan hiperurisemia. Kadar asam urat yang berlebihan dapat menyebabkan kristalisasi dan penumpukan di plasma dan cairan ekstraseluler terutama di sendi  sehingga mengakibatkan terjadinya radang sendi, yaitu artitis gout.  Di Indonesia, prevalensi radang sendi, termasuk artritis gout sebesar 11,9%.  Pada pasien hiperurisemia, pemantauan kadar asam urat sangat penting, karena angka kejadian artritis gout meningkat sesuai dengan tingginya asam urat plasma. Pemeriksaan asam urat standar dilakukan di laboratorium, namun pada prakteknya skrining kadar asam urat untuk pasien yang datang di layanan kesehatan primer sering dilakukan dengan menggunakan alat uric acid meter. Beberapa penelitian yang membandingkan hasil pemeriksaan asam urat dari laboratorium dengan uric acid meter melaporkan bahwa alat-alat tersebut dapat digunakan, namun di Indonesia belum ada penelitian yang membandingkan akurasi beberapa alat yang tersedia di pasaran. Penelitian ini merupakan penelitian analitik dengan desain potong lintang yang bertujuan untuk menilai validitas tiga alat uric acid meter (UA sure, Autocheck dan Easytouch) dengan baku emas standar laboratorium. Data kadar asam urat alat uric acid met
尿酸是嘌呤代谢的最终产物,由肾脏排出。高尿酸血症是由尿酸分泌过多或排泄减少引起的。高尿酸血症导致尿酸结晶或沉积在血浆和细胞外液中。尿酸结晶沉积在滑液中引起关节炎,称为痛风性关节炎。在印度尼西亚,关节炎(包括痛风性关节炎)的患病率为11.9%。监测尿酸水平对高尿酸血症患者很重要,因为痛风性关节炎急性发作的增加与尿酸水平的升高相对应。标准的尿酸测定应在实验室进行,但在日常实践中,患者到基层卫生院监测,并使用尿酸计测定尿酸水平。先前的研究报道尿酸计可以在日常实践中使用,但在印度尼西亚,没有发表的研究比较不同品牌的尿酸计在市场上的有效性。本分析横断面研究旨在确定三种尿酸计(UA sure, Autocheck和Easytouch)与金标准实验室方法相比的有效性。采用Bland-Altman方法、单样本t检验和普通最小二乘回归对连续选取的39名成年男女的数据进行分析。本研究结果表明,UA sure和Easytouch尿酸仪的效度较好,而Autocheck由于存在固定偏倚和比例偏倚,效度不可靠。关键词:尿酸,高尿酸血症,痛风性关节炎,尿酸测量高尿酸血症是由高尿酸血症引起的。Kadar asam urat yang berlebihan dapat menyebabkan kristalisasi dan penumpukan di plasma dan cairan ekstraseluler terutama di sendi seingga mengakibatkan terjadinya radang sendi, yitu artitis痛风。在印度尼西亚,该病的发病率为11.9%。帕帕性高尿酸血症,帕帕性高尿酸血症,帕帕性高尿酸血症,帕帕性高尿酸血症,帕帕性高尿酸血症,帕帕性高尿酸血症,帕帕性高尿酸血症。peremeriksaan asam akkan标准实验室,namun pakakteknya skrining kadar asam akkan untuk pasien yang datang dilayanan kesehatan引物服务dilakkan dengan menggunakan血尿酸计。尿酸测量仪、尿酸测量仪、尿酸测量仪、尿酸测量仪、尿酸测量仪、尿酸测量仪、尿酸测量仪、尿酸测量仪、尿酸测量仪、尿酸测量仪。杨Penelitian ini merupakan Penelitian analitik dengan desain potong lintang bertujuan为她menilai validitas tiga alat尿酸计(UA当然,Autocheck丹Easytouch) dengan巴库复合standar公司。数据kadar asam urat alat尿酸计,diperoleh dari样品,darah kapiler丹,数据kadar asam urat baku emas diambil dari样品,darah vena pada subyek yang sama dan waktu yang sama kemudian diukur dengan menggunakan法酶量热法实验室标准。数据采用单样本t检验和普通最小二乘回归分析,分析了单样本t检验与普通最小二乘回归的关系,分析了单样本t检验与普通最小二乘回归的关系。Pada penelitian ini didapatkan 39样品dengan hasil didapatkan UA sure dan Easy touch tidak mempunyai固定偏倚(p=0,31;p=0,12) maupun比例偏差(p=0,91, p=0,42) terhadap baku emas, sedangkan Autocheck mempunyai固定偏差(p=0,001)和比例偏差(p=0,006) bila dibandingkan dengan baku emas。自动检查自动检查自动检查自动检查自动检查自动检查自动检查自动检查自动检查自动检查自动检查。
{"title":"PERBANDINGAN VALIDITAS PEMERIKSAAN ASAM URAT MENGGUNAKAN TIGA URIC ACID METER DENGAN BAKU EMAS STANDAR LABORATORIUM","authors":"Fia Fia, M. Rumawas, Alfianto Martin","doi":"10.24912/jmstkik.v6i2.9507","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.9507","url":null,"abstract":"Uric acid is an end-product from Purine metabolism, excreted in kidney. Hyperuricemia is resulted from either over production or decreased excretion of uric acid. Hyperuricemia results in uric acid crystallization or deposition in plasm and extracellular fluid. Deposition of uric acid crystal in synovial fluid cause arthritis, called gouty arthritis. In Indonesia, the prevalence of arthritis (including gouty arthritis) is 11,9%. Monitoring uric acid level is important for hyperurisemic patients, as an increased of acute episodes of gouty arthritis corresponds to the raised of uric acid level. Standard uric acid determination should be done in laboratory, but in daily practice, patient come to primary health center for monitoring, and uric acid meter is used to determine uric acid level. Prior studies reported that uric acid meters could be used in daily practice, yet in Indonesia, there has no published study comparing the  validity of different brands of uric acid meter available in the market. This analytic cross-sectional study aimed to determine the validity of three uric acid meters (UA sure, Autocheck dan Easytouch) as compared to the gold standard Laboratory method. Data of 39 adult men and women who were selected consecutively were analyzed by using the Bland-Altman method, one-sample t-test and ordinary least-square regression.   Result of this study showed that the validity of UA sure and Easytouch  uric acid meters were suitably good, whereas the validity of Autocheck was unrealiable  due to the present of fixed bias dan proportional bias.\u0000Keywords: uric acid, hyperuricemia, gouty arthritis, uric acid meter\u0000Abstrak\u0000Asam urat adalah hasil akhir metabolisme purin yang diekskresikan melalui ginjal. Produksi berlebihan atau penurunan ekskresi, atau keduanya dapat menyebabkan hiperurisemia. Kadar asam urat yang berlebihan dapat menyebabkan kristalisasi dan penumpukan di plasma dan cairan ekstraseluler terutama di sendi  sehingga mengakibatkan terjadinya radang sendi, yaitu artitis gout.  Di Indonesia, prevalensi radang sendi, termasuk artritis gout sebesar 11,9%.  Pada pasien hiperurisemia, pemantauan kadar asam urat sangat penting, karena angka kejadian artritis gout meningkat sesuai dengan tingginya asam urat plasma. Pemeriksaan asam urat standar dilakukan di laboratorium, namun pada prakteknya skrining kadar asam urat untuk pasien yang datang di layanan kesehatan primer sering dilakukan dengan menggunakan alat uric acid meter. Beberapa penelitian yang membandingkan hasil pemeriksaan asam urat dari laboratorium dengan uric acid meter melaporkan bahwa alat-alat tersebut dapat digunakan, namun di Indonesia belum ada penelitian yang membandingkan akurasi beberapa alat yang tersedia di pasaran. Penelitian ini merupakan penelitian analitik dengan desain potong lintang yang bertujuan untuk menilai validitas tiga alat uric acid meter (UA sure, Autocheck dan Easytouch) dengan baku emas standar laboratorium. Data kadar asam urat alat uric acid met","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131163846","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
FAKTOR UTAMA YANG MEMPENGARUHI TINGKAT KEPUASAN HUNIAN PERUMAHAN SUBSIDI KECAMATAN PARUNG PANJANG, KABUPATEN BOGOR (STUDI KASUS : PERUMAHAN PURI HARMONI 8)
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.8444
Hendy Viandra Reza, Lana Winayanti, Liong Ju Tjung
House as a one basic human need is a place to live. The need for housing has never diminished and continues to grow every year. The number of decent and affordable houses is limited so that a backlog occurs. To overcome the housing problem the government created a One Million Houses Program (PSR), where with this program, government provide subsidize the housing development which the development itself could be carried out by the public and private sector. Based on Bank Indonesia's data, region with the largest FLPP in Indonesia occur in West Java, where the specific region with the highest real estate sector GRDP occurs in Bogor Regency. Parung Panjang as a sub-distirict in Bogor have massive housing subsidized in the past 5 years. There are 7 subsidized housing developement in Parung Panjang. As the purpose of this thesis, Puri Harmoni 8 in Parung Panjang is choosen as the subject of study. Puri Harmoni 8 is completed in 2016 with starting price 148 mio/unit, however occupancy rate is only 30% .Therefore, this study aims to determine the main factors that influence the level of satisfaction in subsidized housing in Puri Harmoni 8, Parung Panjang. The method used in this study is PCA  (Principal Component Analysis). This method aims to simplify the observed variables by reducing their dimensions. This is done by eliminating the correlation between the independent variables through the transformation of the original independent variable into a new independent variable that does not correlate at all. As the results, there are several factors influencing the level of satisfaction in subsidized houses in Puri Harmoni 8, Parung Panjang, which are (1) Health facilities & accommodation, (2) Residential infrastructure and (3) Build quality and safety.. Keywords: Subsidized Houses, Occupancy Satisfaction Level, FLPP, Facilities and InfrastructureAbstrakRumah sebagai kebutuhan dasar manusia sebagai tempat tinggal. Kebutuhan akan rumah tidak pernah berkurang bahkan terus bertambah setiap tahun. Jumlah rumah yang layak dan terjangkau terbatas sehingga terjadi Backlog. Untuk mengatasi masalah perumahan pemerintah membuat Program Satu Juta Rumah (PSR) dimana dalam program ini pemerintah memberikan subsidi, dan pembangunan perumahan sendiri dilakukan oleh sektor publik dan swasta. Berdasarkan data Bank Indonesiam wilayah dengan FLPP terbesar di Indonesia terjadi di Jawa Barat, di mana wilayah spesifik dengan PDRB sektor real estat tertinggi terjadi di Kabupaten Bogor. Parung Panjang sebagai kecamatan di Bogor memiliki subsidi perumahan besar dalam 5 tahun terakhir. Terdapat 7 perumahan subsidi di Parung Panjang. Tujuan dari thesis ini, Puri Harmoni 8 dipilih sebagai subjek penelitian. Puri Harmoni 8 selesai dibangun tahun 2016 dengan harga mulai 148 juta/unit, namun tingkat huniannya hanya 30%. Oleh karena itu, penelitian ini bertujuan untuk mengetahui faktor-faktor utama yang mempengaruhi tingkat kepuasan dalam perumahan bersubsidi di Puri Harmoni 8, Parun
房子作为一个基本的人类需求是居住的地方。对住房的需求从未减少,而且每年都在继续增长。体面和负担得起的房子数量有限,因此出现了积压。为了解决住房问题,政府制定了“百万住房计划”(PSR),通过该计划,政府为住房开发提供补贴,开发本身可以由公共和私营部门进行。根据印尼银行的数据,印尼FLPP最高的地区位于西爪哇,而房地产行业GRDP最高的特定地区位于茂物摄政。Parung Panjang作为茂物的一个街道,在过去的5年里获得了大量的住房补贴。帕隆班让有7个补贴住房开发项目。本文的研究目的是选取帕隆班让的普里哈莫尼8号作为研究对象。Puri Harmoni 8于2016年完工,起价1.48亿美元/单位,但入住率只有30%。因此,本研究旨在确定影响Parung Panjang Puri Harmoni 8补贴住房满意度的主要因素。本研究使用的方法是主成分分析(PCA)。该方法旨在通过降低观测变量的维数来简化观测变量。这是通过将原始自变量转换为完全不相关的新自变量来消除自变量之间的相关性来实现的。结果表明,影响帕隆班让市Puri Harmoni 8村保障性住房满意度的因素有:(1)卫生设施和住宿;(2)居住基础设施;(3)建筑质量和安全。关键词:保障性住房,入住满意度,FLPP,设施和基础设施Kebutuhan akan rumah tidak pernah berkurang bahkan terus bertamba setiap tahun。Jumlah rumah yang layak dan terjangkau terbatas seingga terjadi Backlog。Untuk mengatasi masalah perumahan perumahan成员计划Satu Juta Rumah (PSR) dimana dalam计划为perumahan成员提供补贴,dan pembangunan perumahan sendiri dilakukan oleh部门公共部门dan swasta。印尼Berdasarkan数据银行的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,印尼的数据显示,Parung Panjang sebagai kecamatan di boboor memiliki susui perumahan besar dalam 5 tahun terakhir。Terdapat 7 perumahan subi di Parung Panjang。Tujuan dari thesis ini, Puri Harmoni 8 dipilih sebagai subject penelitian。Puri Harmoni 8 selesai dibangun tahun 2016 dengan harga mulai 148 juta/单位,namun tingkat huniannya hanya 30%。Oleh karena itu, penelitian ini bertujuan untuk mengetahui因子-因子utama yang mempengaruhi tingkat kepuasan dalam perumahan bersubi di Puri Harmoni 8, Parung Panjang。主成分分析(PCA)。Metode ini bertujuan untuk menyederhanakan变量yang diamati dengan mengurangi维数。我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是。8, Parung Panjang, yitu (1) Sarana Kesehatan dan akomodasi, (2) Prasarana lingkungan perumahan, dan (3) Kualitas bangunan dan keamanan。
{"title":"FAKTOR UTAMA YANG MEMPENGARUHI TINGKAT KEPUASAN HUNIAN PERUMAHAN SUBSIDI KECAMATAN PARUNG PANJANG, KABUPATEN BOGOR (STUDI KASUS : PERUMAHAN PURI HARMONI 8)","authors":"Hendy Viandra Reza, Lana Winayanti, Liong Ju Tjung","doi":"10.24912/jmstkik.v6i2.8444","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.8444","url":null,"abstract":"House as a one basic human need is a place to live. The need for housing has never diminished and continues to grow every year. The number of decent and affordable houses is limited so that a backlog occurs. To overcome the housing problem the government created a One Million Houses Program (PSR), where with this program, government provide subsidize the housing development which the development itself could be carried out by the public and private sector. Based on Bank Indonesia's data, region with the largest FLPP in Indonesia occur in West Java, where the specific region with the highest real estate sector GRDP occurs in Bogor Regency. Parung Panjang as a sub-distirict in Bogor have massive housing subsidized in the past 5 years. There are 7 subsidized housing developement in Parung Panjang. As the purpose of this thesis, Puri Harmoni 8 in Parung Panjang is choosen as the subject of study. Puri Harmoni 8 is completed in 2016 with starting price 148 mio/unit, however occupancy rate is only 30% .Therefore, this study aims to determine the main factors that influence the level of satisfaction in subsidized housing in Puri Harmoni 8, Parung Panjang. The method used in this study is PCA  (Principal Component Analysis). This method aims to simplify the observed variables by reducing their dimensions. This is done by eliminating the correlation between the independent variables through the transformation of the original independent variable into a new independent variable that does not correlate at all. As the results, there are several factors influencing the level of satisfaction in subsidized houses in Puri Harmoni 8, Parung Panjang, which are (1) Health facilities & accommodation, (2) Residential infrastructure and (3) Build quality and safety.. \u0000Keywords: Subsidized Houses, Occupancy Satisfaction Level, FLPP, Facilities and Infrastructure\u0000Abstrak\u0000Rumah sebagai kebutuhan dasar manusia sebagai tempat tinggal. Kebutuhan akan rumah tidak pernah berkurang bahkan terus bertambah setiap tahun. Jumlah rumah yang layak dan terjangkau terbatas sehingga terjadi Backlog. Untuk mengatasi masalah perumahan pemerintah membuat Program Satu Juta Rumah (PSR) dimana dalam program ini pemerintah memberikan subsidi, dan pembangunan perumahan sendiri dilakukan oleh sektor publik dan swasta. Berdasarkan data Bank Indonesiam wilayah dengan FLPP terbesar di Indonesia terjadi di Jawa Barat, di mana wilayah spesifik dengan PDRB sektor real estat tertinggi terjadi di Kabupaten Bogor. Parung Panjang sebagai kecamatan di Bogor memiliki subsidi perumahan besar dalam 5 tahun terakhir. Terdapat 7 perumahan subsidi di Parung Panjang. Tujuan dari thesis ini, Puri Harmoni 8 dipilih sebagai subjek penelitian. Puri Harmoni 8 selesai dibangun tahun 2016 dengan harga mulai 148 juta/unit, namun tingkat huniannya hanya 30%. Oleh karena itu, penelitian ini bertujuan untuk mengetahui faktor-faktor utama yang mempengaruhi tingkat kepuasan dalam perumahan bersubsidi di Puri Harmoni 8, Parun","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"27 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124818115","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
INTERVENSI ILUMINANSI DAN OTOMATISASI ON/OFF LAMPU RUANG KELAS UNTUK MENCAPAI KENYAMANAN VISUAL DAN HEMAT ENERGI 照明干预与教室灯光自动化,以获得视觉和节能舒适
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.22721
Endah Setyaningsih, Yohanes Calvinus, Joni Fat, Fransisca Iriani Roesmaladewi
the quality of room lighting are the level of lighting/illuminance, light color, and glare. The classroom as a place for learning and teaching requires quality lighting. This study uses a classroom for case studies, namely at Perti Tomang Islamic Vocational School, West Jakarta, but is limited in terms of illuminance. Based on measurements, the illuminance of this classroom does not meet SNI room lighting standards. For this reason, illumination interventions are needed in the classroom, in the form of increased lighting. Improved lighting has an impact on increasing the use of electric power, for this reason efforts are needed to save energy. The problem is how to increase lighting and save energy at the same time. The purpose of this study was to determine the number of classroom lamps so that they achieve illuminance according to SNI, but still achieve energy saving. The research method is to make a classroom model with lighting that meets SNI and there are automation on/off room lights. The step is in the form of a simulation using dialux software, so that the number of lights that must be added can be known. The method for saving energy is by installing an on/off automation system for classroom lights. The results obtained from this study are an increase in average illuminance from 213.8 lux to 350 lux and is in accordance with SNI, so that visual comfort can be achieved. The on/off automation intervention was carried out by installing 3 motion sensors with the Doppler effect microwave sensor type in the classroom. The lights will turn on if there is movement of students or teachers entering the room, and the lights will turn off if there are no students or teachers. Thus, the lamp is not continuously lit for 10 hours. Based on this intervention, 14,004 KWH of electrical energy can be saved for 1 (one) month.Keywords: intervention; illuminance; light on/off automation; visual comfort; energy savingAbstrakKenyamanan visual adalah rasa nyaman dari indra penglihatan seseorang terhadap pencahayaan ruangan yang berkualitas. Parameter yang menentukan pencahayaan ruang berkualitas yaitu tingkat pencahayaan/iluminansi, warna cahaya, dan kesilauan. Ruang kelas sebagai tempat belajar, memerlukan pencahayaan yang berkualitas. Penelitian ini menggunakan ruang kelas untuk studi kasus, yaitu di SMK Islam Perti Tomang Jakarta Barat, namun dibatasi tentang iluminansi. Berdasarkan hasil pengukuran, iluminansi rata-rata ruangan kelas ini, belum memenuhi standar pencahayaan ruang sesuai SNI. Untuk itu diperlukan intervensi iluminansi pada ruang kelas, berupa peningkatan pencahayaan. Peningkatan pencahayaan berdampak pada peningkatan penggunaan daya listrik, untuk itu diperlukan usaha penghematan energi. Permasalahannya adalah bagaimana melakukan peningkatan pencahayaan dan sekaligus hemat energi. Tujuan penelitian ini adalah menentukan jumlah lampu ruang kelas sehingga mencapai iluminansi sesuai SNI, namun hemat energi. Metoda penelitian adalah membuat mode
室内照明的质量是照明/照度,光色和眩光的水平。教室作为学习和教学的场所,需要高质量的照明。本研究使用一间教室进行个案研究,即雅加达西部的Perti Tomang伊斯兰职业学校,但照明有限。经测量,该教室的照度不符合SNI室内照明标准。出于这个原因,教室需要照明干预,以增加照明的形式。改善照明对增加电力的使用有影响,因此需要努力节约能源。问题是如何在增加照明的同时节约能源。本研究的目的是确定教室灯具的数量,使其在达到SNI照度的同时仍能达到节能的目的。研究方法是制作一个符合SNI要求的照明教室模型,并且有自动开/关房间灯。该步骤采用dialux软件模拟的形式,这样就可以知道必须添加的灯的数量。节约能源的方法是为教室的灯安装一个自动开关系统。本研究得到的结果是平均照度从213.8 lux增加到350 lux,符合SNI,从而达到视觉舒适。通过在教室内安装3个多普勒效应微波传感型运动传感器,实现自动干预的开/关。如果有学生或老师进入房间,灯就会打开,如果没有学生或老师,灯就会关闭。因此,灯不是连续点亮10小时。通过本次干预,1个月可节约电能14004千瓦时。关键词:干预;照度;自动开/关灯;视觉舒适;【摘要】肯尼亚人的视觉感知能力强,可感知能力强,可感知能力强。参数杨门门图坎,黄伯奎里塔,叶图亭卡特,潘克夏,卢明西,沃娜,丹克斯劳。Ruang kelas sebagai tempat belajar,成员lukan pencahayaan yang berkualitas。Penelitian ini menggunakan ruang kelas untuk studi kasus, yitu di SMK Islam Perti Tomang Jakarta Barat, namun dibatasi tentanuminansi。Berdasarkan hasil pengukuran, iluminansi rata-rata ruangan kelas ini, belum memenuhi standard penahayaan ruang sesuai SNI。Untuk itu diperlukan intervensi - iluminani padang kelas, berupa peningkatan pencahayaan。Peningkatan pencahayaan berdampak padingkatan penggunaan daya listrik, untuk itu diperlukan usaha penghamanenergi。Permasalahannya adalah bagaimana melakukan peningkatan pencahayaan dan sekaligus hemat energi。Tujuan penelitian ini adalah menentukan jumlah lampu ruang kelas seingga menapai iluminansi sesuai SNI, namun hemat energy。元数据模型的数据集模型,如:dengan penhahahaan yang的数据集模型,如:SNI数据集的数据集模型。Langkahnya berupa simulasasdenan menggunakan软件dialux, seingga dapat diketahui jumlah lampu yang harus ditambahkan。方法:将彭氏能量分解为一种能量分解系统。Hasil penelitian adalah adanya peningkatan iluminansi rata-rata dari 213,8 lux menjadi 350 lux yang telah sesuai SNI, seingga kenyamanan visual dapat tercapan。介入性手术的开/关,dilakukan dengan pemasangan berupa 3传感器gerakan dengan type传感器gelombang微型多普勒padangangan kelas。Lampu阿坎人menyala吉卡ada红十字会内唯一一名gerakan siswa atau大师杨memasuki ruangan,丹Lampu阿坎人马蒂斯著名吉卡有些红十字会内唯一一名ada siswa atau大师。Jadi lampu tidak terus menerus menyala selama果酱。Adanya干预ini, terjadi penghman能源清单显示,1号(satu) bulan发电量为14,004千瓦时。
{"title":"INTERVENSI ILUMINANSI DAN OTOMATISASI ON/OFF LAMPU RUANG KELAS UNTUK MENCAPAI KENYAMANAN VISUAL DAN HEMAT ENERGI","authors":"Endah Setyaningsih, Yohanes Calvinus, Joni Fat, Fransisca Iriani Roesmaladewi","doi":"10.24912/jmstkik.v6i2.22721","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.22721","url":null,"abstract":"the quality of room lighting are the level of lighting/illuminance, light color, and glare. The classroom as a place for learning and teaching requires quality lighting. This study uses a classroom for case studies, namely at Perti Tomang Islamic Vocational School, West Jakarta, but is limited in terms of illuminance. Based on measurements, the illuminance of this classroom does not meet SNI room lighting standards. For this reason, illumination interventions are needed in the classroom, in the form of increased lighting. Improved lighting has an impact on increasing the use of electric power, for this reason efforts are needed to save energy. The problem is how to increase lighting and save energy at the same time. The purpose of this study was to determine the number of classroom lamps so that they achieve illuminance according to SNI, but still achieve energy saving. The research method is to make a classroom model with lighting that meets SNI and there are automation on/off room lights. The step is in the form of a simulation using dialux software, so that the number of lights that must be added can be known. The method for saving energy is by installing an on/off automation system for classroom lights. The results obtained from this study are an increase in average illuminance from 213.8 lux to 350 lux and is in accordance with SNI, so that visual comfort can be achieved. The on/off automation intervention was carried out by installing 3 motion sensors with the Doppler effect microwave sensor type in the classroom. The lights will turn on if there is movement of students or teachers entering the room, and the lights will turn off if there are no students or teachers. Thus, the lamp is not continuously lit for 10 hours. Based on this intervention, 14,004 KWH of electrical energy can be saved for 1 (one) month.\u0000Keywords: intervention; illuminance; light on/off automation; visual comfort; energy saving\u0000Abstrak\u0000Kenyamanan visual adalah rasa nyaman dari indra penglihatan seseorang terhadap pencahayaan ruangan yang berkualitas. Parameter yang menentukan pencahayaan ruang berkualitas yaitu tingkat pencahayaan/iluminansi, warna cahaya, dan kesilauan. Ruang kelas sebagai tempat belajar, memerlukan pencahayaan yang berkualitas. Penelitian ini menggunakan ruang kelas untuk studi kasus, yaitu di SMK Islam Perti Tomang Jakarta Barat, namun dibatasi tentang iluminansi. Berdasarkan hasil pengukuran, iluminansi rata-rata ruangan kelas ini, belum memenuhi standar pencahayaan ruang sesuai SNI. Untuk itu diperlukan intervensi iluminansi pada ruang kelas, berupa peningkatan pencahayaan. Peningkatan pencahayaan berdampak pada peningkatan penggunaan daya listrik, untuk itu diperlukan usaha penghematan energi. Permasalahannya adalah bagaimana melakukan peningkatan pencahayaan dan sekaligus hemat energi. Tujuan penelitian ini adalah menentukan jumlah lampu ruang kelas sehingga mencapai iluminansi sesuai SNI, namun hemat energi. Metoda penelitian adalah membuat mode","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130515056","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
IDENTIFIKASI FAKTOR PENGHAMBAT PENYEDIAAN HUNIAN PEKERJA INDUSTRI DI KABUPATEN TANGERANG (STUDI KASUS: KAWASAN INDUSTRI & PERGUDANGAN CIKUPAMAS DAN KAWASAN INDUSTRI MILLENIUM)
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.12126
Ridho Rifky Ariansyah
The Central Government's policy that mandates the provision of housing for workers in industrial estates in order to achieve efficiency and effectiveness in industrial estates, as well as in the framework of fulfilling housing for workers in industrial estates is still far from a reality. One of these things happened in industrial areas in the Regency. This condition has occurred for years and in many places, therefore it is interesting to know the causal factors that hinder the realization of housing provision for industrial workers in the Cikupamas Industrial & Warehousing Area and the Millennium Industrial Area, Tangerang Regency, which are the main objectives of this research. To explore these objectives, this study uses a qualitative approach by collecting data through semi-structured interviews, field observations, and processed maps, as well as efforts to validate and validate the data and results that have been collected. Next, the analysis uses content analysis which is obtained through audio recordings, field notes, and documentation in the form of images which will be converted into transcripts for further analysis. The results of this study indicate five factors inhibiting the provision of housing for industrial workers in the Cikupamas Industrial & Warehousing Area and the Millennium Industrial Area, namely the regulatory vacuum at the regional level which should execute the directives of the central government; climate of cooperation between stakeholders that has not been created properly; then limited land in industrial areas; lack of technical coordination between related agencies; and the business orientation tendency of industrial estate managers to override workers' housing needs. What hinders the most is the climate aspect of cooperation between stakeholders (Public Private Partnership), as well as law enforcement carried out by the government/regional government.Keywords: Housing Provision, Industrial Workers, Government Policy, Inhibiting FactorsAbstrakKebijakan Pemerintah Pusat yang mengamanatkan penyediaan hunian bagi pekerja di kawasan industri agar dapat tercapai efisiensi dan efektivitas dalam kawasan industri, serta dalam rangka pemenuhan hunian bagi tenaga kerja di kawasan industri masih jauh dari kenyataan. Hal tersebut salah satunya terjadi di kawasan industri di Kabupaten. Kondisi ini terjadi bertahun-tahun dan banyak tempat, oleh karena itu menarik untuk mengetahui faktor penyebab yang menghambat realisasi penyediaan hunian bagi pekerja industri di Kawasan Industri & Pergudangan Cikupamas dan Kawasan Industri Millenium, Kabupaten Tangerang, yang menjadi tujuan utama penelitian ini. Untuk menggali tujuan tersebut, penelitian ini menggunakan pendekatan kualitatif dengan pengumpulan data melalui wawancara semi struktur, observasi lapangan, dan hasil olahan peta, juga upaya validitas dan keabsahan dari data dan hasil yang telah dikumpulkan. Selnjutnya, analisis menggunakan analisis isi (content analysis) yang didap
中央政府的政策规定为工业园区的工人提供住房,以实现工业园区的效率和效益,以及在实现工业园区工人住房的框架内,这一政策仍远未实现。其中一件事发生在摄政时期的工业区。这种情况已经发生了多年,在许多地方,因此很有趣的是,了解阻碍实现为产业工人提供住房的原因因素在Cikupamas工业和仓储区和千年工业区,Tangerang Regency,这是本研究的主要目标。为了探索这些目标,本研究采用定性方法,通过半结构化访谈、实地观察和处理过的地图收集数据,并努力验证和验证收集到的数据和结果。接下来,分析使用内容分析,内容分析通过音频记录、现场笔记和图像形式的文档获得,这些图像将转换为文本以供进一步分析。研究结果表明,制约奇库帕马斯工业仓储区和千年工业区产业工人住房供给的因素有五个:一是区域层面的监管真空,需要执行中央政府的指令;利益相关者之间的合作氛围没有适当创造;然后是工业区的有限土地;有关机构之间缺乏技术协调;工业地产管理者凌驾于工人住房需求之上的商业导向倾向。最大的障碍是利益相关者之间合作的气候方面(公私伙伴关系),以及政府/地区政府的执法。[关键词]住房供给,产业工人,政府政策,抑制因素][关键词]住房供给,产业工人,政府政策,抑制因素][关键词]住房供给,产业工人,政府政策,抑制因素][关键词]住房供给,产业工人,政府政策,抑制因素][关键词]住房供给,产业工人,政府政策,抑制因素][关键词]住房供给,产业工人,政府政策haltersebut salah satunya terjadi di kawasan industrii di Kabupaten。Kondisi ini terjadi bertahun-tahun danbanyak tempat, oleh karena to menarik untuk mengetahui fakto penyebab, yang menghanbat realisisi penyedian, hunian bagi pekerja industri di Kawasan industry & Pergudangan Cikupamas dan Kawasan industrii millennium, Kabupaten Tangerang, yang menjadi tujuan utama penelitian ini。Untuk menggali tujuan tersebut, penelitian ini menggunakan pendekatan kualitatif dengan pengpulan数据,melalui wawankara半构造,observasi lapangan, dan hasil olahan peta, juga upaya validitas dan keabsahan dari数据dan hasil yang telah dikumpulkan。Selnjutnya, analyisis menggunakan analyisis isi(内容分析)yang didapat melalui rekaman audio, catatan lapangan, dan dokumentasi berupa gambar yang akan diubah menjadi transktrip untuk dianalisis lebih lanjut。四川川山工业有限公司、四川川山工业有限公司、四川川山工业有限公司、四川川山工业有限公司、四川川山工业有限公司、四川川山工业有限公司、四川川山工业有限公司、四川川山工业有限公司、四川川山工业有限公司、四川川山工业有限公司、四川川山工业有限公司。Ilkim kerjasama antar利益相关者Yang belum tercipta dengan baik;拉山工业;拉山工业;Minimnya koordinasi teknis antar dinas terkait;丹克森德隆,东方学,彭格洛,川山,工业,杨孟格,三平侃,克布图罕,湖南,佩克贾。Adapun yang paling menghambat adalah是iklim kerjasama antar利害关系人(公私伙伴关系),serta penegakan hukum yang dilakukan oleh pihak pemerintah/pemerintah daerah。
{"title":"IDENTIFIKASI FAKTOR PENGHAMBAT PENYEDIAAN HUNIAN PEKERJA INDUSTRI DI KABUPATEN TANGERANG (STUDI KASUS: KAWASAN INDUSTRI & PERGUDANGAN CIKUPAMAS DAN KAWASAN INDUSTRI MILLENIUM)","authors":"Ridho Rifky Ariansyah","doi":"10.24912/jmstkik.v6i2.12126","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.12126","url":null,"abstract":"The Central Government's policy that mandates the provision of housing for workers in industrial estates in order to achieve efficiency and effectiveness in industrial estates, as well as in the framework of fulfilling housing for workers in industrial estates is still far from a reality. One of these things happened in industrial areas in the Regency. This condition has occurred for years and in many places, therefore it is interesting to know the causal factors that hinder the realization of housing provision for industrial workers in the Cikupamas Industrial & Warehousing Area and the Millennium Industrial Area, Tangerang Regency, which are the main objectives of this research. To explore these objectives, this study uses a qualitative approach by collecting data through semi-structured interviews, field observations, and processed maps, as well as efforts to validate and validate the data and results that have been collected. Next, the analysis uses content analysis which is obtained through audio recordings, field notes, and documentation in the form of images which will be converted into transcripts for further analysis. The results of this study indicate five factors inhibiting the provision of housing for industrial workers in the Cikupamas Industrial & Warehousing Area and the Millennium Industrial Area, namely the regulatory vacuum at the regional level which should execute the directives of the central government; climate of cooperation between stakeholders that has not been created properly; then limited land in industrial areas; lack of technical coordination between related agencies; and the business orientation tendency of industrial estate managers to override workers' housing needs. What hinders the most is the climate aspect of cooperation between stakeholders (Public Private Partnership), as well as law enforcement carried out by the government/regional government.\u0000Keywords: Housing Provision, Industrial Workers, Government Policy, Inhibiting Factors\u0000Abstrak\u0000Kebijakan Pemerintah Pusat yang mengamanatkan penyediaan hunian bagi pekerja di kawasan industri agar dapat tercapai efisiensi dan efektivitas dalam kawasan industri, serta dalam rangka pemenuhan hunian bagi tenaga kerja di kawasan industri masih jauh dari kenyataan. Hal tersebut salah satunya terjadi di kawasan industri di Kabupaten. Kondisi ini terjadi bertahun-tahun dan banyak tempat, oleh karena itu menarik untuk mengetahui faktor penyebab yang menghambat realisasi penyediaan hunian bagi pekerja industri di Kawasan Industri & Pergudangan Cikupamas dan Kawasan Industri Millenium, Kabupaten Tangerang, yang menjadi tujuan utama penelitian ini. Untuk menggali tujuan tersebut, penelitian ini menggunakan pendekatan kualitatif dengan pengumpulan data melalui wawancara semi struktur, observasi lapangan, dan hasil olahan peta, juga upaya validitas dan keabsahan dari data dan hasil yang telah dikumpulkan. Selnjutnya, analisis menggunakan analisis isi (content analysis) yang didap","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"44 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129865663","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS VALUE ENGINEERING PADA PERENCANAAN FONDASI DI TANAH LUNAK DENGAN MENGGUNAKAN PERBAIKAN TANAH METODE VACUUM 通过真空土修复方法对软土平面图进行分析
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.13128
Anthony Kesumah
Indonesia is an area that is dominated by soft soils. Soft soils are the type of soil that is less supporting for construction work. Failures of construction on soft soils actually have often occurred in Indonesia and in other countries. Therefore, construction planning on soft soils must be considered both in terms of design and implementation so that the work can be carried out properly. Moreover, cost, time, and safety aspects must also be considered. In order to get appropriate performance, cost, and time results, Value Engineering (VE) method can be applied in the initial design stage. This study is intended to find a better alternative method for construction on soft soil. Results of the study shows that direct construction without vacuum has a lower cost with the difference of Rp. 2,605,156,860.00. Moreover, the bored pile production time is 11 months faster using direct construction. The vacuum method gives advantages to the soil condition becomes more stable and also gives an opportunity to cut the bored pile length for cost efficiency. However, the soil stability after improvement is not significantly different. Moreover, the cost efficiency of cutting the bored pile length is smaller than the cost of vacuum works. Based on the comparison information above, the coefficient of function, cost coefficient, and value coefficient calculated. The calculation result shows that the coefficient value for the direct construction alternative is 1.0649, so it can be concluded that the direct construction alternative is better than performing the soil improvement first with vacuum method. Keywords: Soft Soils, Value Engineering, Vacuum, Bored Pile Abstrak Indonesia merupakan daerah yang didominasi oleh tanah lunak. Tanah lunak merupakan jenis tanah yang kurang mendukung untuk suatu pekerjaan konstruksi. Kegagalan konstruksi pada tanah lunak sudah sering terjadi di Indonesia maupun di negara lain. Oleh karena itu, perencanaan konstruksi pada tanah lunak harus diperhatikan baik dari segi desain maupun segi pelaksanaan sehingga pekerjaan dapat dilaksanakan dengan baik. Selain itu, pertimbangan dari segi biaya, waktu, dan tingkat keamanan juga tetap harus diperhatikan. Untuk mendapatkan hasil pekerjaan dengan kinerja, biaya, dan waktu yang sesuai, dapat diterapkan metode Value Engineering (VE) pada tahap perencanaan proyek. Penelitian ini dimaksudkan untuk mencari alternatif metode mana yang lebih baik jika konstruksi fondasi berada pada tanah lunak. Dari hasil penelitian didapatkan bahwa konstruksi langsung tanpa vacuum menghasilkan selisih biaya yang lebih murah yaitu sebesar Rp. 2.605.156.860,00. Selain itu waktu penyelesaian pekerjaan fondasi bored pile lebih cepat 11 bulan jika dilakukan konstruksi langsung. Metode vacuum memberikan keuntungan dimana kondisi tanah menjadi lebih stabil dan juga memberikan efisiensi pemotongan panjang bored pile. Tetapi, kestabilan yang diberikan tidak terlalu signifikan perbedaannya. Selain itu, efisiensi biaya d
印度尼西亚是一个以软土为主的地区。软土是一种对建筑工程的支撑力较小的土壤。在印度尼西亚和其他国家,软土地基上的建筑破坏经常发生。因此,软土上的施工规划必须从设计和实施两方面进行考虑,才能使工作顺利进行。此外,还必须考虑成本、时间和安全方面的问题。为了获得合适的性能、成本和时间结果,可以在初始设计阶段应用价值工程(VE)方法。本研究旨在寻找一种较好的软土施工替代方法。研究结果表明,无真空直接施工成本较低,相差Rp. 2,60,156,860.00。采用直接施工,钻孔灌注桩生产时间缩短11个月。真空法不仅有利于土体条件的稳定,而且为降低钻孔桩的长度和成本效益提供了机会。改良后的土壤稳定性差异不显著。此外,缩短钻孔桩长度的成本效益小于真空工程的成本。根据以上对比信息,计算出功能系数、成本系数和价值系数。计算结果表明,直接施工方案的系数值为1.0649,表明直接施工方案优于先用真空法进行土壤改良。关键词:软土,价值工程,真空,钻孔灌注桩摘要:印尼merupakan daerah yang didominasi oleh tanah lunak那是我的祖国,我的祖国,我的祖国,我的祖国,我的祖国。Kegagalan konstruksi pada tanah lunak sudah服务terjadi di Indonesia maupun di negara lain。我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说。Selain itu, pertimbangan dari segi biaya, waktu, dan tingkat keamanan juga tetap harus diperhatikan。Untuk mendapatkan hasil pekerjaan dengan kinerja, biaya, danwaktu yang sesuai, dapat diterapkan方法,价值工程(VE)方法,dapterapatkan proyek。Penelitian ini dimaksukan untuk mencari替代方法manmanyang lebih baikka konstruksi fondasi berada pada tanah lunak。达哈西尔penelitian didapatkan bahwa konstruksi langsung tanpa真空蒙哈西尔坎selisih biaya yang lebih murah yaitsebesar . 2.605.156.86万。Selain i waktu penyelesan pekerjaan fondasi钻孔桩lebih cepa 11 bulan jika dilakukan konstruksi langsung。Metode真空桩keuntungan dimana kondisi tanah menjadi lebih stabil dan juga memberikan efisiensi pemotongan panjang钻孔桩。Tetapi, kestabilan yang diberikan tidak terlalu signfikan perbedaannya。Selain itu, efisiensi biaya dari peemotongan panjang钻孔桩lebih kecil dibandingkan dengan biaya yang dikeluarkan untuk真空。中文:中文:中文:中文:中文:中文:中文:中文:中文:中文:中文:中文:中文:中文:中文:Hasil perhitungan menunjukkan koefisien nilai sebesar 1,0649 untuk alterntuk konstruksi langsung seingga dapat dispulpulkan bahwa alternatifkonstruksi langsung lebih baik dibandingkan dengan melakukan perbaikan tanah mede真空terlebih dahulu。
{"title":"ANALISIS VALUE ENGINEERING PADA PERENCANAAN FONDASI DI TANAH LUNAK DENGAN MENGGUNAKAN PERBAIKAN TANAH METODE VACUUM","authors":"Anthony Kesumah","doi":"10.24912/jmstkik.v6i2.13128","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.13128","url":null,"abstract":"Indonesia is an area that is dominated by soft soils. Soft soils are the type of soil that is less supporting for construction work. Failures of construction on soft soils actually have often occurred in Indonesia and in other countries. Therefore, construction planning on soft soils must be considered both in terms of design and implementation so that the work can be carried out properly. Moreover, cost, time, and safety aspects must also be considered. In order to get appropriate performance, cost, and time results, Value Engineering (VE) method can be applied in the initial design stage. This study is intended to find a better alternative method for construction on soft soil. Results of the study shows that direct construction without vacuum has a lower cost with the difference of Rp. 2,605,156,860.00. Moreover, the bored pile production time is 11 months faster using direct construction. The vacuum method gives advantages to the soil condition becomes more stable and also gives an opportunity to cut the bored pile length for cost efficiency. However, the soil stability after improvement is not significantly different. Moreover, the cost efficiency of cutting the bored pile length is smaller than the cost of vacuum works. Based on the comparison information above, the coefficient of function, cost coefficient, and value coefficient calculated. The calculation result shows that the coefficient value for the direct construction alternative is 1.0649, so it can be concluded that the direct construction alternative is better than performing the soil improvement first with vacuum method. Keywords: Soft Soils, Value Engineering, Vacuum, Bored Pile Abstrak Indonesia merupakan daerah yang didominasi oleh tanah lunak. Tanah lunak merupakan jenis tanah yang kurang mendukung untuk suatu pekerjaan konstruksi. Kegagalan konstruksi pada tanah lunak sudah sering terjadi di Indonesia maupun di negara lain. Oleh karena itu, perencanaan konstruksi pada tanah lunak harus diperhatikan baik dari segi desain maupun segi pelaksanaan sehingga pekerjaan dapat dilaksanakan dengan baik. Selain itu, pertimbangan dari segi biaya, waktu, dan tingkat keamanan juga tetap harus diperhatikan. Untuk mendapatkan hasil pekerjaan dengan kinerja, biaya, dan waktu yang sesuai, dapat diterapkan metode Value Engineering (VE) pada tahap perencanaan proyek. Penelitian ini dimaksudkan untuk mencari alternatif metode mana yang lebih baik jika konstruksi fondasi berada pada tanah lunak. Dari hasil penelitian didapatkan bahwa konstruksi langsung tanpa vacuum menghasilkan selisih biaya yang lebih murah yaitu sebesar Rp. 2.605.156.860,00. Selain itu waktu penyelesaian pekerjaan fondasi bored pile lebih cepat 11 bulan jika dilakukan konstruksi langsung. Metode vacuum memberikan keuntungan dimana kondisi tanah menjadi lebih stabil dan juga memberikan efisiensi pemotongan panjang bored pile. Tetapi, kestabilan yang diberikan tidak terlalu signifikan perbedaannya. Selain itu, efisiensi biaya d","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"29 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125156400","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS KEKUATAN TARIK SAMBUNGAN PLAT ALUMINIUM AA 5083 PADA PADA PROSES SPOT WELDING
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.13298
S. Lubis, Sofyan Djamil, Rosehan Rosehan, Harley Anugrah, Kevin Raynaldo
Spot welding is a method of electrical resistance welding in which two or more metal sheets are clamped between two electrodes and at the same time an electric current is applied so that the surface of the material reaches the welding temperature and then the material is fused. The purpose of the study was to determine the tensile strength of the 5083 aluminum plate connection in the spot welding process. This research was carried out experimentally as for the plate material that is connected is aluminum AA 5083 which has a thickness of 1 mm. Before welding is carried out, it is necessary to determine the variation of parameters, namely the welding current of 1.75 volts, 2.20 volts, 2.28 volts and the welding time for 1 second, 1.5 seconds, and 2 seconds. The spot welding process is carried out by varying these parameters, with the shape of the connection that occurs is overlapping. After the splicing process, then the specimen is tested for connection strength through a tensile. From the results of the study, it was obtained that the greater the electric current used, the greater the electric power used and it can be seen that the longer the welding time, the greater the electric power used.Keywords: Spot welding, tensile strength, AA 5083. aluminumAbstrakLas titik (spot welding) merupakan salah satu cara pengelasan resistansi listrik di mana dua atau lebih lembaran logam di jepit di antara dua elektroda dan pada saat yang bersamaan arus listrik di alirkan sehingga permukaan material mencapai temperatur pengelasan kemudian material bersatu. Penelitian di laksanakan bertujuan untuk mengetahui kekuatan tarik sambungan plat alumunium 5083 pada proses spot welding. Penelitian di lakukan secara eksperimen, adapun bahan plat yang di sambung adalah aluminium AA 5083 yang memiliki ketebalan 1 mm. Sebelum pengelasan di lakukan, maka di tentukan terlebih dahulu variasi parameter yaitu arus pengelasan yang terdiri dari 1,75 V, 2,20 V, 2,28 V dan waktu pengelasan selama 1 s, 1,5 s, 2 s. Proses spot welding di lakukan memvariasikan parameter tersebut, dengan bentuk sambungan adalah tumpang tindih. setelah proses penyambungan, kemudian spesimen di lakukan pengujian kekuatan sambungan melalui uji tarik.Hasil penelitian di peroleh bahwa jika tegangan arus listrik semakin besar di gunakan, maka semakin besar daya listriknya, dan semakin lama waktu pengelasan maka daya listrik yang di gunakan semakin besar.
点焊是一种电阻焊方法,将两块或多块金属片夹在两个电极之间,同时施加电流,使材料表面达到焊接温度,然后将材料熔化。本研究的目的是确定5083铝板接头在点焊过程中的抗拉强度。本研究对所连接的板材为厚度为1mm的AA 5083铝进行了实验研究。在进行焊接前,需要确定参数的变化,即焊接电流为1.75伏、2.20伏、2.28伏,焊接时间为1秒、1.5秒、2秒。点焊过程是通过改变这些参数来进行的,所发生的连接形状是重叠的。拼接完成后,通过拉伸测试试件的连接强度。从研究结果可以看出,所使用的电流越大,所使用的电功率越大,并且可以看出,焊接时间越长,所使用的电功率越大。关键词:点焊,抗拉强度,AA 5083。摘要:点焊(点焊),点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊,点焊Penelitian di laksanakan bertujuan untuk mengetahui kekuatan tarik sambungan板铝5083帕达加工点焊。Penelitian di lakukan secara ekspersperen, adapun bahan板yang di sambung adalah铝AA 5083 yang memiliki ketebalan 1毫米。1、75 V, 2、20 V, 2、28 V, 1、1、5 V, 2 s。介绍了点焊技术,点焊工艺参数,点焊工艺参数,点焊工艺参数。Setelah写了一篇关于企鹅的文章,写了一篇关于企鹅的文章。Hasil penelitian di peroleh bahka tegangan arus lisstrik semakin besar di gunakan, maka semakin besar daya listrikya, dan semakin lama waktu penelasan maka daya listrik yang di gunakan semakin besar。
{"title":"ANALISIS KEKUATAN TARIK SAMBUNGAN PLAT ALUMINIUM AA 5083 PADA PADA PROSES SPOT WELDING","authors":"S. Lubis, Sofyan Djamil, Rosehan Rosehan, Harley Anugrah, Kevin Raynaldo","doi":"10.24912/jmstkik.v6i2.13298","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.13298","url":null,"abstract":"Spot welding is a method of electrical resistance welding in which two or more metal sheets are clamped between two electrodes and at the same time an electric current is applied so that the surface of the material reaches the welding temperature and then the material is fused. The purpose of the study was to determine the tensile strength of the 5083 aluminum plate connection in the spot welding process. This research was carried out experimentally as for the plate material that is connected is aluminum AA 5083 which has a thickness of 1 mm. Before welding is carried out, it is necessary to determine the variation of parameters, namely the welding current of 1.75 volts, 2.20 volts, 2.28 volts and the welding time for 1 second, 1.5 seconds, and 2 seconds. The spot welding process is carried out by varying these parameters, with the shape of the connection that occurs is overlapping. After the splicing process, then the specimen is tested for connection strength through a tensile. From the results of the study, it was obtained that the greater the electric current used, the greater the electric power used and it can be seen that the longer the welding time, the greater the electric power used.\u0000Keywords: Spot welding, tensile strength, AA 5083. aluminum\u0000Abstrak\u0000Las titik (spot welding) merupakan salah satu cara pengelasan resistansi listrik di mana dua atau lebih lembaran logam di jepit di antara dua elektroda dan pada saat yang bersamaan arus listrik di alirkan sehingga permukaan material mencapai temperatur pengelasan kemudian material bersatu. Penelitian di laksanakan bertujuan untuk mengetahui kekuatan tarik sambungan plat alumunium 5083 pada proses spot welding. Penelitian di lakukan secara eksperimen, adapun bahan plat yang di sambung adalah aluminium AA 5083 yang memiliki ketebalan 1 mm. Sebelum pengelasan di lakukan, maka di tentukan terlebih dahulu variasi parameter yaitu arus pengelasan yang terdiri dari 1,75 V, 2,20 V, 2,28 V dan waktu pengelasan selama 1 s, 1,5 s, 2 s. Proses spot welding di lakukan memvariasikan parameter tersebut, dengan bentuk sambungan adalah tumpang tindih. setelah proses penyambungan, kemudian spesimen di lakukan pengujian kekuatan sambungan melalui uji tarik.Hasil penelitian di peroleh bahwa jika tegangan arus listrik semakin besar di gunakan, maka semakin besar daya listriknya, dan semakin lama waktu pengelasan maka daya listrik yang di gunakan semakin besar.","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121779468","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
EFECTIVITY OF UNIT WALL FINISHING WITH STICK ON WALL METHOD IN CATTLEYA TOWER SAKURA GARDEN CITY APARTMENT PROJECT, EAST JAKARTA 雅加达东部卡特莱塔樱花花园城市公寓项目贴墙法单元墙面整理效果分析
Pub Date : 2022-10-31 DOI: 10.24912/jmstkik.v6i2.18148
M. Rafky, Maryo Inri Pratama, I. Bali, B. A. Bangkara
In building construction, interior wall finishing work usually uses conventional methods, namely plastering and nat grout. At Cattleya Tower Sakura Garden City Apartment, East Jakarta, the unit wall finishing uses a more modern method: Stick on wall. The Stick on wall method uses alternative finishing materials other than plaster and nat grout as a hebel wall covering made of large boards covered with thick paper which must be glued with a glue-like material to the hebel walls. The use of this method in the apartment case aims to speed up the project construction process because 90% of the units in Cattleya Tower have been sold, so the completion of the project must be realized immediately. This study was conducted to evaluate the effectiveness in terms of cost and time of the Stick on wall finishing method compared to the plastering and nat grout method. By calculating using the SNI method and considering other aspects such as transportation from the supplier to the project site, it is known that wall finishing work using stick on wall is 0.74% cheaper than wall finishing work using plaster and nat grout. As for the comparison of work time, work using stick on wall is 74.58% faster than wall finishing work using plaster and nat grout with a difference in working time of 52 days.Keywords: Stick on wall; wall finishing; plastering cost; nat groutAbstrakDalam konstruksi bangunan, pekerjaan finishing dinding interior biasanya menggunakan metode konvensional yaitu plesteran dan nat grout. Di Cattleya Tower Sakura Garden City Apartment, Jakarta Timur, finishing dinding unit menggunakan metode yang lebih modern: Stick on wall. Metode Stick on wall menggunakan bahan finishing alternatif selain plaster dan nat grout sebagai penutup dinding hebel yang terbuat dari papan besar yang dilapisi kertas tebal yang harus direkatkan dengan bahan sejenis lem pada dinding hebel. Penggunaan metode ini pada kasus apartemen tersebut bertujuan untuk mempercepat proses konstruksi proyek karena di Cattleya Tower tersebut unit yang telah terjual sebesar 90%, sehingga penyelesaian proyek tersebut harus segera direalisasikan. Studi ini dilakukan untuk mengevaluasi efektivitas dari segi biaya dan waktu dari metode pekerjaan finishing dinding Stick on wall dibandingkan dengan metode plesteran dan nat grout. Dengan menghitung menggunakan metode SNI dan mempertimbangkan aspek lain seperti transportasi dari pemasok ke lokasi proyek, diketahui bahwa pekerjaan finishing dinding menggunakan stick on wall lebih murah 0,74% dibandingkan pekerjaan finishing dinding menggunakan plesteran dan nat grout. Sedangkan untuk perbandingan waktu pengerjaan, pekerjaan menggunakan stick on wall lebih cepat 74,58% dibandingkan pekerjaan finishing dinding menggunakan plesteran dan nat grout dengan selisih waktu kerja adalah 52 hari.
在建筑施工中,内墙的整理工作通常采用常规的方法,即抹灰和灌浆。在雅加达东部的katleya Tower Sakura Garden City公寓,单元墙的装饰采用了一种更现代的方法:贴在墙上。粘在墙上的方法使用替代的饰面材料,而不是石膏和nat灌浆,作为一个大板,覆盖厚纸,必须用胶状材料粘在hebel墙上。在公寓案例中使用这种方法的目的是为了加快项目的建设进程,因为catleya Tower 90%的单元已经售出,所以必须立即实现项目的完成。本研究旨在评估贴墙法与抹灰和灌浆法相比在成本和时间方面的有效性。通过SNI方法的计算,并考虑供应商到项目现场的运输等其他方面,可以知道,使用粘在墙上的墙面饰面比使用石膏和nat灌浆的墙面饰面便宜0.74%。在工作时间的对比上,墙面上粘贴的工作比墙面上抹灰和不灌浆的工作快74.58%,工作时间相差52天。关键词:贴墙;墙完成;抹成本;【摘要】达拉姆孔洞灌浆、巴古纳坎灌浆、巴古纳坎灌浆、巴古纳坎灌浆、蒙古纳坎灌浆方法。雅加达帖木儿樱花花园城市公寓,装修单元menggunakan metode yang lebih现代:贴在墙上。方法贴墙蒙古纳坎巴汉涂饰替代抹灰、灰泥、灌浆、木浆、木浆、木浆、木浆、木浆、木浆、木浆、木浆、木浆、木浆、木浆、木浆、木浆、木浆。彭家南的方法是将公寓的结构和结构相结合,而不是将公寓的结构和结构相结合,而将公寓的结构和结构相结合,将公寓的结构和结构相结合,将公寓的结构和结构相结合。研究了墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴、墙贴。登安,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎,蒙古那坎Sedangkan untuk perbandingan waktu pengerjaan, pekerjaan menggunakan贴在墙上lebih cepat 74,58% dibandingkan pekerjaan finish dinding menggunakan plesteran danngrout dengan selisih waktu kerja adalah 52 hari。
{"title":"EFECTIVITY OF UNIT WALL FINISHING WITH STICK ON WALL METHOD IN CATTLEYA TOWER SAKURA GARDEN CITY APARTMENT PROJECT, EAST JAKARTA","authors":"M. Rafky, Maryo Inri Pratama, I. Bali, B. A. Bangkara","doi":"10.24912/jmstkik.v6i2.18148","DOIUrl":"https://doi.org/10.24912/jmstkik.v6i2.18148","url":null,"abstract":"In building construction, interior wall finishing work usually uses conventional methods, namely plastering and nat grout. At Cattleya Tower Sakura Garden City Apartment, East Jakarta, the unit wall finishing uses a more modern method: Stick on wall. The Stick on wall method uses alternative finishing materials other than plaster and nat grout as a hebel wall covering made of large boards covered with thick paper which must be glued with a glue-like material to the hebel walls. The use of this method in the apartment case aims to speed up the project construction process because 90% of the units in Cattleya Tower have been sold, so the completion of the project must be realized immediately. This study was conducted to evaluate the effectiveness in terms of cost and time of the Stick on wall finishing method compared to the plastering and nat grout method. By calculating using the SNI method and considering other aspects such as transportation from the supplier to the project site, it is known that wall finishing work using stick on wall is 0.74% cheaper than wall finishing work using plaster and nat grout. As for the comparison of work time, work using stick on wall is 74.58% faster than wall finishing work using plaster and nat grout with a difference in working time of 52 days.\u0000Keywords: Stick on wall; wall finishing; plastering cost; nat grout\u0000Abstrak\u0000Dalam konstruksi bangunan, pekerjaan finishing dinding interior biasanya menggunakan metode konvensional yaitu plesteran dan nat grout. Di Cattleya Tower Sakura Garden City Apartment, Jakarta Timur, finishing dinding unit menggunakan metode yang lebih modern: Stick on wall. Metode Stick on wall menggunakan bahan finishing alternatif selain plaster dan nat grout sebagai penutup dinding hebel yang terbuat dari papan besar yang dilapisi kertas tebal yang harus direkatkan dengan bahan sejenis lem pada dinding hebel. Penggunaan metode ini pada kasus apartemen tersebut bertujuan untuk mempercepat proses konstruksi proyek karena di Cattleya Tower tersebut unit yang telah terjual sebesar 90%, sehingga penyelesaian proyek tersebut harus segera direalisasikan. Studi ini dilakukan untuk mengevaluasi efektivitas dari segi biaya dan waktu dari metode pekerjaan finishing dinding Stick on wall dibandingkan dengan metode plesteran dan nat grout. Dengan menghitung menggunakan metode SNI dan mempertimbangkan aspek lain seperti transportasi dari pemasok ke lokasi proyek, diketahui bahwa pekerjaan finishing dinding menggunakan stick on wall lebih murah 0,74% dibandingkan pekerjaan finishing dinding menggunakan plesteran dan nat grout. Sedangkan untuk perbandingan waktu pengerjaan, pekerjaan menggunakan stick on wall lebih cepat 74,58% dibandingkan pekerjaan finishing dinding menggunakan plesteran dan nat grout dengan selisih waktu kerja adalah 52 hari.","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"90 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133566108","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1